CN104404857A - Permeable brick paving ground and construction method - Google Patents
Permeable brick paving ground and construction method Download PDFInfo
- Publication number
- CN104404857A CN104404857A CN201410736738.4A CN201410736738A CN104404857A CN 104404857 A CN104404857 A CN 104404857A CN 201410736738 A CN201410736738 A CN 201410736738A CN 104404857 A CN104404857 A CN 104404857A
- Authority
- CN
- China
- Prior art keywords
- ground
- sand
- permeable
- pervious concrete
- construction method
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01C—CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
- E01C15/00—Pavings specially adapted for footpaths, sidewalks or cycle tracks
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01C—CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
- E01C11/00—Details of pavings
- E01C11/22—Gutters; Kerbs ; Surface drainage of streets, roads or like traffic areas
- E01C11/224—Surface drainage of streets
- E01C11/225—Paving specially adapted for through-the-surfacing drainage, e.g. perforated, porous; Preformed paving elements comprising, or adapted to form, passageways for carrying off drainage
Abstract
The invention provides a permeable brick paving ground. The permeable brick paving ground sequentially comprises a non-sand permeable concrete cushion, a dry-sand leveling layer and a surface layer from an original earth road foundation from bottom to up, wherein the dry-sand leveling layer is a coarse sand layer; the surface layer comprises grid face bricks and permeable bricks in various grid units formed by the grid face bricks in an encircling manner. A construction method of the permeable brick paving ground comprises the following steps: constructing a draining canal in an earth road foundation; constructing the non-sand permeable concrete cushion; paving the grid face bricks to divide a square ground into a plurality of grid units; then vertically building the permeable bricks of the surface layer in the grid units; finally, carrying out dry-sand seam sweeping to compact brick joints. According to the permeable brick paving ground, all the structural layers have the ventilated and permeable function; meanwhile, water seepage on the ground and the draining canal in the ground are combined together to form a perfect ground rainwater drainage and seepage system; when the rain is relatively light, rainwater directly seeps underground through the ground; when the rain is relatively heavy, rainwater is removed by mainly adopting the draining canal, and is assisted by ground water seepage; the permeable brick paving ground is good in effects of water drainage and seepage.
Description
Technical field
The invention belongs to large-scale square ground Construction Technology field, especially relate to a kind of permeable tile work ground and construction method.
Background technology
Tile work ground, large-scale square adopts concrete as bed course usually, then adopts cement mortar to lay face brick surface layer.Usually there is the following weak point: 1, rainwater drains into drainage pipe or irrigation canals and ditches by the gradient on ground, the approach of storm-water drainage is too single.When rainwater is larger, often can there is seeping phenomenon in ground not mean place; Therefore, us are needed to improve the storm-water system of square ground.2, along with the development in city, and the requirement to environmental protection, permeable Ground Application is also more and more extensive.And how to make tile work ground possess good pervious function, need us to go further investigation.The tile work ground of Normal practice does not possess pervious function substantially, and first common plain concrete cushion layer has just directly intercepted the infiltration of rainwater, secondly, the cement mortar that setting course is used, though be dry plasticity, As time goes on, progressively harden, also can have a strong impact on the osmotic effect of rainwater.
Summary of the invention
The problem to be solved in the present invention is to provide a kind of permeable tile work ground and construction method, can either ensure square ground face brick decorative effect, and can improve the construction technology that ground row oozes function permeable tile work ground.
For solving the problems of the technologies described above, the technical solution used in the present invention is: a kind of permeable tile work ground, is followed successively by from the bottom to top without sand pervious concrete bed course, dry sand leveling layer and surface layer from the ground of original soil road; Described dry sand leveling layer is coarse sands layer; Described surface layer comprises lattice face brick and water-permeable brick in each grid cell of being enclosed by lattice face brick.
The construction method on permeable tile work ground, comprises the steps:
1. elder generation's construction drainage irrigation canals and ditches on dirt road ground, and smooth rammed subgrade;
2. examination is joined without sand pervious concrete match ratio, determines cement consumption in concrete, and the specification of stone and consumption, and making is without sand pervious concrete;
3. select suitable paving and build machinery, on the ground of original soil road, block placement is without sand pervious concrete bed course, and ensures concrete degree of compaction and planeness;
When 4. starting to pave surface layer, first pave separation face brick by cement mortar by design elevation, whole square ground is separated into some grid cells uniformly;
5. until step 4. in pave division surface brick cement mortar reach some strength time, carry out levelling at each grid cell inner utilization coarse sand, and adopt dry laid process to pave the water-permeable brick of surface layer;
6. corner process, and carry out dry sand and sweep seam, compacted brickwork joint.
Further, step 2. pilot scale prepare described without sand pervious concrete, under guaranteed strength meets the prerequisite of designing requirement, certain porosity and coefficient of permeability should be had.
Further, build haulage time for shortening, step is 2. described can adopt the method for on-the-spot concentrated compactness to make without sand pervious concrete.
Further, step 2. described in without sand pervious concrete layer adopt C15 without sand pervious concrete.
Further, step 4. in pave division surface brick cement mortar adopt 1:3 match ratio.
Further, the dry sand leveling layer thickness of step when 5. middle coarse sand is levelling is 30 ~ 50mm.
The advantage that the present invention has and good effect are:
1) surface layer on dirt road ground, dry sand leveling layer, all possess air-and water-permeable function without decks such as sand pervious concrete bed courses, under realizing the infiltration of rainwater and road surface, soil communicates with air.
2) infiltration on ground and the escape canal on ground form perfect ground rainwater and arrange and ooze system, rainwater is got rid of fast, avoids the ponding on ground, when rainwater is less, directly permeated the ground by ground, when rainwater is larger, take gutter as main the eliminating, be aided with ground sweat.Meanwhile, the infiltration of rainwater also achieves the effect utilizing rainwater to carry out supplement ambient water.
3) carry out dividing elements to ground, the paving of lattice face brick serves the displacement of face brick within the scope of restriction junior unit, also makes ground maintenance only within the scope of unit, does not affect the face brick beyond unit.Paving of lattice face brick also serves similar " floating screed " effect of plastering in process, and the absolute altitude on ground is well controlled.
Accompanying drawing explanation
Fig. 1 is middle berth brick flooring cross sectional representation of the present invention;
Fig. 2 is the structural representation of middle berth brick flooring of the present invention;
Fig. 3 is that the present invention separates face brick grid division cell schematics.
Detailed description of the invention
Below in conjunction with accompanying drawing, specific embodiments of the invention are elaborated.
A kind of permeable tile work ground, as depicted in figs. 1 and 2, is followed successively by from the bottom to top without sand pervious concrete bed course 1, dry sand leveling layer 2 and surface layer 3 from the ground of original soil road; Described dry sand leveling layer 2 is coarse sands layer; Described surface layer 3 comprises lattice face brick 4 and water-permeable brick 6 in each grid cell 5 of being surrounded by lattice face brick 4.
It should be noted that, lattice face brick 4 preferably blue bricks, the water-permeable brick of surface layer can select specification to be the blue bricks modelled after an antique of 280x140x75, and laid on end, such rain penetration better effects if.In addition, the size of grid cell 5 is usually designed to 5mx5m.With the grid cell 5 that lattice face brick 4 divides, effectively can control the absolute altitude of whole square ground, and constraint and fixation are risen to the face brick (water-permeable brick) of junior unit inside.
The construction method on permeable tile work ground, comprises the steps:
1. elder generation's construction drainage irrigation canals and ditches 7 on dirt road ground, and smooth rammed subgrade;
2. examination is joined without sand pervious concrete match ratio, determines cement consumption in concrete, and the specification of stone and consumption, and making is without sand pervious concrete; Generally in every cube of concrete, cement consumption is about 350kg (intensity is considered by C15), should join be as the criterion in practice of construction with examination.
3. select suitable paving and build machinery, on the ground of original soil road, block placement is without sand pervious concrete bed course 1, and ensures concrete degree of compaction and planeness; Here, the plain concrete cushion layer in Normal practice is changed into non-fine concrete, the pervious function that made it possess.It should be noted that paving process notes the arrangement of operation and the control of time.Avoid because mix dehydration is too much and initial set in advance, and affect concrete quality.
When 4. starting to pave surface layer 3, first pave separation face brick 4 by cement mortar by design elevation, whole square ground is separated into some grid cells 5 uniformly;
5. until step 4. in pave division surface brick 4 cement mortar reach some strength time, carry out levelling at each grid cell 5 inner utilization coarse sand, and adopt dry laid process to pave the water-permeable brick 6 of surface layer 3; Like this, adopt the surface layer of dry laid process, ensure that the upper and lower space of deck, whole ground is through.
6. corner process, and carry out dry sand and sweep seam, compacted brickwork joint.It is mentioned here that what is done can for coarse sand, also can be sand material mixture.
Wherein, step 2. pilot scale prepare described without sand pervious concrete, under guaranteed strength meets the prerequisite of designing requirement, certain porosity and coefficient of permeability should be had.
Wherein, build haulage time for shortening, step is 2. described can adopt the method for on-the-spot concentrated compactness to make without sand pervious concrete.
Wherein, step 2. described in adopt C15 without sand pervious concrete without sand pervious concrete layer 1.
Wherein, step 4. in pave division surface brick 4 cement mortar adopt 1:3 match ratio.
Wherein, dry sand leveling layer 2 thickness of step when 5. middle coarse sand is levelling is 30 ~ 50mm.
All possess air-and water-permeable function without decks such as sand pervious concrete bed course 1, dry sand leveling layer 2, surface layers 3 in the present invention on dirt road ground, under realizing the infiltration of rainwater and road surface, soil communicates with air.Meanwhile, the escape canal 7 on the infiltration on ground and ground is formed perfect ground rainwater and arrange and ooze system, rainwater is got rid of fast, avoid the ponding on ground, when rainwater is less, directly permeated the ground by ground, when rainwater is larger, is main the eliminating with escape canal 7, is aided with ground sweat.Meanwhile, the infiltration of rainwater also achieves the effect utilizing rainwater to carry out supplement ambient water.
Above one embodiment of the present of invention have been described in detail, but described content being only preferred embodiment of the present invention, can not being considered to for limiting practical range of the present invention.All equalizations done according to the present patent application scope change and improve, and all should still belong within patent covering scope of the present invention.
Claims (7)
1. a permeable tile work ground, is characterized in that: be followed successively by without sand pervious concrete bed course, dry sand leveling layer and surface layer from the ground of original soil road from the bottom to top; Described dry sand leveling layer is coarse sands layer; Described surface layer comprises lattice face brick and water-permeable brick in each grid cell of being surrounded by lattice face brick.
2. the construction method on permeable tile work ground described in claim 1, is characterized in that, comprise the steps:
1. elder generation's construction drainage irrigation canals and ditches on dirt road ground, and smooth rammed subgrade;
2. examination is joined without sand pervious concrete match ratio, determines cement consumption in concrete, and the specification of stone and consumption, and making is without sand pervious concrete;
3. select suitable paving and build machinery, on the ground of original soil road, block placement is without sand pervious concrete bed course, and ensures concrete degree of compaction and planeness;
When 4. starting to pave surface layer, first pave separation face brick by cement mortar by design elevation, whole square ground is separated into some grid cells uniformly;
5. until step 4. in pave division surface brick cement mortar reach some strength time, carry out levelling at each grid cell inner utilization coarse sand, and adopt dry laid process to pave the water-permeable brick of surface layer;
6. corner process, and carry out dry sand and sweep seam, compacted brickwork joint.
3. the construction method on a kind of permeable tile work ground according to claim 2, is characterized in that: step 2. pilot scale prepare described without sand pervious concrete, under guaranteed strength meets the prerequisite of designing requirement, certain porosity and coefficient of permeability should be had.
4. the construction method on a kind of permeable tile work ground according to claim 2, is characterized in that: build haulage time for shortening, step is 2. described can adopt the method for on-the-spot concentrated compactness to make without sand pervious concrete.
5. the construction method on a kind of permeable tile work ground according to claim 2, is characterized in that: step 2. described in without sand pervious concrete layer adopt C15 without sand pervious concrete.
6. the construction method on a kind of permeable tile work ground according to claim 2, is characterized in that: step 4. in pave division surface brick cement mortar adopt 1:3 match ratio.
7. the construction method on a kind of permeable tile work ground according to claim 2, is characterized in that: the dry sand leveling layer thickness of step when 5. middle coarse sand is levelling is 30 ~ 50mm.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410736738.4A CN104404857B (en) | 2014-12-04 | 2014-12-04 | A kind of permeable tile work ground and construction method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410736738.4A CN104404857B (en) | 2014-12-04 | 2014-12-04 | A kind of permeable tile work ground and construction method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104404857A true CN104404857A (en) | 2015-03-11 |
CN104404857B CN104404857B (en) | 2016-08-31 |
Family
ID=52642519
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410736738.4A Active CN104404857B (en) | 2014-12-04 | 2014-12-04 | A kind of permeable tile work ground and construction method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104404857B (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105421183A (en) * | 2015-12-22 | 2016-03-23 | 福建大农景观建设有限公司 | Ecological glue-building water-permeable terrace and preparation method thereof |
CN107675576A (en) * | 2017-09-05 | 2018-02-09 | 李子木 | A kind of processing method of building waste |
CN113356519A (en) * | 2021-06-25 | 2021-09-07 | 北京建工新型建材有限责任公司 | Ground stirring-free stone-filled concrete leveling construction process and ground leveling structure |
CN113605172A (en) * | 2021-08-02 | 2021-11-05 | 河南中交路通工程监理咨询有限公司 | Permeable pavement and construction method thereof |
CN114737435A (en) * | 2022-04-12 | 2022-07-12 | 浙江科技学院 | Pavement adopting heat-reflecting bricks to be spliced into water-permeable bricks in mixed mode and paving method thereof |
Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH11181706A (en) * | 1997-12-25 | 1999-07-06 | Chugai Ro Co Ltd | Work execution structure of paving material |
CN200981968Y (en) * | 2006-12-18 | 2007-11-28 | 北京市市政工程设计研究总院 | Water permeability footway |
CN201206233Y (en) * | 2008-04-30 | 2009-03-11 | 上海园林(集团)公司 | Ecological footpath system |
CN101565997A (en) * | 2009-05-25 | 2009-10-28 | 青岛恒生源集团建设有限公司 | Construction method for large-area irregular floor tile |
KR100985558B1 (en) * | 2009-10-21 | 2010-10-05 | 이랜드체육산업 (주) | Water permeable elasticity pavement having oyster shell and manufacturing method and construction method thereof |
CN201678926U (en) * | 2010-05-12 | 2010-12-22 | 叶新 | Novel combined type water-permeable sidewalk |
KR20120103234A (en) * | 2011-03-10 | 2012-09-19 | 공주대학교 산학협력단 | Sidewalk using woodchip and paving method thereof |
CN203383414U (en) * | 2013-07-31 | 2014-01-08 | 陕西建工集团第八建筑工程有限公司 | Arranging and dividing structure for parapet wall with tapestry bricks in laying and sticking mode |
CN103669147A (en) * | 2013-12-31 | 2014-03-26 | 北京东方园林股份有限公司 | Pavement method of permeable ground and permeable pavement structure paved through pavement method |
CN203583313U (en) * | 2013-11-19 | 2014-05-07 | 苏州金螳螂园林绿化景观有限公司 | Anti-cracking washing stone road surface |
-
2014
- 2014-12-04 CN CN201410736738.4A patent/CN104404857B/en active Active
Patent Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH11181706A (en) * | 1997-12-25 | 1999-07-06 | Chugai Ro Co Ltd | Work execution structure of paving material |
CN200981968Y (en) * | 2006-12-18 | 2007-11-28 | 北京市市政工程设计研究总院 | Water permeability footway |
CN201206233Y (en) * | 2008-04-30 | 2009-03-11 | 上海园林(集团)公司 | Ecological footpath system |
CN101565997A (en) * | 2009-05-25 | 2009-10-28 | 青岛恒生源集团建设有限公司 | Construction method for large-area irregular floor tile |
KR100985558B1 (en) * | 2009-10-21 | 2010-10-05 | 이랜드체육산업 (주) | Water permeable elasticity pavement having oyster shell and manufacturing method and construction method thereof |
CN201678926U (en) * | 2010-05-12 | 2010-12-22 | 叶新 | Novel combined type water-permeable sidewalk |
KR20120103234A (en) * | 2011-03-10 | 2012-09-19 | 공주대학교 산학협력단 | Sidewalk using woodchip and paving method thereof |
CN203383414U (en) * | 2013-07-31 | 2014-01-08 | 陕西建工集团第八建筑工程有限公司 | Arranging and dividing structure for parapet wall with tapestry bricks in laying and sticking mode |
CN203583313U (en) * | 2013-11-19 | 2014-05-07 | 苏州金螳螂园林绿化景观有限公司 | Anti-cracking washing stone road surface |
CN103669147A (en) * | 2013-12-31 | 2014-03-26 | 北京东方园林股份有限公司 | Pavement method of permeable ground and permeable pavement structure paved through pavement method |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105421183A (en) * | 2015-12-22 | 2016-03-23 | 福建大农景观建设有限公司 | Ecological glue-building water-permeable terrace and preparation method thereof |
CN107675576A (en) * | 2017-09-05 | 2018-02-09 | 李子木 | A kind of processing method of building waste |
CN107675576B (en) * | 2017-09-05 | 2019-08-20 | 李子木 | A kind of processing method of building waste |
CN113356519A (en) * | 2021-06-25 | 2021-09-07 | 北京建工新型建材有限责任公司 | Ground stirring-free stone-filled concrete leveling construction process and ground leveling structure |
CN113356519B (en) * | 2021-06-25 | 2022-11-15 | 北京建工新型建材有限责任公司 | Ground stirring-free stone-filled concrete leveling construction process and ground leveling structure |
CN113605172A (en) * | 2021-08-02 | 2021-11-05 | 河南中交路通工程监理咨询有限公司 | Permeable pavement and construction method thereof |
CN113605172B (en) * | 2021-08-02 | 2022-12-02 | 河南中交路通工程监理咨询有限公司 | Permeable pavement |
CN114737435A (en) * | 2022-04-12 | 2022-07-12 | 浙江科技学院 | Pavement adopting heat-reflecting bricks to be spliced into water-permeable bricks in mixed mode and paving method thereof |
Also Published As
Publication number | Publication date |
---|---|
CN104404857B (en) | 2016-08-31 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104878678A (en) | Construction method for water-permeable and water-retaining water-permeable pavement structure | |
CN106049217B (en) | Fabricated permeable paving method and block and paving structure | |
CN103774616B (en) | From the Ecological Retaining Wall construction method that embedded block is built by laying bricks or stones | |
CN104404857B (en) | A kind of permeable tile work ground and construction method | |
CN202945619U (en) | Basement wall and baseplate waterproof and drainage structure | |
CN104153400B (en) | A kind of construction method of soft foundation pouring pile head waterproof | |
CN105256692A (en) | Color and pervious concrete pavement structure and construction technology therefor | |
CN105201025B (en) | Basement waterproofing construction and its construction method | |
CN203295913U (en) | Novel ecological permeable road structure | |
CN105463967A (en) | Water-permeable wear-resistant garden path and construction method thereof | |
CN206256334U (en) | A kind of novel environment friendly paving structure | |
CN105040554A (en) | Garden path structure and paving construction technology thereof | |
CN106193066A (en) | A kind of Loess landslide administering method based on restoration of the ecosystem | |
CN102535520A (en) | Waterproof construction method of large-area civil air defense basement | |
CN103669147A (en) | Pavement method of permeable ground and permeable pavement structure paved through pavement method | |
CN104631713A (en) | Roof greening construction method | |
CN107152012A (en) | Sluice construction technique | |
CN202627166U (en) | Novel water-discharging ecological zone for town road | |
CN103469828A (en) | Construction method of hydrophobic structure of post-cast strip of bottom plate of basement | |
CN205501754U (en) | Ecological ceramic tile | |
CN208815955U (en) | A kind of swimming pool bottom plate structure and its expansion joint node waterproof structure | |
CN208685390U (en) | Sponge city paved road structure | |
CN105421183A (en) | Ecological glue-building water-permeable terrace and preparation method thereof | |
CN105332328A (en) | Collapsible loess road structure capable of preventing water seepage and construction method of road with structure | |
CN107386416A (en) | A kind of basement boulder is from draining construction method of ground |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |