CN206737388U CN201720557870.8U CN201720557870U CN206737388U CN 206737388 U CN206737388 U CN 206737388U CN 201720557870 U CN201720557870 U CN 201720557870U CN 206737388 U CN206737388 U CN 206737388U
Authority
CN
China
Prior art keywords
lift
support platform
support
platform
elevator
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720557870.8U
Other languages
Chinese (zh)
Inventor
杜明清
王旭岗
李宪辉
王联君
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Geshan Construction Group Co Ltd
Original Assignee
Geshan Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Geshan Construction Group Co Ltd filed Critical Geshan Construction Group Co Ltd
Priority to CN201720557870.8U priority Critical patent/CN206737388U/en
Application granted granted Critical
Publication of CN206737388U publication Critical patent/CN206737388U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

It the utility model is related to a kind of lift-on/lift-off type elevator hoistway construction platform device,Including support platform,At least provided with two supporting frames in support platform,The bars of two supporting frames it is long parallel with the supporting plane of support platform and between connected by support spring,The both sides of support platform are stretched out at the both ends of two supporting frames,Two supporting frames are connected with drawing mechanism,Drawing mechanism drives two supporting frames to move towards and causes upper surface of the both ends of supporting frame away from elevator shear wall,In practice of construction operation,Constructed first against the first layer elevator of building,Construction finishes,After coming on the concrete strength of shear wall,Above-mentioned support platform lifting is placed on to the shear wall upper end of last layer elevator,So that the both ends of two supporting frames ride upon the shear wall upper end of stair shaft,So as to realize the bracketing to support platform,It can be realized to elevator inner template using support platform,Instrument or the support of personnel,The degree of safety for being able to ensure that the safety of personnel and entirely constructing,And the efficiency of construction is high.

