CN206692970U - A kind of water-permeable brick of energy Quick drainage - Google Patents

A kind of water-permeable brick of energy Quick drainage Download PDF

Info

Publication number
CN206692970U
CN206692970U CN201720515453.7U CN201720515453U CN206692970U CN 206692970 U CN206692970 U CN 206692970U CN 201720515453 U CN201720515453 U CN 201720515453U CN 206692970 U CN206692970 U CN 206692970U
Authority
CN
China
Prior art keywords
water
drainage
permeable brick
projection
groove
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720515453.7U
Other languages
Chinese (zh)
Inventor
吕新春
韩春美
李本启
刘�英
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Xin Yu Yu Building Material Technology Co Ltd
Original Assignee
Shandong Xin Yu Yu Building Material Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Xin Yu Yu Building Material Technology Co Ltd filed Critical Shandong Xin Yu Yu Building Material Technology Co Ltd
Priority to CN201720515453.7U priority Critical patent/CN206692970U/en
Application granted granted Critical
Publication of CN206692970U publication Critical patent/CN206692970U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Road Paving Structures (AREA)

Abstract

The utility model discloses a kind of water-permeable brick of energy Quick drainage, including body, the top of the body is provided with splicing body, the splicing body includes the first projection, first groove, second projection and the second groove, first projection is arranged on the front end on the top of body, the rear end of the body upper part is provided with the first groove to match with the first projection, second projection is arranged on the right side on the top of body, the second groove to match with the second projection is provided with the left of the body upper part, mutual contact surface is fluted between the beneficial effects of the utility model water-permeable brick and projection, the road surface after laying is completed because splicing can form an entirety each other between brick body, Stability Analysis of Structures, it is less prone to loosening, the phenomenon to come off, so as to improve the antidetonation on road surface, compressive property.

Description

A kind of water-permeable brick of energy Quick drainage
Technical field
Road pavement technical field is the utility model is related to, is specifically related to a kind of water-permeable brick of energy Quick drainage.
Background technology
At present, in the public open space time such as urban construction pavement, square, to solve sleet sky excess surface water or row The problem of water is not smooth, through frequently with floor laying material of the water-permeable brick as these open spaces;After raining, the product on outdoor ground Water can penetrate into water-permeable brick, especially when rainfall is small, the problem of common water-permeable brick temporarily can solve the problem that excess surface water,
Most of the floor tile that city pavement, public open space are spread is very solid waterproof floor tile, its Structure is comparatively dense, bad hydraulic permeability, is unfavorable for the ponding drained in time on ground, and one to the rainy day, road surface and place ponding are very deep, Along with mud mixes, the walking of people is largely effected on;Prior art solves the problems, such as that surface gathered water generally uses water-permeable brick, but It is that existing water-permeable brick can not use binder materials to lay in laying, can so causes structure of the water-permeable brick after laying unstable It is fixed, easy loose or dislocation, along with the roadbed not hardened, caused through easily occurring roadbed precipitation after rainwater long period of soaking Water-permeable brick loosens, rough phenomenon, Application No. 201521046282.5, applying date 2015.12.14, Granted publication Number it is CN205276099U, authorized announcement date is that 2016.06.01 utility model patent discloses a kind of drainage type water-permeable brick, Comprising:Top, bottom and the middle part of connection top and bottom, the width W3 of the bottom is narrower than the width W1 on the top, A drainage channel, which can be formed, after its two pieces of water-permeable brick splicings in stitching portion facilitates permeable effect so as to reach, but the practicality New the problem of existing is, the contact surface between the water-permeable brick is plane, the road overall structure that the water-permeable brick is laid to It is unstable, easily there is the problem of loose or dislocation;In addition, when if substantial amounts of ponding occurs in road, water-permeable brick sheet is relied solely on Draining is carried out in the gap oozed between Permeable characteristic and water-permeable brick of body, can not complete the quick exclusion of a large amount of ponding the short time Work, causes road surface to accumulate excessive ponding, and drainage effect is unsatisfactory;Further, since the bottom of the utility model is plane, by In bottom plane and ground contact surface too closely, from the gap that water-permeable brick is in contact with each other between to permeate the ponding to get off unfavorable In continuing to flow to pre-buried PVC drain pipe, the decline of drainage efficiency can be caused.
Utility model content
For above-mentioned the deficiencies in the prior art, the purpose of this utility model is to provide a kind of the saturating of energy Quick drainage Water brick, mutual contact surface is fluted between water-permeable brick and projection, completes the road surface after laying due to splicing each other between brick body An entirety, Stability Analysis of Structures, the phenomenon for be less prone to loosening, coming off, so as to improve the antidetonation on road surface, compressive property can be formed.
This programme is achieved by the following technical measures:A kind of water-permeable brick of energy Quick drainage, including body, it is described The top of body is provided with splicing body, and it is recessed that the splicing body includes the first projection, the first groove, the second projection and second Groove, first projection are arranged on the front end on the top of body, and first groove is located at the rear end on the top of body, and first is recessed Groove matches with the first projection, and second projection is arranged on the right side on the top of body, and second groove is located at body The left side on top, the second groove match with the second projection, such brick body splice each other after Stability Analysis of Structures, be less prone to pine The phenomenon move, to come off, so as to improve the antidetonation on road surface, compressive property.
Preferably, the width at the top of the body is more than the width of the bottom of body, so when being stitched together, two Cavity occurs in middle part to the bottom of the vertical contact surface of block brick, and cavity can improve displacement and drainage speed.
Preferably, the body is additionally provided with drainage hole, and the drainage hole runs through body vertically, when water-permeable brick is certainly When stature material limits its drainage speed and displacement, a large amount of ponding occur in road surface, and at this moment, drainage hole can accelerate a large amount of ponding Straight-through brick body bottom, ponding can be discharged into Urban Underground water system from the pre-buried pipeline of ground.
Preferably, the drainage hole is four, and four drainage holes are respectively distributed on four angles of body, are carried High drainage efficiency and drainage speed.
Preferably, the top both sides of the body be tiltedly installed be oriented to Drainage Division, two pieces of brick bodies after splicing, they Drainage Division is oriented to link together and can form a draining guide groove, be oriented to Drainage Division be obliquely installed can help ponding drain into Enter the gap between brick body.
Preferably, the bottom of the body is provided with drainage channel, and the drainage channel includes the transversal draining laterally set The ponding that passage and the tandem aquaporin vertical with horizontally-arranged aquaporin, horizontally-arranged aquaporin and tandem aquaporin are easy to permeate is arranged Enter in underground preburied drainage pipeline.
Preferably, the bottom of the body is additionally provided with catch basin, and the catch basin connects with drainage channel, is easy to improve Displacement and drainage speed.
Preferably, the both sides at the middle part of the body are provided with drain groove, and drain groove is easy to help between brick body The ponding that gets off of gap penetration continue to the pipe drainage being embedded in ground.
Preferably, the longitudinal section of the drain groove is V-arrangement.
The beneficial effects of the utility model can be learnt from above-mentioned technical scheme:Completed using the utility model laying Road, because the splicing of projection groove is completed between fragment of brick, the structure of an entirety can be formed, Stability Analysis of Structures, is less prone to The phenomenon loosen, to come off, so as to improve the antidetonation on road surface, compressive property;In addition, the utility model drainage effect is notable, have more Weight drainage pattern, the drainage speed of gap drainage pattern than original material property using water-permeable brick itself and each other It is fast, the exclusion work of a large amount of ponding in road surface can be completed in a short time;In addition, the utility model be provided with bottom it is horizontal, Tandem aquaporin, drainage hole and catch basin, coordinate the drainage pipeline for being embedded in ground, improve drainage efficiency, efficient quick Ponding is discharged into Urban Underground water system.
Brief description of the drawings
In order to illustrate more clearly of the technical solution of the utility model, the required accompanying drawing used in description will be made below Simply introduce, it should be apparent that, drawings in the following description are only some embodiments of the utility model, for this area For those of ordinary skill, on the premise of not paying creative work, other accompanying drawings can also be obtained according to these accompanying drawings.
Fig. 1 is the southwestern normal axomometric drawing of the water-permeable brick of energy Quick drainage;
Fig. 2 is the northwest normal axomometric drawing of the water-permeable brick of energy Quick drainage;
Fig. 3 is the upward view of the water-permeable brick of energy Quick drainage;
Fig. 4 is the horizontally-spliced schematic diagram of the water-permeable brick of energy Quick drainage;
In figure:1- bodies, 1.1- drainage holes, 1.2- are oriented to Drainage Division, 2- splicing bodies, the projections of 2.1- first, 2.2- First groove, the projections of 2.3- second, the grooves of 2.4- second, 3- drainage channels, the horizontally-arranged aquaporins of 3.1-, 3.2- tandem aquaporins, 4- catch basins, 5- drain grooves.
Embodiment
Preferred embodiment of the present utility model described with reference to the accompanying drawings, it should be understood by those skilled in the art that It is that these embodiments are used only for explaining technical principle of the present utility model, it is not intended that limit protection of the present utility model Scope, although for example, each component and position relationship are drawn by a certain percentage in accompanying drawing, this position relationship is non-one one-tenth Constant, those skilled in the art can adjust to it as needed, to adapt to specific application scenario.
It should be noted that in description of the present utility model, term " " center ", " on ", " under ", it is "left", "right", " perpendicular Directly ", " level ", " interior ", " outer ", etc. the direction of instruction or the term of position relationship be to be closed based on direction shown in the drawings or position System, this is intended merely to facilitate description, rather than instruction or hint described device or element must have specific orientation, Yi Te Fixed azimuth configuration and operation, therefore it is not intended that to limitation of the present utility model.In addition, term " first ", " second ", " the 3rd ", it is only used for describing purpose, and it is not intended that instruction or hint relative importance.In addition it is also necessary to explanation, In description of the present utility model, unless otherwise clearly defined and limited, term " installation ", " connected ", " connection " should do broad sense Understand, for example, it may be being fixedly connected or being detachably connected, or be integrally connected;Can mechanically connect, also may be used Be electrical connection;Can be joined directly together, can also make to be indirectly connected by intermediary, can be the company of two element internals It is logical.To those skilled in the art, the concrete meaning of above-mentioned term in the present invention can be understood as the case may be.
As illustrated, a kind of water-permeable brick of energy Quick drainage, including body 1, the top of the body 1 are provided with splicing machine Structure 2, the splicing body 2 include the first projection 2.1, the first groove 2.2, the second projection 2.3 and the second groove 2.4, and described One projection 2.1 is arranged on the front end on the top of body 1, and first groove 2.2 is located at the rear end on the top of body 1, and first is recessed Groove 2.2 matches with the first projection 2.1, and second projection 2.3 is arranged on the right side on the top of body 1, second groove 2.4 are located at the left side on the top of body 1, and the second groove 2.4 matches with the second projection 2.3.
Further, the width at the top of the body 1 is more than the width of the bottom of body 1, is so being stitched together When, cavity occurs in middle part to the bottom of the vertical contact surface of two blocks of bricks, and cavity can improve displacement and drainage speed.
Further, the body 1 is additionally provided with drainage hole 1.1, and the drainage hole 1.1 runs through body 1 vertically, when For water-permeable brick when own material limits its drainage speed and displacement, a large amount of ponding occur in road surface, at this moment, drainage hole 1.1 A large amount of ponding can be accelerated and lead directly to brick body bottom, ponding can be discharged into Urban Underground water system from the pre-buried pipeline of ground.
Further, the drainage hole 1.1 is four, and four drainage holes 1.1 are respectively distributed to the four of body 1 On individual angle, drainage efficiency and drainage speed are improved.
Further, the top both sides of the body 1 be tiltedly installed be oriented to Drainage Division 1.2, two pieces of brick bodies after splicing, Their guiding Drainage Division 1.2, which links together, can form a draining guide groove, be oriented to Drainage Division 1.2 and be obliquely installed and can help The gap for helping ponding drainage to enter between brick body.
Further, the bottom of the body 1 is provided with drainage channel 3, and the drainage channel 3 includes the horizontal stroke laterally set Drainage channel 3.1 and the tandem aquaporin 3.2 vertical with horizontally-arranged aquaporin 3.1, horizontally-arranged aquaporin 3.1 and tandem aquaporin 3.2 The ponding for being easy to permeate is discharged into underground preburied drainage pipeline.
Further, the bottom of the body 1 is additionally provided with catch basin 4, and the catch basin 4 connects with drainage channel 3, just In raising displacement and drainage speed.
Further, the both sides at the middle part of the body 1 are provided with drain groove 5, and drain groove 5 is easy to help from brick body Between the ponding that gets off of gap penetration continue to the pipe drainage being embedded in ground.
Further, the longitudinal section of the drain groove 5 is V-arrangement.
Its operation principle is:Worker only utilizes the first projection 2.1 and the first groove 2.2, the second projection of brick body to each other 2.3 and second groove 2.4 mutual cooperation complete splicing, complete laying after, fragment of brick can form a unified structure of entirety, knot Structure is stable, the phenomenon for be less prone to loosening, coming off, so as to improve the antidetonation on road surface, compressive property;In addition, after the splicing of two brick bodies, Because the top of brick body is wider than bottom, two drain grooves 5 at the middle part of two brick bodies can be formed between two brick bodies one with The drainage channel 3 of bottom connects cavity, can help Quick drainage;In addition, the ponding on road surface can permeate from the body 1 of water-permeable brick Go down, if ponding is excessive, drainage hole 1.1 can help the draining of body 1, and then rainwater can be from horizontally-arranged aquaporin 3.1 and tandem Aquaporin 3.2 enters drainage pipeline pre-buried in ground after catch basin 4 and enters Urban Underground water system, while rainwater also can be from The guiding Drainage Division 1.2 on the top of body 1 enters draining, drainage speed and row in urban groundwater system after entering drain groove 5 Water efficiency all greatly improves.
So far, combined preferred embodiment shown in the drawings describes the technical solution of the utility model, still, this Art personnel are it is easily understood that the scope of protection of the utility model is expressly not limited to these embodiments. On the premise of principle of the present utility model, those skilled in the art can make equivalent change to correlation technique feature Or replace, the technical scheme after these are changed or replaced it is fallen within the scope of protection of the utility model.

Claims (9)

1. a kind of water-permeable brick of energy Quick drainage, including body(1), it is characterised in that:The body(1)Top be provided with spelling Connection mechanism(2), the splicing body(2)Including the first projection(2.1), the first groove(2.2), the second projection(2.3)With second Groove(2.4), first projection(2.1)It is arranged on body(1)Top front end, first groove(2.2)It is located at this Body(1)Top rear end, the first groove(2.2)With the first projection(2.1)Match, second projection(2.3)It is arranged on Body(1)Top right side, second groove(2.4)It is located at body(1)Top left side, the second groove(2.4)With Second projection(2.3)Match.
2. the water-permeable brick of energy Quick drainage according to claim 1, it is characterised in that:The body(1)Top width Degree is more than body(1)Bottom width.
3. the water-permeable brick of energy Quick drainage according to claim 1, it is characterised in that:The body(1)The row of being additionally provided with Water through hole(1.1), the drainage hole(1.1)Run through body vertically(1).
4. the water-permeable brick of energy Quick drainage according to claim 3, it is characterised in that:The drainage hole(1.1)For four It is individual, four drainage holes(1.1)It is respectively distributed to body(1)Four angles on.
5. the water-permeable brick of the energy Quick drainage according to claim any one of 1-4, it is characterised in that:The body(1)'s Top both sides, which are tiltedly installed with, is oriented to Drainage Division(1.2).
6. the water-permeable brick of the energy Quick drainage according to claim any one of 1-4, it is characterised in that:The body(1)'s Bottom is provided with drainage channel(3), the drainage channel(3)Including the horizontally-arranged aquaporin laterally set(3.1)With with transversal draining Passage(3.1)Vertical tandem aquaporin(3.2).
7. the water-permeable brick of energy Quick drainage according to claim 6, it is characterised in that:The body(1)Bottom also set It is equipped with catch basin(4), the catch basin(4)With drainage channel(3)Connection.
8. the water-permeable brick of the energy Quick drainage according to claim any one of 1-4, it is characterised in that:The body(1)'s The both sides at middle part are provided with drain groove(5).
9. the water-permeable brick of energy Quick drainage according to claim 8, it is characterised in that:The drain groove(5)Vertical cut Face is V-arrangement.
CN201720515453.7U 2017-05-10 2017-05-10 A kind of water-permeable brick of energy Quick drainage Expired - Fee Related CN206692970U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720515453.7U CN206692970U (en) 2017-05-10 2017-05-10 A kind of water-permeable brick of energy Quick drainage

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720515453.7U CN206692970U (en) 2017-05-10 2017-05-10 A kind of water-permeable brick of energy Quick drainage

Publications (1)

Publication Number Publication Date
CN206692970U true CN206692970U (en) 2017-12-01

Family

ID=60449220

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720515453.7U Expired - Fee Related CN206692970U (en) 2017-05-10 2017-05-10 A kind of water-permeable brick of energy Quick drainage

Country Status (1)

Country Link
CN (1) CN206692970U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109112921A (en) * 2018-09-17 2019-01-01 汤文健 A kind of water-permeable colored brick structure for sponge city

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109112921A (en) * 2018-09-17 2019-01-01 汤文健 A kind of water-permeable colored brick structure for sponge city

Similar Documents

Publication Publication Date Title
CN205420946U (en) Novel ecology that prevents surface gathered water road structure of permeating water
CN104313967B (en) Row's water-seepage type is mated formation combining structure
CN204401390U (en) A kind of novel pavement drainage system
CN205276099U (en) Drainage formula brick that permeates water
CN211036597U (en) Municipal administration road surface infiltration drainage brick
CN106087632A (en) A kind of laying brick having both row's water storage function based on sponge urban construction
CN204875442U (en) Pavement ceramic tile and pavement
CN103556672A (en) Rainwater harvesting and water storage system for field road and construction method thereof
CN109403181A (en) A kind of porous pavement
CN206692970U (en) A kind of water-permeable brick of energy Quick drainage
CN104594155A (en) Permeable pavement laying method
CN209243482U (en) A kind of town road for receiving water function with face formula
CN105178134A (en) Ditch cover and green road reconstruction method
CN207295446U (en) A kind of bridge pave-load layer water-proof drainage structure
CN206800124U (en) High-performance permeable pavement paving structure
CN209722651U (en) A kind of water-permeable brick and its pavement with the water-permeable brick
CN211689725U (en) Landscape drainage road surface
CN211340276U (en) Semi-permeable brick for sponge city laying
CN204690894U (en) Road drainage structure
KR100352143B1 (en) Planting belts construction method for street trees
KR102114494B1 (en) a easily interjoin waterway making up easily walking and easily passing in earth of rainwater and a construction method using the waterway
CN209482082U (en) A kind of assembled gap porous pavement of novel belt rain water collecting system
CN105672455A (en) Water seepage and drainage ditch component
CN207452611U (en) Latch gap water-permeable brick
CN209568328U (en) A kind of water penetration road foundation

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20171201

CF01 Termination of patent right due to non-payment of annual fee