CN207801340U - A kind of device of the quick cabling of vertical - Google Patents

A kind of device of the quick cabling of vertical Download PDF

Info

Publication number
CN207801340U
CN207801340U CN201721339689.6U CN201721339689U CN207801340U CN 207801340 U CN207801340 U CN 207801340U CN 201721339689 U CN201721339689 U CN 201721339689U CN 207801340 U CN207801340 U CN 207801340U
Authority
CN
China
Prior art keywords
cable
vertical
mine
steel wire
wire rope
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721339689.6U
Other languages
Chinese (zh)
Inventor
刘善仁
李祥迎
蔡金良
丁彦杰
丁洋
李莎
王娟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Mining Administration Technology Service Group Co Ltd
Co Ltd Of New Building Engineering Group Of Shandong China
Original Assignee
Shandong Mining Administration Technology Service Group Co Ltd
Co Ltd Of New Building Engineering Group Of Shandong China
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Mining Administration Technology Service Group Co Ltd, Co Ltd Of New Building Engineering Group Of Shandong China filed Critical Shandong Mining Administration Technology Service Group Co Ltd
Priority to CN201721339689.6U priority Critical patent/CN207801340U/en
Application granted granted Critical
Publication of CN207801340U publication Critical patent/CN207801340U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Emergency Lowering Means (AREA)

Abstract

The utility model discloses a kind of devices of the quick cabling of vertical, including stock in mine and well head, stock includes first in well head, second support and multiple cross-braces, first, second support is symmetrically disposed in both sides above mine, multiple cross-braces are equally spaced located at first, between second support, mobile mechanism is provided in cross-brace, mobile mechanism is connected with Hanging roller, steel wire rope is equipped on Hanging roller, steel wire rope one end is connected by circulator with cable drum fixed mechanism, the other end is connected with stable car, stable car is by earth anchorage on the ground of mine side, rotatably arranged with there is cable drum on cable drum fixed mechanism, cable is arranged on cable drum, cable passes sequentially through cable clamping mechanism and is laid on mine side wall.The utility model solves the problems, such as that cable and steel wire rope mutually twine in decentralization process, rotate and cable broken skin is damaged, and improves cabling efficiency and cable protection, ensure that the mine operation time.

Description

A kind of device of the quick cabling of vertical
Technical field
The utility model is related to pit gear technical field more particularly to a kind of devices of the quick cabling of vertical.
Background technology
Currently, after in mine main shaft equipment, installation is complete, it is actually needed according to scene, mine side generally requires pit shaft to increase by one Root control cable can preferably serve production, according to old technique strain relief clamp by steel wire rope in cable fixing together under It puts, there are cables and steel wire rope mutually to twine phenomenon in decentralization process, and cable has the possibility that broken skin is damaged, and the construction time is longer, influences Mine side produces.In addition, scene is difficult the steel wire rope that arrangement is mutually twisted.
Invention content
It is the technical issues of in the presence of the utility model mainly solution prior art, short to provide a kind of construction time And the efficient and quick cabling of the good vertical of protectiveness device.
The above-mentioned technical problem of the utility model is mainly to be addressed by following technical proposals:
The device of the quick cabling of vertical provided by the utility model comprising:
Stock in mine and well head, stock includes the first support, the second support and multiple cross-braces, institute in the well head It states the first, second support and is symmetrically disposed in both sides above the mine, multiple cross-braces are equally spaced in institute Between stating the first, second support, mobile mechanism is provided in the cross-brace, the mobile mechanism is connected with Hanging roller, institute It states and is equipped with steel wire rope on Hanging roller, described steel wire rope one end is connected by circulator with cable drum fixed mechanism, another End is connected with stable car, and for the stable car by earth anchorage on the ground of the mine side, the cable drum fixes machine Rotatably arranged with there is cable drum on structure, cable is arranged on the cable drum, the cable passes through cable clamping mechanism It is laid on the mine side wall.
Further, the mobile mechanism includes slide rail pair, sliding block and fixing bolt, and the slide rail pair is arranged in the cross To in support, the sliding block is movably disposed in the slide rail pair, and the Hanging roller passes through to be opened up in the cross-brace Sliding slot be connected with the slider bottom, the fixing bolt is arranged on the sliding block, for by the sliding block with it is described Slide rail pair is mutually locked.
Further, the cable drum fixed mechanism includes lifting hug part, the first vertical fixed link, the second vertical fixation Bar, horizontal bull stick and skip bucket workbench, the lifting hug part upper center are connected with the circulator, lower end both sides respectively with institute State the first vertical fixed link, the second vertical fixed link is fixedly connected, the first vertical fixed link, the second vertical fixed link are symmetrical Ground is arranged in skip bucket workbench both sides, and the horizontal bull stick is removably installed in the described first vertical fixed link, second perpendicular Between straight fixed link, the cable drum is rotatably sleeved on the horizontal bull stick.
Further, the cable clamping mechanism includes cable bearer, strain relief clamp and protective case, and the protective case is arranged On the strain relief clamp, and the protective case and the cable clamped contact, the strain relief clamp are installed in the cable branch On frame, the cable bearer is spaced apart and arranged in the mine wall.
Further, multiple steel wire rope snap rings are additionally provided on the steel wire rope.
Further, the second vertical fixed link is made using channel steel, and the horizontal bull stick is the round steel of diameter phi 50mm.
The beneficial effects of the utility model are:Machine is fixed by stock, Hanging roller, steel wire rope, cable drum in well head Structure, circulator, stable car and cable clamping mechanism, solve cable and steel wire rope in cable decentralization laid processes mutually twine, cable rolling Cylinder fixed mechanism rotates integrally and cable has the problem of broken skin damage, improves cabling efficiency and cable finished product protection, It ensure that the upright often production of mine, save labour and reduce labor intensity, more production times have been won for mine operation; Mobile mechanism realizes the reasonable adjusting of cable drum fixed mechanism position, is conducive to construction personnel's cabling, improves laying Efficiency.Meanwhile the utility model is simple in structure, firm and durable, securely and reliably.
Description of the drawings
In order to illustrate the embodiment of the utility model or the technical proposal in the existing technology more clearly, below will be to embodiment Or attached drawing needed to be used in the description of the prior art is briefly described, it should be apparent that, the accompanying drawings in the following description is only It is some embodiments of the utility model, for those of ordinary skill in the art, in the premise not made the creative labor Under, other drawings may also be obtained based on these drawings.
Fig. 1 is the structural schematic diagram of the device of the quick cabling of vertical of the utility model;
Fig. 2 is the partial enlarged view of the device of the quick cabling of vertical of the utility model.
Specific implementation mode
The preferred embodiment of the utility model is described in detail below in conjunction with the accompanying drawings, so that the advantages of the utility model It can be easier to be readily appreciated by one skilled in the art with feature, it is apparent clear to be made to the scope of protection of the utility model Define.
Refering to fig. 1 shown in -2, the device of the quick cabling of vertical of the utility model comprising:
Stock 2 in mine 1 and well head, stock 2 includes first the 21, second support 22 of support and multiple cross-braces in well head 23, the first, second support (21,22) is symmetrically disposed in 1 top both sides of mine, and multiple cross-braces 23 are equally spaced Between first, second support (21,22), mobile mechanism 3 is provided in cross-brace 23, mobile mechanism 3 is connected with Hanging roller 4, Steel wire rope 5 is equipped on Hanging roller 4,5 one end of steel wire rope is connected by circulator 7 with cable drum fixed mechanism 6, the other end It is connected with stable car 8, stable car 8 is by earth anchorage on the ground of 1 side of mine, and in the present embodiment, stable car 8 uses the rule of 5t Lattice;Rotatably arranged with there is cable drum 10 on cable drum fixed mechanism 6, cable 12, cable are arranged on cable drum 10 12 are laid in by cable clamping mechanism 9 on 1 side wall of mine.
The utility model by stock in well head 2, Hanging roller 4, steel wire rope 5, cable drum fixed mechanism 6, circulator 7, Stable car 8 and cable clamping mechanism 9, solve cable 12 transfer cable 12 and steel wire rope 5 in laid processes mutually twine, cable drum it is solid Determining the integral-rotation of mechanism 6 and cable has the problem of broken skin damage, improves cabling efficiency and cable finished product protection, ensures The upright often production of mine, saving labour simultaneously reduces labor intensity, and more production times have been won for mine operation;It is mobile Mechanism 3 realizes the reasonable adjusting of 6 position of cable drum fixed mechanism, is conducive to construction personnel's cabling 12, improves laying Efficiency.Meanwhile the utility model is simple in structure, firm and durable, securely and reliably.
Specifically, mobile mechanism 3 includes slide rail pair 31, sliding block 32 and fixing bolt 33, and slide rail pair 31 is arranged in lateral branch In support 23, sliding block 32 is movably disposed in slide rail pair 31, and Hanging roller 4 passes through the sliding slot and sliding block opened up in cross-brace 23 32 bottoms are connected, and fixing bolt 33 is arranged on sliding block 32, for locking sliding block 32 and 31 phase of slide rail pair.It is rolled according to cable Position of the cylinder fixed mechanism 6 in mine 1 needs, while facilitating construction personnel's cabling 12, by mobile sliding block 32 in cunning The position in mine 1 of cable drum fixed mechanism 6 is realized to drive the movement of 4 position of Hanging roller in position in rail pair 31 It adjusts, when meeting construction demand, is mutually locked sliding block 32 and slide rail pair 31 by the fixing bolt 33 on sliding block 32, to Ensure that the position of Hanging roller 4 and cable drum fixed mechanism 6 is stablized, constructs convenient for construction personnel.
Specifically, cable drum fixed mechanism 6 is fixed vertically including lifting hug part 61, the first vertical fixed link 62, second Bar 63, horizontal bull stick 64 and skip bucket workbench 65,61 upper center of lifting hug part are connected with circulator 7, lower end both sides respectively with First vertical fixed link 62, the second vertical fixed link 63 are fixedly connected, and the first vertical fixed link 62, the second vertical fixed link 63 are right Ground is claimed to be arranged in 65 both sides of skip bucket workbench, it is solid vertically that horizontal bull stick 64 is removably installed in the first vertical fixed link 62, second Between fixed pole 63, cable drum 10 is rotatably sleeved on horizontal bull stick 64.Wherein, circulator 7 is mainly used for preventing cable 12 Rotation.
First, by 10 sets of horizontal bull sticks 64 put into cable drum fixed mechanism 6 of cable drum, and by 64 liang of horizontal bull stick End is fixed on the first vertical fixed link 62, in the second vertical fixed link 63;Then, stable car 8 will by steel wire rope 5 and Hanging roller 4 Cable drum fixed mechanism 6 is hung to 1 mouthful of mine, and construction personnel's seating skip bucket workbench 65 follows transfers together, at this time will 12 length of cable on mine 1 reserves in advance, and cable clamping mechanism 9 by strain relief clamp in corresponding position, when first layer card Gu after the completion of, stable car 8 transfers steel wire rope 5, is slowly transferred using the dead weight of cable drum 10, while cable drum 10 is in horizontal bull stick 64 Upper automatic rotation release cable 12, after reaching 20 meters of decentralization, construction personnel carries out the second layer by cable clamping mechanism 9 and fixes electricity Cable 12 has blocked 20 meters and transfers 20 meters again and blocked again, is completed until cable 12 fixes;Finally, stable car 8 carries steel wire rope 5 to 1 well of mine Mouthful, the laying of cable 12 is completed.
Specifically, cable clamping mechanism 9 includes cable bearer 91, strain relief clamp 92 and protective case 93, and protective case 93 is arranged On strain relief clamp 92, and protective case 93 and 12 clamped contact of cable, strain relief clamp 92 are installed on cable bearer 91, cable branch Frame 91 is spaced apart and arranged on 1 wall of mine.Cable 12 is installed in 1 wall of mine along upper cable branch successively by strain relief clamp 92 On frame 91, prevent other work of 12 wobble effects mine of cable, protective case 93 from can prevent cable 12 from occurring during clamping Decortication and destruction, improve the safety of the service life and mine underground work of cable 12.
Preferably, being additionally provided with multiple steel wire rope snap rings 11 on steel wire rope 5, prevents steel wire rope 5 loose, improve steel wire rope Wearability;In the rope strand of steel wire rope 5 between each layer steel wire be wire-shaped contact, equal lay, metal tomography area is big, unit area Contact stress is small, is not easy fracture of wire, wear-resisting, endurance, pull-off force height, service life length, safe and reliable etc..
Preferably, in the utility model, the first, second vertical fixed link (62,63) be respectively adopted 20# channel steels make and At horizontal bull stick 64 is the round steel of diameter phi 50mm, and to keep cable drum fixed mechanism 6 solid not easily broken, tensile strength is big, carries The safety of high whole device and service life.
More than, only specific embodiment of the present utility model, but protection scope of the utility model is not limited thereto, Any change or replacement expected without creative work, should be covered within the scope of the utility model.Therefore, The scope of protection of the utility model should be determined by the scope of protection defined in the claims.

Claims (6)

1. a kind of device of the quick cabling of vertical, including stock in mine and well head, which is characterized in that the well head inner sleeve Frame includes the first support, the second support and multiple cross-braces, and first, second support is symmetrically disposed on the mine Square both sides, multiple cross-braces are equally spaced between first, second support, are arranged in the cross-brace There are mobile mechanism, the mobile mechanism to be connected with Hanging roller, steel wire rope is equipped on the Hanging roller, described steel wire rope one end is logical It crosses circulator with cable drum fixed mechanism to be connected, the other end is connected with stable car, and the stable car is by earth anchorage in institute On the ground for stating mine side, rotatably arranged with having cable drum, the cable drum on the cable drum fixed mechanism On be arranged with cable, the cable is laid in by cable clamping mechanism on the mine side wall.
2. the device of the quick cabling of vertical as described in claim 1, which is characterized in that the mobile mechanism includes sliding rail Secondary, sliding block and fixing bolt, the slide rail pair are arranged in the cross-brace, and the sliding block is movably disposed at the cunning In rail pair, the Hanging roller passes through the sliding slot opened up in the cross-brace to be connected with the slider bottom, the fixed spiral shell Bolt is arranged on the sliding block, for mutually locking the sliding block and the slide rail pair.
3. the device of the quick cabling of vertical as claimed in claim 2, which is characterized in that the cable drum fixed mechanism Including lifting hug part, the first vertical fixed link, the second vertical fixed link, horizontal bull stick and skip bucket workbench, on the lifting hug part End middle part is connected with the circulator, and lower end both sides are fixed with the described first vertical fixed link, the second vertical fixed link respectively Connection, the first vertical fixed link, the second vertical fixed link are symmetrically disposed in skip bucket workbench both sides, described horizontal turn Bar is removably installed between the described first vertical fixed link, the second vertical fixed link, and the cable drum rotationally covers It is located on the horizontal bull stick.
4. the device of the quick cabling of vertical as claimed in claim 3, which is characterized in that the cable clamping mechanism includes Cable bearer, strain relief clamp and protective case, the protective case are set on the strain relief clamp, and the protective case and the electricity Cable clip close contact, the strain relief clamp are installed on the cable bearer, and the cable bearer is spaced apart and arranged in the mine On wall.
5. the device of the quick cabling of vertical according to any one of claims 1-4, which is characterized in that on the steel wire rope It is additionally provided with multiple steel wire rope snap rings.
6. the device of the quick cabling of vertical as claimed in claim 3, which is characterized in that described first, second is vertical solid Fixed pole is made using channel steel, and the horizontal bull stick is the round steel of diameter phi 50mm.
CN201721339689.6U 2017-10-18 2017-10-18 A kind of device of the quick cabling of vertical Expired - Fee Related CN207801340U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721339689.6U CN207801340U (en) 2017-10-18 2017-10-18 A kind of device of the quick cabling of vertical

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721339689.6U CN207801340U (en) 2017-10-18 2017-10-18 A kind of device of the quick cabling of vertical

Publications (1)

Publication Number Publication Date
CN207801340U true CN207801340U (en) 2018-08-31

Family

ID=63273928

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721339689.6U Expired - Fee Related CN207801340U (en) 2017-10-18 2017-10-18 A kind of device of the quick cabling of vertical

Country Status (1)

Country Link
CN (1) CN207801340U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109256726A (en) * 2018-11-22 2019-01-22 陕西陕煤铜川矿业有限公司 A kind of cable laying method of vertical laying pipeline
CN110112681A (en) * 2019-05-23 2019-08-09 广州市机电安装有限公司 A kind of modular cable lifting laying auxiliary device
CN112615336A (en) * 2020-12-08 2021-04-06 安徽马钢罗河矿业有限责任公司 Underground midspan power distribution system and method

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109256726A (en) * 2018-11-22 2019-01-22 陕西陕煤铜川矿业有限公司 A kind of cable laying method of vertical laying pipeline
CN110112681A (en) * 2019-05-23 2019-08-09 广州市机电安装有限公司 A kind of modular cable lifting laying auxiliary device
CN112615336A (en) * 2020-12-08 2021-04-06 安徽马钢罗河矿业有限责任公司 Underground midspan power distribution system and method

Similar Documents

Publication Publication Date Title
CN207801340U (en) A kind of device of the quick cabling of vertical
CN205489264U (en) Hydraulic pressure assembled crossing structure
CN204760890U (en) Wire hoisting device in distribution lines construction
CN102290742A (en) Tension stringing construction technology
CN104953507A (en) Device and method for lifting wire during distribution line construction
KR100953688B1 (en) The wire guide apparatus for string on transmission line, and method for wire string on transmission line using the wire guide apparatus
CN103790113B (en) A kind of steel strand stay cable reeving device and method of reeving thereof
CN105905815B (en) The method of work of seat ground self-balancing pole
CN101582572A (en) Method of extra-high voltage tension stringing
CN110886576A (en) Adjustable insulation flat ladder
CN208220671U (en) Telescopic wire rope handling guide pulley device
CN110002343B (en) Self-driven urban underground prefabricated comprehensive pipe gallery laying hoisting machine and construction method
CN102593759A (en) One-pulling-two expansion and construction process of large-section lead
CN209702181U (en) A kind of insulator lifting device
CN214527565U (en) Quick laying structure of deep vertical shaft steel wire rope
CN205955166U (en) Hanging flower basket couple formula prevents weighing down anti -shaking device
CN206076833U (en) A kind of wire-binding device of convenient use
CN206375502U (en) The crossover device of distribution line unwrapping wire
CN206035369U (en) Load formula rope ladder
CN113526187B (en) Method for laying belt at head of belt conveyor in limited space of transfer station into rolled belt
CN210658017U (en) Support arrangement for steel strand wires construction
CN206554809U (en) A kind of civil engineering drilling piling machine
CN206232309U (en) A kind of glomeration building concrete hollow block wall piece banding system
CN218482617U (en) Suspension structure of temporary power cable
CN111431086A (en) Can stride across with fill coaster of conductor spacer

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180831

Termination date: 20191018

CF01 Termination of patent right due to non-payment of annual fee