CN105421183A - Ecological glue-building water-permeable terrace and preparation method thereof - Google Patents
Ecological glue-building water-permeable terrace and preparation method thereof Download PDFInfo
- Publication number
- CN105421183A CN105421183A CN201510971478.3A CN201510971478A CN105421183A CN 105421183 A CN105421183 A CN 105421183A CN 201510971478 A CN201510971478 A CN 201510971478A CN 105421183 A CN105421183 A CN 105421183A
- Authority
- CN
- China
- Prior art keywords
- permeable
- layer
- ecological
- glue
- rock layers
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01C—CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
- E01C7/00—Coherent pavings made in situ
- E01C7/08—Coherent pavings made in situ made of road-metal and binders
- E01C7/32—Coherent pavings made in situ made of road-metal and binders of courses of different kind made in situ
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01C—CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
- E01C11/00—Details of pavings
- E01C11/22—Gutters; Kerbs ; Surface drainage of streets, roads or like traffic areas
- E01C11/224—Surface drainage of streets
- E01C11/225—Paving specially adapted for through-the-surfacing drainage, e.g. perforated, porous; Preformed paving elements comprising, or adapted to form, passageways for carrying off drainage
- E01C11/226—Coherent pavings
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01C—CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
- E01C7/00—Coherent pavings made in situ
- E01C7/08—Coherent pavings made in situ made of road-metal and binders
- E01C7/32—Coherent pavings made in situ made of road-metal and binders of courses of different kind made in situ
- E01C7/325—Joining different layers, e.g. by adhesive layers; Intermediate layers, e.g. for the escape of water vapour, for spreading stresses
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Road Paving Structures (AREA)
Abstract
The invention relates to an ecological glue-building water-permeable terrace which includes, from bottom to top successively, an original soil layer, a water-permeable pad layer, a leveling layer, a water-permeable stone layer and a transparent protective layer. The original soil layer is composed of roadbed. The water-permeable pad layer is prepared by mixing stones and cement. The leveling layer is prepared by mixing cement and fine sand. The water-permeable stone layer is prepared by mixing glue and natural ecological colorful stones. The terrace overcomes the defects that a water-permeable terrace in the prior art is poor in fastness, is complex in process, is high in cost, is not environment-friendly, and is poor in color fastness. The terrace is high in layer-to-layer fastness, is good in water permeability, is good in color fastness and is environment-friendly.
Description
Technical field
The present invention relates to a kind of ecological glue and build permeable terrace and preparation method thereof, be particularly applied on nonmotorized vehicle lane.
Background technology
In current view road construction, concrete is mostly used directly to build as deck, or using water-permeable brick, pervious concrete as permeable garden road, mainly there is following shortcoming in these ways above: 1, concrete road itself does not have drain function; 2, easily there is cracking in water-permeable brick road surface, and the easy threshing of pervious concrete pavement, reduce the application life on road surface, add the maintenance cost on road surface; 3, surface drainage effect is not strong; 4, landscape effect is single, is difficult to the requirement meeting landscape design.
Although also have some permeable terraces now, but there is following shortcoming in it: 1. directly lay macadam or sandstone layer on original soil layer, other pervious layers (as 201120440027.4,201220154211.7 and 201110397682.0) are set above again, cause the insufficient strength on road surface, and make the degree of being connected firmly between original soil layer and other pervious layers inadequate with macadam or sandstone layer as intermediate layer, also make the firmness of each interlayer not strong; 2. to adopt in pervious layer directly interpolation pigment imparting permeable terrace color, not only complex process, cost high, not environmentally and the firmness of color good yet.
Therefore a kind of layer is provided and interlayer firmness is high, good water permeability, color firmness are good and the ecological glue of environmental protection build permeable terrace and preparation method thereof become when be engaged in urgently.
Summary of the invention
The invention provides a kind of ecological glue and build permeable terrace and preparation method thereof, which overcome that existing permeable terrace firmness is bad, complex process, cost are high, not environmentally and the also not good shortcoming of the firmness of color, there is layer and interlayer firmness is high, good water permeability, color firmness are good and environmental advantages.
Technical scheme of the present invention is as follows:
Permeable terrace built by a kind of ecological glue, and it comprises the original soil layer set gradually from below to up, permeable bed course, leveling layer, permeable rock layers and protective clear layer; Wherein, described original soil layer is made up of roadbed itself; Described permeable bed course is made up of stone and cement mixing; Described leveling layer is mixed by cement and fine sand; Described permeable rock layers is mixed by glue and natural ecological colored stone.
The ecological glue of this application is built in permeable terrace, and original soil layer can ensure that the recovery of rainwater infiltrates through in earth's surface, keeps ecological balance.Original soil layer and roadbed are laid and forms permeable bed course by stone and cement, maintain the intensity that original road structure turn improves road surface, also make permeable terrace have good permeable infiltration function in addition.This ecological glue is built permeable terrace and is added the leveling layer be made up of cement and fine sand, leveling layer strengthens the planeness on surface on the basis of permeable bed course, also improve caking property and the permanence of laying permeable rock layers thereon, ensure that the connection of permeable bed course and permeable rock layers.Permeable rock layers have employed natural ecological colored stone but not adds pigment, can reach good color firmness environmental protection again.Protective clear layer effectively raises anti-soil, the antiageing effect of permeable rock layers, substantially increases guarantor's colourity of natural ecological colored stone and the application life of permeable rock layers.Generally speaking, this ecological glue builds the superior and rich color of the entire firmness of permeable terrace, water permeability, environmental protection.
This glue is mixed by modified epoxy and modified fat acid epoxy hardener; Protective clear layer is mixed by acrylated polyurethane resin and isocyanate curing agent.The permeable rock layers of this glue bonding natural ecological colored stone not only bonds firmly but also can ensure water permeability.The protective clear layer transparency be made up of above-mentioned formula is high and intensity good, can well protect permeable rock layers.
Thickness>=the 100mm of described permeable bed course, pellet pores is 0.5-1mm, and coefficient of permeability is 1.8-2.2 × 10
-2cm/S; The cement of permeable bed course and the weight ratio of stone are 1:3-5, and the particle diameter of stone is 3-6mm.The setting of above-mentioned permeable bed course relevant parameter index ensure that its good permeable degree, is enough to ensure that rain penetration is to original soil layer.
Described ecological glue is built permeable terrace and is also comprised french drain, and described french drain is close to bottom permeable rock layers and is arranged, and through leveling layer and permeable bed course, be provided with between permeable rock layers and french drain upper port and cover french drain upper port completely and the steel plate being greater than french drain upper port.French drain the drainage performance that can improve permeable bed course is greatly set.Steel plate, in order to load-bearing, prevents ecological glue from building permeable terrace and to cave in blocking french drain.Wherein, french drain can through portion or whole permeable bed courses.
The thickness of described leveling layer is 30-50mm, and coefficient of permeability is 1.8-2.2 × 10
-2cm/S; The cement of described leveling layer and the volume ratio of fine sand are 1:10-14.The mud content < 2% of the fine sand of described leveling layer, clod content < 1%, moisture content < 1%.The main order arranging leveling layer ensures absolute altitude, ensures the surface finish of permeable rock layers, simultaneously because leveling layer adopts cement and sandy soil to mix, possesses good water permeability, ensure that permeable function and seepage velocity.The relevant parameter index of above-mentioned leveling layer both ensure that planeness is beneficial to the laying of layers of material, its permeable degree can be ensured again.With the leveling layer consolidation more made after impure few fine sand and cement mixing, firmness is good, better with the conjugation of permeable bed course and permeable rock layers.
The thickness of described permeable rock layers is 3-5cm, and pellet pores is 1-2mm, and coefficient of permeability is 3.8-4.2 × 10
-2cm/S; The particle diameter of the natural ecological colored stone of described permeable rock layers is 6-9mm, and the weight ratio of described modified epoxy and modified fat acid epoxy hardener is 250-300:80-100; The weight ratio of described glue and natural ecological colored stone is 4:90-110.Adopt the glue of special preparation to mix with natural ecological colored stone the firmness that both ensure that permeable rock layers with the ratio of selected mistake, in turn ensure that its water permeability.
The thickness of described protective clear layer is 0.8-1.2mm, and the weight ratio of acrylated polyurethane resin and isocyanate curing agent is 400-500:80-100 mixing.Protective clear layer can carry out anti-soil, anti-aging protection to permeable rock layers, the gloss keeping it bright-coloured and color, simultaneously due to the very thin thickness of protective clear layer, is therefore not enough to block permeable hole, while protection road surface, do not affect water permeability.
The cement of described permeable bed course and the weight ratio of stone are 1:4; The cement of described leveling layer and the volume ratio of fine sand are 1:12; The weight ratio of described glue and natural ecological colored stone is 4:100; The thickness of described protective clear layer is 1mm.Preferred each layer material rate ensure that the water permeability of the entirety of permeable terrace built by described ecological glue.
The preparation method of permeable terrace built by described ecological glue, it is characterized in that: it comprises the step that next coming in order carry out:
1. tamp original soil layer: original soil layer is tamped, while compacting, keep planeness, absolute altitude and original permeable infiltration function;
2. pave permeable bed course: will pave at the permeable bed course of original soil layer surface formation after cement and stone mix and blend;
3. leveling: will pave at permeable mat surface formation leveling layer after cement and fine sand mix and blend;
4. pave permeable rock layers: modified epoxy and modified fat acid epoxy hardener are mixed and made into described glue; This glue and natural ecological colored stone are formed permeable rock layers in paving after described weight ratio ratio mix and blend on leveling layer surface, and by smooth for permeable rock layers surface compaction;
5. protective clear layer is coated with: form protective clear layer in permeable rock layers surface coating.
Described step 1. in compacted coefficient be 90-95%, step 3. in leveling layer pave after wharf's pavement quality is carried out to its surface, to improve inter-layer bonding force.
Compared with prior art, the present patent application has the following advantages:
1) be provided with multiple pervious layer, water permeability promotes greatly;
2) conjugation grade between multiple pervious layers of permeable terrace is good, and entire firmness is high, and the intensity on road surface is good;
3) permeable rock layers is close to the protective clear layer being positioned at the superiors, and it adopts natural ecological colored stone as the raw material of permeable rock layers, and it has will never fade, natural feature, more gets close to nature; Various colors, allows landscape architect more have Material for design, and garden landscape road effect is got close to nature more, ecological; Its source is the leftover bits and pieces in mining area, and through again broken, polishing forms, and secondary make use of discarded rock material, environmental protection;
4) because protective clear layer is very thin, therefore in permeable rock layers, the shape of natural ecological colored stone easily highlights, and can play the effect of foot massages;
5) ecological glue builds the preparation technology of permeable terrace without the need to adopting the construction equipment of specialty, and only raw material need be uniformly mixed and pave, easy construction is simple, suits large area to popularize;
6) to build time of permeable terrace pavement construction short for ecological glue, and under the condition of temperature 25 DEG C, after paving, 4h can go away, and efficiency is high;
7) ecological glue is built after prepared by permeable terrace, from now on road surface maintenance, maintain and reprocess very convenient, need not close a road to traffic, not affect the trip of the common people.
Accompanying drawing explanation
Fig. 1 is the sectional drawing that permeable terrace built by ecological glue of the present invention.
Label declaration:
Original soil layer 1, permeable bed course 2, leveling layer 3, permeable rock layers 4, protective clear layer 5, french drain 6, steel plate 61.
Detailed description of the invention
Below in conjunction with each embodiment, technical scheme of the present invention is described in detail.
Raw material sources:
Modified epoxy: ring Xinda, Xiamen Chemical Co., Ltd. model EP240;
Modified fat acid epoxy hardener: ring Xinda, Xiamen Chemical Co., Ltd. model EP242.
Embodiment 1
Permeable terrace built by a kind of ecological glue, and it comprises the original soil layer 1, permeable bed course 2, leveling layer 3, permeable rock layers 4 and the protective clear layer 5 that set gradually from below to up.Wherein, original soil layer 1 is made up of roadbed itself.Permeable bed course 2 is that the stone of 1:4 and cement mixing are made by weight ratio, and the particle diameter of stone is 4mm.The thickness of this permeable bed course 2 is 120mm, and pellet pores is 0.8mm, and coefficient of permeability is 2.0 × 10
-2cm/S.This ecological glue is built permeable terrace and is also comprised french drain 6, described french drain 6 is close to setting bottom permeable rock layers 4, and the permeable bed course 2 of through leveling layer 3 and part, be provided with between permeable rock layers 4 and french drain 6 upper port and cover french drain 6 upper port completely and the steel plate 61 being greater than french drain 6 upper port.