Description

Lift-on/lift-off type elevator hoistway construction platform device
Technical field
It the utility model is related to Construction Technology field, and in particular to a kind of lift-on/lift-off type elevator hoistway construction platform device.
Background technology
More than building in being built due to current engineering based on high level, its elevator setting generally increases, and structure type is big More based on concrete shear force wall, multiple erection construction operating platform is formed in construction, reinforcing bar, template and concrete is carried out and mixes Compound etc. is constructed, the operating platform unstability that happens occasionally, operating personnel's falling accident, and some projects under construction even occur in elevator Wall form and operating personnel fall, and smash the major accident of operating platform.
Utility model content
Primary and foremost purpose of the present utility model is:A kind of lift-on/lift-off type elevator hoistway construction platform device is provided, can conveniently be realized To the construction operation of high rise elevator well, it is ensured that the safety of construction.
To achieve the above object, the technical solution adopted in the utility model is:
Lift-on/lift-off type elevator hoistway construction platform device, including support platform, at least provided with two supports in the support platform Support body, the bar of two supporting frame it is long parallel with the supporting plane of support platform and between connected by support spring, it is described The both sides of support platform are stretched out at the both ends of two supporting frames, and two supporting frame is connected with drawing mechanism, the drawing mechanism Drive two supporting frames to move towards and cause upper surface of the both ends of supporting frame away from elevator shear wall.
Following characteristics also be present in the utility model:
Two supporting frame is slidably arranged in the guide pipe of support platform, and the pipe range direction of the guide pipe is horizontal, The support platform is connected with hoisting mechanism, and hoisting mechanism driving support platform, which is located in elevator, to be moved up and down.
The drawing mechanism includes setting the be hinged pull bar being arranged on two supporting frames respectively, and two pull bar is hinged Axle is horizontal and vertical with the length direction of two supporting frames, and the other end of two pull bar is hinged with two connecting rods, and described two draw Quadric chain is formed between two connecting rods of bar, the drawstring of the hoisting mechanism is connected with the pin joint of two connecting rods.
It is hinged in the support platform of the two supporting frames both ends side and is provided with rolling wheel support, the hinge of the rolling wheel support Spindle is parallel with the jointed shaft of pull bar, and the projecting end of the rolling wheel support is provided with back-up roller wheel, the end of two supporting frame When the guide pipe of support platform is stretched out in portion, vertical state, the end of two supporting frame and support is presented in the rolling wheel support When the guide pipe mouth of pipe of platform is concordant, the state that extension is tilted to support platform both sides is presented in the rolling wheel support.
The first bar hole, the hole length direction of first bar hole and the length of supporting frame are provided with the support platform It is parallel to spend direction, connecting shaft is respectively arranged with two supporting frame, the connecting shaft forms the jointed shaft of pull bar and stretching First bar hole, the one end of the rolling wheel support away from back-up roller wheel are provided with the second bar hole, second bar hole and rolling Wheel support length direction is parallel, and the external part of the connecting shaft is slidably arranged in the second bar hole.
Two supporting frame is along two groups of support platform length direction arranged for interval.
Compared with prior art, the technique effect that the utility model possesses is:Above-mentioned lift-on/lift-off type elevator hoistway construction platform dress Put in practice of construction operation, constructed first against the first layer elevator of building, construction finishes, and treats the mixed of shear wall Coagulate after coming in native intensity, above-mentioned support platform lifting is placed on to the shear wall upper end of last layer elevator so that two supports The both ends of support body ride upon the shear wall upper end of stair shaft, so as to realize the bracketing to support platform, can be realized using support platform Support to elevator equipment or personnel, it can be ensured that the safety of personnel and the degree of safety entirely constructed, and the construction is imitated Rate is high.
Brief description of the drawings
Fig. 1 is top view when inner frame coordinates with external mould frame;
Fig. 2 is the top view of lift-on/lift-off type elevator hoistway construction platform device;
Fig. 3 and Fig. 4 is the front view of the two states of lift-on/lift-off type elevator hoistway construction platform device;
Fig. 5 is structural representation when lift-on/lift-off type elevator hoistway construction platform device is in elevator shear wall upper end open position Figure;
Fig. 6 is that lift-on/lift-off type elevator hoistway construction platform device is in the structural representation for being inside elevator shear wall.
Embodiment
With reference to Fig. 1 to Fig. 6, the utility model is further described:
Lift-on/lift-off type elevator hoistway construction platform device, including support platform 10, at least provided with two in the support platform 10 Supporting frame 20, the bar of two supporting frame 20 it is long parallel with the supporting plane of support platform 10 and between pass through support spring The both sides of support platform 10, two supporting frame 20 and drawing mechanism are stretched out in 30 connections, the both ends of two supporting frame 20 Connection, the drawing mechanism drive two supporting frames 20 to move towards and the both ends of supporting frame 20 are sheared away from elevator The upper surface of wall;
With reference to shown in Fig. 5 and Fig. 6, above-mentioned construction tower crane stage apparatus is in practice of construction operation, first against building Bottom elevator constructed, construction finishes, after on the concrete strength of shear wall come after, above-mentioned support platform 10 is put To put in the shear wall upper end of last layer elevator so that the both ends of two supporting frames 20 ride upon the shear wall upper end of elevator, So as to realize the bracketing to support platform 10, the support to elevator equipment or personnel, energy can be realized using support platform 10 Enough ensure the safety of personnel, and the degree of safety entirely constructed, and the efficiency of construction is high;
After the concrete coagulation of the elevator shear wall of construction layer, and after reaching some strength, drawing mechanism is utilized So that being moved towards between two supporting frames 20, and support spring 30 is compressed, so that the end of two supporting frames 20 Portion compresses, and starts hoisting mechanism so that support platform 10 moves up along elevator, and is moved to cutting for last layer elevator Power wall upper end, prepare the construction of the shear wall of last layer elevator.
As preferred scheme of the present utility model, with reference to shown in Fig. 3 and Fig. 4, two supporting frame 20 is slidably arranged in In the guide pipe of support platform 10, the pipe range direction of the guide pipe is horizontal, and the support platform 10 is connected with hoisting mechanism, hung Mounting mechanism driving support platform 10, which is located in elevator, to be moved up and down;
Two above-mentioned supporting frames 20 are slidably arranged in the guide pipe of support platform 10, are realized using guide pipe to two The slide-and-guide of support body 20, the direction that can only be limited so as to limit two supporting frames 20 along guide pipe pipe range is slided, in reality During the construction operation of border, when needing to move up support platform 10, the end of two supporting frames 20 moves towards so that support Spring 30 shrinks, and is moved up along the elevator inwall of the second layer or higher.
Further, the drawing mechanism includes setting the be hinged pull bar 41 being arranged on two supporting frames 20, institute respectively State that the jointed shaft of two pull bars 41 is horizontal and vertical with the length direction of two supporting frames 20, and the other end of two pull bar 41 is hinged Have two connecting rods 42, form quadric chain between two connecting rods 42 of two pull bar 41, the lifting rope of the hoisting mechanism with The pin joint connection of two connecting rods 42;
The lifting rope of above-mentioned hoisting mechanism is connected with the pin joint of two connecting rods 42, when the elevator shear wall of place layer is applied After work, during lifting rope lifting so that four connecting rods 42 deform, so that two pull bars 41 move towards, and then So that two supporting frames 20 move towards, and separate with the shear wall end of elevator, hoisting mechanism starts, by support platform 10 are raised to the upper end of the elevator shear wall of higher level, and lifting rope is unclamped, and two supporting frames 20 are moved backward, made The end for obtaining supporting frame 20 rides upon the upper end of elevator shear wall, and then carries out applying for the elevator shear wall of place layer Work.
Further, it is hinged in the support platform 10 of the both ends side of two supporting frame 20 and is provided with rolling wheel support 51, The jointed shaft of the rolling wheel support 51 is parallel with the jointed shaft of pull bar 41, and the projecting end of the rolling wheel support 51 is provided with back-up roller Wheel 50, when the guide pipe of support platform 10 is stretched out in the end of two supporting frame 20, vertical shape is presented in the rolling wheel support 51 State, when the end of two supporting frame 20 is concordant with the guide pipe mouth of pipe of support platform 10, the rolling wheel support 51 present to The both sides of support platform 10 tilt the state of extension;
With reference to shown in Fig. 5 and Fig. 6, the rolling wheel support 51 of above-mentioned back-up roller wheel 50 is hinged and is arranged on support platform 10 On, when hoisting mechanism driving support platform 10 moves up along elevator, the rolling wheel support 51 is presented to support platform 10 both sides tilt the state of extension so that the wheel rim of back-up roller wheel 50 is resisted against the shearing inner wall of elevator, utilizes back-up roller The shearing inner walls that wheel 50 is resisted against elevator so that between the side of support platform 10 and the shearing inner wall of elevator isolate Gap, and then avoid the ambient side of support platform 10 from being contacted with elevator shearing inner wall, and the scuffing of elevator inwall is caused, and And the shearing inner wall of back-up roller wheel 50 itself and elevator is rolled and coordinated, and is also convenient for hoisting mechanism and is realized to support platform 10 Lifting;
When above-mentioned support platform 10 is promoted at the upper end position of elevator shear wall, the supported on both sides of support platform 10 When support body 20 stretches out the guide pipe of support platform 10, and ride upon at the upper end tube nozzle of elevator shear wall, the now rolling Vertical state is presented in wheel support 51, so that the wheel rim of back-up roller wheel 50 separates with the shearing inner wall of elevator.
Specifically, the first bar hole 101 is provided with the support platform 10, the hole of first bar hole 101 is rectangular To parallel with the length direction of supporting frame 20, connecting shaft 201, the connecting shaft are respectively arranged with two supporting frame 20 201 form the jointed shaft of pull bar 41 and stretch out the first bar hole 101, and the described one end of rolling wheel support 51 away from back-up roller wheel 50 is set The second bar hole 511 is equipped with, second bar hole 511 is parallel with the length direction of rolling wheel support 51, and the connecting shaft 201 is stretched Go out end to be slidably arranged in the second bar hole 511;
Above-mentioned quadric chain and connecting shaft 201 coordinates with the first bar hole 101 and the second bar hole 511, lifting rope Lift quadric chain action, and cause two supporting frames 20 when moving towards, interlock described rolling wheel support 51 present to The both sides of support platform 10 tilt the state of extension, so that the shearing inner wall of the wheel rim of back-up roller wheel 50 and elevator supports Lean on, when support platform 10 is raised to the shear wall upper end of elevator, under the elastic reset power effect of support spring 30 so that The mouth of pipe of guide pipe is stretched out at the both ends of two supporting frames 20, and rides upon the upper end of the shear wall of elevator, and above-mentioned Two supporting frames 20 interlock rolling wheel support 51 and vertical state are presented during the mouth of pipe of guide pipe is stretched out, so that support The wheel rim of roller 50 separates with the shearing inner wall of elevator.
The stable of support platform 10 is supported to realize, two supporting frame 20 is along between the length direction of support platform 10 Every arranging two groups.
The construction method of some elevators is described below, the construction of lift well method employs above-mentioned lift-on/lift-off type electricity Stair shaft construction platform device, the construction method comprise the following steps:
A, it is levelling to flooring to be onstructed, inner frame 60 is arranged in external mould frame 70 so that inner frame 60 and external mould frame 70 form the gap of fill concrete, the fixation of inner frame 60 and external mould frame 70 are realized using connecting bolt 80, to inner frame 60 Clearance filled concrete between external mould frame 70, treat concrete coagulation to setting intensity, form removal;
The support platform 10 of the lift-on/lift-off type construction platform device is ridden upon to the elevator being molded of bottom B, At upper end open, and two supporting frames 20 of support platform 10 are caused to ride upon the upper of the elevator shear wall that has been molded End, hoisting mechanism is connected with the upper face of support platform 10;
C, inner frame 60 is arranged in external mould frame 70 on the upper face of support platform 10 so that inner frame 60 with it is outer Framed 70 form the gap of fill concrete, the fixation of inner frame 60 and external mould frame 70 are realized using connecting bolt 80, to internal model Clearance filled concrete between frame 60 and external mould frame 70, treat concrete coagulation to setting intensity, form removal;
D, start hoisting mechanism, using lifting rope so that two supporting frames 20 are relatively close, and cause two supporting frames 20 End it is concordant with the guide pipe mouth of pipe of support platform 10 so that support platform 10 moves up, until support platform 10 it is upper The end of two supporting frames 20 stretches out the guide pipe mouth of pipe of support platform 10 and rides upon the upper end of elevator shear wall;
F, repeat step C to D, until completing the construction of lift well operation to whole floor;
The inner frame 60 of each layer of above-mentioned elevator and the dismounting of external mould frame 70, can according to the strength conditions of concrete, If the intensity of concrete is enough in itself, can dismantle in advance, also can according to circumstances, when constructing last layer elevator, by next layer The inner frame 60 of elevator and the dismounting of external mould frame 70, to improve efficiency of construction.
It is obvious to a person skilled in the art that the utility model is not limited to the details of above-mentioned one exemplary embodiment, and And in the case of without departing substantially from spirit or essential attributes of the present utility model, it can realize that this practicality is new in other specific forms Type.Therefore, no matter from the point of view of which point, embodiment all should be regarded as exemplary, and is nonrestrictive, this practicality is new The scope of type limits by appended claims rather than described above, it is intended that the equivalency fallen in claim is contained All changes in justice and scope are included in the utility model.Any reference in claim should not be considered as limitation Involved claim.
Moreover, it will be appreciated that although the present specification is described in terms of embodiments, not each embodiment is only wrapped Containing an independent technical scheme, this narrating mode of specification is only that those skilled in the art should for clarity Using specification as an entirety, the technical solutions in the various embodiments may also be suitably combined, forms those skilled in the art It is appreciated that other embodiment.

