CN212249184U - An electric climbing formwork device for building construction - Google Patents
An electric climbing formwork device for building construction Download PDFInfo
- Publication number
- CN212249184U CN212249184U CN202020137266.1U CN202020137266U CN212249184U CN 212249184 U CN212249184 U CN 212249184U CN 202020137266 U CN202020137266 U CN 202020137266U CN 212249184 U CN212249184 U CN 212249184U
- Authority
- CN
- China
- Prior art keywords
- climbing
- hydraulic cylinder
- guide rail
- fixed
- formwork
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 230000009194 climbing Effects 0.000 title claims abstract description 94
- 238000009415 formwork Methods 0.000 title claims abstract description 42
- 238000009435 building construction Methods 0.000 title claims abstract description 13
- 238000010276 construction Methods 0.000 abstract description 9
- 238000009434 installation Methods 0.000 abstract 1
- 238000000034 method Methods 0.000 description 5
- 238000010586 diagram Methods 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 230000009191 jumping Effects 0.000 description 1
Images
Landscapes
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
Abstract
一种建筑施工用电动爬模装置,它涉及建筑施工设备技术领域;建筑墙体的外侧通过穿墙螺栓固定有模板,模板的外侧固定有模板支架,模板支架的底部通过承重支撑与滑移底座连接,滑移底座滑动连接在中部操作平台上的滑槽内,滑移液压缸与滑移底座驱动连接,中部操作平台的底部连接有爬架,爬架与建筑墙体中的埋件固定,建筑墙体与爬架之间设置有导轨,第一爬升液压缸安装在导轨上,第一爬升液压缸的活塞杆与中部操作平台通过第一固定螺丝连接,爬架的下部安装有第二爬升液压缸,第二爬升液压缸的活塞杆通过第二固定螺丝与导轨固定。本实用新型无需专门设置防坠落装置,即可使模板支架和爬架位置稳固,安全施工,爬升时拆卸、安装方便。
An electric climbing formwork device for building construction, which relates to the technical field of building construction equipment; a formwork is fixed on the outer side of a building wall through wall bolts; The sliding base is slidably connected in the chute on the middle operating platform, the sliding hydraulic cylinder is drivingly connected with the sliding base, the bottom of the middle operating platform is connected with a climbing frame, and the climbing frame is fixed with the embedded parts in the building wall. A guide rail is arranged between the building wall and the climbing frame. The first climbing hydraulic cylinder is installed on the guide rail. The piston rod of the first climbing hydraulic cylinder is connected with the middle operation platform through the first fixing screw. The lower part of the climbing frame is installed with a second climbing frame. The hydraulic cylinder, the piston rod of the second climbing hydraulic cylinder is fixed with the guide rail through the second fixing screw. The utility model does not need to specially set up an anti-fall device, so that the position of the formwork support and the climbing frame can be stabilized, the construction is safe, and the disassembly and installation are convenient when climbing.
Description
技术领域technical field
本实用新型涉及建筑施工设备技术领域,具体涉及一种建筑施工用电动爬模装置。The utility model relates to the technical field of building construction equipment, in particular to an electric climbing formwork device for building construction.
背景技术Background technique
爬模是爬升模板的简称,国外也叫跳模。它由爬升模板、爬架(也有的爬模没有爬架)和爬升设备三部分组成,在施工剪力墙体系、筒体体系和桥墩筀等高耸结构施工中是一种有效的工具。由于具备自爬的能力,因此不需起重机械的吊运,这减少了施工中运输机械的吊运工作量。在自爬的模板上悬挂脚手架可省去施工过程中的外脚手架。综上,爬升模板有效减少起重机械数量、加快施工速度,有着较好的经济效益。Climbing formwork is the abbreviation of climbing formwork, and it is also called jumping form abroad. It consists of climbing formwork, climbing frame (some climbing formwork does not have a climbing frame) and climbing equipment. It is an effective tool in the construction of high-rise structures such as shear wall systems, cylinder systems and bridge piers. Due to the self-climbing ability, there is no need for hoisting of hoisting machinery, which reduces the hoisting workload of transport machinery during construction. Hanging the scaffolding on the self-climbing formwork eliminates the need for external scaffolding during construction. In summary, the climbing formwork can effectively reduce the number of hoisting machinery, speed up the construction speed, and have good economic benefits.
现有的电动爬模设备在结构上设计了专用的防坠落装置,在模板和导轨的交替爬升中需要经常将防坠落装置拆卸、安装,操作比较繁琐,而且防坠落装置一旦失灵将有可能导致安全性事故。The existing electric climbing formwork equipment is structurally designed with a special anti-fall device. During the alternate climbing of the formwork and the guide rail, the anti-fall device needs to be disassembled and installed frequently, and the operation is cumbersome, and once the anti-fall device fails, it may lead to security incident.
实用新型内容Utility model content
本实用新型的目的在于针对现有技术的缺陷和不足,提供一种结构简单、设计合理、使用方便的建筑施工用电动爬模装置。The purpose of the utility model is to provide an electric climbing formwork device for building construction with simple structure, reasonable design and convenient use, aiming at the defects and deficiencies of the prior art.
为实现上述目的,本实用新型采用的技术方案是:它包含建筑墙体、模板、穿墙螺栓、模板支架、承重支撑、滑移底座、中部操作平台、滑移液压缸、爬架、埋件、导轨、第一爬升液压缸、第一固定螺丝、第二爬升液压缸、第二固定螺丝;所述的建筑墙体的外侧通过穿墙螺栓固定有模板,模板的外侧固定有模板支架,模板支架的底部通过承重支撑与滑移底座连接,滑移底座滑动连接在中部操作平台上的滑槽内,滑移液压缸与滑移底座驱动连接,中部操作平台的底部连接有爬架,爬架与建筑墙体中的埋件连接固定,建筑墙体与爬架之间设置有导轨,第一爬升液压缸安装在导轨上,第一爬升液压缸的活塞杆与中部操作平台通过第一固定螺丝连接,爬架的下部安装有第二爬升液压缸,第二爬升液压缸的活塞杆通过第二固定螺丝与导轨连接固定。In order to achieve the above purpose, the technical scheme adopted by the utility model is as follows: it includes a building wall, a template, a wall bolt, a template bracket, a load-bearing support, a sliding base, a middle operating platform, a sliding hydraulic cylinder, a climbing frame, and an embedded part. , guide rail, the first climbing hydraulic cylinder, the first fixing screw, the second climbing hydraulic cylinder, the second fixing screw; the outer side of the building wall is fixed with a template through the wall bolts, and the outer side of the template is fixed with a template bracket, and the template The bottom of the bracket is connected with the sliding base through the load-bearing support, the sliding base is slidably connected in the chute on the middle operation platform, the sliding hydraulic cylinder is drivingly connected with the sliding base, and the bottom of the middle operation platform is connected with a climbing frame, the climbing frame It is connected and fixed with the embedded parts in the building wall. A guide rail is arranged between the building wall and the climbing frame. The first climbing hydraulic cylinder is installed on the guide rail. The piston rod of the first climbing hydraulic cylinder and the middle operating platform pass through the first fixing screw. The lower part of the climbing frame is installed with a second climbing hydraulic cylinder, and the piston rod of the second climbing hydraulic cylinder is connected and fixed with the guide rail through a second fixing screw.
进一步地,所述的导轨通过导轨支座与建筑墙体固定,导轨穿设在导轨支座内,并通过螺丝固定。Further, the guide rail is fixed to the building wall through a guide rail support, and the guide rail is inserted into the guide rail support and fixed by screws.
进一步地,所述的模板支架的上端设置有上部操作平台,上部操作平台的外侧固定有安全立杆。Further, the upper end of the template support is provided with an upper operating platform, and a safety pole is fixed on the outer side of the upper operating platform.
