- CN206859563U CN206859563U CN201720674833.5U CN201720674833U CN206859563U CN 206859563 U CN206859563 U CN 206859563U CN 201720674833 U CN201720674833 U CN 201720674833U CN 206859563 U CN206859563 U CN 206859563U
- Authority
- CN
- China
- Prior art keywords
- ceramic tile
- wall
- copper wire
- hang structure
- hanging hang
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Abstract
The utility model discloses a kind of half hanging hang structure of ceramic tile metope, solve in the prior art that ceramic tile easily comes off from wall, the problem of potential safety hazard be present, its drip irrigation device is:Including wall and ceramic tile, also include the copper wire being connected between wall and ceramic tile, the wall is provided with nail, the back side of the ceramic tile is provided with opening up mounting groove, mounting groove is fixed in one end of the copper wire and the other end is fixed on nail, even if reaching ceramic tile to come off with wall, also it is unlikely to the purpose to drop.
Description
Technical field
Construction wall construction field is the utility model is related to, more specifically, it relates to a kind of semi-mounted knot of ceramic tile metope
Structure.
Background technology
Tiling has the characteristics that attractive in appearance, practical, durable, ceramic tile is colour-fast for many years, even if dirty as decoration on metope
Also it is easy to clear up, so be widely used.
Due on floor tile wall have the advantages that to allow decoration air, it is attractive in appearance, have class, so the finishing side using wall on floor tile
Formula is applied more and more extensive.But because floor tile is different with the physical characteristic of wall brick, wall brick water absorption rate general 10,
And floor tile water absorption rate only has 1 percent, floor tile water absorption rate easily causes hollowing, the time has grown brick and easily taken off well below wall brick
Fall, potential safety hazard be present.
Publication No. CN205742841U Chinese patent document is now retrieved, a kind of entitled, glass of anti-dropout
Change brick wall, described in its specification, the vitreous brick wall of the anti-dropout by increase pre-buried copper wire and gum layer, clay layer it
Between frictional force, prevent vitrified tile and Nian Jie delamination layer.
But sunk or when hollowing occur in ceramic tile and metope when there is metope, by copper wire and gum layer, clay
Frictional force between layer is not enough to support full brick not drop, however it remains potential safety hazard.
Utility model content
The purpose of this utility model is to provide a kind of half hanging hang structure of ceramic tile metope, is come off even if reaching ceramic tile with wall,
Also it is unlikely to the purpose to drop.
Above-mentioned technical purpose of the present utility model technical scheme is that:The half of a kind of ceramic tile metope
Hanging hang structure, including wall and ceramic tile, in addition to the copper wire being connected between wall and ceramic tile, the wall are provided with nail, institute
The back side for stating ceramic tile is provided with opening up mounting groove, and one end of the copper wire is fixed on mounting groove and the other end is fixed on nail
Son.
By using above-mentioned technical proposal, wall is provided with nail, and ceramic tile offers mounting groove, fixed in mounting groove behind
There is copper wire, the other end of copper wire is fixed on nail, so as to which when ceramic tile comes off from wall, copper wire hangs over ceramic tile on wall,
So that ceramic tile will not drop from wall, reduce ceramic tile and drop and pound the risk of people;The common wire such as copper wire and iron wire
It is stable compared to property, it is not easy to get rusty, and it is softer, easily bending, easy to operation.
Preferably, the depth of the mounting groove is the half of ceramic tile.
By using above-mentioned technical proposal, while aspect buries copper wire, the intensity of ceramic tile ensure that.
Preferably, the mounting groove includes being used to place the metallic channel of copper wire and opening upwards and located at metallic channel end
And it is circular fixing groove.
By using above-mentioned technical proposal, in embedded copper wire, first one end of copper wire is knotted and is placed in fixing groove, is made
Copper wire passes ceramic tile along metallic channel, and copper wire is bonded in fixing groove and metallic channel by blend compounds water.
Preferably, connecting pole is provided with the fixing groove, the connecting pole is provided with the threading hole passed through for copper wire.
By using above-mentioned technical proposal, when copper wire is fixed in fixing groove, copper wire is first passed through into threading hole, and will
Copper wire is wrapped on connecting pole, then copper wire is bonded in fixing groove with glue, so that copper wire is firmly fixed in fixing groove.
Preferably, the nail is provided with the threading hole passed through for copper wire.
By using above-mentioned technical proposal, first copper wire is passed through in the threading hole on nail, be then wound around on nail, with
Copper wire is set to be fixed on nail more firm.
Preferably, the wall include basic unit, the screed-coat on the outside of basic unit, the gum layer on the outside of screed-coat with
And the surface layer on the outside of gum layer.
By using above-mentioned technical proposal, before brushing gum layer, first the dirt of basic unit is removed, then one layer of brush is levelling
Layer, hollowing is filled up, so that wall surface levelling, the brushing gum layer after screed-coat parches, so that basic unit is more firm, on gum layer
Brushing surface layer.
Preferably, the screed-coat is cement sand bed.
It is again levelling to the progress of former metope using common cement sand bed by using above-mentioned technical proposal, avoid out
Now because metope injustice causes the phenomenon of ceramic tile patch loosely.
Preferably, the gum layer is interface agent layer.
By using above-mentioned technical proposal, interfacial agents have very strong permeability, can penetrate into wall, so that basic unit is more
Firmly, the bonding force of ceramic tile and former metope is increased.
Preferably, the surface layer is ceramic tile glue-line.
By using above-mentioned technical proposal, ceramic tile glue-line has very strong water-retaining property so that does not allow between ceramic tile and wall
Moisture-sensitive so that copper wire is not easy to get rusty in ceramic tile.
In summary, the utility model has the advantages that:
Firstth, one end of copper wire through threading hole and is wrapped on connecting pole, and copper wire passes the upper of ceramic tile by metallic channel
Copper wire, is fixed in fixing groove and metallic channel by end using glue;The other end of copper wire is through threading hole and is wrapped on nail,
One layer of cement mortar is smeared between ceramic tile and wall, and nail and copper wire are embedded in cement mortar, when ceramic tile is from wall
When coming off, copper wire is by ceramic tile hung on a wall so that ceramic tile will not drop from wall, reduce ceramic tile and drop and pound the wind of people
Danger;
Secondth, screed-coat is carried out again levelling using cement mortar to former metope, is avoided the occurrence of because metope injustice causes
The phenomenon of ceramic tile patch loosely;For gum layer using interfacial agents brushing on the outside of screed-coat, interfacial agents have very strong permeability, can be with
Wall is penetrated into, so that basic unit is more firm, the bonding force of increase ceramic tile and former metope;Surface layer uses glue for tile, and glue for tile has
Very strong water-retaining property so that be not easy to make moist between ceramic tile and wall.
Brief description of the drawings
Fig. 1 is the overall structure diagram of the present embodiment;
Fig. 2 is the structural representation of nail in the present embodiment;
Fig. 3 is the structural representation when ceramic tile back side is provided with copper wire in the present embodiment;
Fig. 4 is partial structural diagram when copper wire is removed at the ceramic tile back side in the present embodiment;
Fig. 5 is the part-structure schematic diagram of the present embodiment.
In figure:1st, wall;11st, basic unit;12nd, screed-coat;13rd, gum layer;14th, surface layer;141st, metope tooth;2nd, ceramic tile;21、
Brick body tooth;22nd, fixing groove;23rd, metallic channel;24th, connecting pole;241st, threading hole;3rd, copper wire;4th, nail;41st, threading hole.
Embodiment
The utility model is described in further detail below in conjunction with accompanying drawing.
This specific embodiment is only that it is not to limitation of the present utility model, ability to explanation of the present utility model
Field technique personnel can make the modification of no creative contribution to the present embodiment as needed after this specification is read, but
As long as all protected in right of the present utility model by Patent Law.
Embodiment:A kind of half hanging hang structure of ceramic tile metope, as shown in Figures 1 and 2, including wall 1 and ceramic tile 2, wall 1 lean on
The one side of nearly ceramic tile 2 is brushed with some metope teeth 141, and metope tooth 141 solidifies to be formed by glue for tile, and metope tooth 141 is wave
Shape, metope tooth 141 protrude three to five millimeters of 1 surface of wall.Being followed closely on wall 1 has nail 4, on the metope of each piece of top of ceramic tile 2
All nail has two nails 4, and threading hole 41 is offered on nail 4.Connected between ceramic tile 2 and wall 1 by copper wire 3, the one of copper wire 3
End is fixed on inside ceramic tile 2 by glue, and the other end of copper wire 3 is wrapped on nail 4 through the threading hole 41 on nail 4,
Ceramic tile 2 is pasted onto on wall 1 by cement mortar, and copper wire 3 and nail 4 are embedded in cement mortar.
As shown in Figure 3 and Figure 4, the back side of ceramic tile 2 is brushed with seven corrugated brick body teeth 21, and brick body tooth 21 passes through glue for tile
Solidification is formed, and brick body tooth 21 is waveform, and brick body tooth 21 protrudes three to five millimeters of 2 back side of ceramic tile.The back side of ceramic tile 2 is further opened with
Two fixing grooves 22, fixing groove 22 are circle, and the depth of fixing groove 22 is the half of the thickness of ceramic tile 2, and fixing groove 22 is apart from ceramic tile 2
The distance of upper end is the height of 1/3rd ceramic tiles 2, and a cylindrical connecting pole 24, connecting pole 24 are reserved in fixing groove 22
Height be 3/4ths of the depth of fixing groove 22, offer threading hole 241 on connecting pole 24.The back side of ceramic tile 2 is further opened with
Parallel to the metallic channel 23 of the short transverse of ceramic tile 2, the depth of metallic channel 23 is the half of the thickness of ceramic tile 2, and metallic channel 23 is communicated in
Fixing groove 22 and the upper end of ceramic tile 2.
Copper wire 3 is passed through into threading hole 241, and copper wire 3 is wrapped on connecting pole 24, then makes copper wire 3 along metallic channel 23
The upper end of ceramic tile 2 is passed, finally copper wire 3 is bonded in fixing groove 22 and metallic channel 23 with glue, so as to which copper wire 3 be fixed.
As shown in figure 5, wall 1 includes basic unit 11, screed-coat 12, gum layer 13 and surface layer 14.First by the dirt of basic unit 11
Dirt removes, and then brushing screed-coat 12, screed-coat 12 use cement mortar, by cement mortar brushing on the outside of basic unit 11, treats water
After cement mortar parches, brushing gum layer 13;Gum layer 13 uses interfacial agents, by interfacial agents brushing at the outside of screed-coat 12, interface
Agent has very strong permeability so that screed-coat 12 and basic unit 11 are more firm, while it is bonding with former metope to increase ceramic tile 2
Power;One layer of surface layer 14 is brushed in the outside of gum layer 13, surface layer 14 uses glue for tile, and glue for tile has very strong water-retaining property, made
Obtain ceramic tile 2 to be not easy to make moist with wall 1, the copper wire 3 being clipped between ceramic tile 2 and wall 1 is also not easy to get rusty.Metope tooth 141 is logical
Scraper plate is crossed to scrape on surface layer 14.
Operation principle and process:One end of copper wire 3 is through threading hole 241 and is wrapped on connecting pole 24, and copper wire 3 is by leading
Wire casing 23 passes the upper end of ceramic tile 2, and copper wire 3 is fixed in fixing groove 22 and metallic channel 23 using glue;The other end of copper wire 3
Through threading hole 41 and it is wrapped on nail 4, ceramic tile 2 is fixed with wall 1 by cement mortar, and nail 4 and copper wire 3 are embedded in
In cement mortar.When ceramic tile 2 comes off from wall 1, copper wire 3 is by the hung on a wall of ceramic tile 2 so that ceramic tile 2 will not be from wall 1
Drop, reduce ceramic tile 2 and drop and pound the risk of people.
Claims (9)
1. a kind of half hanging hang structure of ceramic tile metope, including wall (1) and ceramic tile (2), it is characterized in that:Also include being connected to wall
(1) copper wire (3) between ceramic tile (2), the wall (1) are provided with nail (4), and the back side of the ceramic tile (2) is provided with opening court
On mounting groove, one end of the copper wire (3) is fixed on mounting groove and the other end is fixed on nail (4).
2. a kind of half hanging hang structure of ceramic tile metope according to claim 1, it is characterized in that:The depth of the mounting groove is porcelain
The half of brick (2).
3. a kind of half hanging hang structure of ceramic tile metope according to claim 2, it is characterized in that:The mounting groove includes being used to put
Put the metallic channel (23) of copper wire (3) and opening upwards and located at metallic channel (23) end and for circular fixing groove (22).
4. a kind of half hanging hang structure of ceramic tile metope according to claim 3, it is characterized in that:It is provided with the fixing groove (22)
Connecting pole (24), the connecting pole (24) are provided with the threading hole (241) passed through for copper wire (3).
5. a kind of half hanging hang structure of ceramic tile metope according to claim 1, it is characterized in that:The nail (4) is provided with and supplies copper
The threading hole (41) that silk (3) passes through.
6. a kind of half hanging hang structure of ceramic tile metope according to claim 1, it is characterized in that:The wall (1) includes basic unit
(11), the screed-coat (12) on the outside of basic unit (11), the gum layer (13) on the outside of screed-coat (12) and located at gum
Surface layer (14) on the outside of layer (13).
7. a kind of half hanging hang structure of ceramic tile metope according to claim 6, it is characterized in that:The screed-coat (12) is cement
Screed.
8. a kind of half hanging hang structure of ceramic tile metope according to claim 6, it is characterized in that:The gum layer (13) is interface
Oxidant layer.
9. a kind of half hanging hang structure of ceramic tile metope according to claim 6, it is characterized in that:The surface layer (14) is glue for tile
Layer.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720674833.5U CN206859563U (en) | 2017-06-10 | 2017-06-10 | A kind of half hanging hang structure of ceramic tile metope |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720674833.5U CN206859563U (en) | 2017-06-10 | 2017-06-10 | A kind of half hanging hang structure of ceramic tile metope |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206859563U true CN206859563U (en) | 2018-01-09 |
Family
ID=60831170
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720674833.5U Active CN206859563U (en) | 2017-06-10 | 2017-06-10 | A kind of half hanging hang structure of ceramic tile metope |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206859563U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113073802A (en) * | 2021-04-23 | 2021-07-06 | 华北水利水电大学 | External wall tile structure and construction method thereof |
CN115217282A (en) * | 2022-07-21 | 2022-10-21 | 中国五冶集团有限公司 | Anti-falling method for wall natural surface stone pasting |
-
2017
- 2017-06-10 CN CN201720674833.5U patent/CN206859563U/en active Active
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113073802A (en) * | 2021-04-23 | 2021-07-06 | 华北水利水电大学 | External wall tile structure and construction method thereof |
CN115217282A (en) * | 2022-07-21 | 2022-10-21 | 中国五冶集团有限公司 | Anti-falling method for wall natural surface stone pasting |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206859563U (en) | A kind of half hanging hang structure of ceramic tile metope | |
CN207063397U (en) | A kind of plaster ceramic tile metope | |
CN105155794B (en) | The wet hanging method of stone material and its structure of a kind of gypsum aerating brick wall | |
CN206545282U (en) | Toilet bathroom waterproof construction | |
CN205025000U (en) | Wet structure of hanging of stone material of gypsum air entrainment brick wall face | |
CN202714689U (en) | Binding mouth structure of stepping carpet | |
CN206220272U (en) | Ground hot water lays heating toilet doorway sealing damp proof insulation construction | |
CN100462515C (en) | External wall ceramic tile wall surface with heat insulation function and constructing method thereof | |
CN201747021U (en) | Retaining structure of decorating material layer and building outer wall | |
CN201125520Y (en) | Brick layer special trowel for plastering | |
CN206707192U (en) | A kind of non-slip floor brick for being easy to cleaning | |
CN206571071U (en) | A kind of step ceramics paving structure | |
CN2934449Y (en) | Combined type natural sandstone board wall surface | |
CN109826404A (en) | A kind of wall decoration technique | |
CN206917143U (en) | A kind of decorative panel for building | |
CN107090959A (en) | The wall and ceramic tile for posting ceramic tile paste technique | |
CN207453363U (en) | Safety-type Anti-coming off glazed tile | |
CN204983447U (en) | Building external tile face structure | |
CN207538383U (en) | Wall device on a kind of floor tile for indoor wall decoration | |
CN206581546U (en) | A kind of accomodation ground structure | |
CN204040378U (en) | A kind of stone material is pasted and protection system | |
CN104453190B (en) | The processing method of ghost after a kind of tile laying | |
CN205677187U (en) | A kind of taper hole copper wire strengthens the building Imitation Rock Porcelain Tiles of bonding | |
CN205135250U (en) | Window board that joint strength is high | |
CN208618718U (en) | Water guide system at bottom of stone terrace |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |