CN105401500A - Permeable gap brick convenient for draining - Google Patents
Permeable gap brick convenient for draining Download PDFInfo
- Publication number
- CN105401500A CN105401500A CN201511025513.9A CN201511025513A CN105401500A CN 105401500 A CN105401500 A CN 105401500A CN 201511025513 A CN201511025513 A CN 201511025513A CN 105401500 A CN105401500 A CN 105401500A
- Authority
- CN
- China
- Prior art keywords
- brick
- gap
- brick body
- convenient
- draining
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01C—CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
- E01C5/00—Pavings made of prefabricated single units
- E01C5/04—Pavings made of prefabricated single units made of bricks
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01C—CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
- E01C11/00—Details of pavings
- E01C11/22—Gutters; Kerbs ; Surface drainage of streets, roads or like traffic areas
- E01C11/224—Surface drainage of streets
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01C—CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
- E01C15/00—Pavings specially adapted for footpaths, sidewalks or cycle tracks
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Road Paving Structures (AREA)
Abstract
The invention discloses a permeable gap brick convenient for draining. Main points of a technical scheme in the invention are that the permeable gap brick comprises a brick body; the bottom surface of the brick body is provided with an arc hole which penetrates two opposite side surfaces of the brick body; the brick body is provided with an abutting part used for forming a gap between two adjacent brick bodies; and through arrangement of the abutting part, certain gaps are formed among brick bodies after laying of the brick bodies, which enables rainwater to be rapidly discharged from the gaps among the brick bodies during a rainy day, so the phenomenon of gathering of rainwater on a pavement is prevented. The permeable gap brick responds to the national call of construction of a sponge city in China and will be heavily demanded in the future.
Description
Technical field
The present invention relates to a kind of water-permeable brick, more particularly, it relates to a kind of gap water-permeable brick being convenient to draining.
Background technology
Pavior brick in the market, is mostly solid construction, during laying, be arranged in order and be layed on roadbed, this pavior brick is not only very heavy, and waste material, intensity neither be very high, cannot meet the living needs of people already, the road surface of being laid by this pavior brick, because pavior brick is solid construction up and down, when rainy, rainwater cannot be discharged bottom pavior brick, very easily causes the accumulation of rainwater, brings very large inconvenience to the trip of people.
Therefore, application number be 201420664515.7 invention provide a kind of drainage pavement brick, by arranging arch hole in the bottom of drainage pavement brick, after laying completes, arch hole can form a gutter, can be drained by the rainwater permeated down in the gap between pavior brick very rapidly.
But when reality is laid, there is following problem, owing between draining brick and draining brick being a plane, after such laying completes, the side laminating of adjacent two draining bricks is arranged, gap between adjacent like this two draining bricks is just very little, rainwater can not be discharged very rapidly in the gap between adjacent two draining bricks, drainage speed is limited, in addition, due between draining brick and draining brick without any latch-up structure, after laying completes, draining brick is easily moved, and it not is very solid for laying the road surface formed.
Summary of the invention
For the deficiency that prior art exists, the object of the present invention is to provide a kind of rainwater that can facilitate in the gap between adjacent water-permeable brick, discharge the gap water-permeable brick being convenient to draining.
For achieving the above object, the invention provides following technical scheme: a kind of gap water-permeable brick being convenient to draining, comprise brick body, described brick body bottom surface is provided with arch hole, two sides relative on brick body are run through in described arch hole, and described brick body is provided with the abutment for producing gap between adjacent bricks body.
By adopting technique scheme, by arranging abutment, after spreading bricks completes, certain gap can be produced between brick body and brick body, like this when rainy, rainwater can be discharged very rapidly in the gap between brick body and brick body, there will not be the phenomenon of surface gathered water.
Preferably, described abutment comprises the abutting block being arranged on adjacent two sides on brick body.
By adopting technique scheme, when piling up, abutting block can abut with adjacent bricks body, and between two brick bodies, just can produce a gap like this, the rainwater dropped on brick body can drop very rapidly in gap.
Preferably, described brick body is not arranged two sides abutting block to be provided with for limiting the positive stop strip abutting block motion.
By adopting technique scheme, by arranging positive stop strip, brick body 1 can be avoided to be moved after laying completes, positive stop strip with abut block and coordinate, serve as latch-up structure, the robustness on road surface can be improved.
Preferably, the thickness of described abutting block is 5-12mm.
By adopting technique scheme, namely the gap between adjacent two brick bodies is 5-12mm, is in the gap of this thickness, can realize the whereabouts of rainwater very rapidly, can not cause due to excesssive gap again, affects the normal use on road surface,
Preferably, described arch hole is two and is symmetrical arranged.
By adopting technique scheme, when laying, be preferably crisscross arranged by fragment of brick, adjacent fragment of brick is engaged, can improve the bonding strength between fragment of brick, and then improves the structural strength on whole road surface.
Preferably, the thickness of described abutting block is 6-8mm.
By adopting technique scheme, being in the gap of this thickness, high-heeled shoes can being avoided to be stuck between two brick bodies, can not impact the walking of passerby, design very hommization.
Preferably, the shape of cross section of described abutting block is isosceles trapezoid.
By adopting technique scheme, when splicing, can conveniently abutting block be sent between two positive stop strips.
Preferably, described brick body end face is provided with the chamfering structure arranged ringwise.
By adopting technique scheme, when can avoid like this piling up, the finger of staff causes scratch, and be arranged to chamfering structure, after laying completes, chamfering structure can play guide effect, guide current to flow down from brick body upper surface, improve falling speed.
Preferably, described positive stop strip two is one group and is separately positioned on the both sides abutting block
By adopting technique scheme, pile up complete after, positive stop strip with abut block and abut, the stable clamping achieving abutting block.
Accompanying drawing explanation
Fig. 1 is the structural representation one of the embodiment of the present invention;
Fig. 2 is the structural representation two of the embodiment of the present invention;
Fig. 3 be the embodiment of the present invention pile up schematic diagram one;
Fig. 4 be the embodiment of the present invention pile up schematic diagram two;
Fig. 5 be the embodiment of the present invention pile up upward view.
In figure: 1, brick body; 2, block is abutted; 3, positive stop strip; 4, arch hole; 5, chamfering structure; 6, gutter.
Detailed description of the invention
Referring to figs. 1 through Fig. 5 and embodiment, the present invention will be further described.
A kind of gap water-permeable brick being convenient to draining, comprise brick body 1, brick body 1 is made up of concrete, brick body 1 bottom surface is provided with arch hole 4, by being provided with arch hole 4 on the bottom surface of brick body 1, after laying completes, arch hole 4 bottom brick body 1 can be connected to each other, form the gutter 6 of a draining, two sides relative on brick body 1 are run through in arch hole 4, brick body 1 is provided with the abutment for producing gap between adjacent bricks body 1, by arranging abutment, after laying completes, certain gap can be formed between adjacent two brick bodies 1, gap can realize the infiltration of rainwater very rapidly, avoid rainwater to pile up at brick body 1 external surface, after below rain penetration to brick body 1, rainwater can be discharged in the gutter 6 of brick body 1 bottom surface, the discharge of rainwater is very rapid, avoid rainwater to pile up on road surface, thus avoid urban inner to occur waterlogging situation, reduce the potential safety hazard existed in city when raining in torrents, when laying, directly brick body 1 is stitched together mutually, the laying on road surface can be completed, sandstone is not filled in gap, such rainwater can flow out very rapidly from gap, enter in gutter 6 and be discharged.
Abutment comprises the abutting block 2 being arranged on adjacent two sides on brick body 1.When piling up, abutting block 2 can abut with adjacent bricks body 1, can produce a gap between adjacent bricks body 1, the rainwater dropped on brick body 1 can drop very rapidly in gap, and the thickness abutting block 2 is the width in gap, abuts block 2 by arranging, structure is simple, and splicing is convenient.The thickness abutting block 2 is 5-12mm, namely the width in gap is 5-12mm, is in the gap of this thickness, can realize the whereabouts of rainwater very rapidly, can not cause due to excesssive gap again, affect the normal use on road surface, preferably, the thickness abutting block 2 is 6-8mm, be in the gap of this thickness, high-heeled shoes can be avoided to be stuck between two brick bodies 1, can not to impact the walking of passerby, design very hommization.
In order to avoid brick body 1 is moved after laying completes, brick body 1 is not arranged abut block 2 two sides on be provided with for limit abut block 2 move positive stop strip 3, positive stop strip 3 two is one group, distance between two positive stop strips 3 with abut block 2 and match, when splicing, abut block 2 between two positive stop strips 3, abut block 2 to abut with positive stop strip 3, by arranging positive stop strip 3, brick body 1 degree of freedom in the horizontal direction can be limited, pile up complete after, positive stop strip 3 with abut block 2 and coordinate, serve as latch-up structure, the robustness on road surface can be improved.
Arch hole 4 is two and is symmetrical arranged, abut block 2 be two and be symmetrical arranged, when piling up, relatively can pile up successively as Fig. 3, also can as Fig. 4 alternate tiers row pattern, when laying, preferably fragment of brick is crisscross arranged, adjacent fragment of brick is engaged, the bonding strength between fragment of brick can be improved, and then improve the structural strength on whole road surface, the position in two arch holes 4 is moderate, pile up complete after, arch hole 4 on former and later two brick bodies 1 can be connected to each other, after laying completes, still can form a gutter 6 between adjacent bricks body and facilitate draining.
In addition, the shape of cross section abutting block 2 is isosceles trapezoid.By being arranged to isosceles trapezoid by abutting block 2, can improving and abut block 2 structural strength, convenient abutting block 2 to be sent between two positive stop strips 3.Brick body 1 end face is provided with chamfering structure 5.Chamfering structure 5 is arranged ringwise, and when can avoid like this piling up, the finger of staff causes scratch, further, chamfering structure 5 is arranged to, after laying completes, chamfering structure 5 can play guide effect, guides current to flow down from brick body 1 upper surface, improves falling speed.
Below be only the preferred embodiment of the present invention, protection scope of the present invention be not only confined to above-described embodiment, all technical schemes belonged under thinking of the present invention all belong to protection scope of the present invention.It should be pointed out that for those skilled in the art, some improvements and modifications without departing from the principles of the present invention, these improvements and modifications also should be considered as protection scope of the present invention.
Claims (9)
1. be convenient to the gap water-permeable brick of draining for one kind, comprise brick body (1), described brick body (1) bottom surface is provided with arch hole (4), described arch hole (4) runs through upper two the relative sides of brick body (1), it is characterized in that: described brick body (1) is provided with the abutment for producing gap between adjacent bricks body (1).
2. a kind of gap water-permeable brick being convenient to draining according to claim 1, is characterized in that: described abutment comprises the abutting block (2) being arranged on the upper adjacent two sides of brick body (1).
3. a kind of gap water-permeable brick being convenient to draining according to claim 2, is characterized in that: described brick body (1) is not arranged two sides abutting block (2) and be provided with for limiting the positive stop strip (3) abutting block (2) and move.
4. a kind of gap water-permeable brick being convenient to draining according to Claims 2 or 3, is characterized in that: the thickness of described abutting block (2) is 5-12mm.
5. a kind of gap water-permeable brick being convenient to draining according to claim 1, is characterized in that: described arch hole (4) is two and is symmetricly set on brick body (1).
6. a kind of gap water-permeable brick being convenient to draining according to claim 4, is characterized in that: the thickness of described abutting block (2) is 6-8mm.
7. a kind of gap water-permeable brick being convenient to draining according to claim 2, is characterized in that: the shape of cross section of described abutting block (2) is isosceles trapezoid.
8. a kind of gap water-permeable brick being convenient to draining according to claim 1, is characterized in that: described brick body (1) end face is provided with the chamfering structure (5) arranged ringwise.
9. a kind of gap water-permeable brick being convenient to draining according to claim 3, is characterized in that: described positive stop strip (3) two is one group and is separately positioned on the both sides abutting block (2).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201511025513.9A CN105401500A (en) | 2015-12-30 | 2015-12-30 | Permeable gap brick convenient for draining |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201511025513.9A CN105401500A (en) | 2015-12-30 | 2015-12-30 | Permeable gap brick convenient for draining |
Publications (1)
Publication Number | Publication Date |
---|---|
CN105401500A true CN105401500A (en) | 2016-03-16 |
Family
ID=55467232
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201511025513.9A Pending CN105401500A (en) | 2015-12-30 | 2015-12-30 | Permeable gap brick convenient for draining |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105401500A (en) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106758678A (en) * | 2016-12-30 | 2017-05-31 | 苏州市清泽环境技术有限公司 | Multifunctional permeable water storage brick |
CN107059526A (en) * | 2017-06-04 | 2017-08-18 | 王行忠 | A kind of sponge urban water-through brick |
CN108221536A (en) * | 2018-01-12 | 2018-06-29 | 上海江叶园林景观工程有限公司 | A kind of regeneration floor and its application |
CN108316092A (en) * | 2018-01-27 | 2018-07-24 | 嘉兴市欣盛新型墙体材料有限责任公司 | A kind of assembled ecological block and the laying method of the building block |
CN108867242A (en) * | 2018-08-02 | 2018-11-23 | 南京吉欧地下空间科技有限公司 | A kind of urban road draining brick and water discharge method |
CN109024149A (en) * | 2018-09-20 | 2018-12-18 | 连云港东浦建筑工业化发展有限公司 | It is a kind of from saturating brick |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP0861351B1 (en) * | 1995-11-14 | 2001-05-09 | Fergus Jonathan Ardern | Ground-reinforcement panels, and multi-panel, ground-decking arrays incorporating them |
CN2575138Y (en) * | 2002-10-14 | 2003-09-24 | 王沛行 | Continuous double-rotary drum regeneration bitumen mixing apparatus |
KR20090126365A (en) * | 2008-06-04 | 2009-12-09 | (주)휴먼네이쳐텍 | A high elasticity footway block mat having marble pattern and manufacturing method the same |
CN102995844A (en) * | 2012-10-28 | 2013-03-27 | 赵延波 | Heat insulating and water draining brick |
CN203412255U (en) * | 2013-07-31 | 2014-01-29 | 安徽森泰塑木新材料有限公司 | Multifunctional combined hanging and buckling-type floor tile |
CN105155380A (en) * | 2015-09-29 | 2015-12-16 | 安徽华普节能材料股份有限公司 | Water-permeable brick bodies for pavements |
CN205295833U (en) * | 2015-12-30 | 2016-06-08 | 昆山通海建材科技有限公司 | Brick permeates water in gap convenient to drainage |
-
2015
- 2015-12-30 CN CN201511025513.9A patent/CN105401500A/en active Pending
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP0861351B1 (en) * | 1995-11-14 | 2001-05-09 | Fergus Jonathan Ardern | Ground-reinforcement panels, and multi-panel, ground-decking arrays incorporating them |
CN2575138Y (en) * | 2002-10-14 | 2003-09-24 | 王沛行 | Continuous double-rotary drum regeneration bitumen mixing apparatus |
KR20090126365A (en) * | 2008-06-04 | 2009-12-09 | (주)휴먼네이쳐텍 | A high elasticity footway block mat having marble pattern and manufacturing method the same |
CN102995844A (en) * | 2012-10-28 | 2013-03-27 | 赵延波 | Heat insulating and water draining brick |
CN203412255U (en) * | 2013-07-31 | 2014-01-29 | 安徽森泰塑木新材料有限公司 | Multifunctional combined hanging and buckling-type floor tile |
CN105155380A (en) * | 2015-09-29 | 2015-12-16 | 安徽华普节能材料股份有限公司 | Water-permeable brick bodies for pavements |
CN205295833U (en) * | 2015-12-30 | 2016-06-08 | 昆山通海建材科技有限公司 | Brick permeates water in gap convenient to drainage |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106758678A (en) * | 2016-12-30 | 2017-05-31 | 苏州市清泽环境技术有限公司 | Multifunctional permeable water storage brick |
CN107059526A (en) * | 2017-06-04 | 2017-08-18 | 王行忠 | A kind of sponge urban water-through brick |
CN108221536A (en) * | 2018-01-12 | 2018-06-29 | 上海江叶园林景观工程有限公司 | A kind of regeneration floor and its application |
CN108316092A (en) * | 2018-01-27 | 2018-07-24 | 嘉兴市欣盛新型墙体材料有限责任公司 | A kind of assembled ecological block and the laying method of the building block |
CN108867242A (en) * | 2018-08-02 | 2018-11-23 | 南京吉欧地下空间科技有限公司 | A kind of urban road draining brick and water discharge method |
CN109024149A (en) * | 2018-09-20 | 2018-12-18 | 连云港东浦建筑工业化发展有限公司 | It is a kind of from saturating brick |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105401500A (en) | Permeable gap brick convenient for draining | |
CN107881871A (en) | A kind of water-permeable brick and water-permeable brick paving method | |
CN204875687U (en) | Chain preformed block of river course bank protection | |
CN204875442U (en) | Pavement ceramic tile and pavement | |
CN107059526A (en) | A kind of sponge urban water-through brick | |
CN202644338U (en) | Ecological water holding paving brick | |
CN205295833U (en) | Brick permeates water in gap convenient to drainage | |
CN204000542U (en) | A kind of trapezoidal water-permeable brick | |
CN206721596U (en) | A kind of pavement structure of permeable road | |
CN202989727U (en) | Cement square brick | |
CN106996063A (en) | A kind of pavement structure of permeable road | |
CN201517192U (en) | Anti-raising and anti-splashing sidewalk board | |
CN211340276U (en) | Semi-permeable brick for sponge city laying | |
CN207143630U (en) | A kind of permeable, anti-settling pavement bricks | |
CN211227948U (en) | Prefabricated water-permeable base layer block for laying green path drift diameter | |
CN208885303U (en) | A kind of cap excavation method pipe gallery supporting construction | |
CN202969339U (en) | Building block for dry piled retaining wall | |
CN206736666U (en) | A kind of base course suitable for porous pavement and the basic road surface using the brick | |
CN206034227U (en) | Ecological brick who is difficult for rocking | |
CN206873225U (en) | A kind of novel garden road pavior brick | |
CN206692970U (en) | A kind of water-permeable brick of energy Quick drainage | |
CN206233054U (en) | A kind of draining floor tile | |
CN205557227U (en) | Engineering construction is with laying bricks | |
CN210561561U (en) | High-strength water permeable brick for road | |
CN216275075U (en) | Archaize broken stone road |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20160316 |
|
RJ01 | Rejection of invention patent application after publication |