CN202785255U - Turnover hoisting tool for reinforced concrete pipe joint - Google Patents

Turnover hoisting tool for reinforced concrete pipe joint Download PDF

Info

Publication number
CN202785255U
CN202785255U CN 201220389585 CN201220389585U CN202785255U CN 202785255 U CN202785255 U CN 202785255U CN 201220389585 CN201220389585 CN 201220389585 CN 201220389585 U CN201220389585 U CN 201220389585U CN 202785255 U CN202785255 U CN 202785255U
Authority
CN
China
Prior art keywords
tube coupling
ferro
reinforced concrete
pipe joint
holes
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201220389585
Other languages
Chinese (zh)
Inventor
李胜
贾国强
赵建立
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC20 Group Corp Ltd
Shanghai Ershiye Construction Co Ltd
Original Assignee
MCC Tiangong Group Corp Ltd
CMTCC Shanghai Shisanye Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by MCC Tiangong Group Corp Ltd, CMTCC Shanghai Shisanye Construction Co Ltd filed Critical MCC Tiangong Group Corp Ltd
Priority to CN 201220389585 priority Critical patent/CN202785255U/en
Application granted granted Critical
Publication of CN202785255U publication Critical patent/CN202785255U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Load-Engaging Elements For Cranes (AREA)

Abstract

The utility model relates to the construction field of reinforced concrete pipelines, and in particular relates to a turnover hoisting tool for a reinforced concrete pipe joint. The turnover hoisting tool comprises a portal frame, two lifting lugs, two coaxial through holes, two coaxial pipe joint hoisting holes, and two pin bolts, wherein the two lifting lugs are symmetrically arranged on the top of the portal frame; the two coaxial through holes are formed on the two sides of the portal frame; the two coaxial pipe joint hoisting holes are symmetrically formed on the pipe wall of the reinforced concrete pipe joint; and the two pin bolts are matched with the through holes and the hoisting holes for use. The turnover hoisting tool adopts the design, so that the reinforced concrete pipe joint is convenient to position and hoist, thus hoisting operation safety for large-diameter and large-weight reinforced concrete pipe joints is improved.

Description

The upset lifting device of ferro-concrete tube coupling
Technical field
The utility model relates to the concrete duct construction field, is specially a kind of upset lifting device of ferro-concrete tube coupling.
Background technology
Because the prefabricated reinforced concrete tube coupling has the advantages such as economical and practical, that stress performance is excellent, is widely used in the pipe-jacking project.Yet, excessive because of its deadweight, give safety, successfully tube coupling is lifted to upper pipe working well by ground brought difficulty.At present, lifting ferro-concrete tube coupling mainly contains two kinds of methods: 1) cooperate the purlin car to lift special steel wire penetrating cement concrete tube coupling; 2) utilize girder steel to add two hoist cables and cooperate the hoist ceiling crane lifting.First method causes the cement concrete that contacts with steel rope damaged because of extruding in hoisting process easily.Second method lifting minor diameter concrete pipe is more convenient, but when hoisting large-size ferro-concrete tube coupling, tube coupling may come off from hoist cable, exists larger potential safety hazard.
Summary of the invention
The purpose of this utility model is to overcome the existing defective of method of existing lifting ferro-concrete tube coupling, provides a kind of hoisting process steady, safe, makes the upset lifting device of simple ferro-concrete tube coupling.
In order to achieve the above object, the utility model is achieved in that
A kind of upset lifting device of ferro-concrete tube coupling, two hangers, the symmetries that it comprises portal frame, be located at both sides, portal frame top are opened in two coaxial through-holes on the portal frame dual-side, symmetry is opened in two coaxial tube coupling holes for hoist on the reinforced concrete pipe pipe joint wall, and mates two pins that use with through hole and tube coupling hole for hoist.
The upset lifting device of described ferro-concrete tube coupling also comprises the upset hanger that is embedded in ferro-concrete tube coupling one end.
The upset lifting device of described ferro-concrete tube coupling, the degree of depth of tube coupling hole for hoist is more than or equal to 15 centimetres.
The utility model adopts above-mentioned design, so that the ferro-concrete tube coupling is convenient to be positioned, lift, thus the safety that has improved the lifting operation of major diameter, heavy weight ferro-concrete tube coupling.
Description of drawings
Fig. 1 is front view of the present utility model.
Fig. 2 is the structural representation of ferro-concrete tube coupling.
The specific embodiment
Below further specify the utility model by specific embodiment.
As shown in Figure 1 and Figure 2, a kind of upset lifting device of ferro-concrete tube coupling, two hangers 4, the symmetries that it comprises portal frame 1, be located at both sides, portal frame 1 top are opened in two coaxial through-holes on portal frame 1 dual-side, symmetry is opened in two coaxial tube coupling holes for hoist 5 on ferro-concrete tube coupling 6 tube walls, and mates two pins 2 that use with through hole and tube coupling hole for hoist 5.
The upset lifting device of described ferro-concrete tube coupling also comprises the upset hanger 7 that is embedded in ferro-concrete tube coupling 6 one ends, and for reaching best upset control effect, upset plane, hanger 7 place should be vertical with plane, tube coupling hole for hoist 5 place.
The upset lifting device of described ferro-concrete tube coupling, the degree of depth of tube coupling hole for hoist 5 is more than or equal to 15 centimetres.
The utility model adopts above-mentioned design, so that the ferro-concrete tube coupling is convenient to be positioned, lift, thus the safety that has improved the lifting operation of major diameter, heavy weight ferro-concrete tube coupling.
Use the step of this lifting device as follows:
The first step links to each other with the hanger 4 on 1 one on two steel wire penetrating portal frame tops and with the hoisting crane hook.
Second step is with sling portal frame 1 and to tube coupling hole for hoist 5 positions of hoisting crane.
The 3rd step, two pins 2 are passed insert behind the through hole on the portal frame 1 in the tube coupling hole for hoist 5 that ferro-concrete tube coupling 6 reserves, with hoisting crane ferro-concrete tube coupling 6 is promoted overhead certain altitude.At this moment, under ferro-concrete tube coupling 6 action of gravitations, pin 2 will be inwardly stuck in tube coupling hole for hoist 5, to guarantee hoisting process safety.
In the 4th step, with another root steel wire penetrating upset hanger 7, with second this steel rope of crane lifting, make ferro-concrete tube coupling 6 integral inclinations, until the axis of ferro-concrete tube coupling 6 becomes greater than the 45° angle position with plumb line.At this moment, under ferro-concrete tube coupling 6 Gravitative Loads, ferro-concrete tube coupling 6 will be finished the upset of horizontal direction automatically.In this process, the overweight machine of First remains quiescence.
The 5th step removed steel rope from upset hanger 7, the First hoisting crane slowly hangs in ferro-concrete tube coupling 6 in the upper pipe working well.
The 6th step, after lifting is finished, rotate pin 2, it is extracted in tube coupling hole for hoist 5, finish lifting operation and withdraw portal frame 1.

Claims (3)

1. the upset lifting device of a ferro-concrete tube coupling, it is characterized in that: two hangers, the symmetries that it comprises portal frame, be located at both sides, portal frame top are opened in two coaxial through-holes on the portal frame dual-side, symmetry is opened in two coaxial tube coupling holes for hoist on the reinforced concrete pipe pipe joint wall, and mates two pins that use with through hole and tube coupling hole for hoist.
2. the upset lifting device of ferro-concrete tube coupling according to claim 1 is characterized in that: also comprise the upset hanger that is embedded in ferro-concrete tube coupling one end.
3. the upset lifting device of ferro-concrete tube coupling according to claim 1, it is characterized in that: the degree of depth of tube coupling hole for hoist is more than or equal to 15 centimetres.
CN 201220389585 2012-08-08 2012-08-08 Turnover hoisting tool for reinforced concrete pipe joint Expired - Fee Related CN202785255U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220389585 CN202785255U (en) 2012-08-08 2012-08-08 Turnover hoisting tool for reinforced concrete pipe joint

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220389585 CN202785255U (en) 2012-08-08 2012-08-08 Turnover hoisting tool for reinforced concrete pipe joint

Publications (1)

Publication Number Publication Date
CN202785255U true CN202785255U (en) 2013-03-13

Family

ID=47812563

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220389585 Expired - Fee Related CN202785255U (en) 2012-08-08 2012-08-08 Turnover hoisting tool for reinforced concrete pipe joint

Country Status (1)

Country Link
CN (1) CN202785255U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104669434A (en) * 2013-11-27 2015-06-03 五冶集团上海有限公司 Construction method of large reinforced concrete prefabricated column and beam lifting auxiliary embedded part
CN107311029A (en) * 2017-08-08 2017-11-03 安徽海龙建筑工业有限公司 It is a kind of for the demoulding of polygon prefabricated toilet, upset, lifting device
CN113415712A (en) * 2021-07-09 2021-09-21 上海隧道工程有限公司 Lifting appliance for large-section jacking pipe joints in urban dense area and lifting method thereof

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104669434A (en) * 2013-11-27 2015-06-03 五冶集团上海有限公司 Construction method of large reinforced concrete prefabricated column and beam lifting auxiliary embedded part
CN107311029A (en) * 2017-08-08 2017-11-03 安徽海龙建筑工业有限公司 It is a kind of for the demoulding of polygon prefabricated toilet, upset, lifting device
CN113415712A (en) * 2021-07-09 2021-09-21 上海隧道工程有限公司 Lifting appliance for large-section jacking pipe joints in urban dense area and lifting method thereof

Similar Documents

Publication Publication Date Title
CN101434366B (en) Hoisting tool and hoisting method for column component
CN104963301A (en) Dragging, translating and lowering device and method for dismantling pier top beam section and pier
CN104480930B (en) A kind of filling pile cage of reinforcement hangs fixing construction method
CN203794498U (en) Built-in self-elevating tower crane device
CN202785255U (en) Turnover hoisting tool for reinforced concrete pipe joint
CN102910532B (en) Method for butting and hoisting large box type derricks in air
CN206767425U (en) A kind of integral hoisting device for rapid for ground-connecting-wall steel reinforcement cage
CN205114843U (en) Prefabricated post hoist device with unhook function
CN203820287U (en) Composite steel carrying pole for hoisting roof tiles of steel structure workshops
CN105464456A (en) Method and lifting sling for assembling extra-high voltage transmission iron tower through helicopter
CN203187333U (en) Light carrying device for building block installment
CN201334306Y (en) Hoisting machine for upright post member
CN203998604U (en) The be threaded vertical reinforcement erecting equipment of form of employing
CN105621231A (en) Combined lifting appliance special for large-diameter reinforced concrete drainage pipe
CN204162282U (en) A kind of large-diameter steel reinforced concrete drainage pipe special combination suspender
CN105040592B (en) A kind of horizontal drawing cable bridge and its erection method
CN103979442B (en) The method of 6400 tons of Hydraulic double-type crane lifting cost tropsch reactors
CN203741842U (en) SMW construction method profile steel pullout auxiliary device
CN204265208U (en) A kind of segment lifting appliance
CN205132926U (en) Special well word hoist of hydroelectric set tail water ell
CN205590168U (en) Overturning lifting device
CN108644471B (en) Pipeline sliding transportation structure system on large-area water area and construction method thereof
CN218969768U (en) Hoisting device for corrugated steel web section beam
CN111255132A (en) Unit type glass curtain wall construction method
CN105113426A (en) Cable connector and steel truss arch bridge cable connecting method

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 201900 Shanghai city Baoshan District Tieli Road No. 2469

Co-patentee after: MCC TIANGONG GROUP Corp.,Ltd.

Patentee after: SHANGHAI ERSHIYE CONSTRUCTION Co.,Ltd.

Address before: 201900 Shanghai city Baoshan District Tieli Road No. 2469

Co-patentee before: MCC TIANGONG GROUP Corp.,Ltd.

Patentee before: SHANGHAI MCC13 CONSTRUCTION Co.,Ltd.

Address after: 201900 Shanghai city Baoshan District Tieli Road No. 2469

Co-patentee after: MCC TIANGONG GROUP Corp.,Ltd.

Patentee after: SHANGHAI MCC13 CONSTRUCTION Co.,Ltd.

Address before: 201900 Shanghai city Baoshan District Tieli Road No. 2469

Co-patentee before: MCC TIANGONG GROUP Corp.,Ltd.

Patentee before: CMTCC Shanghai 13th Construction Co.,Ltd.

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20200511

Address after: 201999 room A, room 1325, Mudanjiang Road, Shanghai, Baoshan District, 403

Co-patentee after: CHINA MCC20 GROUP Corp.,Ltd.

Patentee after: SHANGHAI ERSHIYE CONSTRUCTION Co.,Ltd.

Address before: 201900 Shanghai city Baoshan District Tieli Road No. 2469

Co-patentee before: MCC TIANGONG GROUP Corp.,Ltd.

Patentee before: SHANGHAI ERSHIYE CONSTRUCTION Co.,Ltd.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130313

Termination date: 20200808