CN108867242A - A kind of urban road draining brick and water discharge method - Google Patents

A kind of urban road draining brick and water discharge method Download PDF

Info

Publication number
CN108867242A
CN108867242A CN201810872177.9A CN201810872177A CN108867242A CN 108867242 A CN108867242 A CN 108867242A CN 201810872177 A CN201810872177 A CN 201810872177A CN 108867242 A CN108867242 A CN 108867242A
Authority
CN
China
Prior art keywords
brick
urban road
draining
draining brick
rhone
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810872177.9A
Other languages
Chinese (zh)
Inventor
王志华
张举华
高洪赟
武颖利
夏云刚
李方明
孙晋晶
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nanjing Geo Underground Interspace Technology Ltd
Nanjing Tech University
Original Assignee
Nanjing Geo Underground Interspace Technology Ltd
Nanjing Tech University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nanjing Geo Underground Interspace Technology Ltd, Nanjing Tech University filed Critical Nanjing Geo Underground Interspace Technology Ltd
Priority to CN201810872177.9A priority Critical patent/CN108867242A/en
Publication of CN108867242A publication Critical patent/CN108867242A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C11/00Details of pavings
    • E01C11/22Gutters; Kerbs ; Surface drainage of streets, roads or like traffic areas
    • E01C11/224Surface drainage of streets
    • E01C11/225Paving specially adapted for through-the-surfacing drainage, e.g. perforated, porous; Preformed paving elements comprising, or adapted to form, passageways for carrying off drainage

Abstract

The invention discloses a kind of urban road draining brick and water discharge methods.The bottom of draining brick is provided with rhone, and the rhone at least penetrates through one group of opposite bottom edge of bottom surface, can reach good drainage effect, while guaranteeing good support performance.Water discharge method is:Firstly, carrying out the construction of cement stabilized macadam bed course, cement mortar screeding layer on roadbed, then draining brick is subjected to splicing by the position of gutter channel and is paved.The conduit being mutually communicated makes the rainwater permeated from brick flow to the gutter of pavement side, achievees the purpose that Quick drainage, and can be realized the rational utilization of water resource through the rainwater that gutter is collected, and meets the idea of development in sponge city.

Description

A kind of urban road draining brick and water discharge method
Technical field
The present invention relates to urban road technical field, in particular to a kind of urban road draining brick and water discharge method.
Background technique
The Process of Urbanization Construction process in China is constantly accelerated, and with the continuous extension of urban construction, derives city water resource In short supply, water pollution environmental problem, these problems have greatly perplexed urban development.Novel sponge the idea of the city has caused people Highest attention, it has changed traditional city management theory, breach " with arrange based on " urban rainwater manage thinking.And During designing of city road, the rational utilization to rainwater resource is realized, to maintenance urban ecology hydrological environment, there is pole For important realistic meaning.
The drainage sunk well measure of China's urban road is mainly the discharge for utilizing urban rainwater canal system system to realize to rainwater Management.The application of this road design system can cope with the Rainstorms within design standard, however also result in a series of Urban Water Environment problem and ecosystem problem.Concrete reason is probed into as follows:(1)The quickening of Urbanization Construction step and city The rapid expansion of city's scale causes the fluid-tight area of earth's surface to increase severely, and the Rainfall runoff of earth's surface increases, and rainwater infiltration amount subtracts It is few, increase the draining burden of urban duct.(2)Road rain water runoff is entered in water system in a manner of discharge of pipes, certain The waste of rainwater is caused in degree, and city can not also be made to obtain the supplement of effective water resource after waterlogging.
Before making the present invention, patent " drainage bricks for road(Application number 200520200140.X)" disclose a kind of road drainage Brick is equipped with groove in the side of brick body.After the spreading bricks of the patent are good, the groove of side can form drainage channel, due to The bed-plate dimension of brick body is greater than top surface size, and fine crack together is formed between such brick body and brick body.When raining, rainwater is from fine crack stream Into groove, then pass through groove for rain drainage.
A kind of patent " drainage bricks for road(Application number 201621087845.X)" disclose a kind of drainage bricks for road, including this Body, drainage, arcuate recess and pillar, ontology are inverted trapezoidal, including surface, bottom surface and two sides, and arcuate recess is ontology bottom surface It is recessed and runs through two faces opposite on ontology;Drainage is made of multiple drainage holes, and drainage hole is symmetricly set on arch Slot two sides and through surface and bottom surface with ontology, pillar is arranged below drainage hole;Pillar is equipped with inclined baffling hole, Baffling hole is connect with drainage hole.This draining brick can make lower section form drainage channel, exclude the water in gap in time, avoid rain Water and mud spray.
Above-mentioned patent has following shortcoming:1. rain penetration path is single, drainage speed cannot be solved effectively.2. road Base top surface is arranged without waterproof, will cause the waste of water resource.3. brick pattern is single, it is unable to satisfy road surfacing flexible choice It is required that.4. the drainage path after rainwater catchment is indefinite.
Summary of the invention
It is above-mentioned it is an object of the invention to solve the problems, such as, provide a kind of urban road draining brick and draining side Method.
The technical solution adopted by the present invention is that:
A kind of urban road draining brick, the bottom of draining brick are provided with rhone, and the rhone at least penetrates through the one of bottom surface The opposite bottom edge of group.
Further, the urban road draining brick, the shape of draining brick are polygon.
Further, the urban road draining brick, the shape of draining brick are quadrangle or hexagon.
Further, the urban road draining brick, draining brick are water-permeable brick.
Further, the setting height of the urban road draining brick, the rhone is the 1/3 of draining brick height.
Further, the urban road draining brick, the shape of draining brick are quadrangle, are arranged in quadrangular base There are two the rhones of perforation width direction.
Further, the urban road draining brick, the shape of draining brick are hexagon, hexagonal base it is each Side is respectively provided with a rhone, and six rhones are mutually communicated among bottom.
A kind of urban road brick water discharge method, includes the following steps:
Step 1, cement stabilized macadam bed course is laid on roadbed;
Step 2, cement mortar is laid with as screed-coat, the gradient 3%, the gutter of slope aspect roadside side;
Step 3, levelling rear progress surface maintenance, is then laid with urban road draining brick described in claim 1.
Further, the urban road brick water discharge method, the mass ratio of cement and sand is in cement mortar in step 2 1:3。
Further, the urban road brick water discharge method, cement mortar is the cement with barrier performance in step 2 Mortar.
The draining brick used in the present invention can be prefabricated water-permeable brick, which is concrete product, material be river sand, Cement, water, then add a certain proportion of impregnating agent and be made;Material used in screed-coat(Cement mortar)Meet wanting for waterproof It asks, prevents rain penetration into foundation soil.
The draining brick that the present invention uses can guarantee during the rainfall for water-permeable brick according to the maximum rainfall in city Water energy is gone down from brick infiltration, and the brick being laid with meets the requirement of top bearing capacity.It will be adjacent when being overlapped between each brick The rhone of draining brick is mutually butted connection, realizes drainage performance well.
Beneficial effects of the present invention are as follows compared with prior art:
1. draining brick provided by the invention may be provided with a plurality of rhone, can reach the purpose of Quick drainage, with effectively solve because Occur when rainfall explodes draining it is unfavorable and the case where cause waterlogging.
2. the road brick using a variety of patterns can carry out Mutiple Choice to road surface is laid with.
It is used, meets in sponge city to rainwater 3. the setting in gutter can be collected the rainwater in gutter channel The theory of effective use.
4. the penetration of rainwater can be improved, reduce washing away for road pavement using the road of sponge the idea of the city construction, alleviate The tropical island effect in city, has adjusted weather.
It is quickly discharged from gutter channel 5. the cement mortar screeding layer that the gradient is 3% can be conducive to rainwater, and the cement mortar has There is barrier performance, thus rain penetration can be effectively prevent into foundation soil.
Detailed description of the invention
Fig. 1 is draining brick schematic diagram described in the embodiment of the present invention 1.
Fig. 2 is that draining brick described in the embodiment of the present invention 1 overlaps schematic diagram.
Fig. 3 is draining brick schematic diagram described in the embodiment of the present invention 2.
Fig. 4 is that draining brick described in the embodiment of the present invention 2 overlaps schematic diagram.
In figure 1 above -4,1 is rhone.
Specific embodiment
Below with reference to the embodiments and with reference to the accompanying drawing further being specifically described to technical solution of the present invention.
Embodiment 1:
As shown in Figure 1, being draining brick schematic diagram provided in this embodiment, it can be seen that the draining brick of the present embodiment is rectangle, Bottom surface is provided with the rhone 1 of perforation on opposite bottom edge, and in order to improve drainage efficiency, the direction of rhone setting is that perforation is wide Direction is spent, the height of rhone 1 is the 1/3 of draining brick height, and draining brick uses water-permeable brick.
The construction that urban road is carried out using the above draining brick, uses the size of draining brick for 220mm × 115mm × 60mm (Length × width x thickness), the width of rhone is 30mm, and specific step is as follows:
Step 1:The dust stratification of road bed and sundries etc. are cleaned out.It, should be by convex chipping, recess if part is uneven Filling-in.
Step 2:It is laid with cement stabilized macadam bed course, removes the sundries on bed course, is put down and is tamped with coarse sand fine tuning.
Step 3:The screed-coat on pavement uses 1:3 cement mortar, the gradient 3%, and the row of slope aspect pavement side Ditch.After screed-coat sprinkling maintenance 7d, paving for the above draining brick is carried out.
Step 4:Surveying setting-out, by horizontal and sideline(Or middle line)Then hanging wire in length and breadth first spreads one piece of conduct every 3-5m Control point.It should gently lay flat when paving, be flattened with wooden mallet or rubber hammer tapping.Since conduit arranged at brick bottom, between brick Splicing need to guarantee between conduit it is all connection(Such as Fig. 2), a continuous pipelined channel need to be formed.
Step 5:When paving brick, the flatness of adjacent brick is checked with horizontal ruler, if the loosening of discovery brick or height are not Usually, it paves again.
Step 6:Pavement is paved finish and be qualified on inspection after, fill out filling brickwork joint with cement mortar in time, and smash with ash spoon Brickwork joint is inserted until full, forbids the applying mortar on brick face.(Brick seam does not need to carry out special processing, meets the requirements ?)
Step 7:After above-mentioned operation is fully completed, after sprinkling maintenance three days, side is permitted to pass through.
Embodiment 2:
As shown in figure 3, for another drainage brick structure schematic diagram provided in this embodiment, it can be seen that shown draining brick is six Side shape, each edge of bottom are respectively provided with the rhone 1 on a vertical side, and each rhone collects and is mutually communicated in bottom centre, Form the drainage system of a connection.
The construction that urban road is carried out using the above draining brick, uses the size of draining brick for 120mm × 60mm(Side length × Thickness), the width of the rhone on every side is 25mm, and specific step is as follows:
Step 1:The dust stratification of road bed and sundries etc. are cleaned out.It, should be by convex chipping, recess if part is uneven Filling-in.
Step 2:It is laid with cement stabilized macadam bed course, removes the sundries on bed course, is put down and is tamped with coarse sand fine tuning.
Step 3:The screed-coat on pavement uses 1:3 cement mortar, the gradient 3%, and the row of slope aspect pavement side Ditch.After screed-coat sprinkling maintenance 7d, paving for the above draining brick is carried out.
Step 4:Surveying setting-out, by horizontal and sideline(Or middle line)Then hanging wire in length and breadth first spreads one piece of conduct every 3-5m Control point.It should gently lay flat when paving, be flattened with wooden mallet or rubber hammer tapping.Since conduit arranged at brick bottom, between brick Splicing need to guarantee between conduit it is all connection(Such as Fig. 4), a continuous pipelined channel need to be formed.
Step 5:When paving brick, the flatness of adjacent brick is checked with horizontal ruler, if the loosening of discovery brick or height are not Usually, it paves again.
Step 6:Pavement is paved finish and be qualified on inspection after, fill out filling brickwork joint with cement mortar in time, and smash with ash spoon Brickwork joint is inserted until full, forbids the applying mortar on brick face.
Step 7:After above-mentioned operation is fully completed, after sprinkling maintenance three days, side is permitted to pass through.
Draining brick provided by the invention can be needed to be prefabricated into draining brick of various shapes in advance, only be wanted according to application Seeking the rhone of the adjacent drainage channel brick after draining brick overlap joint can be interconnected.
Draining brick provided by the invention is different from conventional draining brick, and rhone only is arranged in bottom surface, ensure that draining brick Good support performance, while good water penetration can be guaranteed using water-permeable brick.
Simple, the not additional working procedure of urban road brick water discharge method work progress provided by the invention, roadbed Face is handled using the cement mortar of antiseepage, protects road surface well, can in combination with the drainage character of draining brick of the present invention Reach good urban road drainage effect.

Claims (10)

1. a kind of urban road draining brick, which is characterized in that the bottom of draining brick is provided with rhone, and the rhone is at least Penetrate through one group of opposite bottom edge of bottom surface.
2. urban road draining brick according to claim 1, which is characterized in that the shape of draining brick is polygon.
3. urban road draining brick according to claim 2, which is characterized in that the shape of draining brick is quadrangle or six Side shape.
4. urban road draining brick according to claim 1, which is characterized in that draining brick is water-permeable brick.
5. urban road draining brick according to claim 1, which is characterized in that the setting height of the rhone is row The 1/3 of water brick height.
6. urban road draining brick according to claim 3, which is characterized in that the shape of draining brick is quadrangle, Quadrangular base is provided with the rhone of perforation width direction.
7. urban road draining brick according to claim 3, which is characterized in that the shape of draining brick be hexagon, six A rhone is respectively provided in each of shape bottom, six rhones are mutually communicated among bottom.
8. a kind of urban road brick water discharge method, which is characterized in that include the following steps:
Step 1, cement stabilized macadam bed course is laid on roadbed;
Step 2, cement mortar is laid with as screed-coat, the gradient 3%, the gutter of slope aspect roadside side;
Step 3, levelling rear progress surface maintenance, is then laid with urban road draining brick described in claim 1.
9. urban road brick water discharge method according to claim 7, which is characterized in that water in cement mortar in step 2 The mass ratio of mud and sand is 1:3.
10. urban road brick water discharge method according to claim 7, which is characterized in that cement mortar is tool in step 2 There is the cement mortar of barrier performance.
CN201810872177.9A 2018-08-02 2018-08-02 A kind of urban road draining brick and water discharge method Pending CN108867242A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810872177.9A CN108867242A (en) 2018-08-02 2018-08-02 A kind of urban road draining brick and water discharge method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810872177.9A CN108867242A (en) 2018-08-02 2018-08-02 A kind of urban road draining brick and water discharge method

Publications (1)

Publication Number Publication Date
CN108867242A true CN108867242A (en) 2018-11-23

Family

ID=64307533

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810872177.9A Pending CN108867242A (en) 2018-08-02 2018-08-02 A kind of urban road draining brick and water discharge method

Country Status (1)

Country Link
CN (1) CN108867242A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113215902A (en) * 2021-05-28 2021-08-06 中国水利水电第五工程局有限公司 Ecological permeable pavement and construction method

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003147715A (en) * 2001-11-12 2003-05-21 Jiotekku:Kk Pavement stone, its manufacturing method and its laying method
CN105040554A (en) * 2015-06-23 2015-11-11 滁州市瑞景园林建设有限公司 Garden path structure and paving construction technology thereof
CN105401500A (en) * 2015-12-30 2016-03-16 昆山通海建材科技有限公司 Permeable gap brick convenient for draining
CN105507104A (en) * 2016-01-04 2016-04-20 上海市政工程设计研究总院(集团)有限公司 Novel water-permeable sidewalk pavement
CN106638918A (en) * 2016-12-02 2017-05-10 浙江鑫直建筑有限公司 Construction method for sponge city rainwater collection system

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003147715A (en) * 2001-11-12 2003-05-21 Jiotekku:Kk Pavement stone, its manufacturing method and its laying method
CN105040554A (en) * 2015-06-23 2015-11-11 滁州市瑞景园林建设有限公司 Garden path structure and paving construction technology thereof
CN105401500A (en) * 2015-12-30 2016-03-16 昆山通海建材科技有限公司 Permeable gap brick convenient for draining
CN105507104A (en) * 2016-01-04 2016-04-20 上海市政工程设计研究总院(集团)有限公司 Novel water-permeable sidewalk pavement
CN106638918A (en) * 2016-12-02 2017-05-10 浙江鑫直建筑有限公司 Construction method for sponge city rainwater collection system

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113215902A (en) * 2021-05-28 2021-08-06 中国水利水电第五工程局有限公司 Ecological permeable pavement and construction method

Similar Documents

Publication Publication Date Title
CN104313967B (en) Row's water-seepage type is mated formation combining structure
CN106351105A (en) Porous pavement for sponge city
CN209099113U (en) A kind of pavement pavement structure
US20200354900A1 (en) Method and device for a permeable pavement of dirt interception
CN108625252A (en) Urban road laying construction method
CN108086087A (en) A kind of construction method of porous pavement
CN202627166U (en) Novel water-discharging ecological zone for town road
CN208563030U (en) A kind of sponge city Route for pedestrians infiltration structure
CN110424226A (en) Kerbstone precast assembly side form and its construction technology
CN207484193U (en) Permeable road structure
CN108221533A (en) A kind of laying method in backroad face
CN109972475A (en) A kind of ecological permeable paving structure
CN206655077U (en) A kind of porous base course brick suitable for porous pavement and the basic road surface using the brick
CN107724201A (en) A kind of novel water permeable brick structure and method for paving
CN108867242A (en) A kind of urban road draining brick and water discharge method
CN102644224A (en) Novel roadbed side slope building protecting method and precast concrete blocks therefor
CN207469190U (en) A kind of infitration galleries structure of efficient draining
CN211689725U (en) Landscape drainage road surface
CN108867822A (en) A kind of constructing device and its construction method of anti-water Double-layer floor drain
CN209443368U (en) The overhead anti-ponding structure in bridge floor edge
CN207525575U (en) A kind of novel water permeable brick structure
CN210151514U (en) Drainage floor tile
CN210596864U (en) Stone paving structure capable of preventing efflorescence
CN207227882U (en) A kind of permeable brick structure in sponge city
CN102535493A (en) Method for constructing inverted type foundation beam

Legal Events