CN206783107U - Anti-twisting fast rope arranging device of derrick hoisting system - Google Patents

Anti-twisting fast rope arranging device of derrick hoisting system Download PDF

Info

Publication number
CN206783107U
CN206783107U CN201720626532.5U CN201720626532U CN206783107U CN 206783107 U CN206783107 U CN 206783107U CN 201720626532 U CN201720626532 U CN 201720626532U CN 206783107 U CN206783107 U CN 206783107U
Authority
CN
China
Prior art keywords
coaster
derrick
shaped steel
tackling system
hanger
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720626532.5U
Other languages
Chinese (zh)
Inventor
程为书
唐怀勇
吴向东
张鲁鲁
党勇
袁浩
惠晓帆
丁正军
杨毅东
刘飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Coal Third Construction Group Mechanical And Electrical Installation Projects Ltd
China Coal No 3 Construction Group Co Ltd
Original Assignee
China Coal Third Construction Group Mechanical And Electrical Installation Projects Ltd
China Coal No 3 Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Coal Third Construction Group Mechanical And Electrical Installation Projects Ltd, China Coal No 3 Construction Group Co Ltd filed Critical China Coal Third Construction Group Mechanical And Electrical Installation Projects Ltd
Priority to CN201720626532.5U priority Critical patent/CN206783107U/en
Application granted granted Critical
Publication of CN206783107U publication Critical patent/CN206783107U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Load-Engaging Elements For Cranes (AREA)

Abstract

The utility model provides a derrick hoisting system prevents turning round quick rope ranging device, including the shaped steel crossbeam the equidistance is equipped with a plurality of winds on the shaped steel crossbeam free rotation's coaster lug, coaster lug both sides are equipped with the retaining ring respectively, coaster hoisting system is installed to coaster lug below the both ends of shaped steel crossbeam are equipped with the jack-up lug. The structure not only ensures that the relative position of each set of tackle hoisting system is kept unchanged, avoids the winding and crossing phenomenon between ropes, but also can realize synchronous walking of each set of tackle hoisting system, improves the construction stability and safety, and has substantial characteristics and progress.

Description

A kind of derrick tackling system is anti-to turn round quick rope guide
Technical field
It the utility model is related to mine construction technical field, and in particular to a kind of quick row of anti-torsion of derrick of copper-mine tackling system Rope device.
Background technology
Derrick is indispensable equipment in mine construction, and during derrick setting, when derrick lifts by crane, secondary tiltedly erect is hung Tackle pulley rope wear the method for crossing mainly have at present it is following two:
The first:First the major and minor hanging pulley that rises tiltedly on frame is connected with shackle with hanger respectively, waits main oblique frame to be lifted to Behind position, then wear the major and minor connection rope tiltedly risen on frame between hanging pulley.Such way, not only wastes time and energy, and is endangered during operation It is dangerous very big.
Second:First the hanging pulley shackle that rises on the oblique frame of master is connected with hanger, then the coaster being connected with secondary oblique frame It is placed on the front of main oblique frame, in one line in order, subsequent wire rope handling.Rope is worn cross after the completion of, using stable car oblique with pair The connected tackle pulley of frame is slowly pulled open so that connection distance between major and minor tiltedly frame tackle pulley is more oblique than master erect master when hanging in place, Secondary tiltedly the distance between frame is longer.So just can guarantee that it is main tiltedly erect hang in place after, can with the tackle pulley that frame is connected secondary tiltedly It is connected with secondary hanger tiltedly on frame.But when the tackle pulley of major and minor tiltedly frame is pulled open, connection rope is all with strength, when main oblique When frame slowly rises, the tackle pulley of ground is along dragging forward, and rope breaks strength, and the connection rope of the oblique frame of major-minor can all be wrapped in one Rise, them can only be separated by manpower, difficulty is very big.During derrick setting, the pair crossed is worn in advance and carries tackle pulley rope Also it is easy to be intertwined.How to prevent rope from turning round strength winding, turn into current derrick and erect the technology for being badly in need of solving in construction Problem.
Utility model content
The utility model proposes a kind of anti-quick rope guide of torsion of derrick tackling system, solve derrick in the prior art and erect Erect during hanging, major and minor tiltedly rope turns round the technical problem of strength winding between frame and tackle pulley.
What the technical solution of the utility model was realized in:A kind of derrick tackling system is anti-to turn round quick rope guide, bag Shaped steel crossbeam is included, it is equidistant on the shaped steel crossbeam to be provided with multiple coaster hangers that freely rotated around the shaped steel crossbeam, The coaster hanger both sides are respectively equipped with back-up ring, coaster tackling system are installed below the coaster hanger, in the shaped steel crossbeam Both ends be provided with lifting hanger.This structure not only ensure that each set coaster tackling system relative position keeps constant, avoid Occur winding crossover phenomenon between rope and rope, and each set coaster tackling system synchronous walking simultaneously can be realized, improve and apply The stationarity and security of work.
The lifting hanger is connected by bearing pin with the shaped steel crossbeam.Bearing pin connection can realize lifting hanger certain Is rotated around bearing pin in angular range, to stay the stationarity and security of lifting after better ensuring that.
To ensure the balance during lifting is transported in rope guide, the shaped steel crossbeam both ends are provided with unrestrained wind rope.
The shaped steel crossbeam uses thick-walled seamless steel pipes.
The coaster hanger is Long Circle steel plate, and both ends open up respectively to be connected with thick-walled seamless steel pipes and coaster tackling system Hole.
The back-up ring is annular steel plate, is welded with the thick-walled seamless steel pipes.
Derrick tackling system provided by the utility model is anti-to turn round quick rope guide, is set by equidistant on shaped steel crossbeam Coaster hanger is put, has reached beneficial effect:
(1) it ensure that each set coaster tackling system relative position keeps constant, avoid appearance winding between rope and rope and hand over Pitch phenomenon;
(2) each set coaster tackling system synchronous walking simultaneously is realized;
(3) wire rope handling efficiency is improved;
(4) it is each to cover coaster tackling system when derrick is erect, it can lift by crane while " energetic " rope closing, improves and apply Work efficiency rate.
In summary, during the utility model solves derrick setting lifting in the prior art, major and minor tiltedly frame and tackle pulley Between rope turn round strength winding technical problem, there is substantive distinguishing features and progress.
Brief description of the drawings
In order to illustrate more clearly of the utility model embodiment, the required accompanying drawing used in being described below to embodiment It is briefly described, it should be apparent that, drawings in the following description are only some embodiments of the utility model, for ability For the those of ordinary skill of domain, on the premise of not paying creative work, it can also be obtained according to these accompanying drawings other attached Figure.
Fig. 1, which is that a kind of derrick tackling system of the utility model is anti-, turns round quick rope guide structural representation;
Fig. 2 uses schematic diagram for the quick rope guide;
Fig. 3 is that derrick erects construction schematic diagram.
Fig. 4 is coaster shackle structure figure;
Fig. 5 is back-up ring structure chart.
Marked in figure, 1, shaped steel crossbeam;2nd, coaster hanger;3rd, back-up ring;4th, lifting hanger;5th, bearing pin;6th, shackle;7th, steel wire Rope;8th, gib head;9th, coaster tackling system;10th, unrestrained wind rope;11st, tackling system is stayed after;12nd, derrick.
Embodiment
Below in conjunction with the accompanying drawing in the utility model embodiment, the technical scheme in the embodiment of the utility model is carried out Clearly and completely describing, it is clear that described embodiment is only the utility model part of the embodiment, rather than whole Embodiment.Based on the embodiment in the utility model, those of ordinary skill in the art are not under the premise of creative work is made The every other embodiment obtained, belong to the scope of the utility model protection.
Shown in figure, derrick tackling system provided by the utility model is anti-to turn round quick rope guide, including shaped steel crossbeam 1, Using lifting beams of the thick-walled seamless steel pipes Ф 219 × 25 as coaster tackling system 9,1 is equidistant provided with multiple on shaped steel crossbeam Coaster hanger 2, coaster hanger 2 are Long Circle steel plate, and both ends open up respectively to be connected with thick-walled seamless steel pipes and coaster tackling system 9 Hole, so coaster hanger 2 can be around the rotation of 360 ° of thick-walled seamless steel pipes.The both sides of coaster hanger 2 are welded with annular back-up ring respectively 3, prevent coaster hanger 2 is opened from being slid axially on shaped steel crossbeam 1.The lower section of coaster hanger 2 installation coaster tackling system 9, shaped steel crossbeam 1 Both ends lifting hanger 4 is provided with by bearing pin 5 respectively, lifting hanger 4 can rotate in the range of certain angle around bearing pin 5.The row Rope device passes sequentially through lifting hanger 4, shackle 6, steel wire rope 7, gib head 8 are stayed after being suspended on tackling system 11.To ensure row's rope Balance during lifting is transported in device, the both ends of shaped steel crossbeam 1 are provided with unrestrained wind rope 10.
In the setting process of derrick 12, coaster tackling system 9 is first arranged on shaped steel crossbeam 1, then stays lifting afterwards The side buttonhole selvage walking of system 11, coaster tackling system 9 follows rope closing, until rope is received into derrick head hoisting point position, it is last complete Into the setting of derrick 12.
Preferred embodiment of the present utility model is the foregoing is only, it is all at this not to limit the utility model Within the spirit and principle of utility model, any modification, equivalent substitution and improvements made etc., the utility model should be included in Protection domain within.

Claims (6)

1. a kind of derrick tackling system is anti-to turn round quick rope guide, including shaped steel crossbeam (1), it is characterised in that:In the shaped steel It is equidistant on crossbeam (1) to be provided with multiple coaster hangers (2) that freely rotated around the shaped steel crossbeam (1), the coaster hanger (2) both sides are respectively equipped with back-up ring (3), coaster tackling system (9) are installed below the coaster hanger (2), in the shaped steel crossbeam (1) both ends are provided with lifting hanger (4).
2. derrick tackling system according to claim 1 is anti-to turn round quick rope guide, it is characterised in that:The lifting hanger (4) it is connected by bearing pin (5) with the shaped steel crossbeam (1).
3. derrick tackling system according to claim 2 is anti-to turn round quick rope guide, it is characterised in that:The shaped steel crossbeam (1) both ends are provided with unrestrained wind rope (10).
4. the anti-quick rope guide of torsion of any derrick tackling system according to claims 1 to 3, it is characterised in that:Institute State shaped steel crossbeam (1) and use thick-walled seamless steel pipes.
5. derrick tackling system according to claim 4 is anti-to turn round quick rope guide, it is characterised in that:The coaster hanger (2) it is Long Circle steel plate, both ends open up the hole being connected with thick-walled seamless steel pipes and coaster tackling system (9) respectively.
6. derrick tackling system according to claim 5 is anti-to turn round quick rope guide, it is characterised in that:The back-up ring (3) For annular steel plate, welded with the thick-walled seamless steel pipes.
CN201720626532.5U 2017-06-01 2017-06-01 Anti-twisting fast rope arranging device of derrick hoisting system Expired - Fee Related CN206783107U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720626532.5U CN206783107U (en) 2017-06-01 2017-06-01 Anti-twisting fast rope arranging device of derrick hoisting system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720626532.5U CN206783107U (en) 2017-06-01 2017-06-01 Anti-twisting fast rope arranging device of derrick hoisting system

Publications (1)

Publication Number Publication Date
CN206783107U true CN206783107U (en) 2017-12-22

Family

ID=60714892

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720626532.5U Expired - Fee Related CN206783107U (en) 2017-06-01 2017-06-01 Anti-twisting fast rope arranging device of derrick hoisting system

Country Status (1)

Country Link
CN (1) CN206783107U (en)

Similar Documents

Publication Publication Date Title
CN202080812U (en) Dedicated sling system for large-scaled reinforcing cage
CN205489264U (en) Hydraulic pressure assembled crossing structure
CN206502579U (en) Power pole hoisting device
CN206767425U (en) A kind of integral hoisting device for rapid for ground-connecting-wall steel reinforcement cage
CN107761738B (en) The mask gabion string bag is without throwing construction method of colliding with
CN206590793U (en) Connect arm assembly and the movable arm tower crane comprising the device in the air
CN100593624C (en) Mine using great steel derrick lifting special tool
CN216235734U (en) Vertical transportation hoisting structure for curtain wall unit plate
CN205114843U (en) Prefabricated post hoist device with unhook function
CN207801340U (en) A kind of device of the quick cabling of vertical
CN206783107U (en) Anti-twisting fast rope arranging device of derrick hoisting system
CN204625045U (en) A kind of steel structure hoisting door shaped stent formula hanging apparatus
CN204162282U (en) A kind of large-diameter steel reinforced concrete drainage pipe special combination suspender
CN105110205B (en) A kind of reverse method for dismounting of derrick crane
CN207918270U (en) A kind of straight thread reinforced bar handling apparatus
CN208293447U (en) A kind of device of bent cap bracket overall pulling down
CN201176567Y (en) Mobile angular adjustment frame hanging at end of staying cable beam
CN104153637A (en) Sphere tower crane type derrick
CN202988556U (en) Special lifting appliance for angle-steel type frame body
CN103979442B (en) The method of 6400 tons of Hydraulic double-type crane lifting cost tropsch reactors
CN203716062U (en) Integral type pier body decorating hanging basket
CN203445520U (en) Live spanning device
CN202785255U (en) Turnover hoisting tool for reinforced concrete pipe joint
CN205590168U (en) Overturning lifting device
CN204778496U (en) Platform sling structure of tower crane

Legal Events

Date Code Title Description
GR01 Patent grant