Claims (6)

1. lift-on/lift-off type elevator hoistway construction platform device, it is characterised in that:Including support platform (10), on the support platform (10) At least provided with two supporting frames (20), the bar length of two supporting frame (20) is parallel with the supporting plane of support platform (10) Connected between and by support spring (30), the both sides of support platform (10), institute are stretched out in the both ends of two supporting frame (20) State two supporting frames (20) to be connected with drawing mechanism, the drawing mechanism drives two supporting frames (20) to move towards and causes branch Upper surface of the both ends away from elevator shear wall of support body (20).
2. lift-on/lift-off type elevator hoistway construction platform device according to claim 1, it is characterised in that:Two supporting frame (20) it is slidably arranged in the guide pipe of support platform (10), the pipe range direction of the guide pipe is horizontal, the support platform (10) it is connected with hoisting mechanism, hoisting mechanism driving support platform (10), which is located in elevator, to be moved up and down.
3. lift-on/lift-off type elevator hoistway construction platform device according to claim 2, it is characterised in that:The drawing mechanism includes The be hinged pull bar (41) being arranged on two supporting frames (20) is set respectively, and the jointed shaft of two pull bar (41) is horizontal and with two The length direction of supporting frame (20) is vertical, and the other end of two pull bar (41) is hinged with two connecting rods (42), and described two draw Form quadric chain between two connecting rods (42) of bar (41), the lifting rope of the hoisting mechanism and two connecting rods (42) it is be hinged Point connection.
4. lift-on/lift-off type elevator hoistway construction platform device according to claim 3, it is characterised in that:Two supporting frame (20) be hinged in the support platform (10) of both ends side and be provided with rolling wheel support (51), the jointed shaft of the rolling wheel support (51) with The jointed shaft of pull bar (41) is parallel, and the projecting end of the rolling wheel support (51) is provided with back-up roller wheel (50), two support frame When the guide pipe of support platform (10) is stretched out in the end of body (20), rolling wheel support (51) the presentation vertical state, described two When the end of support body (20) is concordant with the guide pipe mouth of pipe of support platform (10), the rolling wheel support (51) presents flat to support Platform (10) both sides tilt the state of extension.
5. lift-on/lift-off type elevator hoistway construction platform device according to claim 4, it is characterised in that:The support platform (10) On be provided with the first bar hole (101), the hole length direction of first bar hole (101) and the length direction of supporting frame (20) It is parallel, connecting shaft (201) is respectively arranged with two supporting frame (20), the connecting shaft (201) forms pull bar (41) Jointed shaft and the first bar hole of stretching (101), the one end of the rolling wheel support (51) away from back-up roller wheel (50) are provided with second Bar hole (511), second bar hole (511) is parallel with rolling wheel support (51) length direction, and connecting shaft (201) stretch Go out end to be slidably arranged in the second bar hole (511).
6. lift-on/lift-off type elevator hoistway construction platform device according to claim 5, it is characterised in that:Two supporting frame (20) along two groups of support platform (10) length direction arranged for interval.
CN201720557870.8U 2017-05-18 2017-05-18 Lift-on/lift-off type elevator hoistway construction platform device Active CN206737388U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720557870.8U CN206737388U (en) 2017-05-18 2017-05-18 Lift-on/lift-off type elevator hoistway construction platform device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720557870.8U CN206737388U (en) 2017-05-18 2017-05-18 Lift-on/lift-off type elevator hoistway construction platform device

Publications (1)

Publication Number Publication Date
CN206737388U true CN206737388U (en) 2017-12-12

Family

ID=60567065

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720557870.8U Active CN206737388U (en) 2017-05-18 2017-05-18 Lift-on/lift-off type elevator hoistway construction platform device

Country Status (1)

Country Link
CN (1) CN206737388U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107013030A (en) * 2017-05-18 2017-08-04 歌山建设集团有限公司 Lift-on/lift-off type elevator hoistway construction platform device and the construction of lift well method
CN108678443A (en) * 2018-05-22 2018-10-19 四川石油天然气建设工程有限责任公司 A kind of natural gas processing plant's various dimensions construction method and construction system
CN110541558A (en) * 2019-09-11 2019-12-06 严仁海 Building construction scaffold fastener
WO2021036026A1 (en) * 2019-08-31 2021-03-04 上海宝冶集团有限公司 Pre-assembled temporary operating platform in core tube and construction method therefor
CN114704067A (en) * 2022-05-03 2022-07-05 山西三建集团有限公司 Method for erecting and lifting foldable platform in elevator shaft

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107013030A (en) * 2017-05-18 2017-08-04 歌山建设集团有限公司 Lift-on/lift-off type elevator hoistway construction platform device and the construction of lift well method
CN107013030B (en) * 2017-05-18 2022-12-06 歌山建设集团有限公司 Hoisting type elevator shaft construction platform device and elevator shaft construction method
CN108678443A (en) * 2018-05-22 2018-10-19 四川石油天然气建设工程有限责任公司 A kind of natural gas processing plant's various dimensions construction method and construction system
CN108678443B (en) * 2018-05-22 2020-07-03 四川石油天然气建设工程有限责任公司 Multi-dimensional construction method and system for natural gas treatment plant
WO2021036026A1 (en) * 2019-08-31 2021-03-04 上海宝冶集团有限公司 Pre-assembled temporary operating platform in core tube and construction method therefor
CN110541558A (en) * 2019-09-11 2019-12-06 严仁海 Building construction scaffold fastener
CN110541558B (en) * 2019-09-11 2021-12-21 宿迁市苏宿工业园区城市发展投资有限公司 Building construction scaffold fastener
CN114704067A (en) * 2022-05-03 2022-07-05 山西三建集团有限公司 Method for erecting and lifting foldable platform in elevator shaft

Similar Documents

Publication Publication Date Title
CN206737388U (en) Lift-on/lift-off type elevator hoistway construction platform device
CN105201195B (en) One kind can lift supporting leg type elevator hoistway construction platform and construction method
CN206608189U (en) The all-hydraulic integrated upright bow member dedicated trolley of constructing tunnel
CN106065661A (en) Large span unsettled steel corridor construction engineering method
CN206278874U (en) A kind of construction Special lifting ladder
CN106698251A (en) Lifting device with height adjusting function
CN110952755B (en) Indoor side installation method for building glass
CN109763423A (en) A kind of adjustable split-type movable hanging basket and operating method for bridge maintenance
CN105926929A (en) Straight wall concrete pouring construction method
CN205713147U (en) A kind of quick positioning apparatus of precast floor slab
CN107013030A (en) Lift-on/lift-off type elevator hoistway construction platform device and the construction of lift well method
CN103422662B (en) The integral movable type operation platform cast-in-place for elevator shaft and using method thereof
CN207079890U (en) A kind of scaffold for building for being easy to regulation
CN206562264U (en) A kind of hanging device for transport outside high-rise building
CN108286332A (en) A kind of concrete of crossing soars aloft beam from climbing monoblock type bylinder system and construction method
CN206800968U (en) Elevator electric hydaulic construction platform device
CN107178204A (en) Elevator electric hydaulic construction platform device and the elevator shear wall construction method
CN108946542A (en) A kind of small gun carriage and its construction method
CN204456816U (en) One can promote supporting leg type elevator hoistway construction platform
CN203769281U (en) Installation construction operation platform for elevators without machine rooms
CN204024015U (en) Operation platform modular unit and operation platform thereof
CN103835294A (en) Concrete casting frame for construction of cast-in-place pile and using method
CN205636489U (en) Platform truck is restoreed to anticollision wall
CN212249184U (en) Electric creeping formwork device for building construction
CN208122299U (en) A kind of concrete of crossing soars aloft beam from climbing monoblock type tub system

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant