CN206800968U - Elevator electric hydaulic construction platform device - Google Patents
Elevator electric hydaulic construction platform device Download PDFInfo
- Publication number
- CN206800968U CN206800968U CN201720559196.7U CN201720559196U CN206800968U CN 206800968 U CN206800968 U CN 206800968U CN 201720559196 U CN201720559196 U CN 201720559196U CN 206800968 U CN206800968 U CN 206800968U
- Authority
- CN
- China
- Prior art keywords
- elevator
- platform
- support platform
- shear wall
- support body
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Abstract
It the utility model is related to a kind of elevator electric hydaulic construction platform device,Including support platform,The periphery of support platform is provided with supporting frame,The shear wall upper end of supporting frame and elevator against or separate,Operation support body is provided with support platform,Operate and be provided with detachable template on the outside of support body,The mutual split of template forms the shear wall construction inner template of elevator,Hoisting mechanism is additionally provided with support platform,Hoisting mechanism driving support platform moves straight up,After concrete setting,Start climbing structure,The operation support body being supported on platform is jacked to shear wall upper end,Stretch out the column of support body,It is fixed on shear wall,Support platform is lifted to shear wall upper end,Supporting member automatically resets,Reach fixed platform,Operation support body is resetted again,Therefore the degree of safety that the elevator electric hydaulic construction platform device is able to ensure that the safety of personnel and entirely constructed,And efficiency high.
Description
Technical field
It the utility model is related to Construction Technology field, and in particular to a kind of elevator electric hydaulic construction platform dress
Put.
Background technology
More than building in being built due to current engineering based on high level, its elevator setting generally increases, and structure type is big
More based on concrete shear force wall, multiple erection construction operating platform is formed in construction, reinforcing bar, template and concrete is carried out and mixes
Compound etc. is constructed, the operating platform unstability that happens occasionally, operating personnel's falling accident, and some projects under construction even occur in elevator
Wall form and operating personnel fall, and smash the major accident of operating platform.
Utility model content
Primary and foremost purpose of the present utility model is:A kind of elevator electric hydaulic construction platform device is provided, can be conveniently real
Now to the construction operation of high rise elevator well, it is ensured that the safety of construction.
To achieve the above object, the technical solution adopted in the utility model is:
Elevator electric hydaulic construction platform device, including support platform, the periphery of the support platform are provided with support
Support body, the shear wall upper end of support frame as described above body and elevator against or separate, operation support body is provided with the support platform,
Detachable template is provided with the outside of the operation support body, the mutual split of template forms the shear wall of elevator
Construct inner template, hoisting mechanism is additionally provided with the support platform, the hoisting mechanism driving support platform is moved straight up
It is dynamic.
Following characteristics also be present in the utility model:
Operation support body and the support platform form detachable connection, and the hoisting mechanism is hydraulic push rod, the liquid
Press the piston rod of push rod vertical, one end of the hydraulic push rod is fixed in support platform, the other end and support platform are fixed.
Support frame as described above body is more than first in folding rod-like structure and including first, second bending segment, second bending segment
The weight of bending segment, the shear wall upper end of first bending segment and elevator against or separate, four of the support platform
Corner is provided with the opening for accommodating supporting frame, the be hinged opening for being arranged on support platform in bending place of support frame as described above body
At two side and jointed shaft is horizontal, the shear wall upper end of first bending segment and elevator against when, first bending segment
Upper surface and support platform bottom surface against.
It is provided with back-up roller wheel above the end of first bending segment, the core wheel of the back-up roller wheel and supporting frame
Jointed shaft is parallel.
The upper face of the support platform is provided with insertion pipe, and the operation support body is plugged in insertion pipe including vertical pole,
Detachable connection is formed by fastening bolt between the insertion pipe and the vertical pole for operating support body.
The operation support body also includes transverse tube, and length direction of the transverse tube along vertical pole is arranged at intervals with more, the mould
Back is provided with connection inserted link and is plugged in transverse tube, and detachable company is formed by bolt between the transverse tube and connection inserted link
Connect.
The transverse tube and vertical pole are provided with multiple and mutually enclose rectangular truss-like structure, the work of the hydraulic push rod
Stopper rod end at truss center of the connecting pin with operating support body by being connected.
Compared with prior art, the technique effect that the utility model possesses is:Above-mentioned construction platform device is in practice of construction
During operation, constructed first against the first layer elevator of building, construction finishes, and treats on the concrete strength of shear wall
Afterwards, above-mentioned support platform is placed on to the shear wall upper end of bottom elevator so that four supporting frames ride upon stair shaft
Shear wall upper end, so as to realize the bracketing to support platform, operation support body is arranged in support platform, and template is fixed
On operation support body so that template encloses the shear wall construction inner template of elevator, and it is external that exterior sheathing is arranged on into crosshead,
The construction to the elevator shear wall of place layer is completed, after concrete setting, starts hoisting mechanism, support platform is raised to
Higher level, therefore the degree of safety that the electric platforms device is able to ensure that the safety of personnel and entirely constructed, and efficiency high.
Brief description of the drawings
Fig. 1 is top view when inner template coordinates with exterior sheathing;
Fig. 2 is the top view of support platform in elevator electric hydaulic construction platform device;
Fig. 3 is the front view of support platform in elevator electric hydaulic construction platform device;
Fig. 4 is the top view that support body is operated in elevator electric hydaulic construction platform device;
Fig. 5 to Fig. 7 is three kinds of views when electric platforms device coordinates construction of lift well.
Embodiment
With reference to Fig. 1 to Fig. 7, the utility model is further described:
Elevator electric hydaulic construction platform device, including support platform 10, the periphery of the support platform 10 are provided with
Supporting frame 20, the shear wall upper end of support frame as described above body 20 and elevator against or separate, set in the support platform 10
There is operation support body 30, be provided with detachable template 40 on the outside of the operation support body 30, the template 40 is mutually spelled
The shear wall construction inner template for forming elevator is closed, hoisting mechanism, the hoisting mechanism are additionally provided with the support platform 10
Driving support platform 10 moves straight up;
With reference to shown in Fig. 5 to Fig. 7, above-mentioned construction platform device is in practice of construction operation, first against the of building
One layer of elevator is constructed, and construction finishes, and after coming on the concrete strength of shear wall, above-mentioned support platform 10 is placed
In the shear wall upper end of bottom elevator so that four supporting frames 20 ride upon the shear wall upper end of stair shaft, so as to realize pair
The bracketing of support platform 10, operation support body 30 is arranged in support platform 10, and template 40 is fixed on operation support body 30
On so that template 40 encloses the shear wall construction inner template of elevator, exterior sheathing is arranged on outside operation support body 30 so that interior
Template and exterior sheathing are formed from the gap of day concrete, by fill concrete in the gap, after concrete setting, by template 40
Disassemble, start hoisting mechanism, support platform 10 is raised to higher level, template 40 is then arranged on operation support body 30
On, the construction of the elevator shear wall of higher level is completed, therefore the electric platforms device is able to ensure that personnel's is safe and whole
The degree of safety of individual construction, and efficiency high.
As preferred scheme of the present utility model, with reference to shown in Fig. 5, the operation support body 30 is formed with support platform 10 can
It is detachably connected with, the hoisting mechanism is hydraulic push rod 50, and the piston rod of the hydraulic push rod 50 is vertical, the hydraulic push rod 50
One end be fixed in support platform 10, the other end and support platform 10 are fixed;
Above-mentioned operation support body 30 forms detachable connection with support platform 10, when the elevator shear wall construction of this layer
After the completion of, operation support body 30 is disassembled from support platform 10, then hydraulic push rod 50 is powered, by operation support body 30 and mould
Plate 40 pushes up the upper end for the elevator shear wall for extending this layer, and causes template 40 to ride upon the upper end of elevator shear wall, so
Starting backhaul hydraulic push rod 50 afterwards, the piston rod of hydraulic push rod 50 resets, so as to which support platform 10 be stretched back up, and
And support platform 10 is stretched to the upper end of the shear wall of elevator, to complete applying to the elevator shear wall of higher level
Work;
Above-mentioned hydraulic push rod 50 can realize the negative drawing of two structures, be acted in the negative drawing of hydraulic push rod 50
Under, you can so that whole construction direction of the electric platforms device along elevator climbs upwards, so as to the hydraulic push rod 50 and its
Annexation, while facilitating whole construction operation, moreover it is possible to simplify the structure of whole electric platforms device, reduce whole platform dress
The cost put.
Further, with reference to shown in Fig. 3, support frame as described above body 20 is in folding rod-like structure and including first, second bending segment
21st, 22, second bending segment 22 is more than the weight of the first bending segment 21, the shear wall of first bending segment 21 and elevator
Upper end against or separation, four corners of the support platform 10 be provided with the opening for accommodating supporting frame 20, the branch
The bending place of support body 20 is be hinged to be arranged at the opening two side of support platform 10 and jointed shaft is horizontal, first bending segment
21 with the shear wall upper end of elevator against when, the upper surface of first bending segment 21 and the bottom surface of support platform 10 against;
The second above-mentioned bending segment 22 is more than the weight of the first bending segment 21, at supporting frame 20 in free state,
The upper surface of first bending segment 21 and the bottom surface of support platform 10 be in all the time against state so that supporting frame 20
The upper surface of elevator shear wall is ridden upon, when support platform 10 moves up along the shear wall of elevator, in elevator
In the presence of shear wall so that supporting frame 20 rotates around jointed shaft, so that supporting frame 20 and elevator shear wall shape
Into avoidance.
Further, back-up roller wheel 60 is provided with above the end of first bending segment 21, the back-up roller wheel 60
Core wheel is parallel with the jointed shaft of supporting frame 20;
With reference to shown in Fig. 7, the rolling that above-mentioned back-up roller wheel 60 forms to supporting frame 20 is oriented to, and on the one hand can avoid propping up
Support body 20 causes the scuffing to elevator shearing inner wall, and in the presence of back-up roller wheel 60, can reduce supporting frame
Frictional resistance caused by 20 slip, facilitate the upward lifting of whole equipment.
For convenience of installing and dismantling, with reference to shown in Fig. 5, the upper face of the support platform 10 is provided with insertion pipe 11, institute
State operation support body 30 to be plugged in insertion pipe 11 including vertical pole 31, lead between the insertion pipe 11 and the vertical pole 31 for operating support body 30
Cross fastening bolt 111 and form detachable connection.
With reference to shown in Fig. 4, for convenience of the regulation and fixation realized to the horizontal direction of template 40, the operation support body 30 is also
Including transverse tube 32, length direction of the transverse tube 32 along vertical pole 31 is arranged at intervals with more, and the back side of template 40 is provided with company
Patch bar 41 to be plugged in transverse tube 32, detachable connection is formed by bolt between the transverse tube 32 and connection inserted link 41;
Connected using above-mentioned transverse tube 32 with being connected inserted link 41, so as to conveniently realize the regulation of the horizontal direction of template 40.
To ensure support strength of the hydraulic push rod 50 to operation support body 30, the transverse tube 32 and vertical pole 31 are provided with multiple
And rectangular truss-like structure is mutually enclosed, the tailpiece of the piston rod of the hydraulic push rod 50 passes through connecting pin and operation support body 30
Connected at truss center.
With reference to shown in Fig. 5 to Fig. 7, the construction method of the elevator shear wall, the elevator shearing is described below
Wall construction method employs above-mentioned elevator electric hydaulic construction platform device, and the construction method comprises the following steps:
A, by floor leveling to be onstructed, with reference to shown in Fig. 1, inner template 70 is arranged in exterior sheathing 80 so that internal model
Plate 70 and exterior sheathing 80 form the gap of fill concrete, to the clearance filled concrete between inner template 70 and exterior sheathing 80,
Treat concrete coagulation to setting intensity, form removal;
B, the support platform 10 of the construction platform device is ridden upon at the upper end open for the elevator being molded, and
And cause four supporting frames 20 of support platform 10 to ride upon the upper end for the elevator shear wall being molded, support body will be operated
30 vertical pole 31 is arranged in the insertion pipe 11 of support platform 10, and is fixed with fastening bolt 111;
The lower end of hydraulic push rod 50 is fixed on to the upper face of support platform 10, the upper end of hydraulic push rod 50 is fixed on C,
The center position of support body 30 is operated, the connection inserted link 41 at the back side of template 40 is plugged in the transverse tube 32 of operation support body 30, and
And connection inserted link 41 is plugged on stretching into for transverse tube 32 so that the lateral surface of template 40 is concordant with the medial surface of elevator shear wall,
Then exterior sheathing 80 is fixed on into template 40 to enclose outside the inner template to be formed, the internal model to be formed is enclosed to exterior sheathing 80 and template 40
Clearance filled concrete between plate, treat concrete coagulation to setting intensity, form removal;
D, fastening bolt 111 is removed, and causes the vertical pole 31 and the insertion pipe 11 of support platform 10 of operation support body 30
Separation;
E, the connection inserted link 41 at the back side of template 40 is unclamped with operating the bolt that is connected of transverse tube 32 of support body 30, and by mould
The connection inserted link 41 at the back side of plate 40 is inserted the deeper position of connection inserted link 41 at the back side of template 40 so that template 40 with into
The shear wall separation of type;
F, it is powered to hydraulic push rod 50 so that the piston rod elongation of hydraulic push rod 50, and support body 30 will be operated along electricity
Stair shaft is lifted up, until operation support body 30 stretches out the upper end of elevator shear wall, and by the connection inserted link at the back side of template 40
41 are plugged in the transverse tube 32 of operation support body 30 so that the lower surface of template 40 is resisted against the upper end of elevator shear wall;
G, backhaul hydraulic push rod 50 will be started, the piston rod of hydraulic push rod 50 resets, and lifting support platform 10 moves up, directly
The upper end of elevator shear wall is ridden upon to supporting frame 20 is caused;
H, repeat step B to G, until completing the construction of lift well operation to whole floor;
The shear wall construction of the elevator of above-mentioned first layer, it can be applied using only inner template 70 with exterior sheathing 80
Work, can be temporarily without using above-mentioned electric platforms device, will be above-mentioned after coming in the elevator shear wall intensity of first layer
Electric platforms device is placed on the upper end of first layer elevator shear wall, so as to successively complete elevator shearing in the manner described above
The construction of wall;
The dismounting of the exterior sheathing 80 of elevator, can according to the strength conditions of concrete, if the intensity of concrete is enough in itself,
Can dismantle in advance, also can according to circumstances, when constructing last layer elevator, by the dismounting of the exterior sheathing 80 of next layer of elevator,
To improve efficiency of construction.
It is obvious to a person skilled in the art that the utility model is not limited to the details of above-mentioned one exemplary embodiment, and
And in the case of without departing substantially from spirit or essential attributes of the present utility model, it can realize that this practicality is new in other specific forms
Type.Therefore, no matter from the point of view of which point, embodiment all should be regarded as exemplary, and is nonrestrictive, this practicality is new
The scope of type limits by appended claims rather than described above, it is intended that the equivalency fallen in claim is contained
All changes in justice and scope are included in the utility model.Any reference in claim should not be considered as limitation
Involved claim.
Moreover, it will be appreciated that although the present specification is described in terms of embodiments, not each embodiment is only wrapped
Containing an independent technical scheme, this narrating mode of specification is only that those skilled in the art should for clarity
Using specification as an entirety, the technical solutions in the various embodiments may also be suitably combined, forms those skilled in the art
It is appreciated that other embodiment.
Claims (7)
1. elevator electric hydaulic construction platform device, it is characterised in that:Including support platform (10), the support platform (10)
Periphery be provided with supporting frame (20), the shear wall upper end of support frame as described above body (20) and elevator against or separate, it is described
Operation support body (30) is provided with support platform (10), detachable mould is provided with the outside of the operation support body (30)
Plate (40), the template (40) mutually split form the shear wall construction inner template of elevator, gone back on the support platform (10)
Hoisting mechanism is provided with, the hoisting mechanism driving support platform (10) is moved straight up.
2. elevator electric hydaulic construction platform device according to claim 1, it is characterised in that:The operation support body
(30) detachable connection is formed with support platform (10), the hoisting mechanism is hydraulic push rod (50), and the electric hydaulic pushes away
The piston rod of bar (50) is vertical, and one end of the electric drive hydraulic thruster (50) is fixed in support platform (10), the other end and branch
It is fixed to support platform (10).
3. elevator electric hydaulic construction platform device according to claim 2, it is characterised in that:Support frame as described above body
(20) it is in roll over rod-like structure and be more than the first bending segment including first, second bending segment (21,22), second bending segment (22)
(21) weight, the shear wall upper end of first bending segment (21) and elevator against or separate, the support platform (10)
Four corners be provided with the opening for accommodating supporting frame (20), the bending place of support frame as described above body (20) is be hinged to be arranged on
At the opening two side of support platform (10) and jointed shaft is horizontal, first bending segment (21) and the shear wall upper end of elevator
Against when, the upper surface of first bending segment (21) and the bottom surface of support platform (10) against.
4. elevator electric hydaulic construction platform device according to claim 3, it is characterised in that:First bending segment
(21) back-up roller wheel (60), the core wheel of the back-up roller wheel (60) and the jointed shaft of supporting frame (20) are provided with above end
It is parallel.
5. elevator electric hydaulic construction platform device according to claim 4, it is characterised in that:The support platform
(10) upper face is provided with insertion pipe (11), and the operation support body (30) is plugged in insertion pipe (11) including vertical pole (31),
Detachable connection is formed by fastening bolt (111) between the vertical pole (31) of the insertion pipe (11) and operation support body (30).
6. elevator electric hydaulic construction platform device according to claim 5, it is characterised in that:The operation support body
(30) transverse tube (32) is also included, length direction of the transverse tube (32) along vertical pole (31) is arranged at intervals with more, the template
(40) back side is provided with connection inserted link (41) and is plugged in transverse tube (32), and the transverse tube (32) passes through with being connected between inserted link (41)
Bolt forms detachable connection.
7. elevator electric hydaulic construction platform device according to claim 6, it is characterised in that:The transverse tube (32) and
Vertical pole (31) is provided with multiple and mutually encloses rectangular truss-like structure, and the tailpiece of the piston rod of the hydraulic push rod (50) passes through
Connecting pin at the truss center of operation support body (30) with being connected.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720559196.7U CN206800968U (en) | 2017-05-18 | 2017-05-18 | Elevator electric hydaulic construction platform device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720559196.7U CN206800968U (en) | 2017-05-18 | 2017-05-18 | Elevator electric hydaulic construction platform device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206800968U true CN206800968U (en) | 2017-12-26 |
Family
ID=60740288
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720559196.7U Active CN206800968U (en) | 2017-05-18 | 2017-05-18 | Elevator electric hydaulic construction platform device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206800968U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107975233A (en) * | 2018-01-11 | 2018-05-01 | 山东方圆建筑材料有限公司 | A kind of elevator inner template revenue and expenditure system |
CN110700572A (en) * | 2019-10-23 | 2020-01-17 | 上海建工集团股份有限公司 | Height-adjustable supporting base and using method thereof |
-
2017
- 2017-05-18 CN CN201720559196.7U patent/CN206800968U/en active Active
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107975233A (en) * | 2018-01-11 | 2018-05-01 | 山东方圆建筑材料有限公司 | A kind of elevator inner template revenue and expenditure system |
CN110700572A (en) * | 2019-10-23 | 2020-01-17 | 上海建工集团股份有限公司 | Height-adjustable supporting base and using method thereof |
CN110700572B (en) * | 2019-10-23 | 2021-09-21 | 上海建工集团股份有限公司 | Height-adjustable supporting base and using method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206737388U (en) | Lift-on/lift-off type elevator hoistway construction platform device | |
CN105201195B (en) | One kind can lift supporting leg type elevator hoistway construction platform and construction method | |
CN105297635B (en) | Assembled lifting type construction platform for pier column construction and construction method thereof | |
CN105926929B (en) | A kind of pouring construction method of stalk concrete | |
CN101824910B (en) | Quick template supporting construction method of elevator shaft | |
CN206800968U (en) | Elevator electric hydaulic construction platform device | |
CN206143646U (en) | Bridge construction slip -form system | |
CN205778918U (en) | Loess tunnel excavation and just formwork build concrete construction combined type chassis | |
CN109184190A (en) | It climbs and carries integrated beam type hydraulic climbing platform and its installation method | |
CN207048345U (en) | Construction discharge platform device | |
CN107178204A (en) | Elevator electric hydaulic construction platform device and the elevator shear wall construction method | |
CN107013030A (en) | Lift-on/lift-off type elevator hoistway construction platform device and the construction of lift well method | |
CN101492962A (en) | Big-load integral hydraulic automatic mould raising device set | |
CN202064281U (en) | Slip form frame | |
JP3074765U (en) | Pillar building construction system equipment | |
CN203394032U (en) | Inside-cylinder climb-type operation frame | |
CN208734045U (en) | Monoblock type mould bases for Super High fission conjoined composite structure | |
CN201400997Y (en) | Step alternate support platform device | |
CN202899608U (en) | Climbing device of building construction hydraulic pressure template | |
CN202718385U (en) | Jack-raising formwork mechanism | |
CN206111212U (en) | Rock -anchored beam construction trolley car | |
CN105113777B (en) | The structure construction equipment and its method of climbing of power transmission are cooperateed with using multilayer beam | |
CN203559574U (en) | Elevator shaft formwork supporting movable support | |
CN209397925U (en) | It is a kind of apply to concrete barrier formwork peace tear open packaged type peace tear frame open | |
CN203320922U (en) | Supporting device for forming of elevator shaft template |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant |