CN206681116U - A kind of cavernous body permeable channel and a kind of drainage system against rain - Google Patents

A kind of cavernous body permeable channel and a kind of drainage system against rain Download PDF

Info

Publication number
CN206681116U
CN206681116U CN201621158878.9U CN201621158878U CN206681116U CN 206681116 U CN206681116 U CN 206681116U CN 201621158878 U CN201621158878 U CN 201621158878U CN 206681116 U CN206681116 U CN 206681116U
Authority
CN
China
Prior art keywords
tube wall
cavernous body
parts
water
permeable channel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201621158878.9U
Other languages
Chinese (zh)
Inventor
崔恒香
周玲琴
严巍
史集蘅
殷英
史亚儒
安磊
李庆
徐英嘉
崔鹏
龚琴
龚新来
张璟
王瑛
杨瑞卿
王本耀
徐佩贤
顾汤华
季德成
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Building Materials Technology Co Ltd
SHANGHAI GREEN MANAGEMENT GUIDANCE STATION
Community Putuo District Shanghai City Greening Administrative Institute
Original Assignee
Jiangsu Building Materials Technology Co Ltd
SHANGHAI GREEN MANAGEMENT GUIDANCE STATION
Community Putuo District Shanghai City Greening Administrative Institute
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Building Materials Technology Co Ltd, SHANGHAI GREEN MANAGEMENT GUIDANCE STATION, Community Putuo District Shanghai City Greening Administrative Institute filed Critical Jiangsu Building Materials Technology Co Ltd
Priority to CN201621158878.9U priority Critical patent/CN206681116U/en
Application granted granted Critical
Publication of CN206681116U publication Critical patent/CN206681116U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02WCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO WASTEWATER TREATMENT OR WASTE MANAGEMENT
    • Y02W30/00Technologies for solid waste management
    • Y02W30/50Reuse, recycling or recovery technologies
    • Y02W30/91Use of waste materials as fillers for mortars or concrete

Abstract

The utility model discloses a kind of cavernous body permeable channel, the tube chamber enclosed including tube wall and by the tube wall, the material of the tube wall includes tube wall concrete, prepares the raw material of the tube wall concrete and includes cement, sand, stone, wood fibre and water, the weight proportion of each raw material is:100 parts of cement, 85~120 parts of sands, 200~330 parts of stones, 3~15 parts of wood fibres and 35~45 parts of water.The invention also discloses a kind of drainage system against rain, including porous pavement and the cavernous body permeable channel that is arranged under porous pavement;The material of porous pavement includes pervious concrete and permeable mortar.The tube wall of cavernous body permeable channel has the function of water-permeable and air permeable, and rainwater can be allowed voluntarily to leak into pipeline, and and can avoids debris from entering, its anti-pressure ability is big simultaneously, is used cooperatively with porous pavement, can be while rainwater is effectively excluded, deep soil is nourished, is advantageous to the formation of underground water.

Description

A kind of cavernous body permeable channel and a kind of drainage system against rain
Technical field
The utility model belongs to municipal works rain-water drainage field, more particularly to a kind of cavernous body permeable channel and a kind of rain Water drainage system.
Background technology
Storm sewer is collection ground natural rain and is transported to the pipeline of natural water body.Existing storm sewer has two kinds Type, one kind are impermeable waterpipes, and ground rainwater is collected by punching, slotting or separately connecting rainwater access container.Such Pipeline is mostly concrete duct or reinforced concrete pipiline, and its anti-pressure ability is strong, can with it is buried enter road surface below, do not influence road surface Upper vehicle traveling.But various debris are readily incorporated to collect ground rainwater by punching, slotting or connecting rainwater access container, it is long Year month after month, easily causes rainwater flows decrease in pipeline, or even line clogging, periodically need to investigate and clear up.
Another kind is Water penetrative flexible pipe, is to support body with antirust turn, forms the soft structure of high resistance to compression, non-woven fabric inside lining Filtering, prevent sediment contamination from entering in pipe, so as to reach the function of seeping water only.Because its anti-pressure ability is significantly smaller than concrete Pipeline and reinforced concrete pipiline, therefore be mainly used in subgrade draining, and can not it is buried enter underground.
Utility model content
In view of the shortcomings of the prior art, the utility model, which provides one kind, both has high anti-pressure ability, has again good permeable The pipeline of property.Its technical scheme is a kind of cavernous body permeable channel, including tube wall and the tube chamber that is enclosed by the tube wall, The material of the tube wall includes tube wall concrete, and preparing the raw material of the tube wall concrete includes cement, sand, stone, wooden Fiber and water, the weight proportion of each raw material are:100 parts of cement, 85~120 parts of sands, 200~330 parts of stones, 3~15 Part wood fibre and 35~45 parts of water.Wood fibre refers to plant refuse, such as branch, the leaf to drop, rice caused by trimming Shell, stalk etc. garden waste and/or agricultural waste material, realize in Process of Urban Development to garden waste material again Distribute rationally in production-goods source.Wood fibre plays filling effect in tube wall concrete so that tube wall inside concrete forms net Shape space, so that the tube wall concrete has the permeable and airing function as sponge.On the other hand, tube wall concrete It is to prepare conventional concrete in advance in preparation process, wood fibre is then added when conventional concrete does not solidify enters Row stirring forms.Such benefit is:Cement in hydration reaction, that is, prepare during concrete can with it is weak in solution Sour weak base reaction.If now, adding wood fibre, because wood fibre is in faintly acid, therefore can be reacted with cement, so as to It is unfavorable for the formation of water permeability.Only when concrete has prepared, but wood fibre is added during ot-yet-hardened again, mixed Close, can effectively avoid cement from being reacted with wood fibre.And because wood fibre surface compares sandstone aggregate in whipping process Rough surface, thus the bur on sandstone aggregate can be grabbed part and come so as to be formed carefully in inside concrete by wood fibre Small space, enhances water penetration.In addition, preparing concrete in advance is also possible that the intensity of concrete and uniformity to the greatest extent may be used Few it can be influenceed by wood fibre.
Further, the cross section of the cavernous body permeable channel is circular, polygon or ellipse, the tube wall Material also includes reinforcing bar.
Further, in addition to support, the support are arranged in the tube chamber.
Further, the quantity of the support is N number of, N >=2.
Further, at a distance of S rice, S >=2 between the adjacent support.
Further, the support includes the one or more in bar-shaped support, A-frame, four angle supports.
Further, the both ends of the bar-shaped support contact with the tube wall;Three end points of the A-frame are equal Contacted with the tube wall;Four end points of four angle support contact with the tube wall.
The utility model also provides a kind of drainage system against rain, including porous pavement and is arranged under the porous pavement Cavernous body permeable channel as claimed in claim 1;
The material of the porous pavement includes pervious concrete and permeable mortar;Prepare the raw material bag of the pervious concrete Cement, sand, stone, wood fibre and water are included, the weight proportion of each raw material is:100 parts of cement, 90~150 parts of sands, 190~250 parts of stones, 5~40 parts of wood fibres and 45~60 parts of water;Preparing the raw material of the permeable mortar includes cement, sand Son, wood fibre and water, the weight proportion of each raw material are:100 parts of cement, 200~300 parts of sands, 5~40 parts of wooden fibres 45~60 parts of water of peacekeeping.
Further, the porous pavement includes surface layer, articulamentum, basic unit and the bed course being arranged in order from top to bottom, institute It is concrete water-permeable brick to state surface layer, and the articulamentum is the permeable mortar, and the basic unit is the pervious concrete, and the bed course is Blotter.
Further, in addition to the soil horizon that is arranged between the porous pavement and the cavernous body permeable channel.
Beneficial effect is:
1st, the tube wall of the cavernous body permeable channel involved by the utility model has the function of water-permeable and air permeable, therefore passes through rain Water voluntarily leaks into the cavernous body permeable channel, and connects without punching, fluting or separately rainwater access container to collect Ground rainwater, pipeline is caused to become phenomenon that is narrow or blocking and occur into the pipeline so as to avoid debris.This practicality simultaneously is new The pipeline of type is prepared using tube wall concrete, and its anti-pressure ability is far longer than Water penetrative flexible pipe of the prior art, thus can be deep Underground is embedded to, is in particular arranged at below porous pavement, more than porous pavement can be used for car lane.Overcome Water penetrative flexible pipe The problem of being not used under car lane.
2nd, enter because the cavernous body permeable channel involved by the utility model does not have debris, therefore design upper bracket, Line clogging will not be caused, but the bearing capacity of pipeline can be further provided.
3rd, drainage system against rain of the present utility model, make use of porous pavement and cavernous body permeable channel be respectively provided with it is permeable The characteristics of gas so that while rainwater is effectively excluded, rainwater can also be played to the deep soil below cavernous body permeable channel Osmosis, so as to effectively nourish deep soil so that the depth of water circulation is extended, and is improved soil environment, is also beneficial to The formation of underground water.
With the quickening of urbanization process, various regions are all building a house, repaired the roads.People's is well off, but wherein There is a consequence to be, the nature of script, the soil horizon with water-permeable and air permeable are substituted by tight armored concrete, seal Infiltration of the rainwater to deep soil, have impact on geologic structure, also have impact on the content of underground water.Rainwater row of the present utility model Water system effectively simulates the water-permeable and air permeable function of soil, while has the intensity of conventional concrete concurrently, effectively to deep soil Moisture is delivered, also promotes the generation of underground water.
Brief description of the drawings
Fig. 1 is a kind of structural representation of embodiment of the cavernous body permeable channel involved by the utility model.
Fig. 2 is the knot of the cross section of another embodiment of the cavernous body permeable channel involved by the utility model Structure schematic diagram.
Fig. 3 is a kind of structural representation of embodiment of the drainage system against rain involved by the utility model.
Fig. 4 is the structural representation of another embodiment of the drainage system against rain involved by the utility model.
Embodiment
Below in conjunction with the drawings and specific embodiments, the utility model will be further described.
Embodiment one
Fig. 1 shows a kind of embodiment of cavernous body permeable channel of the present utility model.The cavernous body water-permeable pipe Road 1 includes tube wall 11 and tube chamber 12.The material of tube wall 11 is tube wall concrete.Preparing the raw material of the tube wall concrete includes water Mud, sand, stone, wood fibre and water, the weight proportion of each raw material are:100 parts of cement, 85 parts of sands, 200 parts of stones, 3 parts Wood fibre and 35 parts of water.Wood fibre includes branch, leaf etc. garden waste caused by trimming.
Embodiment two
The raw material of the tube wall concrete of the cavernous body permeable channel of the present embodiment includes cement, sand, stone, wood fibre And water, the weight proportion of each raw material are:100 parts of cement, 120 parts of sands, 330 parts of stones, 15 parts of wood fibres and 45 parts of water.Wood Matter fiber includes branch, leaf etc. garden waste caused by trimming.The cross section of the cavernous body permeable channel does not limit Can be the arbitrary shapes such as polygon or ellipse for circle as shown in Figure 1.Remaining is identical with embodiment one.
Embodiment three
Fig. 2 shows another embodiment of cavernous body permeable channel of the present utility model.The cavernous body is permeable Pipeline 1 includes tube wall 11, tube chamber 12 and the support 13 being arranged in tube chamber 12.The shape of support 13 is not limited to shown in Fig. 2 Triangle, can be bar-shaped, quadrangle etc..Equally, the cross section of cavernous body permeable channel 1 is also not necessarily limited to shown in Fig. 2 Circle, can be ellipse, polygon even other irregular figures etc..
The material of tube wall 11 is tube wall concrete.Preparing the raw material of the tube wall concrete includes cement, sand, stone, wood Matter fiber and water, the weight proportion of each raw material are:100 parts of cement, 110 parts of sands, 210 parts of stones, 5 parts of wood fibres and 40 parts Water.Wood fibre includes stalk, rice husk etc. agricultural wastes.
Example IV
The raw material of the tube wall concrete of the cavernous body permeable channel of the present embodiment includes cement, sand, stone, wood fibre And water, the weight proportion of each raw material are:100 parts of cement, 120 parts of sands, 240 parts of stones, 10 parts of wood fibres and 45 parts of water.Wood Matter fiber includes stalk, rice husk etc. agricultural wastes.Remaining is identical with embodiment one.
Embodiment five
The raw material of the tube wall concrete of the cavernous body permeable channel of the present embodiment includes cement, sand, stone, wooden fibre Dimension, water and additive, the weight proportion of each raw material are:100 parts of cement, 85 parts of sands, 100 parts of stones, 3 parts of wood fibres, 35 parts Water.Wood fibre includes stalk, rice husk etc. agricultural wastes.The material of tube wall also includes reinforcing bar, and reinforcing bar is wrapped in permeable mixed In solidifying soil.Remaining is identical with embodiment one.
Embodiment six
The preparation method of cavernous body permeable channel involved by the utility model comprises the following steps:
Step 1:The preparation of tube wall concrete:Garden waste is crushed, obtains 1~10cm of particle diameter coarse granule;Again will Coarse granule drying and dehydrating obtains product one;Product one is crushed, obtains 0.1~3cm of particle diameter product two;Product two is passed through 10 Mesh, 12 mesh or the choosing of 14 mesh sieve hole sizers, obtain wood fibre;According to weight proportion weigh cement, sand, stone, wood fibre and Water;The cement weighed, sand, stone and water are placed in concrete central mix plant, stirring obtains conventional concrete, then to still The not solidified conventional concrete adds the wood fibre weighed, is stirred for, obtains the tube wall concrete.
Step 2:The tube wall concrete for the ot-yet-hardened that step 1 is obtained is poured into mould, is vibrated, after conserving 2-3 days The mould is removed, obtains the cavernous body permeable channel.For more preferable effect, the cavernous body permeable channel need to continue to support Shield.
Embodiment seven
The preparation method of cavernous body permeable channel involved by the utility model comprises the following steps:
Step 1:The preparation of tube wall concrete:Garden waste is crushed, obtains 1~10cm of particle diameter coarse granule;Again will Coarse granule drying and dehydrating obtains product one;Product one is crushed, obtains 0.1~3cm of particle diameter product two;Product two is passed through 10 Mesh, 12 mesh or the choosing of 14 mesh sieve hole sizers, obtain wood fibre;According to weight proportion weigh cement, sand, stone, wood fibre and Water;The cement weighed, sand, stone and water are placed in concrete central mix plant, stirring obtains conventional concrete, then to still The not solidified conventional concrete adds the wood fibre weighed, is stirred for, obtains the tube wall concrete.
Step 2:Reinforcing bar is put into mould, the tube wall concrete for the ot-yet-hardened that step 1 is obtained is poured into mould, Vibrate so that the reinforcing bar is wrapped up wherein by the tube wall concrete;Maintenance removes the mould after 2-3 days, and it is saturating to obtain the cavernous body Waterpipe.The cavernous body permeable channel can proceed with maintenance.
Embodiment eight
Fig. 3 shows a kind of embodiment of drainage system against rain of the present utility model.The drainage system against rain bag Porous pavement 2 and the cavernous body permeable channel 1 being arranged under porous pavement 2 are included, and is arranged on porous pavement 2 and cavernous body Soil horizon 3 between permeable channel 1.Porous pavement 2 includes the surface layer 21, articulamentum 22, basic unit 23 being arranged in order from top to bottom With bed course 24, surface layer 21 is concrete water-permeable brick, and articulamentum 22 is permeable mortar, and basic unit 23 is pervious concrete, and bed course 24 is rubble Bed course.
The raw material of the pervious concrete includes cement, sand, stone, wood fibre and water, and the weight of each raw material is matched somebody with somebody Than for:100 parts of cement, 90 parts of sands, 190 parts of stones, 5 parts of wood fibres and 45 parts of water.The raw material of the permeable mortar includes water Mud, sand, wood fibre and water, the weight proportion of each raw material are:100 parts of cement, 200 parts of sands, 5 parts of wood fibres and 45 parts of water.Wood fibre includes stalk, rice husk etc. agricultural wastes, or branch, leaf etc. gardens are given up caused by trimming Gurry.
Rainwater is dropped on porous pavement 2, is penetrated into by the Permeable characteristic of porous pavement 2 in soil horizon 3, through soil horizon 3 penetrate into cavernous body permeable channel 1.
Embodiment nine
Fig. 4 shows another embodiment of drainage system against rain of the present utility model.The drainage system against rain Including porous pavement 2 and the cavernous body permeable channel 1 being arranged under porous pavement 2.
The raw material of pervious concrete used includes cement, sand, stone, wood fibre and water, the weight of each raw material Match and be:100 parts of cement, 110 parts of sands, 210 parts of stones, 20 parts of wood fibres and 50 parts of water.Permeable sand used in porous pavement The raw material of slurry includes cement, sand, wood fibre and water, and the weight proportion of each raw material is:100 parts of cement, 250 parts of sand Son, 25 parts of wood fibres and 55 parts of water.
Rainwater is dropped on porous pavement 2, is penetrated into by the Permeable characteristic of porous pavement 2 in cavernous body permeable channel 1.
Remaining is the same as embodiment eight.
Embodiment ten
The raw material of pervious concrete used in the porous pavement of the drainage system against rain of the present embodiment includes cement, sand, stone Son, wood fibre and water, the weight proportion of each raw material are:100 parts of cement, 150 parts of sands, 250 parts of stones, 40 parts it is wooden Fiber and 60 parts of water.The raw material of permeable mortar used in porous pavement includes cement, sand, wood fibre and water, each raw material Weight proportion be:100 parts of cement, 300 parts of sands, 40 parts of wood fibres and 60 parts of water.Remaining is the same as embodiment eight.
The physical and mechanical property such as institute of table 1 of pervious concrete used in tube wall concrete and porous pavement in embodiment one to ten Show:
The physical and mechanical property of pervious concrete used in tube wall concrete and porous pavement after table 1 is cured
The physical and mechanical property of permeable mortar is as shown in table 2 used in porous pavement in embodiment eight to ten:
The physical and mechanical property of permeable mortar used in porous pavement after table 2 is cured
Embodiment 11
Cavernous body permeable channel in embodiment one to seven is sunk in soil vertically, then forms immersed tube.In China rural area All well is being made using immersed tube in many places.When by the use of cavernous body permeable channel as described above as immersed tube, due to the sponge Body permeable channel has good water-permeable and air permeable characteristic, thus can make when the cavernous body permeable channel is squeezed into soil vertically Groundwater seepage is obtained into tube chamber, so as to form well.When rainy, rainwater enters in well the soil that deep layer is penetrated into by tube wall In earth, the situation that rainy day well water spreads unchecked can be reduced again and is occurred, while recharge of groundwater.
Preferred embodiment of the present utility model described in detail above.It should be appreciated that the ordinary skill people of this area Member makes many modifications and variations without creative work can according to design of the present utility model.Therefore, all this technology necks Technical staff passes through logic analysis, reasoning or limited reality on the basis of existing technology according to design of the present utility model in domain Available technical scheme is tested, all should be in the protection domain being defined in the patent claims.

Claims (7)

1. a kind of cavernous body permeable channel, including tube wall and the tube chamber that is enclosed by the tube wall, it is characterised in that the pipe The material of wall includes tube wall concrete and support, and the support is arranged in the tube chamber;The support includes bar-shaped support, three One or more in angle support, four angle supports;The both ends of the bar-shaped support contact with the tube wall;The triangle branch Three end points of frame contact with the tube wall;Four end points of four angle support contact with the tube wall.
2. cavernous body permeable channel as claimed in claim 1, it is characterised in that the cross section of the cavernous body permeable channel is Circular, polygon or ellipse, the material of the tube wall also include reinforcing bar.
3. cavernous body permeable channel as claimed in claim 1, it is characterised in that the quantity of the support is N number of, N >=2.
4. cavernous body permeable channel as claimed in claim 3, it is characterised in that at a distance of S rice, S between the adjacent support ≥2。
A kind of 5. drainage system against rain, it is characterised in that including porous pavement and be arranged under the porous pavement as power Profit requires the cavernous body permeable channel described in 1.
6. drainage system against rain as claimed in claim 5, it is characterised in that the porous pavement includes arranging successively from top to bottom Surface layer, articulamentum, basic unit and the bed course of row, the surface layer are concrete water-permeable brick, and the articulamentum is permeable mortar, and the basic unit is Pervious concrete, the bed course are blotter.
7. drainage system against rain as claimed in claim 5, it is characterised in that also include being arranged on the porous pavement and described Soil horizon between cavernous body permeable channel.
CN201621158878.9U 2016-10-31 2016-10-31 A kind of cavernous body permeable channel and a kind of drainage system against rain Active CN206681116U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621158878.9U CN206681116U (en) 2016-10-31 2016-10-31 A kind of cavernous body permeable channel and a kind of drainage system against rain

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621158878.9U CN206681116U (en) 2016-10-31 2016-10-31 A kind of cavernous body permeable channel and a kind of drainage system against rain

Publications (1)

Publication Number Publication Date
CN206681116U true CN206681116U (en) 2017-11-28

Family

ID=60395366

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621158878.9U Active CN206681116U (en) 2016-10-31 2016-10-31 A kind of cavernous body permeable channel and a kind of drainage system against rain

Country Status (1)

Country Link
CN (1) CN206681116U (en)

Similar Documents

Publication Publication Date Title
CN105625549B (en) A kind of multifunction system for oozing worry available for sponge urban rainwater, harvesting and purifying
CN106900342B (en) Integrated semi-lithologic high slope vegetation reconstruction protection method
CN107326996A (en) System of regulating and storing with dmp filter purification and collecting function
CN108283080A (en) It is a kind of to set pond from ecology is poured for sponge city
CN107034767A (en) A kind of full pervious concrete pavement structure of regeneration aggregate and its construction method
CN207062672U (en) A kind of permeable pavement structure
CN207314476U (en) System of regulating and storing with dmp filter purification and collecting function
CN109183531A (en) A kind of pervious concrete pavement combines rainwater reuse method with composite interstitial substance greenbelt
CN101283663B (en) Roof greening and planting pool convenient for collecting rain water
CN107354844A (en) Ecological pavement with water storage module and section dirty purified treatment
CN106522350A (en) Underground ecological reservoir
CN104148377A (en) Method for producing greened structure soil from silt
CN207633496U (en) A kind of super large square sponge city Integral rain recycling system
CN207582619U (en) A kind of Rain Garden based on sponge city
CN106495589A (en) Cavernous body permeable channel and preparation method thereof, application and drainage system against rain
CN206371177U (en) Rainwater savings utilize integrated greenery patches structure
CN208995858U (en) A kind of sponge urban road using ventilation anti-seepage sand
CN206681116U (en) A kind of cavernous body permeable channel and a kind of drainage system against rain
CN206902877U (en) A kind of permeable cobble ditch and permeable structure
CN204608544U (en) A kind of water conservation layer of water permeable pavement
CN109183546A (en) A kind of sponge urban road and its construction method using ventilation anti-seepage sand
CN202679934U (en) Saline-alkali soil improvement facility
CN203008243U (en) Roof plantation roofing system for underground substation
CN104045282B (en) Nonporous closed water-permeable drainage ditch cover plate and manufacturing method thereof
CN212865490U (en) Be applied to municipal road's ecological area of being detained

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant