CN207144170U - A kind of prefabricated out-hung panel upper and lower opening waterproof connecting structure of prefabricated concrete structure - Google Patents

A kind of prefabricated out-hung panel upper and lower opening waterproof connecting structure of prefabricated concrete structure Download PDF

Info

Publication number
CN207144170U
CN207144170U CN201720841625.XU CN201720841625U CN207144170U CN 207144170 U CN207144170 U CN 207144170U CN 201720841625 U CN201720841625 U CN 201720841625U CN 207144170 U CN207144170 U CN 207144170U
Authority
CN
China
Prior art keywords
hung panel
prefabricated
lower floor
upper strata
joint
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720841625.XU
Other languages
Chinese (zh)
Inventor
朱焕彰
王晓光
薛深
杨黎明
江振兴
陈坤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Overseas Construction Ltd
Original Assignee
SHENZHEN ZHONGHAI CONSTRUCTION CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHENZHEN ZHONGHAI CONSTRUCTION CO Ltd filed Critical SHENZHEN ZHONGHAI CONSTRUCTION CO Ltd
Priority to CN201720841625.XU priority Critical patent/CN207144170U/en
Application granted granted Critical
Publication of CN207144170U publication Critical patent/CN207144170U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of prefabricated out-hung panel upper and lower opening waterproof connecting structure of prefabricated concrete structure, it is related to building structure technology field, upper strata out-hung panel and lower floor's out-hung panel distinguish pre-buried pre-embedded steel slab suitable for reading and lower mouth pre-embedded steel slab, pre-embedded steel slab suitable for reading and lower mouth pre-embedded steel slab carry out bolt connection with the channel-section steel provided with square hole and welded to realize being connected for upper strata out-hung panel and lower floor's out-hung panel respectively, transverse joint and vertical abutment joint internal orifice are set airtight bar and blocked with joint filler, and seam collar extension is set back lining materials and blocked with fluid sealant;The utility model improves the adjustability, adaptability and resist displacement ability of attachment structure, effectively prevents the phenomenon that seeped water caused by glue mouth cracking, significantly improves the water resistance of out-hung panel seam crossing;Lower floor's out-hung panel reserves anchor bar, is overlapped with Cast-in-situ Beam and laminated floor slab cast-in-place structural, effectively improves the globality and stability of attachment structure.

Description

A kind of prefabricated out-hung panel upper and lower opening waterproof connecting structure of prefabricated concrete structure
Technical field
It the utility model is related to building structure technology field, and in particular to one kind is used for the prefabricated plug-in wall of integral concrete The attachment structure of plate.
Background technology
In recent years, housing industrialization constantly developed.Using modern science and technology, advanced management method and industrialized The mode of production, it is directed to realizing the construction of house high efficiency, high-quality, low consumption of resources and low environmental impact.The industry of house Change has epoch-making meaning, realizes housing industry from traditional labour-intensive transformation to technology-intensive type, also will be The direction of Mirae Corp.'s development.
Prefabricated components are a kind of modes of industrialization construction, and in prefabricated components product, prefabricated out-hung panel is widely used. But at present, globality, stability are general during prefabricated out-hung panel installation, resist displacement ability, it is difficult to adjust in installation process Whole, adaptability is poor, and interface is also easy to produce infiltration phenomenon, have impact on the quality of building structure.
Utility model content
The utility model is precisely in order to avoid the weak point present in above-mentioned prior art, there is provided a kind of assembled mixes The prefabricated out-hung panel upper and lower opening waterproof connecting structure of Xtah Crude Clay structure.
The present invention adopts the following technical scheme that to solve technical problem:A kind of prefabricated out-hung panel of prefabricated concrete structure Upper and lower opening waterproof connecting structure, upper strata out-hung panel bottom pre-buried pre-buried steel suitable for reading parallel with the upper strata out-hung panel medial surface Plate, and pre-embedded bolt is set on the pre-embedded steel slab suitable for reading, lower floor's out-hung panel top and lower floor's out-hung panel medial surface It is vertical to bury a mouthful pre-embedded steel slab in advance, and the pre-buried anchor bar below the lower mouth pre-embedded steel slab, the anchor bar stretch out institute Lower floor's out-hung panel is stated, with Cast-in-situ Beam upper reinforcement and superimposed sheet cast-in-place structural bar splicing;Channel-section steel passes through spacer for bolt and spiral shell Female to be connected with the pre-embedded bolt, its bottom is welded with the lower mouth pre-embedded steel slab, by the upper strata out-hung panel and it is described under Layer out-hung panel is fixedly connected, and forms transverse joint in the upper strata out-hung panel and lower floor's out-hung panel;The horizontal stroke Mouth and lower floor's out-hung panel reserved groove suitable for reading under the upper strata out-hung panel into seam, and set in the groove Airtight bar is put, forms constructional waterproofing, the transverse joint internal orifice is blocked with joint filler, and the back of the body is set on the inside of the transverse joint collar extension Lining material, and blocked with fluid sealant.
Further, the upper strata out-hung panel and lower floor's out-hung panel each side set a notch, and Airtight bar is set in the notch;Vertical abutment joint is formed between adjacent out-hung panel with layer, is formed by the airtight bar anti- Water is constructed, and the vertical abutment joint internal orifice is blocked with joint filler, and back lining materials are set on the inside of the vertical abutment joint collar extension, and with sealing Glue blocks.
Further, the square hole of elongate configuration being set on the channel-section steel, adjusting installation site, the pre-buried spiral shell during for installing Bolt can slide before the nut is tightened in the square hole.
Further, the joint filler is refractory material.
Further, the airtight bar is made up of Duprene rubber foamed.
Further, the back lining materials are circular or flat polyethylene foamed rod.
The utility model provides a kind of prefabricated out-hung panel upper and lower opening waterproof connecting structure of prefabricated concrete structure, tool There is following beneficial effect:
1st, upper strata out-hung panel and lower floor's out-hung panel distinguish pre-buried pre-embedded steel slab suitable for reading and lower mouth pre-embedded steel slab, suitable for reading pre- Bury steel plate and lower mouth pre-embedded steel slab respectively with the channel-section steel bolt connection provided with square hole and welding with realize upper strata out-hung panel and under Being connected for layer out-hung panel, improves the adjustability, adaptability and resist displacement ability of attachment structure;
2nd, lower floor's out-hung panel reserves anchor bar, is taken with Cast-in-situ Beam upper reinforcement and laminated floor slab cast-in-place structural reinforcing bar Connect, effectively improve the globality and stability of attachment structure;
3rd, seam internal orifice is set airtight bar and blocked with joint filler, and seam collar extension is set back lining materials and blocked with fluid sealant, Construction, material dual waterproof are formed, effectively prevents the phenomenon that seeped water caused by glue mouth cracking, significantly improves out-hung panel seam crossing Water resistance.
Brief description of the drawings
Fig. 1 is structural representation of the present utility model;
Fig. 2 is the partial structural diagram at the utility model A;
Fig. 3 is the vertical view cutaway drawing at the utility model A.
The structural representation of Fig. 4 positions the utility model vertical abutment joint.
In figure:
1st, upper strata out-hung panel, 11, pre-embedded steel slab suitable for reading, 12, pre-embedded bolt, 13, spacer for bolt;2nd, the plug-in wall of lower floor Plate, 21, lower mouth pre-embedded steel slab, 22, anchor bar;3rd, channel-section steel, 31, square hole;41st, joint filler, 42, airtight bar, 43, backing Material, 44, fluid sealant;51st, Cast-in-situ Beam, 52, superimposed sheet cast-in-place structural.
Embodiment
It is new below in conjunction with this practicality to make the purpose, technical scheme and advantage of the utility model embodiment clearer Type embodiment, the technical scheme in the embodiment of the utility model is clearly and completely described, it is clear that described implementation Example is the utility model part of the embodiment, rather than whole embodiments.Based on the embodiment in the utility model, this area The every other embodiment that those of ordinary skill is obtained under the premise of creative work is not made, belongs to the utility model The scope of protection.
As shown in Figure 1 to 4, its structural relation is:Put down with the medial surface of upper strata out-hung panel 1 bottom of upper strata out-hung panel 1 The pre-buried pre-embedded steel slab 11 suitable for reading of row, and pre-embedded bolt 12 is set on pre-embedded steel slab 11 suitable for reading, the top of lower floor's out-hung panel 2 and lower floor The medial surface of out-hung panel 2 vertically buries mouthful pre-embedded steel slab 21 in advance, and in the pre-buried anchor bar 22 in the lower lower section of mouth pre-embedded steel slab 21, anchor Gu reinforcing bar 22 stretches out lower floor's out-hung panel 2, with the upper reinforcement of Cast-in-situ Beam 51 and the bar splicing of superimposed sheet cast-in-place structural 52;Channel-section steel 3 It is connected by spacer for bolt 13 and nut with pre-embedded bolt 12, its bottom is welded with lower mouth pre-embedded steel slab 21, by the plug-in wall in upper strata Plate 1 is fixedly connected with lower floor out-hung panel 2, and forms transverse joint in upper strata out-hung panel 1 and lower floor's out-hung panel 2;Laterally 1 time mouth of upper strata out-hung panel and lower floor's out-hung panel 2 reserved groove suitable for reading in seam, and in setting airtight bar 42 in groove, Constructional waterproofing is formed, transverse joint internal orifice is blocked with joint filler 41, and back lining materials 43 are set on the inside of transverse joint collar extension, and with close Sealing 44 blocks.
Preferably, upper strata out-hung panel 1 and lower floor's out-hung panel 2 each side set a notch, and are set in notch Put airtight bar 42;Vertical abutment joint is formed between adjacent out-hung panel with layer, water proof structure is formed by airtight bar 42, vertically connect Seam internal orifice is blocked with joint filler 41, sets back lining materials 43 on the inside of vertical abutment joint collar extension, and block with fluid sealant 44.
Preferably, the square hole 31 of elongate configuration being set on channel-section steel 3, adjusting installation site during for installing, pre-embedded bolt 12 exists Nut can slide before tightening in square hole 31.
Preferably, joint filler 41 is refractory material.
Preferably, airtight bar 42 is made up of Duprene rubber foamed.
Preferably, back lining materials 43 are circular or flat polyethylene foamed rod.
During specific installation, the pre-buried pre-embedded steel slab 11 suitable for reading in the bottom of upper strata out-hung panel 1, and set on pre-embedded steel slab 11 suitable for reading Pre-embedded bolt 12.Mouthful pre-embedded steel slab 21 and anchor bar 22, anchor bar 22 and Cast-in-situ Beam are buried in advance in the top of lower floor's out-hung panel 2 51 and superimposed sheet cast-in-place structural 52 overlap.After Cast-in-situ Beam 51 and the casting complete of superimposed sheet cast-in-place structural 52, lower floor's out-hung panel 2 An entirety is formed with Cast-in-situ Beam 51 and superimposed sheet cast-in-place structural 52.Channel-section steel 3 passes through spacer for bolt 13 and nut and pre-embedded bolt 12 connections, bottom and the lower full weld of mouth pre-embedded steel slab 21, upper strata out-hung panel 1 and lower floor's out-hung panel 2 are connected to be formed one it is whole Body, and form transverse joint between upper strata out-hung panel 1 and lower floor's out-hung panel 2.Meanwhile with layer between adjacent out-hung panel Vertical abutment joint be present.
Wherein, the middle part of channel-section steel 3 opens up 50mm × 70mm square holes, and spacer for bolt 13 is diameter 90mm circular steel plate, is installed During, installation can be adjusted by the way that pre-embedded bolt 12 is slided in square hole 31.
Transverse joint and vertical abutment joint internal orifice are filled using Duprene rubber foamed manufactured airtight bar 42, after installation, Airtight bar 42 should close, and form constructional waterproofing.Transverse joint and vertical abutment joint internal orifice are carried out using the joint filler 41 of fire resisting Closure.
Transverse joint and vertical abutment joint collar extension waterproof are filled out using circular or flat polyethylene foamed rod as back lining materials 43 Fill, to control the applying glue thickness of fluid sealant 44 and shape.Before gluing, it is unnecessary that out-hung panel basic unit is removed using sanding machine polishing Cement mortar, reach smooth, cleaning, after air blower removes floating ash, the uniform brushing primary coat at basic unit.After primary coat is dried, use is resistance to The fluid sealant 44 of fiery material is blocked, and Jiao Kou should be continuously and a little excessive, does not allow bubble occur.After the completion of construction, with scraping Fluid sealant 44 is struck off compacting by offset plate, and colloid edge is smeared with slot edge to be enriched, and strengthens sealing effectiveness.
It should be noted that herein, such as first and second or the like relational terms are used merely to a reality Body or operation make a distinction with another entity or operation, and not necessarily require or imply and deposited between these entities or operation In any this actual relation or order.Moreover, term " comprising ", "comprising" or its any other variant are intended to Nonexcludability includes, so that process, method, article or equipment including a series of elements not only will including those Element, but also the other element including being not expressly set out, or it is this process, method, article or equipment also to include Intrinsic key element.In the absence of more restrictions, the key element limited by sentence "including a ...", it is not excluded that Other identical element also be present in process, method, article or equipment including the key element.
Above example is only to illustrate the technical solution of the utility model, rather than its limitations;Although with reference to foregoing reality Example is applied the utility model is described in detail, it will be understood by those within the art that:It still can be to preceding State the technical scheme described in each embodiment to modify, or equivalent substitution is carried out to which part technical characteristic;And these Modification is replaced, and the essence of appropriate technical solution is departed from the spirit and model of various embodiments of the utility model technical scheme Enclose.

Claims (6)

  1. A kind of 1. prefabricated out-hung panel upper and lower opening waterproof connecting structure of prefabricated concrete structure, it is characterised in that:Upper strata is plug-in Wallboard (1) bottom pre-buried pre-embedded steel slab (11) suitable for reading parallel with upper strata out-hung panel (1) medial surface, and described suitable for reading pre- Bury and pre-embedded bolt (12) is set on steel plate (11), it is vertical with lower floor's out-hung panel (2) medial surface at the top of lower floor's out-hung panel (2) It is pre- to bury a mouthful pre-embedded steel slab (21), and the pre-buried anchor bar (22) below the lower mouth pre-embedded steel slab (21), the anchoring steel Muscle (22) stretches out lower floor's out-hung panel (2), is taken with Cast-in-situ Beam (51) upper reinforcement and superimposed sheet cast-in-place structural (52) reinforcing bar Connect;Channel-section steel (3) is connected by spacer for bolt (13) and nut with the pre-embedded bolt (12), its bottom and the lower mouth pre-buried steel Plate (21) is welded, and the upper strata out-hung panel (1) is fixedly connected with lower floor's out-hung panel (2), and in outside the upper strata Wallboard (1) and lower floor's out-hung panel (2) form transverse joint;The upper strata out-hung panel (1) in the transverse joint Lower mouth and lower floor's out-hung panel (2) reserved groove suitable for reading, and in setting airtight bar (42) in the groove, form construction Waterproof, the transverse joint internal orifice are blocked with joint filler (41), and back lining materials (43) are set on the inside of the transverse joint collar extension, and Blocked with fluid sealant (44).
  2. 2. the prefabricated out-hung panel upper and lower opening waterproof connecting structure of a kind of prefabricated concrete structure according to claim 1, It is characterized in that:The upper strata out-hung panel (1) and lower floor's out-hung panel (2) each side set a notch, and Airtight bar (42) is set in the notch;Vertical abutment joint is formed between adjacent out-hung panel with layer, passes through the airtight bar (42) water proof structure is formed, the vertical abutment joint internal orifice is blocked with joint filler (41), and the back of the body is set on the inside of the vertical abutment joint collar extension Lining material (43), and blocked with fluid sealant (44).
  3. 3. the prefabricated out-hung panel upper and lower opening waterproof connecting structure of a kind of prefabricated concrete structure according to claim 1, It is characterized in that:The square hole (31) of elongate configuration being set on the channel-section steel (3), adjusting installation site during for installing, it is described pre-buried Bolt (12) can slide before the nut is tightened in the square hole (31).
  4. A kind of 4. prefabricated out-hung panel upper and lower opening waterproof connection knot of prefabricated concrete structure according to claim 1 or 2 Structure, it is characterised in that:The joint filler (41) is refractory material.
  5. A kind of 5. prefabricated out-hung panel upper and lower opening waterproof connection knot of prefabricated concrete structure according to claim 1 or 2 Structure, it is characterised in that:The airtight bar (42) is made up of Duprene rubber foamed.
  6. A kind of 6. prefabricated out-hung panel upper and lower opening waterproof connection knot of prefabricated concrete structure according to claim 1 or 2 Structure, it is characterised in that:The back lining materials (43) are circular or flat polyethylene foamed rod.
CN201720841625.XU 2017-07-12 2017-07-12 A kind of prefabricated out-hung panel upper and lower opening waterproof connecting structure of prefabricated concrete structure Active CN207144170U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720841625.XU CN207144170U (en) 2017-07-12 2017-07-12 A kind of prefabricated out-hung panel upper and lower opening waterproof connecting structure of prefabricated concrete structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720841625.XU CN207144170U (en) 2017-07-12 2017-07-12 A kind of prefabricated out-hung panel upper and lower opening waterproof connecting structure of prefabricated concrete structure

Publications (1)

Publication Number Publication Date
CN207144170U true CN207144170U (en) 2018-03-27

Family

ID=61674892

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720841625.XU Active CN207144170U (en) 2017-07-12 2017-07-12 A kind of prefabricated out-hung panel upper and lower opening waterproof connecting structure of prefabricated concrete structure

Country Status (1)

Country Link
CN (1) CN207144170U (en)

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109235667A (en) * 2018-09-20 2019-01-18 上海君道住宅工业有限公司 Precast facade waterproof construction and precast facade
CN109707053A (en) * 2019-02-18 2019-05-03 西安市建筑设计研究院有限公司 A kind of assembly concrete building prefabrication exterior wall connecting structure
CN109763600A (en) * 2019-02-18 2019-05-17 西安市建筑设计研究院有限公司 A kind of fireproof blocking construction of composite out-fitting wallboard insulating layer
CN110130531A (en) * 2019-06-06 2019-08-16 深汕特别合作区盛腾科技工业园有限公司 A kind of fabricated shear wall and ground beam connection structure and method
CN110359584A (en) * 2019-06-14 2019-10-22 成都建工第二建筑工程有限公司 Assembly concrete wall waterproof structure
CN110387974A (en) * 2019-06-14 2019-10-29 成都建工第二建筑工程有限公司 Assembly concrete building prefabrication external wall waterproof construction method
CN110528730A (en) * 2019-09-18 2019-12-03 上海建科建筑设计院有限公司 A kind of waterproof construction of prefabricated plug-in sandwich type wall panel
CN112726871A (en) * 2020-12-30 2021-04-30 上海建工五建集团有限公司 Waterproof structure of prefabricated external wall panel
CN112814194A (en) * 2020-12-31 2021-05-18 中电建池州长智建工有限公司 Dry-type connection outer wall structure system and installation method thereof
CN113502929A (en) * 2021-06-23 2021-10-15 新余学院 Assembled steel structure building wallboard top surface gap processing structure and method
CN114135020A (en) * 2021-12-03 2022-03-04 广东二十冶建设有限公司 External wall device and construction method

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109235667A (en) * 2018-09-20 2019-01-18 上海君道住宅工业有限公司 Precast facade waterproof construction and precast facade
CN109707053A (en) * 2019-02-18 2019-05-03 西安市建筑设计研究院有限公司 A kind of assembly concrete building prefabrication exterior wall connecting structure
CN109763600A (en) * 2019-02-18 2019-05-17 西安市建筑设计研究院有限公司 A kind of fireproof blocking construction of composite out-fitting wallboard insulating layer
CN110130531A (en) * 2019-06-06 2019-08-16 深汕特别合作区盛腾科技工业园有限公司 A kind of fabricated shear wall and ground beam connection structure and method
CN110359584A (en) * 2019-06-14 2019-10-22 成都建工第二建筑工程有限公司 Assembly concrete wall waterproof structure
CN110387974A (en) * 2019-06-14 2019-10-29 成都建工第二建筑工程有限公司 Assembly concrete building prefabrication external wall waterproof construction method
CN110528730A (en) * 2019-09-18 2019-12-03 上海建科建筑设计院有限公司 A kind of waterproof construction of prefabricated plug-in sandwich type wall panel
CN112726871A (en) * 2020-12-30 2021-04-30 上海建工五建集团有限公司 Waterproof structure of prefabricated external wall panel
CN112814194A (en) * 2020-12-31 2021-05-18 中电建池州长智建工有限公司 Dry-type connection outer wall structure system and installation method thereof
CN113502929A (en) * 2021-06-23 2021-10-15 新余学院 Assembled steel structure building wallboard top surface gap processing structure and method
CN114135020A (en) * 2021-12-03 2022-03-04 广东二十冶建设有限公司 External wall device and construction method

Similar Documents

Publication Publication Date Title
CN207144170U (en) A kind of prefabricated out-hung panel upper and lower opening waterproof connecting structure of prefabricated concrete structure
CN106677440A (en) Roofing parapet water-floating structure and construction method thereof
CN104358341B (en) Building brickwork and masonry construction method of building brickwork
CN102758456B (en) Construction method of basement waterproofing projects
CN108797847A (en) A kind of assembled steel frame wall filled with masonry structural system and its construction method
CN204492025U (en) The waterproof construction of the contour deformation joint of roofing
CN112411901B (en) Waterproof and heat-insulating construction process for roof deformation joint
CN208934190U (en) A kind of assembled steel frame wall filled with masonry structural system
CN104790684A (en) Wall hole opening construction method adopting encased angle iron method
CN208718152U (en) Embedded ALC wallboard shock-resistant node structure
CN108571016A (en) The deformation joint structure and construction method of underground pipe gallery
CN106988440A (en) A kind of waterproof construction and its construction method at subway station main body and accessory interface
CN2929033Y (en) External wall heat insulation structure of building water-proof and anti-cracks
CN106869169A (en) A kind of three-dimensional interval construction method of underground pipe gallery warehouse
CN111042392A (en) Construction method of SDHH type disassembly-free formwork foam concrete partition wall
CN207959289U (en) Structure is repaired in a kind of leak for basement post-pouring zone position
CN206220277U (en) The simple type deformation joint structure of site operation
CN206616711U (en) A kind of waterproof construction at subway station main body and accessory interface
CN115288195B (en) Waterproof construction method for foundation pile top of anti-pulling pipe pile with basement
CN206205166U (en) It is a kind of can synchronous crossed construction outer wall of basement waterproofing protection structure
CN206467846U (en) A kind of assembled goes along with sb. to guard him Side fascia transverse joint node component
CN203905265U (en) Building block for assisting function pipeline in penetrating through plain brick wall
CN206438609U (en) The bean column node slip casting mould and slurry injection structure of building of steel frame construction
CN102127940A (en) Honeycomb structure wall body
CN205804419U (en) The tenon formula joint waterproofing structure of concrete waist rail embedded structure side wall

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: 518057 5F, ante building, No.5 Qimin Road, Langshan No.2 Road, North Science Park, Nanshan District, Shenzhen City, Guangdong Province

Patentee after: China Shipping Construction Co.,Ltd.

Address before: 518052 5F, ante building, No.5 Qimin Road, Langshan No.2 Road, North Science Park, Nanshan District, Shenzhen City, Guangdong Province

Patentee before: Shenzhen Zhonghai Construction Co.,Ltd.