CN201176567Y - Mobile angular adjustment frame hanging at end of staying cable beam - Google Patents

Mobile angular adjustment frame hanging at end of staying cable beam Download PDF

Info

Publication number
CN201176567Y
CN201176567Y CNU200720300464XU CN200720300464U CN201176567Y CN 201176567 Y CN201176567 Y CN 201176567Y CN U200720300464X U CNU200720300464X U CN U200720300464XU CN 200720300464 U CN200720300464 U CN 200720300464U CN 201176567 Y CN201176567 Y CN 201176567Y
Authority
CN
China
Prior art keywords
suspension cable
bracing frame
frame
cable beam
adjustment frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNU200720300464XU
Other languages
Chinese (zh)
Inventor
张鸿
刘先鹏
罗承斌
陈鸣
邓惠斌
饶华容
谢军波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCCC Second Harbor Engineering Co
CCCC Road and Bridge Special Engineering Co Ltd
Original Assignee
CCCC Second Harbor Engineering Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCCC Second Harbor Engineering Co filed Critical CCCC Second Harbor Engineering Co
Priority to CNU200720300464XU priority Critical patent/CN201176567Y/en
Application granted granted Critical
Publication of CN201176567Y publication Critical patent/CN201176567Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model discloses a movable angle adjusting frame which is hung on one end of a stay cable beam and comprises a bracing frame of a truss structure, wherein an operating platform is arranged on the upper portion of the bracing frame, a sliding orbit is arranged on the operating platform, and at least two calabash slings are arranged on the sliding orbit. The bracing frame is arranged on the orbit. The movable angle adjusting frame has the characteristics of convenient installation and disassembly, simple operation, safe use, accurate positioning, high working efficiency and the like, and greatly enriches the construction technique of a stay cable. Simultaneously, the adjusting frame has light weight, small generated load, repeatable use and good economical efficiency.

Description

The suspension cable beam-ends hangs portable angle adjustment frame
Technical field
The utility model belongs to the suspension cable construction equipment of large and medium-sized cable stayed bridge, is specifically related to a kind of portable angle adjustment frame that the suspension cable beam-ends hangs that is used for.
Background technology
Suspension cable is hanged up construction and is mainly comprised bridge floor on the rope, exhibition rope, hangs and operation such as stretch-draw, hangs wherein that the operation technology content is the highest, difficulty and risk maximum.Hang branch tower end and hang with beam-ends and hang, consider the reliability and the safety of construction, suspension cable carries out the tower end earlier and hangs, and carries out beam-ends then and hangs.After the oblique tensile tower end hangs, the effect of the stretched wire power of being conducted oneself with dignity, in the suspension cable beam-ends distraction procedure, its anchored end is difficult to enter cable guide pipe (having angle between suspension cable anchored end and the cable guide pipe), simultaneously, knuckle must not appear in soft, the hard draw-gear part that beam-ends adopts, therefore, must carry out angle adjustment to beam-ends rope in the traction anchoring process, to make things convenient for traction construction; Existing all is to adopt single-point lifting adjustment to finish suspension cable to hang up.But the single-point lifting force is big, very easily suspension cable PE is produced and damages, and can not finish above-mentioned construction requirement for the suspension cable construction of large and medium-sized cable stayed bridge;
Take multiple spot to promote, but the lifting appliance that needs thus will roll up, the increase of equipment also can strengthen construction temporary load(ing) (also uneconomical), and this will produce very adverse effect to structure (steel case beam) and linear control.And do not have corresponding device thereof to address the above problem now as yet.
Summary of the invention
The purpose of this utility model is to provide a kind of suspension cable that is suitable for large and medium-sized cable stayed bridge that is exclusively used in to hang up the suspension cable beam-ends of construction and hang portable angle adjustment frame.To address the above problem.
The technical solution of the utility model is: the suspension cable beam-ends hangs portable angle adjustment frame, and it comprises the bracing frame of trussed construction, and operating platform is established on bracing frame top, and sliding rail is established in the operating platform top, and sliding rail is provided with at least two cucurbit suspenders.
Support frame as described above is located on the track.
Portable angle adjustment frame has peace and tears convenience, simple to operate, safe in utilization, characteristics such as the location is accurate, operating efficiency height open, has enriched stay cable construction technique to a great extent.Simultaneously, in light weight, little, reusable, the good economy performance of generation load of adjustment rack.
Description of drawings
Fig. 1 suspension cable beam-ends hangs portable angle adjustment shelf structure schematic diagram.
Fig. 2 suspension cable beam-ends hangs portable angle adjustment frame schematic top plan view.
Fig. 3 suspension cable beam-ends hangs portable angle adjustment frame schematic side view.
Fig. 4 suspension cable beam-ends hangs portable angle adjustment frame construction schematic diagram.
The specific embodiment
Present embodiment is used for the explanation to technical solutions of the utility model, and it is concrete structure that protection domain of the present utility model is not limited to down.
As shown in Figure 1, bracing frame 1 is the trussed construction that is formed by the rod member bolt; No longer this type of states trussed construction.Bracing frame 1 top setting operation platform 2, operating platform 2 shape as shown in Figure 2; Operating platform 2 tops, promptly sliding rail 3 is established at bracing frame 1 top; Sliding rail 3 is provided with at least two cucurbit suspenders 4; Establish cat ladder 5 on the bracing frame 1 and lead to operating platform 2 (as shown in Figure 3).As shown in Figure 3, bracing frame 1 has running roller 6, and running roller 6 is located on the track 7.Whole bracing frame 1 is located on the steel case beam 8.
The suspension cable beam-ends hangs construction as shown in Figure 4, in the time of near the suspension cable traction arrives beam-ends noose pipe, on rope, hoisting fixture is installed by certain spacing, and be connected with Chain block on the adjustment rack, upwards spur Chain block, make the angle and the noose pipe basically identical of beam-ends suspension cable, start jack traction suspension cable then and enter the noose pipe, constantly finely tune the drag-line angle in the distraction procedure by the folding and unfolding Chain block, until anchoring, when this skew cables hang finish after, adjustment rack integral body is drawn the installation site that moves to next root rope by hoist engine.This device can have been protected suspension cable and constructor's safety effectively, has guaranteed construction speed.

Claims (3)

1, a kind of suspension cable beam-ends hangs portable angle adjustment frame, and it comprises the bracing frame of trussed construction, it is characterized in that bracing frame top establishes operating platform, and sliding rail is established in the operating platform top, and sliding rail is provided with at least two cucurbit suspenders.
2, the suspension cable beam-ends hangs portable angle adjustment frame according to claim 1, it is characterized in that support frame as described above is located on the track.
3, hang portable angle adjustment frame as suspension cable beam-ends as described in the claim 2, it is characterized in that bracing frame divides into running roller, running roller is located on the track.
CNU200720300464XU 2007-12-27 2007-12-27 Mobile angular adjustment frame hanging at end of staying cable beam Expired - Fee Related CN201176567Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU200720300464XU CN201176567Y (en) 2007-12-27 2007-12-27 Mobile angular adjustment frame hanging at end of staying cable beam

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU200720300464XU CN201176567Y (en) 2007-12-27 2007-12-27 Mobile angular adjustment frame hanging at end of staying cable beam

Publications (1)

Publication Number Publication Date
CN201176567Y true CN201176567Y (en) 2009-01-07

Family

ID=40216585

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU200720300464XU Expired - Fee Related CN201176567Y (en) 2007-12-27 2007-12-27 Mobile angular adjustment frame hanging at end of staying cable beam

Country Status (1)

Country Link
CN (1) CN201176567Y (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101775782B (en) * 2010-01-07 2012-01-25 中交第二公路工程局有限公司 Elevator for setting angle adjustment of stayed-cable bridge
CN103603486A (en) * 2013-10-30 2014-02-26 北京工业大学 Adaptive angle self-climbing construction platform
CN106284073A (en) * 2016-08-25 2017-01-04 中铁大桥局集团有限公司 A kind of suspension cable beam-ends hanging cable equipment
CN111593674A (en) * 2020-06-12 2020-08-28 安徽省公路桥梁工程有限公司 Suspended casting beam cable construction structure and construction method for n-shaped beam bridge

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101775782B (en) * 2010-01-07 2012-01-25 中交第二公路工程局有限公司 Elevator for setting angle adjustment of stayed-cable bridge
CN103603486A (en) * 2013-10-30 2014-02-26 北京工业大学 Adaptive angle self-climbing construction platform
CN106284073A (en) * 2016-08-25 2017-01-04 中铁大桥局集团有限公司 A kind of suspension cable beam-ends hanging cable equipment
CN111593674A (en) * 2020-06-12 2020-08-28 安徽省公路桥梁工程有限公司 Suspended casting beam cable construction structure and construction method for n-shaped beam bridge

Similar Documents

Publication Publication Date Title
CN203377546U (en) High speed railway spanning construction apparatus
CN104276514B (en) Mounting method of flooring self-balance wrapping rod
CN201376848Y (en) Large-scale double-tower automatic-elevation hoisting equipment
CN201176567Y (en) Mobile angular adjustment frame hanging at end of staying cable beam
CN107476560B (en) Wind power tower construction platform and method
CN206590793U (en) Connect arm assembly and the movable arm tower crane comprising the device in the air
CN204625045U (en) A kind of steel structure hoisting door shaped stent formula hanging apparatus
CN108625289A (en) A kind of stringer and erection method suitable for stiffening girder of suspension bridge
CN210886924U (en) Maintenance platform in retractable double-cable-plane cable-stayed bridge tower stay cable area
CN201598570U (en) Cable-stayed bridge cableway erecting equipment
CN204474191U (en) The jib body dumping mechanism of tower crane
CN203867198U (en) Slip equipment for high-rise steel structure transfer layer truss
CN203716062U (en) Integral type pier body decorating hanging basket
CN202518943U (en) Creeper-traveler for coating bridge location
CN206110810U (en) Fixed armful of pole structure of staple bolt that slides
CN102061681A (en) Fixed dual-hoisting point cantilever track type joist truss installing method
CN201722937U (en) Sliding platform for installation of net rack
CN204138213U (en) Track gun carriage is used in a kind of cell cube curtain wall lifting
CN103896153A (en) Zig-zag derrick for replacing disconnecting link
CN209276035U (en) A kind of self-supporting superelevation Lift-on/Lift-off System
CN203530863U (en) Liftable operating platform for tensioning of hanging basket
CN204198306U (en) A kind of device for purlin lifting in building operation
CN203333224U (en) Steel structural beam upward lifting tool
CN202658521U (en) Overhauling system of stayed cable of single plane cable stayed bridge
CN207244453U (en) A kind of suspension bridge light anchorage mast apparatus

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: WUHAN CCCC ROAD + BRIDGE SPECIAL ENGINEERING CO.,

Effective date: 20120606

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 430014 WUHAN, HUBEI PROVINCE TO: 430032 WUHAN, HUBEI PROVINCE

TR01 Transfer of patent right

Effective date of registration: 20120606

Address after: 430032. 11 Golden Lake Road, Dongxihu lake, Wuhan, Hubei

Co-patentee after: CCCC Road & Bridge Special Engineering Co., Ltd.

Patentee after: China Communications 2nd Navigational Bureau

Address before: 430014 No. 16, Nanjing Road, Jianghan District, Hubei, Wuhan

Patentee before: China Communications 2nd Navigational Bureau

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20090107

Termination date: 20161227