进一步地,所述的中部操作平台的外侧也固定有安全立杆。Further, the outer side of the middle operation platform is also fixed with a safety pole.
进一步地,所述的爬架的底部设置有下部操作平台。Further, the bottom of the climbing frame is provided with a lower operating platform.
进一步地,所述的模板支架和爬架上分别固定有斜撑。Further, diagonal braces are respectively fixed on the formwork support and the climbing frame.
本实用新型的工作原理为:首先进行导轨的提升,通过滑移液压缸将模板和模板支架右移,拆卸导轨支座上的螺丝,第二爬升液压缸驱动导轨上升,拆卸第二固定螺丝,第一爬升液压缸驱动中部操作平台上升,从而带动爬架、模板支架以及模板上升,在施工的过程中,将第二爬升液压缸的活塞杆用第二固定螺丝固定在导轨上,一方面准备下一轮的导轨爬升,另一方面,此时第一爬升液压缸和第二爬升液压缸的活塞杆分别作用在爬架和导轨上,可起到防坠落的作用,当下一轮的爬升进行时,拆卸第一固定螺丝即可先进行导轨的提升。The working principle of the utility model is as follows: firstly, the guide rail is lifted, the formwork and formwork support are moved to the right by the sliding hydraulic cylinder, the screws on the guide rail support are removed, the second climbing hydraulic cylinder drives the guide rail to rise, and the second fixing screw is removed, The first climbing hydraulic cylinder drives the middle operation platform to rise, thereby driving the climbing frame, formwork support and formwork to rise. During the construction process, the piston rod of the second climbing hydraulic cylinder is fixed on the guide rail with the second fixing screw. On the one hand, prepare The next round of guide rail climbing, on the other hand, at this time, the piston rods of the first climbing hydraulic cylinder and the second climbing hydraulic cylinder act on the climbing frame and the guide rail respectively, which can play the role of anti-fall, and the next round of climbing will be carried out. When the first fixing screw is removed, the guide rail can be lifted first.
采用上述结构后,本实用新型产生的有益效果为:本实用新型所述的一种建筑施工用电动爬模装置,无需专门设置防坠落装置,即可使模板支架和爬架位置稳固,安全施工,爬升时拆卸、安装方便,本实用新型具有结构简单、设置合理、制作成本低等优点。After the above structure is adopted, the beneficial effects of the present utility model are as follows: the electric climbing formwork device for building construction described in the present utility model can make the formwork support and the climbing frame stable in position without the need for special anti-falling devices, and the construction is safe. The utility model has the advantages of simple structure, reasonable setting, low production cost and the like.
附图说明Description of drawings
图1是本实用新型的结构图;Fig. 1 is the structure diagram of the present utility model;
图2是图1中的A部放大图;Fig. 2 is the enlarged view of A part in Fig. 1;
图3是本实用新型模板和模板支架右移后的状态图;Fig. 3 is the state diagram after the template of the present invention and the template support are moved to the right;
图4是图3中的B部放大图。FIG. 4 is an enlarged view of part B in FIG. 3 .
附图标记说明:Description of reference numbers:
建筑墙体1、模板2、穿墙螺栓3、模板支架4、承重支撑5、滑移底座 6、中部操作平台7、滑移液压缸8、爬架9、埋件10、导轨11、第一爬升液压缸12、第一固定螺丝13、第二爬升液压缸14、第二固定螺丝15、导轨支座16、上部操作平台17、安全立杆18、下部操作平台19、斜撑20。Building wall 1, formwork 2,
具体实施方式Detailed ways
为了更清楚地说明本实用新型实施例或现有技术中的技术方案,下面将对实施例或现有技术描述中所需要使用的附图作简单地介绍,显而易见地,下面描述中的附图仅仅是本实用新型的一些实施例,对于本领域普通技术人员来讲,在不付出创造性劳动性的前提下,还可以根据这些附图获得其他的附图。In order to more clearly illustrate the embodiments of the present utility model or the technical solutions in the prior art, the following briefly introduces the accompanying drawings that need to be used in the description of the embodiments or the prior art. Obviously, the accompanying drawings in the following description These are just some embodiments of the present invention, and for those of ordinary skill in the art, other drawings can also be obtained from these drawings without any creative effort.
参看如图1——图4所示,本具体实施方式采用如下技术方案:它包含建筑墙体1、模板2、穿墙螺栓3、模板支架4、承重支撑5、滑移底座6、中部操作平台7、滑移液压缸8、爬架9、埋件10、导轨11、第一爬升液压缸12、第一固定螺丝13、第二爬升液压缸14、第二固定螺丝15;所述的建筑墙体1 的外侧通过穿墙螺栓3固定有模板2,模板2的外侧固定有模板支架4,模板支架4的底部通过承重支撑5与滑移底座6连接,滑移底座6滑动连接在中部操作平台7上的滑槽内,滑移液压缸8与滑移底座6驱动连接,通过滑移液压缸8将模板2和模板支架4右移,以便于导轨11的提升。Referring to Figures 1 to 4, this specific embodiment adopts the following technical solutions: it includes a building wall 1, a template 2, a
中部操作平台7的底部连接有爬架9,爬架9与建筑墙体1中的埋件10 连接固定,建筑墙体1与爬架9之间设置有导轨11,第一爬升液压缸12安装在导轨11上,第一爬升液压缸12的活塞杆与中部操作平台7通过第一固定螺丝13连接,爬架9的下部安装有第二爬升液压缸14,第二爬升液压缸14 的活塞杆通过第二固定螺丝15与导轨11连接固定;所述的导轨11通过导轨支座16与建筑墙体1连接固定,导轨11穿设在导轨支座16内,并通过螺丝连接固定,拆卸导轨支座16上的螺丝,第二爬升液压缸14驱动导轨11上升,拆卸第二固定螺丝15,第一爬升液压缸12驱动中部操作平台7上升,从而带动爬架9、模板支架4以及模板2上升。The bottom of the
在施工的过程中,将第二爬升液压缸14的活塞杆用第二固定螺丝15固定在导轨11上,一方面准备下一轮的导轨爬升,另一方面,此时第一爬升液压缸12和第二爬升液压缸14的活塞杆分别作用在爬架9和导轨11上,可起到防坠落的作用,当下一轮的爬升进行时,拆卸第一固定螺丝13即可先进行导轨11的提升。During the construction process, the piston rod of the second climbing
所述的模板支架4的上端设置有上部操作平台17,上部操作平台17的外侧固定有安全立杆18,用于安全施工操作。The upper end of the formwork support 4 is provided with an
所述的中部操作平台7的外侧也固定有安全立杆18,中部操作平台7用于爬升过程的拆装操作。The outer side of the
所述的爬架9的底部设置有下部操作平台19,也用于爬升过程的拆装操作。The bottom of the
所述的模板支架4和爬架9上分别固定有斜撑20。The formwork support 4 and the
以上显示和描述了本实用新型的基本原理和主要特征以及本实用新型的优点。本行业的技术人员应该了解,本实用新型不受上述实施例的限制,上述实施例和说明书中描述的只是说明本实用新型的原理,在不脱离本实用新型精神和范围的前提下,本实用新型还会有各种变化和改进,这些变化和改进都落入要求保护的本实用新型范围内。本实用新型要求保护范围由所附的权利要求书及其等效物界定。The basic principles and main features of the present invention and the advantages of the present invention are shown and described above. It should be understood by those skilled in the art that the present invention is not limited by the above-mentioned embodiments. The above-mentioned embodiments and descriptions only illustrate the principles of the present invention. Without departing from the spirit and scope of the present invention, the present invention There will also be various changes and improvements in the new model, which all fall within the scope of the claimed invention. The claimed scope of the present invention is defined by the appended claims and their equivalents.
Claims (6)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202020137266.1U CN212249184U (en) | 2020-01-21 | 2020-01-21 | An electric climbing formwork device for building construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202020137266.1U CN212249184U (en) | 2020-01-21 | 2020-01-21 | An electric climbing formwork device for building construction |
Publications (1)
Publication Number | Publication Date |
---|---|
CN212249184U true CN212249184U (en) | 2020-12-29 |
Family
ID=73989909
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202020137266.1U Active CN212249184U (en) | 2020-01-21 | 2020-01-21 | An electric climbing formwork device for building construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN212249184U (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114673343A (en) * | 2022-03-18 | 2022-06-28 | 顾建亮 | Portable hydraulic self-climbing formwork |
CN114961220A (en) * | 2022-06-29 | 2022-08-30 | 中国建筑一局(集团)有限公司 | Electric overall climbing system for high-rise building alternate construction |
CN117005672A (en) * | 2023-08-10 | 2023-11-07 | 云南渝霖模板制造有限公司 | Mechanical climbing formwork device |
-
2020
- 2020-01-21 CN CN202020137266.1U patent/CN212249184U/en active Active
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114673343A (en) * | 2022-03-18 | 2022-06-28 | 顾建亮 | Portable hydraulic self-climbing formwork |
CN114673343B (en) * | 2022-03-18 | 2024-02-27 | 顾建亮 | Portable hydraulic self-climbing formwork |
CN114961220A (en) * | 2022-06-29 | 2022-08-30 | 中国建筑一局(集团)有限公司 | Electric overall climbing system for high-rise building alternate construction |
CN117005672A (en) * | 2023-08-10 | 2023-11-07 | 云南渝霖模板制造有限公司 | Mechanical climbing formwork device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201826525U (en) | Climbing shuttering system device for buildings | |
CN212249184U (en) | An electric climbing formwork device for building construction | |
CN106437130A (en) | Inner roof external climbing type formwork construction platform for super high-rise building construction | |
CN110284703A (en) | A kind of light-duty climbing form system of screw rod promotion | |
CN205296803U (en) | Elevator automatic lifting operation panel | |
CN206188161U (en) | It climbs high slip and attaches wall device to improve construction elevator | |
CN202850484U (en) | Safety mechanism for building construction climbing template | |
CN207812980U (en) | A kind of attachment type raise scaffold hydraulic lifting system | |
CN108331335A (en) | A kind of pre-splicing separation type hydraulic of steel and wood composite is from climbing support | |
CN204590555U (en) | Assembling elevator hoistway construction platform | |
CN203113793U (en) | Large formwork installation system of oblique structure | |
CN115788012A (en) | Hydraulic climbing formwork integral climbing and sliding device and method suitable for inclined wall construction | |
CN205777580U (en) | Automatic lifting type discharging platform | |
CN206784884U (en) | Curved-surface building climbing device | |
CN101457587B (en) | Template mutually lifting climbing apparatus and method | |
CN201158932Y (en) | Self-chucking platform especially for high-rise building elevator shaft formwork supports | |
CN112324153A (en) | A reinforcement auxiliary device for job site | |
CN203050094U (en) | Bowstring trussed totally closed hydraulic pressure creeping formwork system | |
CN211447761U (en) | Electric creeping formwork device for building construction | |
CN205688778U (en) | A kind of elevating scaffold special over sling structure | |
CN210767838U (en) | Large-section inclined column template construction structure for constructional engineering | |
CN209413263U (en) | A tool-type overall hoisting operation platform for an elevator shaft | |
CN2128653Y (en) | Multi-function mutual rise and fall framing scaffold | |
CN210369893U (en) | Light-duty creeping formwork system of lead screw promotion | |
CN209585652U (en) | Self-climbing type discharging platform |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |