CN206655077U - A kind of porous base course brick suitable for porous pavement and the basic road surface using the brick - Google Patents
A kind of porous base course brick suitable for porous pavement and the basic road surface using the brick Download PDFInfo
- Publication number
- CN206655077U CN206655077U CN201720300399.4U CN201720300399U CN206655077U CN 206655077 U CN206655077 U CN 206655077U CN 201720300399 U CN201720300399 U CN 201720300399U CN 206655077 U CN206655077 U CN 206655077U
- Authority
- CN
- China
- Prior art keywords
- support block
- brick
- porous
- base course
- road surface
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Road Paving Structures (AREA)
Abstract
The utility model is a kind of porous base course brick suitable for porous pavement and the basic road surface using the brick, provided with brick body, brick body is made up of the lower support block being connected and upper support block, upper support block is located at the middle part of lower support block, the height of lower support block and upper support block is equal, upper support block accounts for the 1/3 4/5 of whole brick body length, and some collect cavities penetrated along its width are provided with brick body.Basic road surface is made up of some pieces of base courses successively staggered relative lapped layup.Therefore basic road surface globality is strong, and road surface is not in that cracking sinks, while quick construction is convenient, time saving and energy saving, it is not necessary to substantial amounts of cement stone is used, therefore construction cost is low, efficiency of construction is high.
Description
Technical field
It the utility model is related to a kind of water-permeable brick, more particularly to a kind of porous base course brick suitable for porous pavement.This reality
With the new basic road surface for further relating to lay using the brick.
Background technology
At present in public open spaces such as urban construction pavement, squares, to solve rainy day excess surface water or draining not
The problems such as smooth, through frequently with directly laying porous pavement of the water-permeable brick as these open spaces on normal concrete.It is this
Mode cost is high, and construction is inconvenient.When raining, the rainwater on outdoor ground penetrates into underground by water-permeable brick.But due to road
The soft or hard difference of base, common water-permeable brick lay use a period of time after, road surface subsidence, water-permeable brick trampled on appearance fracture,
Phenomena such as loosening, road surface are damaged, and when there is a little ponding on ground, water are also had when people step on and is quickly squeezed from brickwork joint
Go out, get wet and make shoes trousers of pedestrian etc. dirty.
The content of the invention
Technical problem to be solved in the utility model is in view of the shortcomings of the prior art, there is provided one kind is rational in infrastructure, makes
With the porous base course brick for being conveniently suitable for porous pavement.
The utility model further relates to a kind of basic road surface laid using the brick.
Technical problem to be solved in the utility model is realized by following technical scheme, and the utility model is
A kind of porous base course brick suitable for porous pavement, it is characterized in:Provided with brick body, brick body is by the lower support block that is connected and upper
Support block is formed, and upper support block is located at the middle part of lower support block, and the height of lower support block and upper support block is equal, and upper support block accounts for
The 1/3-4/5 of whole brick body length, some collect cavities penetrated along its width are provided with brick body.
Base course has pervious function, can be made up of building waste, and its production cost is low, and twice laid reduces resource
Waste.
Technical problem to be solved in the utility model can also further be realized by following technical scheme, described
The porous base course brick suitable for porous pavement:The collect cavity is provided with 5, is divided into two rows and is located in brick body, upper row
Provided with 2 collect cavities, lower row is provided with 3 collect cavities.
Technical problem to be solved in the utility model can also further be realized by following technical scheme, described
The porous base course brick suitable for porous pavement:The upper surface of the upper support block, which is provided with to correspond with two collect cavities, to be connected
Logical through hole, a diameter of 1.5cm-2.5cm of through hole.
Technical problem to be solved in the utility model can also further be realized by following technical scheme, described
The porous base course brick suitable for porous pavement:The upper surface of the upper support block is provided with depressed area, two equal positions of through hole
In the depressed area.
Technical problem to be solved in the utility model can also further be realized by following technical scheme, described
The porous base course brick suitable for porous pavement:If run through on the front and rear sides face of brick body provided with arterial highway along its short transverse
The groove of extension.Groove is semi-circular recesses, a diameter of 1.5-3cm of groove.
Technical problem to be solved in the utility model can also further be realized by following technical scheme, described
The porous base course brick suitable for porous pavement:The section of the lower support block and upper support block is up big and down small isosceles
Trapezoidal, the upper angle of isosceles trapezoid is 30 ° -75 °.
Technical problem to be solved in the utility model can also further be realized by following technical scheme, described
The porous base course brick suitable for porous pavement:The length of described brick body is 40-110cm, width 10-70cm, height
For 10-40cm.
Technical problem to be solved in the utility model is realized by following technical scheme, and the utility model is
The basic road surface that a kind of base course laying described above is formed, is characterized in:The road surface is relative successively by some pieces of base courses
Staggeredly lapped layup is formed.
Technical problem to be solved in the utility model can also further be realized by following technical scheme, described
Basic road surface in:Groove on per adjacent two pieces of brick bodies docks respectively, is formed several along the permeable of its short transverse extension
Hole.
Technical problem to be solved in the utility model can also further be realized by following technical scheme, described
Basic road surface in:Collect cavity is mutually butted connection and forms collecting channel respectively in adjacent brick body.
Compared with prior art, the utility model base course has pervious function, can be made using building waste, uses
When formation base road surface laid by base course, the then direct laying water-permeable brick on basic road surface.Because basic road surface is by one
Block block base course is mutually twisted laying and formed, therefore basic road surface globality is strong, and road surface is not in that cracking sinks, and is constructed simultaneously
It is efficient and convenient, it is time saving and energy saving, it is not necessary to use substantial amounts of cement stone, construction cost is low, and efficiency of construction is high.In addition using basis
Road surface, drainage effect is good, and base course is provided with collect cavity, and rainwater is more when having little time to drain, can be by collect cavity by rainwater
Discharged after temporary, buffering, the through hole on base course can accelerate the rainwater that discharge is permeated from water-permeable brick.Collect cavity connects structure
Into collecting channel, the rainwater in collect cavity can be made mutually to be flowed by collecting channel, discharge, carry from the both sides on basic road surface
High drainage efficiency, there is the phenomenon of ponding in road surface when reducing heavy rain.
Brief description of the drawings
Fig. 1 is a kind of structural representation of the present utility model.
Embodiment
Referring to the drawings, concrete technical scheme of the present utility model is further described, in order to those skilled in the art
Member is further understood that the utility model, without forming the limitation to its right.
Embodiment 1, reference picture 1, a kind of porous base course brick suitable for porous pavement, the base course are made by building waste etc.
Into the brick with pervious function.Provided with brick body, the length of brick body is 50cm, width 40cm, is highly 20cm.In addition, brick body
It can also be the size of other specifications, all should fall in protection model of the present utility model for the sizes base course of such a structure
In enclosing.Brick body is made up of the lower support block 1 and upper support block 2 being connected, and the section of lower support block 1 and upper support block 2 is
Up big and down small isosceles trapezoid, the upper angle of isosceles trapezoid is 60 °.Lower support block 1 is equal with the height of upper support block 2, upper branch
Bracer 2 is located at the middle part of lower support block 1, and upper support block 2 accounts for the 4/5 of whole brick body length.
Some collect cavities 4 penetrated along its width are provided with brick body.The collect cavity 4 is provided with 5, is divided into up and down
Two rows are located in brick body, and upper row is in upper support block 2 provided with 2 equal-sized 4,2 collect cavities of collect cavity, and lower row is provided with
3 small big equal collect cavity, 3 collect cavities are in lower support block 1, and the sectional area of each collect cavity 4 of upper row is more than
The sectional area of the lower each collect cavity 4 of row.
When base course size is larger, collect cavity 4 is also bigger, and 1-3 roots can be according to circumstances set in each collect cavity 4
Ribs, ribs set along its width, collect cavity 4 divide into some deciles, can so heighten the intensity of brick.
The upper surface of the upper support block 2 is provided with corresponds the through hole 3 connected with two collect cavities 4.The diameter of through hole 3
For 2cm.The upper surface of upper support block 2 is provided with depressed area, and two through holes 3 are respectively positioned on the depressed area.Depressed area is along upper support
The outward flange of block 2 gradually reduces to be formed to the circumferential edge of two through holes 3, is thusly-formed lead-in chamfered, to promote rainwater edge should
Inclined-plane flows to through hole and smoothly enters collect cavity 4.
If groove 5 of the arterial highway along its short transverse through extension is additionally provided with the front and rear sides face of brick body.Groove 5 can be with
In lower support block 1, or it is located in support block 2 and extends to the bottom of lower support block 1, the groove 5 of side is mutually
It is arranged in parallel.
Embodiment 2, it is a kind of using above-mentioned base course lay form basic road surface, the road surface by some pieces of base courses according to
Secondary staggered relative lapped layup is formed.Specifically, width of roadway or length are by some pieces of base courses successively tiling splicing side by side
Form, road surface length or width are directed downward for one upward by a direction, and put the lower support block 1 of one piece of base course
The opposing lap joint ends laying in the lower support block 1 of another piece of base course is put to form.Basic road surface surrounding end portion can use mixed
Solidifying soil sand slurry is filled up using auxiliary fragment of brick, makes road surface complete.
The lower support block 1 of one piece of base course is placed on when being overlapped in the lower support block 1 of another piece of base course, can be complete
Overlap lapped layup.The width that half can also be respectively accounted for by the lower support block 1 of two base courses is placed on same lower support
On block 1, so every three pieces of base courses are mutually twisted laying, and the basic road surface firm stable of laying is good.
Groove 5 on per adjacent two pieces of brick bodies docks respectively, forms several permeable holes extended along its short transverse.Institute
Stating on whole basic road surface has some permeable holes, a diameter of 2cm of permeable hole.It can accelerate to ooze from water-permeable brick using permeable hole
Discharged through the rainwater come, improve drainage speed, effectively prevent ponding.
When some pieces of base courses splice laying side by side, the collect cavity 4 on adjacent base layer brick respectively catchment by interconnected composition
Passage.The rainwater collected in collect cavity 4 can mutually be flowed by collecting channel, can be discharged from the both sides on basic road surface,
Drainage efficiency is improved, when reducing heavy rain, the phenomenon of ponding occurs in road surface.
Claims (10)
- A kind of 1. porous base course brick suitable for porous pavement, it is characterised in that:Provided with brick body, brick body is by the lower branch that is connected Bracer and upper support block are formed, and upper support block is located at the middle part of lower support block, and the height of lower support block and upper support block is equal, on Support block accounts for the 1/3-4/5 of whole brick body length, and some collect cavities penetrated along its width are provided with brick body.
- 2. the porous base course brick according to claim 1 suitable for porous pavement, it is characterised in that:The collect cavity is provided with 5, it is divided into two rows and is located in brick body, upper row is provided with 2 collect cavities, and lower row is provided with 3 collect cavities.
- 3. the porous base course brick according to claim 2 suitable for porous pavement, it is characterised in that:The upper support block Upper surface is provided with corresponds the through hole connected with two collect cavities.
- 4. the porous base course brick according to claim 3 suitable for porous pavement, it is characterised in that:The upper support block Upper surface is provided with depressed area, and two through holes are respectively positioned on the depressed area.
- 5. the porous base course brick according to claim 1 suitable for porous pavement, it is characterised in that:Two before and after brick body If side is provided with groove of the arterial highway along its short transverse through extension.
- 6. the porous base course brick according to claim 1 suitable for porous pavement, it is characterised in that:The lower support block and The section of upper support block is up big and down small isosceles trapezoid, and the upper angle of isosceles trapezoid is 30 ° -75 °.
- 7. the porous base course brick according to claim 1 suitable for porous pavement, it is characterised in that:The length of described brick body Spend for 40-110cm, width 10-70cm, be highly 10-40cm.
- A kind of 8. basic road surface that base course laying as described in claim any one of 1-7 is formed, it is characterised in that:The road Face is made up of some pieces of base courses successively staggered relative lapped layup.
- 9. basic road surface according to claim 8, it is characterised in that:Groove on per adjacent two pieces of brick bodies is right respectively Connect, form several permeable holes extended along its short transverse.
- 10. basic road surface according to claim 8, it is characterised in that:The collect cavity company of being mutually butted respectively in adjacent brick body It is logical to form collecting channel.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720300399.4U CN206655077U (en) | 2017-03-27 | 2017-03-27 | A kind of porous base course brick suitable for porous pavement and the basic road surface using the brick |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720300399.4U CN206655077U (en) | 2017-03-27 | 2017-03-27 | A kind of porous base course brick suitable for porous pavement and the basic road surface using the brick |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206655077U true CN206655077U (en) | 2017-11-21 |
Family
ID=60316871
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720300399.4U Active CN206655077U (en) | 2017-03-27 | 2017-03-27 | A kind of porous base course brick suitable for porous pavement and the basic road surface using the brick |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206655077U (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107905051A (en) * | 2017-12-07 | 2018-04-13 | 广西金智风工程发展有限公司 | Afforestation brick |
CN110184874A (en) * | 2019-05-23 | 2019-08-30 | 上海景铭建设发展有限公司 | A kind of garden landscape road and its construction technology |
CN110685236A (en) * | 2019-09-21 | 2020-01-14 | 陕西金宝迪交通工程建设有限公司 | Self-luminous traffic marking |
-
2017
- 2017-03-27 CN CN201720300399.4U patent/CN206655077U/en active Active
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107905051A (en) * | 2017-12-07 | 2018-04-13 | 广西金智风工程发展有限公司 | Afforestation brick |
CN110184874A (en) * | 2019-05-23 | 2019-08-30 | 上海景铭建设发展有限公司 | A kind of garden landscape road and its construction technology |
CN110184874B (en) * | 2019-05-23 | 2021-08-17 | 上海景铭建设发展有限公司 | Landscape road and construction process thereof |
CN110685236A (en) * | 2019-09-21 | 2020-01-14 | 陕西金宝迪交通工程建设有限公司 | Self-luminous traffic marking |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106988184B (en) | porous pavement | |
CN205276099U (en) | Drainage formula brick that permeates water | |
CN104313967B (en) | Row's water-seepage type is mated formation combining structure | |
CN206655077U (en) | A kind of porous base course brick suitable for porous pavement and the basic road surface using the brick | |
CN106758638A (en) | A kind of city sponge brick and its construction technology | |
AU2016228704B2 (en) | Hard road construction method for natural groundwater recharge | |
CN205347914U (en) | Interlocking formula ecology concrete road surface brick that permeates water with water conservancy diversion hole | |
CN204875442U (en) | Pavement ceramic tile and pavement | |
CN105401500A (en) | Permeable gap brick convenient for draining | |
CN205501754U (en) | Ecological ceramic tile | |
CN210975426U (en) | Prefabricated assembled type oval-shaped groove blind drain ditch system | |
CN206736666U (en) | A kind of base course suitable for porous pavement and the basic road surface using the brick | |
CN206655078U (en) | A kind of porous pavement | |
CN206721596U (en) | A kind of pavement structure of permeable road | |
CN215758338U (en) | Sidewalk drainage structure | |
CN206655080U (en) | Base course suitable for porous pavement and the basic road surface using the brick | |
CN214656073U (en) | Natural permeable quarrying paving structure for sponge city | |
CN106996063A (en) | A kind of pavement structure of permeable road | |
CN205347921U (en) | Concrete road surface brick permeates water + permeates water certainly in gap | |
CN213114153U (en) | Road surface water permeable brick | |
CN211689725U (en) | Landscape drainage road surface | |
CN211227948U (en) | Prefabricated water-permeable base layer block for laying green path drift diameter | |
CN209722651U (en) | A kind of water-permeable brick and its pavement with the water-permeable brick | |
CN108570904B (en) | Sidewalk structure and construction method thereof | |
CN207143630U (en) | A kind of permeable, anti-settling pavement bricks |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |