CN205025000U - Stone wet-hanging structure of gypsum aerated brick wall surface - Google Patents

Stone wet-hanging structure of gypsum aerated brick wall surface Download PDF

Info

Publication number
CN205025000U
CN205025000U CN201520620862.4U CN201520620862U CN205025000U CN 205025000 U CN205025000 U CN 205025000U CN 201520620862 U CN201520620862 U CN 201520620862U CN 205025000 U CN205025000 U CN 205025000U
Authority
CN
China
Prior art keywords
gypsum
brick wall
stone material
screw rod
aerating brick
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201520620862.4U
Other languages
Chinese (zh)
Inventor
郑建华
陈国谦
叶高旋
邓泽敏
石鑫杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Guangtian Group Ltd By Share Ltd
Original Assignee
Shenzhen Grandland Decoration Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen Grandland Decoration Group Co Ltd filed Critical Shenzhen Grandland Decoration Group Co Ltd
Priority to CN201520620862.4U priority Critical patent/CN205025000U/en
Application granted granted Critical
Publication of CN205025000U publication Critical patent/CN205025000U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Finishing Walls (AREA)

Abstract

A stone wet hanging structure of a gypsum aerated brick wall surface is characterized in that copper wires penetrate through each opening and each slot, two ends of each copper wire respectively extend out of the opening and the corresponding slot, and marble glue is filled in the openings and the slots so as to fix the copper wires; the plurality of screws penetrate through and are fixedly arranged on the gypsum aerated brick wall, the end parts of the screws protrude out of the front surface of the gypsum aerated brick wall, the positions of the screws correspond to the openings of the stones one by one, the stones are bound with the ends of the screws through copper wires, a galvanized iron net is fully hung on the gypsum aerated brick wall, each flat iron is transversely connected to the screw of each row of stones and is fastened through a nut II, the galvanized iron net is pressed and fixedly arranged on the front surface of the gypsum aerated brick wall through the flat iron, a cement mortar layer is laid on the front surface of the gypsum aerated brick wall and is solidified and shaped on the galvanized iron net, and the stones are fixedly adhered to the cement mortar layer. The utility model discloses can utilize cement mortar to hang the stone material at the wet on gypsum air entrainment brick wall, overcome the unable defect of rendering a clan of cement mortar on gypsum air entrainment brick wall.

Description

A kind of stone material of gypsum aerated bricks metope wets hanging hang structure
Technical field
The utility model relates to interior decoration field, and especially the stone material of gypsum aerated bricks metope wets hanging hang structure.
Background technology
General wall-surface stone construction method has two kinds, and one is adopt dry-hanging method construction, the wet combining of another kind of employing cement paste.Indoor employing dry-hanging method construction, because keel made by needs angle steel, construction thickness is generally 8 ~ 10cm, greatly reduce indoor pure space, and construction cost is higher; And adopting cement mortar wet combining method to construct, construction thickness only has 3 ~ 4cm, but construction quality is difficult to ensure, easily occurs hollowing and obscission.Especially in south, along with the rise of temperature in spring, during indoor generation moisture regain phenomenon, stone surface often easily condenses, and is covered with the globule, and dew infiltrates back face of stone along the crack of stone of wall-surface stone, and of long duration, wall-surface stone easily comes off naturally.Gypsum aerated bricks is a kind of new material inherently, environmental protection, lightweight, speed of application is fast, rear planarization of having constructed is good, can not the direct Puttying of plaster or directly do construction of waterproof layer, but it is higher as place, rest room metope waterproof requirement, and gypsum aerating brick wall itself can not use conventional cement mortar plaster (gypsum aerated bricks itself is with conventional cement mortar bad adhesion), can only plaster with brushing gypsum, the water proofing property of brushing gypsum own and stretching resistance poor, the rest room partition wall of building by laying bricks or stones with gypsum aerated bricks, its gypsum aerated bricks can not nailing or boring hang weight, traditional wet extension method construction technology cannot meet hangs the requirement of pasting stone material on its surface.
Utility model content
The technical problems to be solved in the utility model is to provide a kind of cement mortar wet stone material hanging stone material on gypsum aerating brick wall that utilizes and wets hanging hang structure.
In order to solve the problems of the technologies described above, the stone material that the utility model provides a kind of gypsum aerated bricks metope wets hanging hang structure, comprises the gypsum aerating brick wall of being built by laying bricks or stones by many lithoexpulsium pastes aerated bricks, the galvanized iron net being fixed on gypsum aerating brick wall front, solidifies sizing cements in stone material on cement sand bed, copper wire, screw rod, multiple and described gypsum aerating brick wall width adaptation band iron the online cement sand bed of described galvanized iron, many rows;
The top side of described stone material is provided with at least two flutings, back face of stone is provided with the through perforate to described fluting respectively, described copper wire runs through each perforate and fluting and two ends are stretched out from perforate and fluting respectively, and described perforate and fluting are filled with cloud stone glue thus fixing copper wire;
Multiple screw rod fastens on gypsum aerating brick wall and end protrudes from gypsum aerating brick wall front, the position of each screw rod respectively with the perforate one_to_one corresponding of stone material, described stone material is by copper wire and described screw rod end bind, galvanized iron net is completely hung on described gypsum aerating brick wall, each band iron is connected laterally at the screw rod of often arranging stone material and fastening by nut two, galvanized iron net presses solidly in gypsum aerating brick wall front by described band iron, described cement sand bed be laid on gypsum aerating brick wall front and solidify sizing online in described galvanized iron, described stone material cements on described cement sand bed.
As preferred embodiment, described screw rod one end is fixedly connected with a pad, front and back and the screw rod intersection of described gypsum aerating brick wall respectively establish a pit, described screw rod is placed in the pit bottom at the back side through described gypsum aerating brick wall and pad, the screw rod other end to stretch out and fastening by nut one from the pit in front, this nut one is placed in the pit bottom in front equally, and all pits are filled and led up by gypsum masonry mortar.
As preferred embodiment, the length that described copper wire exposes the perforate of stone material is 30mm ~ 50mm, expose the length of fluting is 100mm ~ 150mm.
As preferred embodiment, the perforate of described stone material is at least 100mm with the distance of slotting to its side, and the perforate on same stone material and the quantity of fluting are at least 2 and adjacent spacing is 300 ~ 500mm.
As preferred embodiment, described spiro rod length 10mm longer than the thickness of gypsum aerating brick wall, pad length is 30mm, width is 30mm, thickness is 3mm, band iron width is 30mm, thickness is 2mm, pit width is 50mm, highly for 50mm, the degree of depth are 20mm, the steel wire diameter of galvanized iron net is not less than 1mm and mesh width is not less than 10mm.
The stone material of the utility model gypsum aerated bricks metope hanging hang structure tool that wets has the following advantages:
1, compared with hanging method with conventional wet, the utility model passes through screw rod, nut and band iron by full for galvanized iron screen cloth gypsum aerating brick wall front, it is online in galvanized iron that cement mortar solidifies rear sizing, form firmly cement sand bed, avoid the direct plaster of cement mortar at gypsum aerated bricks metope, overcome cement mortar cannot on gypsum aerating brick wall the defect of plaster; And stone material still can with cement mortar strong bond, overcome traditional wet extension method construction technology and cannot hang on gypsum aerating brick wall surface and paste the defect of stone material.
2, compared with general wet combining method, metope, without the need to levelling, can directly be constructed; Without the need to improving cement mortar, adopt conventional cement mortar, fixed structure such as screw rod, band iron, nut etc. adopt existing, that is used tool is easy is easy to get, and construction method is convenient, is conducive to ensureing construction quality, construction cost is lower, and speed of application is faster.
3, it is close that the stone material thickness and the conventional wet that obtain after completion hang method, much thinner than dry-hanging method, is conducive to guarantee indoor pure space size.
Accompanying drawing explanation
Below in conjunction with the drawings and specific embodiments, the utility model is described in further detail:
Fig. 1 is that the stone material of a kind of gypsum aerated bricks of the utility model metope wets the front view of hanging hang structure.
Fig. 2 is that the stone material of a kind of gypsum of the utility model aerated bricks metope wets the cross-sectional figure of hanging hang structure.
Fig. 3 is the partial enlarged drawing in A portion in Fig. 2.
Fig. 4 is the rear elevation of stone material.
Fig. 5 is the sectional view along B-B line in Fig. 4.
Reference numeral: gypsum aerating brick wall-1, pit-101, screw rod-2, pad-203, nut one-201, nut two-202, copper wire-204, cement sand bed-3, stone material-4, fluting-401, perforate-402, galvanized iron net-5, band iron-6.
Detailed description of the invention
As depicted in figs. 1 and 2 for the stone material 4 of a kind of gypsum of the utility model aerating brick wall 1 wets the front view of hanging hang structure and cross-sectional figure, comprise the gypsum aerating brick wall 1 of being built by laying bricks or stones by many lithoexpulsium pastes aerated bricks, the galvanized iron net 5 being fixed on gypsum aerating brick wall 1 front, solidify the cement sand bed 3 of sizing on described galvanized iron net 5, many rows cement in stone material 4 on cement sand bed 3, the band iron 6 of copper wire 204, screw rod 2, multiple and described gypsum aerating brick wall 1 width adaptation.
If Fig. 4 and Fig. 5 is the rear elevation of stone material 5 and stone material 5 sectional view along B-B line, the top side of described stone material 4 be provided with 2 (or more) fluting 401, stone material 4 back side is provided with 2 through perforates 402 to each fluting 401 respectively, the perforate 402 of described stone material 1 and fluting 401 are at least 100mm to the distance of its side, the quantity of the perforate 402 on same stone material 4 is at least 2 and adjacent spacing is 300 ~ 500mm, that is the quantity of fluting 401 and perforate 402 is arranged according to the width of stone material 4, the stone material 4 that volume is larger is slotted more than 2 of the quantity of 401 and perforate 402.Described copper wire 204 runs through each perforate 402 and fluting 401 and two ends are stretched out from perforate 402 and fluting 401 respectively, and the length that described copper wire 204 exposes the perforate 402 of stone material 4 is 30mm ~ 50mm, expose the length of fluting 401 is 100mm ~ 150mm.Described perforate 402 and fluting 401 are filled with cloud stone glue thus fixing copper wire 204.
See Fig. 1 ~ Fig. 3, described screw rod 2 one end is vertically fixedly connected with a pad 203, and (length is 30mm, width is 30mm, thickness is 3mm), multiple screw rod 2 fastens on gypsum aerating brick wall 1 and end protrudes from gypsum aerating brick wall 1 front, front and back and screw rod 2 intersection of described gypsum aerating brick wall 1 respectively establish a pit 101, each screw rod 2 is through described gypsum aerating brick wall 1 and pad 203 is placed in bottom the pit 101 at the back side, screw rod 2 other end to stretch out and fastening by nut 1 from the pit 101 in front, this nut 1 is placed in bottom the pit 101 in front equally, all pits 101 are filled and led up by gypsum masonry mortar, pit 101 effect is to keep wall surface levelling and provides fixed space for the pad 203 of screw rod 2 and nut 1, reduce thickness.Described screw rod 2 length 10mm longer than the thickness of gypsum aerating brick wall 1, pit width is 50mm, highly for 50mm, the degree of depth are 20mm, that is screw rod 2 gives prominence to the length in gypsum aerating brick wall 1 front is 30mm, this outstanding length can be arranged according to designing requirement, be not more than the distance between stone material 4 to gypsum aerating brick wall 1, compared with the stone material thickness of dry hanging construction, it is less that the stone material 4 of this structure takies thickness.
The position of each screw rod 2 respectively with perforate 402 one_to_one corresponding of stone material 4, described stone material 4 is by copper wire 204 and described screw rod 2 end bind, galvanized iron net 5 (its steel wire diameter is not less than 1mm and mesh width is not less than 10mm) completely hangs on described gypsum aerating brick wall 1 by air nail, (band iron width is 30mm to each band iron 6, thickness is 2mm) be connected laterally at and often arrange the screw rod 2 of stone material 4 and fastening by nut 2 202, galvanized iron net 5 presses solidly in gypsum aerating brick wall 1 front by described band iron 6, described cement sand bed 3 is laid on gypsum aerating brick wall 1 front and solidifies sizing on described galvanized iron net 5, described stone material 4 cements on described cement sand bed 3.
The stone material 4 that the present embodiment additionally provides above-mentioned gypsum aerated bricks metope 1 wets hanging method, comprises the following steps:
S1, metope are cleared up: the adhesive in gypsum aerating brick wall 1 front and attachment are cleaned out, and repair putlog hole and water power spool built-in groove rejected region.
S2, metope are surveyed and are established level, snap the line, location: survey the bench mark set out every a segment distance in the front of gypsum aerating brick wall 1 with S3 level gauge, then horizon is ejected, as the level control line that stone material 4 is constructed, on metope, eject grid line according to stone material 4 typesetting figure laser infrared line level gauge again, and measure the extension site of every block stone material 4.
S3, material prepares: the stone material 4 of marching into the arena is carried out walkthrough according to metope typesetting scheme, then top-slitting 401 and back side perforate 402 position of stone material 4 is made by the hanging point position of block stone material 4 every on grid line on wall, described perforate 402 is through with fluting 401 sides, and copper wire 204 one end is penetrated in the perforate 402 of stone material 4 and passes from the open top of fluting 401, in fluting 401 and perforate 402, pour into cloud stone glue fix copper wire 204, according to gypsum aerating brick wall 1 thickness, extract 10mm longer than gypsum aerating brick wall 1 thickness, diameter is the screw rod 2 of 8mm, the pad 203 of the intrinsic a slice 30mm*30mm*3mm of its one end vertical welding, prepare and metope length adaptation, width is 30mm, thickness is the band iron 6 of 2mm.
S4, perforate, wear screw rod 2: be the through hole of 10mm with the diameter that electric hammer is drilled with passed through said front surface and the back side at stone material 4 hanging point position of gypsum aerating brick wall 1, in the gypsum aerating brick wall 1 at through hole two ends, cutting out width is again 50mm, be highly 50mm, the degree of depth is the pit 101 of 20mm, then screw rod 2 is pierced in through hole from gypsum aerating brick wall 1 back side, its pad 203 is placed in bottom the pit 101 at gypsum aerating brick wall 1 back side, the other end exposes and at this end fastening nut 1 (this nut 1 is placed in bottom the pit 101 in gypsum aerating brick wall 1 front equally) in the pit 101 in gypsum aerating brick wall 1 front, finally fill up former and later two pits 101 of gypsum aerating brick wall 1 with gypsum masonry mortar.
S5, construction of waterproof layer: to treat on wall that all water power spools have laid and pressure testing is checked and accepted, then with gypsum masonry mortar all wire casings are cheated and body of wall defect mending complete after, then carry out construction of waterproof layer.
S6, rack plating zinc-iron net 5: until construction of waterproof layer complete and check and accept after, steel wire diameter is selected to be not less than 1mm by design height, and mesh width is not less than the galvanized iron net 5 of 10mm, by nail gun, galvanized iron net 5 is completely hung over gypsum aerating brick wall 1 front, multiple band iron 6 being horizontally installed in fastening nut 2 202 after on each row's screw rod 2 makes band iron 6 press solidly galvanized iron net 5, thus galvanized iron net 5 is layed in gypsum aerating brick wall 1 front.
Rule side, row's plate of S7, orlop stone material 4 are fixed, are in the milk: according to level control line and arrangement requirement, first the bottom cloud stone glue at orlop stone material 4 back side is fixed in the basic unit of gypsum aerating brick wall 1 place, then Founder and the verticality of stone material 4 is adjusted, until meet construction inspection rules requirement, to ensure that room is upright, again the copper wire 204 of stone material 4 is bundled in hang site screw rod 2 on, thus complete orlop stone material 4 side of rule, arrange plate fix.Copper wire 204 plays the effect of temporarily location stone material 204 before being in the milk, and ensures Founder and the verticality of stone material 4 during grouting.Finally the cement mortar be stirred (be preferably 1:1 cement mortar) to be filled between the back side of this layer of stone material 4 and gypsum aerating brick wall 1 front and to insert closely knit with fine steel rib or special tool, then stone material 4 is beaten gently with rubber hammer, make cement mortar vibration compacting, the cement of modulation cement mortar should adopt and be not less than PO32.5# Portland cement, to ensure the intensity of cement mortar.
S8: rule side, row's plate of more top stone material 4 are fixed, are in the milk: according to level control line and arrangement requirement, with cloud stone glue, the bottom at more stone material 4 back side of last layer is fixed on mounted stone material 4, then Founder and the verticality of this layer of stone material 4 is adjusted, until meet construction inspection rules requirement, then the copper wire 204 of stone material 4 is bundled on the screw rod 2 in extension site; Finally the cement mortar be stirred (be preferably 1:1 cement mortar) to be filled between the back side of this layer of stone material 4 and gypsum aerating brick wall 1 front and to insert closely knit with fine steel rib or special tool, then stone material 4 is beaten gently with rubber hammer, make cement mortar vibration compacting, from the bottom up, in layer up repeat this step until design height, wait for that cement mortar is solidified.
Namely cement mortar shapes after solidifying on galvanized iron net 5, because gypsum aerating brick wall 1 front completely hung by galvanized iron net 5, therefore cement mortar avoids the defect cannot fixed on gypsum aerating brick wall, form the cement sand bed 3 being firmly fixed on galvanized iron net 5, thus realize cement mortar mating formation in gypsum aerating brick wall front, stone material 4 cements on cement sand bed 3 simultaneously, reaches the object utilizing cement mortar at gypsum aerating brick wall upper berth dress stone material.

Claims (5)

1. the stone material of gypsum aerated bricks metope wets a hanging hang structure, it is characterized in that: comprise the gypsum aerating brick wall of being built by laying bricks or stones by many lithoexpulsium pastes aerated bricks, the galvanized iron net being fixed on gypsum aerating brick wall front, solidify sizing cements in stone material on cement sand bed, copper wire, screw rod, multiple and described gypsum aerating brick wall width adaptation band iron the online cement sand bed of described galvanized iron, many rows;
The top side of described stone material is provided with at least two flutings, back face of stone is provided with the through perforate to described fluting respectively, described copper wire runs through each perforate and fluting and two ends are stretched out from perforate and fluting respectively, and described perforate and fluting are filled with cloud stone glue thus fixing copper wire;
Multiple screw rod fastens on gypsum aerating brick wall and end protrudes from gypsum aerating brick wall front, the position of each screw rod respectively with the perforate one_to_one corresponding of stone material, described stone material is by copper wire and described screw rod end bind, galvanized iron net is completely hung on described gypsum aerating brick wall, each band iron is connected laterally at the screw rod of often arranging stone material and fastening by nut two, galvanized iron net presses solidly in gypsum aerating brick wall front by described band iron, described cement sand bed be laid on gypsum aerating brick wall front and solidify sizing online in described galvanized iron, described stone material cements on described cement sand bed.
2. the stone material of a kind of gypsum aerated bricks metope according to claim 1 wets hanging hang structure, it is characterized in that: described screw rod one end is fixedly connected with a pad, front and back and the screw rod intersection of described gypsum aerating brick wall respectively establish a pit, described screw rod is placed in the pit bottom at the back side through described gypsum aerating brick wall and pad, the screw rod other end to stretch out and fastening by nut one from the pit in front, this nut one is placed in the pit bottom in front equally, and all pits are filled and led up by gypsum masonry mortar.
3. the stone material of a kind of gypsum aerated bricks metope according to claim 1 and 2 wets hanging hang structure, it is characterized in that: the length that described copper wire exposes the perforate of stone material is 30mm ~ 50mm, expose the length of fluting is 100mm ~ 150mm.
4. the stone material of a kind of gypsum aerated bricks metope according to claim 1 and 2 wets hanging hang structure, it is characterized in that: the perforate of described stone material is at least 100mm with the distance of slotting to its side, and the perforate on same stone material and the quantity of fluting are at least 2 and adjacent spacing is 300 ~ 500mm.
5. the stone material of a kind of gypsum aerated bricks metope according to claim 1 and 2 wets hanging hang structure, it is characterized in that: described spiro rod length 10mm longer than the thickness of gypsum aerating brick wall, pad length is 30mm, width is 30mm, thickness is 3mm, band iron width is 30mm, thickness is 2mm, pit width is 50mm, highly for 50mm, the degree of depth are 20mm, the steel wire diameter of galvanized iron net is not less than 1mm and mesh width is not less than 10mm.
CN201520620862.4U 2015-08-18 2015-08-18 Stone wet-hanging structure of gypsum aerated brick wall surface Active CN205025000U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520620862.4U CN205025000U (en) 2015-08-18 2015-08-18 Stone wet-hanging structure of gypsum aerated brick wall surface

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520620862.4U CN205025000U (en) 2015-08-18 2015-08-18 Stone wet-hanging structure of gypsum aerated brick wall surface

Publications (1)

Publication Number Publication Date
CN205025000U true CN205025000U (en) 2016-02-10

Family

ID=55257543

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520620862.4U Active CN205025000U (en) 2015-08-18 2015-08-18 Stone wet-hanging structure of gypsum aerated brick wall surface

Country Status (1)

Country Link
CN (1) CN205025000U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105155794A (en) * 2015-08-18 2015-12-16 深圳广田装饰集团股份有限公司 Stone wet hanging method and structure of gypsum aerated brick wall surface
CN107514073A (en) * 2017-09-28 2017-12-26 沈炜 The non-load bearing wall of convenient suspension
CN110409738A (en) * 2019-06-20 2019-11-05 温州华派装饰工程有限公司 A kind of assembled ceramic tile metope and its construction method

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105155794A (en) * 2015-08-18 2015-12-16 深圳广田装饰集团股份有限公司 Stone wet hanging method and structure of gypsum aerated brick wall surface
CN107514073A (en) * 2017-09-28 2017-12-26 沈炜 The non-load bearing wall of convenient suspension
CN110409738A (en) * 2019-06-20 2019-11-05 温州华派装饰工程有限公司 A kind of assembled ceramic tile metope and its construction method

Similar Documents

Publication Publication Date Title
CN103321436B (en) Pre-installation construction method for wire box on building bricked body and pre-installation supporting frame thereof
CN101845857B (en) Metal mesh built-in insulating outer wall and construction method thereof
CN105155794B (en) The wet hanging method of stone material and its structure of a kind of gypsum aerating brick wall
CN205025000U (en) Stone wet-hanging structure of gypsum aerated brick wall surface
CN103938869B (en) The construction method of spool, line box in masonry panel after MS building block
CN204662910U (en) Rail mounted brick paving machine
CN103088994B (en) Plastering fillet and building plastering method
CN113775081B (en) Construction method of inner and outer leaf composite wall body of archaize building
CN211229052U (en) Hoist and mount ALC wallboard with outer wall tile structure
CN104674999A (en) Spaced formwork supporting and concrete pouring method for pitched roof
CN105888084A (en) Whole outer wall internal thermal insulation system construction method by using enhanced composite thermal insulation material
CN106121204B (en) A kind of filling type wall, ground fast spreading system and its method for paving
CN203174952U (en) Bonding and hanging type thin-plastered external wall insulation system
CN102587611A (en) Natural rock block fake-dry-masonry decorating wall and construction method
CN104763158B (en) Tenon joint type light-weight aggregate chained block construction method
CN205012550U (en) Take hollow light partition wall board of rack and fiber reinforcement
CN206158102U (en) Balcony construction site layout structure
CN202509724U (en) Rachel structure of natural stone fake-mortarless decoration wall
CN103015657B (en) Construction method for outer heat insulation hanging ceramic plate of outer wall
CN202936976U (en) Steel bar hanging net for stone wet hanging construction
CN202509720U (en) Natural rubble artificial dry masonry decoration wall
CN202359695U (en) Tubular plank partition wall
CN206752818U (en) Integrally formed light wall board
CN206521928U (en) A kind of multi-functional accessory of mating formation
CN201738462U (en) Metal net built-in heat preservation outer wall

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: 518000 Guangdong, Shenzhen, Luohu District, Yanhe Road 1003, Beijing capital east 1~2 level.

Patentee after: Shenzhen Guangtian group Limited by Share Ltd

Address before: 518000 Guangdong, Shenzhen, Luohu District, Yanhe Road 1003, Beijing capital east 1~2 level.

Patentee before: Shenzhen Guangtian Decoration Group Co., Ltd.

CP01 Change in the name or title of a patent holder