Leveling layer 3 is that the cement of 1:12 and fine sand are mixed by volume ratio, the mud content < 2% of this fine sand, clod content < 1%, moisture content < 1%.The thickness of this leveling layer 3 is 40mm, and coefficient of permeability is 2.0 × 10
-2cm/S.
Permeable rock layers 4 is that the glue of 4:100 and natural ecological colored stone are mixed by weight ratio, and the particle diameter of natural ecological colored stone is 8mm.This glue is that the modified epoxy of 280:90 and modified fat acid epoxy hardener mix by weight ratio.The thickness of this permeable rock layers 4 is 4cm, and pellet pores is 1.5mm, and coefficient of permeability is 4.0 × 10
-2cm/S.
Protective clear layer 5 is that the acrylated polyurethane resin of 450:90 and isocyanate curing agent mix by weight ratio.The thickness of this protective clear layer 5 is 1mm.
The preparation method of permeable terrace built by this ecological glue, and it comprises the step that next coming in order carry out:
1. tamp original soil layer: tamp original soil layer, compacted coefficient is 93%, while compacting, keep planeness, absolute altitude and original permeable infiltration function;
2. pave permeable bed course: cement and stone are formed permeable bed course in paving after described weight ratio ratio mix and blend on original soil layer surface;
3. leveling: cement and fine sand being formed leveling layer in paving after described volume ratio ratio mix and blend in permeable mat surface, with wooden scraper plate, wharf's pavement quality being carried out to leveling layer surface;
4. pave permeable rock layers: modified epoxy and modified fat acid epoxy hardener are mixed and made into described glue in described weight ratio ratio; This glue and natural ecological colored stone are formed permeable rock layers in paving after described weight ratio ratio mix and blend on leveling layer surface, and by smooth for permeable rock layers surface compaction;
5. protective clear layer is coated with: acrylated polyurethane resin and isocyanate curing agent are formed protective clear layer in being coated in permeable rock layers surface after described weight ratio ratio mix and blend.
Embodiment 2
Permeable terrace built by a kind of ecological glue, and it comprises the original soil layer 1, permeable bed course 2, leveling layer 3, permeable rock layers 4 and the protective clear layer 5 that set gradually from below to up.Wherein, original soil layer 1 is made up of roadbed itself.Permeable bed course 2 is that the stone of 1:3 and cement mixing are made by weight ratio, and the particle diameter of stone is 6mm.The thickness of this permeable bed course 2 is 100mm, and pellet pores is 0.5mm, and coefficient of permeability is 1.8 × 10
-2cm/S.
Leveling layer 3 is that the cement of 1:10 and fine sand are mixed by volume ratio.The thickness of this leveling layer 3 is 50mm, and coefficient of permeability is 1.8 × 10
-2cm/S.
Permeable rock layers 4 is that the glue of 4:110 and natural ecological colored stone are mixed by weight ratio, and the particle diameter of natural ecological colored stone is 6mm.This glue is that the modified epoxy of 250:100 and modified fat acid epoxy hardener mix by weight ratio.The thickness of this permeable rock layers 4 is 3cm, and pellet pores is 1mm, and coefficient of permeability is 3.8 × 10
-2cm/S.
Protective clear layer 5 is that the acrylated polyurethane resin of 400:100 and isocyanate curing agent mix by weight ratio.The thickness of this protective clear layer 5 is 1.2mm.
The preparation method of permeable terrace built by this ecological glue, and it comprises the step that next coming in order carry out:
1. tamp original soil layer: tamp original soil layer, compacted coefficient is 90%, while compacting, keep planeness, absolute altitude and original permeable infiltration function;
2. pave permeable bed course: cement and stone are formed permeable bed course in paving after described weight ratio ratio mix and blend on original soil layer surface;
3. leveling: cement and fine sand are formed leveling layer in paving after described volume ratio ratio mix and blend in permeable mat surface;
4. pave permeable rock layers: modified epoxy and modified fat acid epoxy hardener are mixed and made into described glue in described weight ratio ratio; This glue and natural ecological colored stone are formed permeable rock layers in paving after described weight ratio ratio mix and blend on leveling layer surface, and by smooth for permeable rock layers surface compaction;
5. protective clear layer is coated with: acrylated polyurethane resin and isocyanate curing agent are formed protective clear layer in being coated in permeable rock layers surface after described weight ratio ratio mix and blend.
Embodiment 3
Permeable terrace built by a kind of ecological glue, and it comprises the original soil layer 1, permeable bed course 2, leveling layer 3, permeable rock layers 4 and the protective clear layer 5 that set gradually from below to up.Wherein, original soil layer 1 is made up of roadbed itself.Permeable bed course 2 is that the stone of 1:5 and cement mixing are made by weight ratio, and the particle diameter of stone is 3mm.The thickness of this permeable bed course 2 is 150mm, and pellet pores is 1mm, and coefficient of permeability is 2.2 × 10
-2cm/S.
Leveling layer 3 is that the cement of 1:14 and fine sand are mixed by volume ratio.The thickness of this leveling layer 3 is 30mm, and coefficient of permeability is 2.2 × 10
-2cm/S.
Permeable rock layers 4 is that the glue of 4:90 and natural ecological colored stone are mixed by weight ratio, and the particle diameter of natural ecological colored stone is 9mm.This glue is that the modified epoxy of 300:80 and modified fat acid epoxy hardener mix by weight ratio.The thickness of this permeable rock layers 4 is 5cm, and pellet pores is 2mm, and coefficient of permeability is 4.2 × 10
-2cm/S.
Protective clear layer 5 is that the acrylated polyurethane resin of 500:80 and isocyanate curing agent mix by weight ratio.The thickness of this protective clear layer 5 is 0.8mm.
The preparation method of permeable terrace built by this ecological glue, and it comprises the step that next coming in order carry out:
1. tamp original soil layer: tamp original soil layer, compacted coefficient is 95%, while compacting, keep planeness, absolute altitude and original permeable infiltration function;
2. pave permeable bed course: cement and stone are formed permeable bed course in paving after described weight ratio ratio mix and blend on original soil layer surface;
3. leveling: cement and fine sand are formed leveling layer in paving after described volume ratio ratio mix and blend in permeable mat surface;
4. pave permeable rock layers: modified epoxy and modified fat acid epoxy hardener are mixed and made into described glue in described weight ratio ratio; This glue and natural ecological colored stone are formed permeable rock layers in paving after described weight ratio ratio mix and blend on leveling layer surface, and by smooth for permeable rock layers surface compaction;
5. protective clear layer is coated with: acrylated polyurethane resin and isocyanate curing agent are formed protective clear layer in being coated in permeable rock layers surface after described weight ratio ratio mix and blend.
Embodiment 4
The difference of itself and embodiment 3 is: this ecological glue is built permeable terrace and also comprised french drain 6, described french drain 6 is close to setting bottom permeable rock layers 4, and through leveling layer 3 and whole permeable bed courses 2, be provided with between permeable rock layers 4 and french drain 6 upper port and cover french drain 6 upper port completely and the steel plate 61 being greater than french drain 6 upper port.
In sum, the ecological glue of the application builds that the interlayer firmness of permeable terrace is high, good water permeability, color firmness are good and environmental protection, and its preparation method is simple, greatly can shorten construction period.
Ecological glue of the present invention is built permeable terrace and preparation method thereof and is had more than and be only confined to above-described embodiment, and every any improvement according to the principle of the invention or replacement, all should within protection scope of the present invention.
Claims (10)
1. a permeable terrace built by ecological glue, it is characterized in that: it comprises the original soil layer (1) set gradually from below to up, permeable bed course (2), leveling layer (3), permeable rock layers (4) and protective clear layer (5); Wherein, described original soil layer (1) is made up of roadbed itself; Described permeable bed course (2) is made up of stone and cement mixing; Described leveling layer (3) is mixed by cement and fine sand; Described permeable rock layers (4) is mixed by glue and natural ecological colored stone.
2. permeable terrace built by ecological glue according to claim 1, it is characterized in that: the glue of described permeable rock layers (4) is mixed by modified epoxy and modified fat acid epoxy hardener; Described protective clear layer (5) is mixed by acrylated polyurethane resin and isocyanate curing agent.
3. permeable terrace built by ecological glue according to claim 1, it is characterized in that: the thickness>=100mm of described permeable bed course (2), and pellet pores is 0.5-1mm, and coefficient of permeability is 1.8-2.2 × 10
-2cm/S; The cement of permeable bed course (2) and the weight ratio of stone are 1:3-5, and the particle diameter of stone is 3-6mm.
4. permeable terrace built by ecological glue according to claim 1, it is characterized in that: it also comprises french drain (6), described french drain (6) is close to permeable rock layers (4) bottom and is arranged, and through leveling layer (3) and permeable bed course (2), be provided with between permeable rock layers (4) and french drain (6) upper port and cover french drain (6) upper port completely and the steel plate (61) being greater than french drain (6) upper port.
5. permeable terrace built by ecological glue according to claim 1, it is characterized in that: the thickness of described leveling layer (3) is 30-50mm, and coefficient of permeability is 1.8-2.2 × 10
-2cm/S; The cement of described leveling layer (3) and the volume ratio of fine sand are 1:10-14; The mud content < 2% of the fine sand of described leveling layer (3), clod content < 1%, moisture content < 1%.
6. build permeable terrace according to ecological glue according to claim 2, it is characterized in that: the thickness of described permeable rock layers (4) is 3-5cm, and pellet pores is 1-2mm, and coefficient of permeability is 3.8-4.2 × 10
-2cm/S; The particle diameter of the natural ecological colored stone of described permeable rock layers (4) is 6-9mm, and the weight ratio of described modified epoxy and modified fat acid epoxy hardener is 250-300:80-100; The weight ratio of described glue and natural ecological colored stone is 4:90-110.
7. build permeable terrace according to ecological glue according to claim 1, it is characterized in that: the thickness of described protective clear layer (5) is 0.8-1.2mm, the weight ratio of acrylated polyurethane resin and isocyanate curing agent is 400-500:80-100 mixing.
8. build permeable terrace according to ecological glue according to claim 1, it is characterized in that: the described cement of permeable bed course (2) and the weight ratio of stone are 1:4; The cement of described leveling layer (3) and the volume ratio of fine sand are 1:12; The weight ratio of described glue and natural ecological colored stone is 4:100; The thickness of described protective clear layer (5) is 1mm.
9. the preparation method of permeable terrace built by the ecological glue according to any one of claim 1-8, it is characterized in that: it comprises the step that next coming in order carry out,
1. tamp original soil layer: original soil layer (1) is tamped, while compacting, keep planeness, absolute altitude and original permeable infiltration function;
2. pave permeable bed course: will pave at the original soil layer surface permeable bed course of formation (2) after cement and stone mix and blend;
3. leveling: will pave permeable mat surface formation leveling layer (3) after cement and fine sand mix and blend;
4. pave permeable rock layers: will pave after glue and natural ecological colored stone mix and blend at the leveling layer surface permeable rock layers of formation (4), and by smooth for permeable rock layers (4) surface compaction;
5. protective clear layer is coated with: form protective clear layer (5) in the coating of permeable rock layers (4) surface.
10. the preparation method of permeable terrace built by ecological glue according to claim 9, it is characterized in that: described step 1. in compacted coefficient be 90-95%, step 3. in leveling layer (3) pave after wharf's pavement quality is carried out to its surface.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510971478.3A CN105421183B (en) | 2015-12-22 | 2015-12-22 | Ecological glue builds permeable terrace and preparation method thereof |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510971478.3A CN105421183B (en) | 2015-12-22 | 2015-12-22 | Ecological glue builds permeable terrace and preparation method thereof |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105421183A true CN105421183A (en) | 2016-03-23 |
CN105421183B CN105421183B (en) | 2018-09-28 |
Family
ID=55499700
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510971478.3A Active CN105421183B (en) | 2015-12-22 | 2015-12-22 | Ecological glue builds permeable terrace and preparation method thereof |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105421183B (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108252181A (en) * | 2018-01-02 | 2018-07-06 | 广东美景园林建设有限公司 | A kind of pervious concrete pavement structure and construction method |
CN109024141A (en) * | 2017-06-12 | 2018-12-18 | 上海景域园林建设发展有限公司 | A kind of multifunctional ecological permeable terrace |
CN111411559A (en) * | 2020-04-02 | 2020-07-14 | 上海仁路科技有限公司 | Permeable pavement and laying method thereof |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20120063846A1 (en) * | 2010-09-09 | 2012-03-15 | Jui-Wen Chen | Method for manufacturing artificial paving that help improving global warming |
CN102677868A (en) * | 2011-12-05 | 2012-09-19 | 王建国 | Manufacturing method of color concrete fancy permeable terrace |
CN202500069U (en) * | 2012-04-20 | 2012-10-24 | 长沙新乐士环保科技有限公司 | Ecological permeable concrete terrace |
CN104233916A (en) * | 2014-06-27 | 2014-12-24 | 重庆多娇保温材料有限公司 | Preparation method of color ecological permeable floor |
CN204174500U (en) * | 2014-10-28 | 2015-02-25 | 苏州基业生态园林股份有限公司 | A kind of road drainage structure with water permeability |
CN104404857A (en) * | 2014-12-04 | 2015-03-11 | 中冶天工集团有限公司 | Permeable brick paving ground and construction method |
-
2015
- 2015-12-22 CN CN201510971478.3A patent/CN105421183B/en active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20120063846A1 (en) * | 2010-09-09 | 2012-03-15 | Jui-Wen Chen | Method for manufacturing artificial paving that help improving global warming |
CN102677868A (en) * | 2011-12-05 | 2012-09-19 | 王建国 | Manufacturing method of color concrete fancy permeable terrace |
CN202500069U (en) * | 2012-04-20 | 2012-10-24 | 长沙新乐士环保科技有限公司 | Ecological permeable concrete terrace |
CN104233916A (en) * | 2014-06-27 | 2014-12-24 | 重庆多娇保温材料有限公司 | Preparation method of color ecological permeable floor |
CN204174500U (en) * | 2014-10-28 | 2015-02-25 | 苏州基业生态园林股份有限公司 | A kind of road drainage structure with water permeability |
CN104404857A (en) * | 2014-12-04 | 2015-03-11 | 中冶天工集团有限公司 | Permeable brick paving ground and construction method |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109024141A (en) * | 2017-06-12 | 2018-12-18 | 上海景域园林建设发展有限公司 | A kind of multifunctional ecological permeable terrace |
CN108252181A (en) * | 2018-01-02 | 2018-07-06 | 广东美景园林建设有限公司 | A kind of pervious concrete pavement structure and construction method |
CN111411559A (en) * | 2020-04-02 | 2020-07-14 | 上海仁路科技有限公司 | Permeable pavement and laying method thereof |
Also Published As
Publication number | Publication date |
---|---|
CN105421183B (en) | 2018-09-28 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102587243B (en) | Urban road water permeability cement concrete pavement structure and construction process thereof | |
CN103669145B (en) | A kind of paving method of permeable pavement structure | |
CN107059525A (en) | A kind of municipal permeable road structure and its construction technology | |
CN206143577U (en) | Ecological garden view road that permeates water | |
CN105463967A (en) | Water-permeable wear-resistant garden path and construction method thereof | |
CN205839508U (en) | Sponge city paved road structure | |
CN103046454A (en) | Gravel pavement and paving method thereof | |
CN105421183A (en) | Ecological glue-building water-permeable terrace and preparation method thereof | |
CN108532401A (en) | A kind of coral sand concrete road surface structure and its construction method | |
CN104404857B (en) | A kind of permeable tile work ground and construction method | |
CN111072333A (en) | Permeable concrete structure and preparation process thereof | |
CN108086459A (en) | A kind of construction method of sponge urban green space water storage system | |
CN208362832U (en) | A kind of spongeization road structure of cracking resistance | |
CN208685390U (en) | Sponge city paved road structure | |
CN206752237U (en) | Stealthy passageway for fire apparatus | |
CN108411728A (en) | Surface drainage | |
KR100874496B1 (en) | Road paving material formation having steel making slag and method for paving of road using that | |
JPS59206502A (en) | Production of water pervious cement concrete construction | |
CN208250846U (en) | Surface drainage | |
CN104045282B (en) | Nonporous closed water-permeable drainage ditch cover plate and manufacturing method thereof | |
CN107165012A (en) | The road structure and its construction method of a kind of tunnel upper | |
CN208486142U (en) | A kind of novel porous runoff porous pavement | |
CN208486146U (en) | A kind of novel filter infiltration garden road step and sunk type square laying structure | |
CN206971030U (en) | A kind of multifunctional ecological permeable terrace | |
CN112030652A (en) | Preparation method of ecological water-permeable concrete pavement |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |