CN105155794B - The wet hanging method of stone material and its structure of a kind of gypsum aerating brick wall - Google Patents

The wet hanging method of stone material and its structure of a kind of gypsum aerating brick wall Download PDF

Info

Publication number
CN105155794B
CN105155794B CN201510505722.7A CN201510505722A CN105155794B CN 105155794 B CN105155794 B CN 105155794B CN 201510505722 A CN201510505722 A CN 201510505722A CN 105155794 B CN105155794 B CN 105155794B
Authority
CN
China
Prior art keywords
gypsum
stone material
brick wall
aerating brick
stone
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510505722.7A
Other languages
Chinese (zh)
Other versions
CN105155794A (en
Inventor
段庆年
郑建华
陈国谦
肖艳艳
邓泽敏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Guangtian Group Ltd By Share Ltd
Original Assignee
Shenzhen Guangtian Group Ltd By Share Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen Guangtian Group Ltd By Share Ltd filed Critical Shenzhen Guangtian Group Ltd By Share Ltd
Priority to CN201510505722.7A priority Critical patent/CN105155794B/en
Publication of CN105155794A publication Critical patent/CN105155794A/en
Application granted granted Critical
Publication of CN105155794B publication Critical patent/CN105155794B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The wet hanging method of stone material and its structure of a kind of gypsum aerating brick wall, method are comprised the following steps:S1, metope cleaning;S2, metope are surveyed and set level, snap the line, positioning;S3, material prepare;S4, perforate, wear screw rod;S5, construction of waterproof layer;S6, rack plating zinc-iron net;S7, the rule side of orlop stone material, row's plate are fixed, are in the milk;S8:The rule side of more top stone material, row's plate are fixed, are in the milk.A kind of stone material wet hanging hang structure of gypsum aerating brick wall, including built by laying bricks or stones by many lithoexpulsium paste aerated bricks gypsum aerating brick wall, be fixed on the positive zinc-plated iron net of gypsum aerating brick wall, solidification sizing in the online cement sand bed of the galvanized iron, multiple rows of stone material cemented on cement sand bed, copper wire, screw rod, multiple band irons being adapted to the gypsum aerating brick wall width.It is of the invention can using cement mortar wet extension stone material on gypsum aerating brick wall, overcome cement mortar cannot on gypsum aerating brick wall plaster defect.

Description

The wet hanging method of stone material and its structure of a kind of gypsum aerating brick wall
Technical field
The present invention relates to interior decoration field, the especially wet hanging method of the stone material of gypsum aerating brick wall and its structure.
Background technology
General wall-surface stone construction method has two kinds, and one is constructed using dry-hanging method, and another kind uses cement mortar wet combining.Room Interior use dry-hanging method construction, due to needing to make keel with angle steel, construction thickness is generally 8~10cm, greatly reduces indoor net Sky, and construction cost is higher;And the construction of cement mortar wet combining method is used, construction thickness only has 3~4cm, but construction quality is difficult To ensure, easily there is hollowing and obscission.Especially in south, with the rise of spring temperature, indoor generation moisture regain phenomenon When, stone surface often easily condenses, and is covered with the globule, and dew penetrates into back face of stone along the crack of stone of wall-surface stone, over time, Wall-surface stone easily comes off naturally.Inherently a kind of new material of gypsum aerated bricks, environmental protection, lightweight, speed of application are fast, have constructed It is good into rear planarization, the direct Puttying of plaster or construction of waterproof layer can not be directly done, but as toilet place metope waterproof It is required that higher, and gypsum aerating brick wall in itself can not (gypsum aerated bricks be in itself with ordinary cement with conventional cement mortar plaster Mortar bonding is poor), can only be plastered with brushing gypsum, water proofing property and stretching resistance are poor in itself for brushing gypsum, use gypsum aerated bricks The division wall of washing one's hands built by laying bricks or stones, its gypsum aerated bricks are unable to nailing or drilling suspension weight, and traditional wet extension method construction technology cannot Meet and hang the requirement of patch stone material on its surface.
The content of the invention
The technical problem to be solved in the present invention is to provide a kind of using cement mortar wet extension stone material on gypsum aerating brick wall Wet hanging method and its structure.
In order to solve the above-mentioned technical problem, the invention provides a kind of wet hanging method of stone material of gypsum aerating brick wall, bag Include following steps:
S1, metope cleaning:The positive adhesive of gypsum aerating brick wall and attachment are cleaned out;
S2, metope are surveyed and set level, snap the line, positioning:With S3 spirit levels in the front of gypsum aerating brick wall every a segment distance The bench mark that survey sets out, then ejects horizontal line, as the level control line that walltile is constructed, is used further according to stone material typesetting figure and swashed Light infrared ray gradienter ejects grid lines on metope, and determines every piece of extension site of stone material;
S3, material prepare:The stone material marched into the arena is carried out into walkthrough according to metope typesetting scheme, then by every on grid lines on wall The hanging point position of block stone material makes the top-slitting and back side position of opening of stone material, the perforate and fluting side insertion, and will Copper wire one end is penetrated from the perforate of stone material and the open top from fluting is passed, and cloud stone glue is irrigated in fluting and perforate and is fixed Copper wire, according to gypsum aerated bricks wall thickness, is extracted than gypsum aerated bricks wall thickness more long bolt, and a pad is vertically connected in its one end Piece, prepares the band iron with metope length adaptation;
S4, perforate, wear screw rod:The through hole through front and back is drilled with the stone material hanging point position of gypsum aerating brick wall, The gypsum aerated bricks at through hole two ends cut out pit within the walls again, and then screw rod is pierced into through hole from the gypsum aerating brick wall back side, Its pad is placed in the pit bottom at the gypsum aerating brick wall back side, the other end expose from the gypsum positive pit of aerating brick wall and Nut one is tightened at the end, finally fills up gypsum aerating brick wall former and later two pits with gypsum masonry mortar;
S5, construction of waterproof layer:Treat on wall that all water power spools have been laid and pressure testing is checked and accepted, then with gypsum masonry mortar by institute After having wire casing hole and wall defect mending complete, construction of waterproof layer is then carried out;
S6, rack plating zinc-iron net:After construction of waterproof layer it is complete and check and accept after, by design height select zinc-plated iron net, by galvanized iron Net completely hangs over gypsum aerating brick wall front, and nut two is tightened after multiple band irons are horizontally installed on each row's screw rod makes band iron press solid plating Zinc-iron net;
S7, the rule side of orlop stone material, row's plate are fixed, are in the milk:According to level control line and arrangement requirement, first by orlop The bottom cloud stone glue of back face of stone is fixed in basic unit where gypsum aerating brick wall, then adjusts the upright and vertical of stone material Degree, until meeting construction inspection rules requirement, to ensure that room is upright, then the copper wire of stone material is bundled in the screw rod for hanging site On, so as to complete the rule side of orlop stone material, row's plate fix, the cement mortar perfusion being finally stirred to this layer of back of the body of stone material It is between face and gypsum aerating brick wall front and slotting closely knit, stone material is gently then beaten with rubber hammer, make cement mortar vibration compacting;
S8:The rule side of more top stone material, row's plate are fixed, are in the milk:According to level control line and arrangement requirement, will with cloud stone glue The bottom of the back face of stone of more last layer is fixed on mounted stone material, then adjusts the upright and vertical of this layer of stone material Degree, until meeting construction inspection rules requirement, then the copper wire of stone material is bundled on the screw rod for hanging site;To finally be stirred Then cement mortar perfusion is gently struck between this layer of back side and gypsum aerating brick wall front of stone material and slotting closely knit with rubber hammer Stone material is broken, makes cement mortar vibration compacting, from the bottom up, in layer up repeat this step until design height, waits water Cement mortar solidifies.
It is preferred that, the length that the copper wire exposes the perforate of stone material is 30mm~50mm, exposes the length of fluting It is 100mm~150mm.
It is preferred that, the perforate of the stone material and the distance slotted to its side are at least 100mm.
It is preferred that, the quantity of perforate on same stone material and fluting be at least 2 and adjacent spacing be 300~ 500mm。
It is preferred that, than the thickness 10mm long of gypsum aerating brick wall, pad length is 30mm, width to the spiro rod length Spend for 30mm, thickness are 3mm, band iron width is that 30mm, thickness are 2mm, pit width is 50mm, highly for 50mm, depth are 20mm, the steel wire diameter of zinc-plated iron net is not less than 1mm and mesh width is not less than 10mm.
Present invention also offers a kind of wet hanging hang structure of stone material of gypsum aerating brick wall, including built by many lithoexpulsium paste aerated bricks The gypsum aerating brick wall built, the positive zinc-plated iron net of gypsum aerating brick wall, solidification sizing are fixed in the zinc-plated iron net On cement sand bed, multiple rows of stone material cemented on cement sand bed, copper wire, screw rod, multiple with the gypsum aerating brick wall The band iron of width adaptation;
The top side of the stone material is provided with least two flutings, and back face of stone is provided with the opening to the fluting of insertion respectively Hole, the copper wire runs through each perforate and fluting and two ends are stretched out from perforate and fluting respectively, and the perforate and fluting are filled with Cloud stone glue is so as to fixed copper wire;
Multiple screw rods are fastened on gypsum aerating brick wall and end protrudes from gypsum aerating brick wall front, the position of each screw rod Put the perforate respectively with stone material to correspond, the stone material completely hangs institute by copper wire and screw rod end bind, zinc-plated iron net State on gypsum aerating brick wall, each band iron is connected laterally at the screw rod of every row's stone material and is fastened by nut two, the band iron will Zinc-plated iron net pressure is solid in gypsum aerating brick wall front, and the cement sand bed is laid on gypsum aerating brick wall front and solidifies sizing Online in the galvanized iron, the stone material is cemented on the cement sand bed.
Described screw rod one end is fixedly connected a pad, and the front and back of the gypsum aerating brick wall is each with screw rod intersection If a pit, the screw rod is placed in the pit bottom at the back side through the gypsum aerating brick wall and pad, and the screw rod other end is from just The pit in face is stretched out and is fastened by nut one, and the nut one is equally placed in positive pit bottom, and all pits pass through gypsum Masonry mortar is filled and led up.
The copper wire expose the length of the perforate of stone material for 30mm~50mm, expose the length of fluting for 100mm~ 150mm。
The distance of the perforate of the stone material and fluting to its side is at least 100mm, perforate on same stone material and opens The quantity of groove is at least 2 and adjacent spacing is 300~500mm.
It is preferred that, than the thickness 10mm long of gypsum aerating brick wall, pad length is 30mm, width to the spiro rod length Spend for 30mm, thickness are 3mm, band iron width is that 30mm, thickness are 2mm, pit width is 50mm, highly for 50mm, depth are 20mm, the steel wire diameter of zinc-plated iron net is not less than 1mm and mesh width is not less than 10mm.
The wet hanging method of stone material and its structure of gypsum aerating brick wall of the present invention have the following advantages that:
1st, compared with conventional wet hangs method, the present invention passes through screw rod, nut and band iron by the full gypsum aerated bricks of galvanized iron screen cloth Wall front, shapes online in galvanized iron after cement mortar solidification, forms firm cement sand bed, it is to avoid cement mortar is directly criticized Swing in gypsum aerating brick wall, overcome cement mortar cannot on gypsum aerating brick wall plaster defect;And stone material still can With cement mortar strong bond, overcoming traditional wet extension method construction technology cannot hang patch stone material on gypsum aerating brick wall surface Defect.
2nd, compared with general wet combining method, metope can directly construct without levelling;Without being improved to cement mortar, adopt With conventional cement mortar, fixed structure such as screw rod, band iron, nut etc. are using existing, that is to say, that institute's recruitment Tool simplicity is easy to get, and construction method is convenient, advantageously ensures that construction quality, and construction cost is lower, and speed of application is faster.
3rd, stone material thickness and conventional wet the extension method obtained after completing are close, it is thinner than dry-hanging method a lot, advantageously ensure that interior Headroom size.
Brief description of the drawings
With reference to the accompanying drawings and detailed description, the present invention is described in further detail:
Fig. 1 is a kind of front view of the wet hanging hang structure of stone material of gypsum aerating brick wall of the invention.
Fig. 2 is a kind of cross sectional view of the wet hanging hang structure of stone material of gypsum aerating brick wall of the invention.
Fig. 3 is the partial enlarged drawing in A portions in Fig. 2.
Fig. 4 is the rearview of stone material.
Fig. 5 is the sectional view in Fig. 4 along line B-B.
Reference:Gypsum aerating brick wall -1, pit -101, screw rod -2, pad -203, nut one -201, nut Two -202, copper wire -204, cement sand bed -3, stone material -4, fluting -401, perforate -402, zinc-plated iron net -5 are flat Iron -6.
Specific embodiment
It is as depicted in figs. 1 and 2 a kind of front view and horizontal stroke of the wet hanging hang structure of stone material 4 in the face of gypsum aerating brick wall 1 of the invention Cut open figure, including built by laying bricks or stones by many lithoexpulsium paste aerated bricks gypsum aerating brick wall 1, be fixed on the positive plating of gypsum aerating brick wall 1 Cement sand bed 3, the multiple rows of stone material cemented on cement sand bed 3 of zinc-iron net 5, solidification sizing in the zinc-plated iron net 5 4th, copper wire 204, screw rod 2, multiple band irons 6 being adapted to the width of gypsum aerating brick wall 1.
As Fig. 4 and Fig. 5 for stone material 5 rearview and stone material 5 along line B-B sectional view, the top side of the stone material 4 sets Have 2 (or more) fluting 401, the back side of stone material 4 be provided with 2 difference insertions to each fluting 401 perforate 402, the stone material 1 Perforate 402 and fluting 401 distance to its side be at least 100mm, the quantity of the perforate 402 on same stone material 4 is at least For 2 and adjacent spacing be 300~500mm, that is to say, that fluting 401 and perforate 402 quantity according to the width of stone material 4 set, The larger fluting of stone material 4 401 of volume and more than 2 of the quantity of perforate 402.The copper wire 204 is through each perforate 402 and fluting 401 and two ends 401 stretched out from perforate 402 and fluting respectively, the length that the copper wire 204 exposes the perforate 402 of stone material 4 is 30mm ~50mm, expose fluting 401 length be 100mm~150mm.The perforate 402 and fluting 401 are filled with cloud stone glue so as to solid Determine copper wire 204.
Referring to Fig. 1~Fig. 3, the one end of the screw rod 2 is vertically fixedly connected a pad 203, and (length is 30mm, width is 30mm, thickness are 3mm), multiple screw rods 2 are fastened on gypsum aerating brick wall 1 and end protrudes from the front of gypsum aerating brick wall 1, The front and back of the gypsum aerating brick wall 1 respectively sets a pit 101 with the intersection of screw rod 2, and each screw rod 2 passes through the gypsum Aerating brick wall 1 and pad 203 are placed in the bottom of pit 101 at the back side, and the other end of screw rod 2 stretches out and pass through from positive pit 101 Nut 1 is fastened, and the nut 1 is equally placed in the bottom of positive pit 101, and all pits 101 build sand by laying bricks or stones by gypsum Slurry is filled and led up, and the effect of pit 101 is to keep wall surface levelling and the pad 203 for screw rod 2 and nut 1 to provide fixed sky Between, reduce thickness.The length of the screw rod 2 than gypsum aerating brick wall 1 thickness 10mm long, pit width be 50mm, be highly 50mm, depth are 20mm, that is to say, that it is 30mm that screw rod 2 protrudes the positive length of gypsum aerating brick wall 1, and the prominent length can root Set according to design requirement, no more than stone material 4 the distance between to gypsum aerating brick wall 1, the stone material thickness with dry hanging construction Compare, the occupancy thickness of stone material 4 of this structure is smaller.
The position of each screw rod 2 corresponds with the perforate 402 of stone material 4 respectively, and the stone material 4 passes through copper wire 204 and institute The end bind of screw rod 2 is stated, zinc-plated iron net 5 (its steel wire diameter is not less than 1mm and mesh width is not less than 10mm) is full by air nail Hang on the gypsum aerating brick wall 1, each band iron 6 (band iron width is 30mm, thickness is 2mm) is connected laterally at every row's stone material 4 screw rod 2 is simultaneously fastened by nut 2 202, and zinc-plated iron net 5 is pressed and consolidated in the front of gypsum aerating brick wall 1 by the band iron 6, described Cement sand bed 3 is laid on the front of gypsum aerating brick wall 1 and solidifies sizing in the zinc-plated iron net 5, and the stone material 4 is cemented in On the cement sand bed 3.
The present embodiment additionally provides the wet hanging method of stone material 4 of above-mentioned gypsum aerating brick wall 1, comprises the following steps:
S1, metope cleaning:The positive adhesive of gypsum aerating brick wall 1 and attachment are cleaned out, putlog hole and water is repaired Wire pipe pre-embedding groove rejected region.
S2, metope are surveyed and set level, snap the line, positioning:With S3 spirit levels in the front of gypsum aerating brick wall 1 every a segment distance The bench mark that survey sets out, then ejects horizontal line, as the level control line that stone material 4 is constructed, is used further according to the typesetting figure of stone material 4 and swashed Light infrared ray gradienter ejects grid lines on metope, and determines every piece of extension site of stone material 4.
S3, material prepare:The stone material 4 marched into the arena is carried out into walkthrough according to metope typesetting scheme, then by grid lines on wall The hanging point position of every block of stone material 4 makes top-slitting 401 and the position of back side perforate 402 of stone material 4, the perforate 402 and fluting 401 side insertions, and the one end of copper wire 204 is penetrated from the perforate 402 of stone material 4 and open top from fluting 401 is passed, Perfusion cloud stone glue fixes copper wire 204 in fluting 401 and perforate 402, according to the thickness of gypsum aerating brick wall 1, extracts than gypsum aerating The screw rod 2 of the thickness of brick wall 1 10mm long, a diameter of 8mm, the pad 203 of the intrinsic a piece of 30mm*30mm*3mm of its one end vertical welding, Prepare and the band iron 6 that metope length adaptation, width are 30mm, thickness is 2mm.
S4, perforate, wear screw rod 2:The hanging point position of stone material 4 with electric hammer in gypsum aerating brick wall 1 is drilled with through front and the back of the body The through hole of a diameter of 10mm in face, then through hole two ends gypsum aerating brick wall 1 in cut out width for 50mm, highly for 50mm, Depth is the pit 101 of 20mm, and then screw rod 2 is pierced into through hole from the back side of gypsum aerating brick wall 1, and its pad 203 is placed in stone The bottom of pit 101 at the back side of cream aerating brick wall 1, the other end exposes and at the end from the positive pit 101 of gypsum aerating brick wall 1 Nut 1 (nut 1 is equally placed in the bottom of 1 positive pit of gypsum aerating brick wall 101) is tightened, is finally built with gypsum Build mortar and fill up gypsum aerating brick wall 1 former and later two pits 101.
S5, construction of waterproof layer:Treat on wall that all water power spools have been laid and pressure testing is checked and accepted, then with gypsum masonry mortar by institute After having wire casing hole and wall defect mending complete, construction of waterproof layer is then carried out.
S6, rack plating zinc-iron net 5:After construction of waterproof layer it is complete and check and accept after, be not less than from steel wire diameter by design height 1mm, and zinc-plated iron net 5 of the mesh width not less than 10mm, the front of gypsum aerating brick wall 1 is completely hung over nail gun by zinc-plated iron net 5, Nut 2 202 is tightened after multiple band irons 6 are horizontally installed on each row's screw rod 2 makes band iron 6 press admittedly zinc-plated iron net 5, so that will be zinc-plated Iron net 5 is layed in the front of gypsum aerating brick wall 1.
S7, the rule side of orlop stone material 4, row's plate are fixed, are in the milk:According to level control line and arrangement requirement, first will most under The bottom cloud stone glue at layer stone material 4 back side is fixed in the place basic unit of gypsum aerating brick wall 1, then adjust stone material 4 Founder and Perpendicularity, until meeting construction inspection rules requirement, to ensure that room is upright, then is bundled in extension site by the copper wire 204 of stone material 4 Screw rod 2 on so that complete the side of rule of orlop stone material 4, row plate fix.Copper wire 204 is played and temporarily positioned before being in the milk The effect of stone material 204, it is ensured that the Founder and perpendicularity of stone material 4 during grouting.The cement mortar (preferably 1 being finally stirred:1 Cement mortar) it is filled between this layer of back side and the front of gypsum aerating brick wall 1 of stone material 4 and inserts close with fine steel rib or specific purpose tool It is real, stone material 4 is then gently beaten with rubber hammer, make cement mortar vibration compacting, the cement for modulating cement mortar should use not low In PO32.5# Portland cements, to ensure the intensity of cement mortar.
S8:The rule side of more top stone material 4, row's plate are fixed, are in the milk:According to level control line and arrangement requirement, cloud stone glue is used The bottom at the back side of stone material 4 of more last layer is fixed on mounted stone material 4, then adjust this layer of stone material 4 Founder and Perpendicularity, until meeting construction inspection rules requirement, then the copper wire 204 of stone material 4 is bundled on the screw rod 2 for hanging site;Finally The cement mortar (preferably 1 that will be stirred:1 cement mortar) it is filled into this layer of back side of stone material 4 and the front of gypsum aerating brick wall 1 Between and with fine steel rib or specific purpose tool insert closely knit, stone material 4 is then gently beaten with rubber hammer, make cement mortar vibration compacting, From the bottom up, this step is in layer up repeated until design height, waits cement mortar solidification.
I.e. sizing in zinc-plated iron net 5, the front of gypsum aerating brick wall 1 is completely hung due to zinc-plated iron net 5 after cement mortar solidification, Therefore cement mortar avoids the defect that cannot be fixed on gypsum aerating brick wall, the cement of zinc-plated iron net 5 is fixed in formation Screed 3, so as to realize that cement mortar is mated formation gypsum aerating brick wall is positive, while stone material 4 cements in cement sand bed 3 On, reach and filled the purpose of stone material on gypsum aerating brick wall upper berth using cement mortar.

Claims (7)

1. the wet hanging method of stone material of a kind of gypsum aerating brick wall, it is characterised in that comprise the following steps:
S1, metope cleaning:The positive adhesive of gypsum aerating brick wall and attachment are cleaned out;
S2, metope are surveyed and set level, snap the line, positioning:Surveyed every a segment distance in the front of gypsum aerating brick wall with S3 spirit levels and set The bench mark for going out, then ejects horizontal line, red with laser further according to stone material typesetting figure as the level control line that walltile is constructed Outside line level meter ejects grid lines on metope, and determines every piece of extension site of stone material;
S3, material prepare:The stone material marched into the arena is carried out into walkthrough according to metope typesetting scheme, then by every block of stone on grid lines on wall The hanging point position of material makes the top-slitting and back side position of opening of stone material, the perforate and fluting side insertion, and by copper wire One end is penetrated from the perforate of stone material and the open top from fluting is passed, and cloud stone glue fixed copper is irrigated in fluting and perforate Silk, according to gypsum aerated bricks wall thickness, is extracted than gypsum aerated bricks wall thickness more long bolt, and a pad is vertically connected in its one end Piece, prepares the band iron with metope length adaptation;
S4, perforate, wear screw rod:The through hole through front and back is drilled with the stone material hanging point position of gypsum aerating brick wall, then The gypsum aerated bricks at through hole two ends cut out pit within the walls, and then screw rod is pierced into through hole from the gypsum aerating brick wall back side, its pad Piece is placed in the pit bottom at the gypsum aerating brick wall back side, and the other end exposes and at the end from the gypsum positive pit of aerating brick wall Nut one is tightened, finally gypsum aerating brick wall former and later two pits is filled up with gypsum masonry mortar;
S5, construction of waterproof layer:Treat that all water power spools have been laid and pressure testing is checked and accepted on wall, then it is with gypsum masonry mortar that institute is wired After groove is cheated and wall defect mending is complete, construction of waterproof layer is then carried out;
S6, rack plating zinc-iron net:After construction of waterproof layer it is complete and check and accept after, by design height select zinc-plated iron net, zinc-plated iron net is expired Gypsum aerating brick wall front is hung over, nut two is tightened after multiple band irons are horizontally installed on each row's screw rod makes band iron press solid galvanized iron Net;
S7, the rule side of orlop stone material, row's plate are fixed, are in the milk:According to level control line and arrangement requirement, first by orlop stone material The bottom cloud stone glue at the back side is fixed in basic unit where gypsum aerating brick wall, then adjusts the Founder and perpendicularity of stone material, directly To construction inspection rules requirement is met, to ensure that room is upright, then the copper wire of stone material is bundled on the screw rod for hanging site, so that Complete the rule side of orlop stone material, row's plate to fix, the back side of the cement mortar that will finally be stirred perfusion to this layer of stone material and stone It is between cream aerating brick wall front and slotting closely knit, stone material is gently then beaten with rubber hammer, make cement mortar vibration compacting;
S8:The rule side of more top stone material, row's plate are fixed, are in the milk:According to level control line and arrangement requirement, will more be gone up with cloud stone glue The bottom of one layer of back face of stone is fixed on mounted stone material, then adjusts this layer of Founder and perpendicularity of stone material, directly To meeting construction inspection rules requirement, then the copper wire of stone material is bundled on the screw rod for hanging site;The cement being finally stirred Then mortar injection gently beats stone between this layer of back side and gypsum aerating brick wall front of stone material and slotting closely knit with rubber hammer Material, makes cement mortar vibration compacting, from the bottom up, in layer up repeats this step until design height, waits cement bonded sand Slurry solidification.
2. the wet hanging method of stone material of gypsum aerating brick wall according to claim 1, it is characterised in that:The copper wire exposes The length of the perforate of stone material be 30mm~50mm, expose fluting length be 100mm~150mm.
3. the wet hanging method of stone material of gypsum aerating brick wall according to claim 1, it is characterised in that:The stone material is opened The distance of hole and fluting to its side is at least 100mm.
4. the wet hanging method of stone material of gypsum aerating brick wall according to claim 3, it is characterised in that:On same stone material Perforate and fluting quantity be at least 2 and adjacent spacing be 300~500mm.
5. the wet hanging method of stone material of gypsum aerating brick wall according to claim 1, it is characterised in that:The spiro rod length Than the thickness 10mm long of gypsum aerating brick wall, pad length is 30mm, width is 30mm, thickness is 3mm, and band iron width is 30mm, thickness are 2mm, pit width is 50mm, be highly 50mm, depth be 20mm, the steel wire diameter of zinc-plated iron net is not less than 1mm and mesh width are not less than 10mm.
6. the wet hanging hang structure of stone material of a kind of gypsum aerating brick wall, it is characterised in that:Including being built by laying bricks or stones by many lithoexpulsium paste aerated bricks and Into gypsum aerating brick wall, be fixed on the positive zinc-plated iron net of gypsum aerating brick wall, solidification sizing it is online in the galvanized iron It is cement sand bed, multiple rows of stone material cemented on cement sand bed, copper wire, screw rod, multiple with the gypsum aerating brick wall width The band iron of adaptation;
The top side of the stone material is provided with least two flutings, and back face of stone is provided with the perforate of insertion respectively to the fluting, The copper wire runs through each perforate and fluting and two ends are stretched out from perforate and fluting respectively, and the perforate and fluting are filled with marble Glue is so as to fixed copper wire;
Multiple screw rods are fastened on gypsum aerating brick wall and end protrudes from gypsum aerating brick wall front, the position point of each screw rod Perforate not with stone material is corresponded, and the stone material completely hangs the stone by copper wire and screw rod end bind, zinc-plated iron net On cream aerating brick wall, each band iron is connected laterally at the screw rod of every row's stone material and is fastened by nut two, and the band iron will be zinc-plated Iron net pressure is solid in gypsum aerating brick wall front, and the cement sand bed is laid on gypsum aerating brick wall front and solidifies sizing in institute State galvanized iron online, the stone material is cemented on the cement sand bed;
Described screw rod one end is fixedly connected a pad, and front and back and the screw rod intersection of the gypsum aerating brick wall respectively set one Pit, the screw rod is placed in the pit bottom at the back side through the gypsum aerating brick wall and pad, and the screw rod other end is from positive Pit is stretched out and is fastened by nut one, and the nut one is equally placed in positive pit bottom, and all pits are built by laying bricks or stones by gypsum Mortar is filled and led up;
The copper wire exposes the length of the perforate of stone material for 30mm~50mm, the length for exposing fluting are 100mm~150mm;
The distance of the perforate of the stone material and fluting to its side is at least 100mm, the perforate on same stone material and fluting Quantity is at least 2 and adjacent spacing is 300~500mm.
7. the wet hanging hang structure of stone material of a kind of gypsum aerating brick wall according to claim 6, it is characterised in that:The screw rod Than the thickness 10mm long of gypsum aerating brick wall, pad length is 30mm to length, width is 30mm, thickness is 3mm, and band iron width is 30mm, thickness are 2mm, pit width is 50mm, be highly 50mm, depth be 20mm, the steel wire diameter of zinc-plated iron net is not less than 1mm and mesh width are not less than 10mm.
CN201510505722.7A 2015-08-18 2015-08-18 The wet hanging method of stone material and its structure of a kind of gypsum aerating brick wall Active CN105155794B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510505722.7A CN105155794B (en) 2015-08-18 2015-08-18 The wet hanging method of stone material and its structure of a kind of gypsum aerating brick wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510505722.7A CN105155794B (en) 2015-08-18 2015-08-18 The wet hanging method of stone material and its structure of a kind of gypsum aerating brick wall

Publications (2)

Publication Number Publication Date
CN105155794A CN105155794A (en) 2015-12-16
CN105155794B true CN105155794B (en) 2017-05-31

Family

ID=54796804

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510505722.7A Active CN105155794B (en) 2015-08-18 2015-08-18 The wet hanging method of stone material and its structure of a kind of gypsum aerating brick wall

Country Status (1)

Country Link
CN (1) CN105155794B (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107514073A (en) * 2017-09-28 2017-12-26 沈炜 The non-load bearing wall of convenient suspension
CN107747363A (en) * 2017-09-28 2018-03-02 胡振强 Split type easily hangs non-load bearing wall
CN110374286B (en) * 2019-07-06 2020-08-14 深圳市新雅建设工程有限公司 Stone wet hanging method and structure of gypsum aerated brick wall surface
CN111305502A (en) * 2020-03-04 2020-06-19 中国十七冶集团有限公司 Fixing technology for installing stone dry hanging keel on porous brick filling wall

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4472511B2 (en) * 2004-12-24 2010-06-02 エコ・リバイバル株式会社 Exterior surface reinforcing member and construction method thereof
CN201826475U (en) * 2010-08-13 2011-05-11 清华大学建筑设计研究院 Ballast concrete hanging board with polished veneer
CN202809891U (en) * 2012-09-27 2013-03-20 河南海格尔高温材料有限公司 Thermal insulation outer wall structure with foaming cement insulation board
CN103615087A (en) * 2013-11-06 2014-03-05 苏州金螳螂建筑装饰股份有限公司 Fastening bolt for fixing pendant to hollow block wall
CN103790322B (en) * 2014-01-17 2017-03-22 上海欧墅节能科技有限公司 Method for installing and connecting small assembly type heat preservation prefabricated plates on wall made of low-strength materials
CN203905374U (en) * 2014-04-10 2014-10-29 吴雄鹏 Hanging piece for hanging stones or tiles in wet hanging mode
CN205025000U (en) * 2015-08-18 2016-02-10 深圳广田装饰集团股份有限公司 Wet structure of hanging of stone material of gypsum air entrainment brick wall face

Also Published As

Publication number Publication date
CN105155794A (en) 2015-12-16

Similar Documents

Publication Publication Date Title
CN105155794B (en) The wet hanging method of stone material and its structure of a kind of gypsum aerating brick wall
CN103510631B (en) A kind of indoor sound insulation constructing structure and construction method thereof
CN101845857B (en) Metal mesh built-in insulating outer wall and construction method thereof
CN103321436B (en) Pre-installation construction method for wire box on building bricked body and pre-installation supporting frame thereof
CN207959612U (en) A kind of frame, shear wall cast-in-place structural fill wall with assembled light
CN204662910U (en) Rail mounted brick paving machine
CN106193624A (en) A kind of wall of aerated concrete block cracking-proof construction technology of improvement
CN105538820B (en) One kind modeling stone moulding back-up coat and its construction method
CN205025000U (en) Wet structure of hanging of stone material of gypsum air entrainment brick wall face
CN211229052U (en) Hoist and mount ALC wallboard with outer wall tile structure
CN106013509A (en) Dry-method construction method for high-performance autolaved aerated concrete block wall
CN107268834A (en) Without construction column combination hollow out plain brick wall and its construction method
CN113775081B (en) Construction method of inner and outer leaf composite wall body of archaize building
CN104695706B (en) AAC building block freely loads wall construction
CN106836551A (en) Infill Wall with Aerated Concrete Block construction method
CN103938869A (en) Construction method for line pipes and line boxes in MS building block rear building wall body
CN108130992A (en) Rubble plate, styrofoam and porous brick compound thermal-insulating decorative external wall construction engineering method
CN207420088U (en) A kind of detachable combination cornice for facade rebuilding construction
CN104763158B (en) Tenon joint type light-weight aggregate chained block construction method
CN109989554A (en) A kind of skyscraper assembled piping shaft and preparation method thereof and installation method
CN206158102U (en) Balcony construction site layout structure
CN205557857U (en) Troweling structure for treatment on junction part of concrete wall column and filler wall
CN103255872A (en) Hollow building block
CN206521928U (en) A kind of multi-functional accessory of mating formation
CN208633311U (en) A kind of wall body structure

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information

Inventor after: Duan Qingnian

Inventor after: Zheng Jianhua

Inventor after: Chen Guoqian

Inventor after: Xiao Yanyan

Inventor after: Deng Zemin

Inventor before: Zheng Jianhua

Inventor before: Chen Guoqian

Inventor before: Ye Gaoxuan

Inventor before: Deng Zemin

Inventor before: Shi Xinjie

COR Change of bibliographic data
CB02 Change of applicant information
CB02 Change of applicant information

Address after: Luohu District Shenzhen Shennan Road 518000 Guangdong province No. 2098 building Hirota Shenghua group

Applicant after: Shenzhen Guangtian group Limited by Share Ltd

Address before: Luohu District Shenzhen City, Guangdong province 518000 along North Road, No. 1003. The East will 1~2 Beijing

Applicant before: Shenzhen Guangtian Decoration Group Co., Ltd.

GR01 Patent grant
GR01 Patent grant