CN108867822A - A kind of constructing device and its construction method of anti-water Double-layer floor drain - Google Patents

A kind of constructing device and its construction method of anti-water Double-layer floor drain Download PDF

Info

Publication number
CN108867822A
CN108867822A CN201810907606.1A CN201810907606A CN108867822A CN 108867822 A CN108867822 A CN 108867822A CN 201810907606 A CN201810907606 A CN 201810907606A CN 108867822 A CN108867822 A CN 108867822A
Authority
CN
China
Prior art keywords
floor drain
layer
construction
floor
waterproof
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810907606.1A
Other languages
Chinese (zh)
Inventor
朱宝君
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Second Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Original Assignee
Second Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Second Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd filed Critical Second Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Priority to CN201810907606.1A priority Critical patent/CN108867822A/en
Publication of CN108867822A publication Critical patent/CN108867822A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03FSEWERS; CESSPOOLS
    • E03F5/00Sewerage structures
    • E03F5/04Gullies inlets, road sinks, floor drains with or without odour seals or sediment traps
    • E03F5/0407Floor drains for indoor use

Abstract

The invention discloses a kind of constructing devices of anti-water Double-layer floor drain; including reinforced concrete floor; reserved opening is provided on the reinforced concrete floor; first of floor drain is provided on the inner wall of the reserved opening; surrounding on the reinforced concrete floor positioned at reserved opening, which is spread, is wiped with mortar levelling layer; the top paving of the mortar levelling layer is wiped with additional waterproof course, and the top film of the additional waterproof course has waterproof protective layer, second floor drain is provided with above the drain hole;The invention also discloses a kind of construction methods of anti-water Double-layer floor drain, include the following steps:First of floor drain construction, the construction of floor leveling layer, waterproof protective layer construction, second floor drain construction and surface construction;Using this anti-water Double-layer floor drain constructing device and construction method, the water in water chamber on ground waterproof layer can be effectively excluded, waterproof layer addles or construct surface layer bulging and other issues caused by avoiding because of a large amount of waters of waterproof protective layer.

Description

A kind of constructing device and its construction method of anti-water Double-layer floor drain
Technical field
The present invention relates to technical field of building construction, the constructing device of specially a kind of anti-water Double-layer floor drain and its construction Method.
Background technique
Floor drain construction mostly uses greatly once mounting construction technology at present, there is the water in water chamber more than ground waterproof layer mostly It is big it is multiple rows of do not go out, cause waterproof layer to addle or construct the generation of surface layer bulging and other issues;For this purpose, it is proposed that a kind of anti- The constructing device and its construction method of water Double-layer floor drain.
Summary of the invention
The purpose of the present invention is to provide the constructing devices and its construction method of a kind of anti-water Double-layer floor drain, on solving State the problem of proposing in background technique.
To achieve the above object, the present invention provides the following technical solutions:A kind of constructing device of anti-water Double-layer floor drain, packet Reinforced concrete floor is included, reserved opening is provided on the reinforced concrete floor, is provided on the inner wall of the reserved opening first Floor drain is mixed polymer by fine-stone concrete between first of floor drain and reserved opening inner wall and is tamped, first of floor drain Top is provided with drain hole, and the surrounding that reserved opening is located on the reinforced concrete floor, which is spread, is wiped with mortar levelling layer, and mortar Screed-coat is draped over one's shoulders to first of floor drain, and the top paving of the mortar levelling layer is wiped with additional waterproof course, the additional waterproof course it is upper Square film has waterproof protective layer, and waterproof protective layer turns in first of floor drain, and the top paving of the waterproof protective layer is wiped with sand Protective layer is starched, the top paving of mortar cover is wiped with surface layer, is provided with second floor drain above the drain hole, and described second Road floor drain is fixed on drain hole by aluminum corner brace support.
Preferably, ten centimeters of the upper end eminence reinforced concrete floor ground of first of floor drain, is arc-shaped shape.
Preferably, the aluminum corner brace support is in the form of an " L ", and the length and width of aluminum corner brace support is 20mm, and thickness is equal For 5mm.
A kind of construction method of anti-water Double-layer floor drain as described above, includes the following steps:
Step 1:First of floor drain construction:First of floor drain is temporarily fixed at according to position placement positioning actinobacillus device with timber wedge In each layer hole to be provided, the gap of first of floor drain and hole to be provided is carried out hanging mould by special messenger, miscellaneous between cleaning gap after the completion of hanging mould Object continues to pour C20 microlith mixed with the one third of C20 pea gravel concreten first time pouring reinforcement concrete building plate thickness for second day Ensure to fiddle with closely knit, third day maintenance at solidifying soil to plate face 5mm;
Step 2:The construction of floor leveling layer:According to metope snap the line absolute altitude, with 1:2 dry cement mortar do ash cake, and paving smears sand Slurry, thinnest part 15mm solid cement mortar levelling layer, slope aspect floor drain, secondary press polish, maintenance 7 days for first of floor drain root, It is higher by ground 10mm or so around, makes circular shape;
Step 3:Waterproof protective layer construction:Leak increases extra play over the ground, will be turned in first of floor drain under coiled material;Waterproof roll Material paving turns over no less than 300mm in wall surrounding using full laid process, and in floor drain position, waterproof roll also needs to turn to the In one of floor drain, guarantee that the water of waterproof protective layer can be discharged by first of floor drain;
Step 4:Second floor drain construction:The installation of second floor drain is carried out after closed-water test, it is genuine by second with aluminum corner brace support Leakage fixation is fixed by design position, and unwrapping wire verifies floor drain position and level height, mortar cover construction, using microlith coagulation Soil, slump are not more than 3cm;
Step 5:Surface construction:Surface construction material is selected according to design requirement, plastering is then spread above mortar cover Layer, strict control ground line gradient avoid surface layer water, slope aspect floor drain.
Compared with prior art, the beneficial effects of the invention are as follows:Rationally, construction method is also more for structure of the invention design Simply, using this anti-water Double-layer floor drain constructing device and construction method, can effectively exclude in water chamber ground waterproof layer it On water, waterproof layer addles or constructs surface layer bulging and other issues caused by avoiding because of a large amount of waters of waterproof protective layer, extends Ground surface works service life saves maintenance cost, while easy construction, and strong operability, labor intensity is low, and construction quality is easy It is guaranteed, can satisfy higher waterproof requirement.
Detailed description of the invention
Fig. 1 is schematic structural view of the invention.
In figure:Reinforced concrete floor 1, first of floor drain 2, fine-stone concrete mix polymer 3, drain hole 4, mortar levelling layer 5, waterproof Extra play 6, waterproof protective layer 7, mortar cover 8, surface layer 9, second floor drain 10, aluminum corner brace support 11.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other Embodiment shall fall within the protection scope of the present invention.
Referring to Fig. 1, the present invention provides a kind of technical solution:A kind of constructing device of anti-water Double-layer floor drain, including steel Steel bar concrete floorslab 1 is provided with reserved opening on reinforced concrete floor 1, is provided with first of floor drain 2 on the inner wall of reserved opening, and first It mixes polymer 3 by fine-stone concrete between road floor drain 2 and reserved opening inner wall to tamp, the top of first of floor drain 2 is provided with sluicing Hole 4, the surrounding that reserved opening is located on reinforced concrete floor 1, which is spread, is wiped with mortar levelling layer 5, and mortar levelling layer 5 is draped over one's shoulders to first The top paving of road floor drain 2, mortar levelling layer 5 is wiped with additional waterproof course 6, and the top film of additional waterproof course 6 has waterproof protective layer 7, and waterproof protective layer 7 turns in first of floor drain 2, the top paving of waterproof protective layer 7 is wiped with mortar cover 8, mortar protection The top paving of layer 8 is wiped with surface layer 9, and the top of drain hole 4 is provided with second floor drain 10, and second floor drain 10 passes through aluminum corner brace support 11 are fixed on drain hole 4.
Further, ten centimeters of 1 ground of upper end eminence reinforced concrete floor of first of floor drain 2, is arc-shaped shape.
Further, aluminum corner brace support 11 is in the form of an " L ", and the length and width of aluminum corner brace support 11 is 20mm, thickness It is 5mm.
Embodiment one:
A kind of construction method of anti-water Double-layer floor drain, includes the following steps:
Step 1:First of floor drain construction:First of floor drain is temporarily fixed at according to position placement positioning actinobacillus device with timber wedge In each layer hole to be provided, the gap of first of floor drain and hole to be provided is carried out hanging mould by special messenger, miscellaneous between cleaning gap after the completion of hanging mould Object continues to pour C20 microlith mixed with the one third of C20 pea gravel concreten first time pouring reinforcement concrete building plate thickness for second day Ensure to fiddle with closely knit, third day maintenance at solidifying soil to plate face 5mm;
Step 2:The construction of floor leveling layer:According to metope snap the line absolute altitude, with 1:2 dry cement mortar do ash cake, and paving smears sand Slurry, thinnest part 15mm solid cement mortar levelling layer, slope aspect floor drain, secondary press polish, maintenance 7 days for first of floor drain root, It is higher by ground 8mm around, makes circular shape;
Step 3:Waterproof protective layer construction:Leak increases extra play over the ground, will be turned in first of floor drain under coiled material;Waterproof roll Material paving turns over not 300mm in wall surrounding, in floor drain position, waterproof roll also needs to turn to first using full laid process In floor drain, guarantee that the water of waterproof protective layer can be discharged by first of floor drain;
Step 4:Second floor drain construction:The installation of second floor drain is carried out after closed-water test, it is genuine by second with aluminum corner brace support Leakage fixation is fixed by design position, and unwrapping wire verifies floor drain position and level height, mortar cover construction, using microlith coagulation Soil, slump 2.5cm;
Step 5:Surface construction:Surface construction material is selected according to design requirement, plastering is then spread above mortar cover Layer, strict control ground line gradient avoid surface layer water, slope aspect floor drain.
Embodiment two:
A kind of construction method of anti-water Double-layer floor drain, includes the following steps:
Step 1:First of floor drain construction:First of floor drain is temporarily fixed at according to position placement positioning actinobacillus device with timber wedge In each layer hole to be provided, the gap of first of floor drain and hole to be provided is carried out hanging mould by special messenger, miscellaneous between cleaning gap after the completion of hanging mould Object continues to pour C20 microlith mixed with the one third of C20 pea gravel concreten first time pouring reinforcement concrete building plate thickness for second day Ensure to fiddle with closely knit, third day maintenance at solidifying soil to plate face 5mm;
Step 2:The construction of floor leveling layer:According to metope snap the line absolute altitude, with 1:2 dry cement mortar do ash cake, and paving smears sand Slurry, thinnest part 15mm solid cement mortar levelling layer, slope aspect floor drain, secondary press polish, maintenance 7 days for first of floor drain root, It is higher by ground 10mm around, makes circular shape;
Step 3:Waterproof protective layer construction:Leak increases extra play over the ground, will be turned in first of floor drain under coiled material;Waterproof roll Material paving turns over 310mm in wall surrounding using full laid process, and in floor drain position, waterproof roll also needs to turn to first genuine In leakage, guarantee that the water of waterproof protective layer can be discharged by first of floor drain;
Step 4:Second floor drain construction:The installation of second floor drain is carried out after closed-water test, it is genuine by second with aluminum corner brace support Leakage fixation is fixed by design position, and unwrapping wire verifies floor drain position and level height, mortar cover construction, using microlith coagulation Soil, slump 2.8mm;
Step 5:Surface construction:Surface construction material is selected according to design requirement, plastering is then spread above mortar cover Layer, strict control ground line gradient avoid surface layer water, slope aspect floor drain.
Embodiment three:
A kind of construction method of anti-water Double-layer floor drain, includes the following steps:
Step 1:First of floor drain construction:First of floor drain is temporarily fixed at according to position placement positioning actinobacillus device with timber wedge In each layer hole to be provided, the gap of first of floor drain and hole to be provided is carried out hanging mould by special messenger, miscellaneous between cleaning gap after the completion of hanging mould Object continues to pour C20 microlith mixed with the one third of C20 pea gravel concreten first time pouring reinforcement concrete building plate thickness for second day Ensure to fiddle with closely knit, third day maintenance at solidifying soil to plate face 5mm;
Step 2:The construction of floor leveling layer:According to metope snap the line absolute altitude, with 1:2 dry cement mortar do ash cake, and paving smears sand Slurry, thinnest part 15mm solid cement mortar levelling layer, slope aspect floor drain, secondary press polish, maintenance 7 days for first of floor drain root, It is higher by ground 12mm around, makes circular shape;
Step 3:Waterproof protective layer construction:Leak increases extra play over the ground, will be turned in first of floor drain under coiled material;Waterproof roll Material paving turns over 320mm in wall surrounding using full laid process, and in floor drain position, waterproof roll also needs to turn to first genuine In leakage, guarantee that the water of waterproof protective layer can be discharged by first of floor drain;
Step 4:Second floor drain construction:The installation of second floor drain is carried out after closed-water test, it is genuine by second with aluminum corner brace support Leakage fixation is fixed by design position, and unwrapping wire verifies floor drain position and level height, mortar cover construction, using microlith coagulation Soil, slump 3cm;
Step 5:Surface construction:Surface construction material is selected according to design requirement, plastering is then spread above mortar cover Layer, strict control ground line gradient avoid surface layer water, slope aspect floor drain.
The construction of the achievable anti-water Double-layer floor drain of above three groups of embodiments, and structure of the invention design is rationally, applies Work method is also more simple, using this anti-water Double-layer floor drain constructing device and construction method, can effectively exclude water chamber Water on interior ground waterproof layer, waterproof layer addles or constructs surface layer bulging etc. caused by avoiding because of a large amount of waters of waterproof protective layer Quality problems extend ground surface works service life, save maintenance cost, while easy construction, strong operability, labor intensity Low, construction quality is easy to get guarantee, can satisfy higher waterproof requirement.
It although an embodiment of the present invention has been shown and described, for the ordinary skill in the art, can be with A variety of variations, modification, replacement can be carried out to these embodiments without departing from the principles and spirit of the present invention by understanding And modification, the scope of the present invention is defined by the appended.

Claims (4)

1. a kind of constructing device of anti-water Double-layer floor drain, including reinforced concrete floor(1), the reinforced concrete floor(1)Upper setting There is reserved opening, it is characterised in that:First of floor drain is provided on the inner wall of the reserved opening(2), first of floor drain (2)Polymer is mixed by fine-stone concrete between reserved opening inner wall(3)It tamps, first of floor drain(2)Top be provided with Drain hole(4), the reinforced concrete floor(1)The upper surrounding positioned at reserved opening, which is spread, is wiped with mortar levelling layer(5), and mortar is looked for Leveling(5)It drapes over one's shoulders to first of floor drain(2), the mortar levelling layer(5)Top paving be wiped with additional waterproof course(6), the waterproof Extra play(6)Top film have waterproof protective layer(7), and waterproof protective layer(7)Turn to first of floor drain(2)It is interior, it is described anti- Water conservation layer(7)Top paving be wiped with mortar cover(8), mortar cover(8)Top paving be wiped with surface layer(9), described to let out Water hole(4)Top be provided with second floor drain(10), the second floor drain(10)Pass through aluminum corner brace support(11)It is fixed on and lets out Water hole(4)On.
2. a kind of constructing device of anti-water Double-layer floor drain according to claim 1, it is characterised in that:Described first is genuine Leakage(2)Upper end eminence reinforced concrete floor(1)Ten centimeters of ground, is arc-shaped shape.
3. a kind of constructing device of anti-water Double-layer floor drain according to claim 1, it is characterised in that:The aluminum corner brace support (11)It is in the form of an " L ", and aluminum corner brace support(11)Length and width be 20mm, thickness is 5mm.
4. a kind of construction method of anti-water Double-layer floor drain as claimed in any one of claims 1-3, which is characterized in that including Following steps:
Step 1:First of floor drain construction:First of floor drain is temporarily fixed at according to position placement positioning actinobacillus device with timber wedge In each layer hole to be provided, the gap of first of floor drain and hole to be provided is carried out hanging mould by special messenger, miscellaneous between cleaning gap after the completion of hanging mould Object continues to pour C20 microlith mixed with the one third of C20 pea gravel concreten first time pouring reinforcement concrete building plate thickness for second day Ensure to fiddle with closely knit, third day maintenance at solidifying soil to plate face 5mm;
Step 2:The construction of floor leveling layer:According to metope snap the line absolute altitude, with 1:2 dry cement mortar do ash cake, and paving smears sand Slurry, thinnest part 15mm solid cement mortar levelling layer, slope aspect floor drain, secondary press polish, maintenance 7 days for first of floor drain root, It is higher by ground 10mm or so around, makes circular shape;
Step 3:Waterproof protective layer construction:Leak increases extra play over the ground, will be turned in first of floor drain under coiled material;Waterproof roll Material paving turns over no less than 300mm in wall surrounding using full laid process, and in floor drain position, waterproof roll also needs to turn to the In one of floor drain, guarantee that the water of waterproof protective layer can be discharged by first of floor drain;
Step 4:Second floor drain construction:The installation of second floor drain is carried out after closed-water test, it is genuine by second with aluminum corner brace support Leakage fixation is fixed by design position, and unwrapping wire verifies floor drain position and level height, mortar cover construction, using microlith coagulation Soil, slump are not more than 3cm;
Step 5:Surface construction:Surface construction material is selected according to design requirement, plastering is then spread above mortar cover Layer, strict control ground line gradient avoid surface layer water, slope aspect floor drain.
CN201810907606.1A 2018-08-10 2018-08-10 A kind of constructing device and its construction method of anti-water Double-layer floor drain Pending CN108867822A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810907606.1A CN108867822A (en) 2018-08-10 2018-08-10 A kind of constructing device and its construction method of anti-water Double-layer floor drain

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810907606.1A CN108867822A (en) 2018-08-10 2018-08-10 A kind of constructing device and its construction method of anti-water Double-layer floor drain

Publications (1)

Publication Number Publication Date
CN108867822A true CN108867822A (en) 2018-11-23

Family

ID=64318640

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810907606.1A Pending CN108867822A (en) 2018-08-10 2018-08-10 A kind of constructing device and its construction method of anti-water Double-layer floor drain

Country Status (1)

Country Link
CN (1) CN108867822A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109322373A (en) * 2018-12-10 2019-02-12 天津天建设集团有限公司 Segmented combined floor drain double-layer drainage moisture discharge device and construction method
CN109811870A (en) * 2019-03-21 2019-05-28 四川奥翔圣铭建设工程有限公司 A kind of segmented combined floor drain double-layer drainage moisture discharge device and construction method

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201722797U (en) * 2010-06-11 2011-01-26 陕西省第八建筑工程公司 Bathroom floor drain waterproof node
WO2014139252A1 (en) * 2013-03-15 2014-09-18 中国十七冶集团有限公司 Method for constructing large raft foundation in high-temperature environment
CN205259340U (en) * 2015-12-28 2016-05-25 中启胶建集团有限公司 Irrigated land hourglass is prevented depositing in indoor ground
CN108005216A (en) * 2017-11-22 2018-05-08 威海建设集团股份有限公司 A kind of floor drain system and its construction method

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201722797U (en) * 2010-06-11 2011-01-26 陕西省第八建筑工程公司 Bathroom floor drain waterproof node
WO2014139252A1 (en) * 2013-03-15 2014-09-18 中国十七冶集团有限公司 Method for constructing large raft foundation in high-temperature environment
CN205259340U (en) * 2015-12-28 2016-05-25 中启胶建集团有限公司 Irrigated land hourglass is prevented depositing in indoor ground
CN108005216A (en) * 2017-11-22 2018-05-08 威海建设集团股份有限公司 A kind of floor drain system and its construction method

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
谢建伟: "《装饰装修工程质量竣工资料实例》", 同济大学出版社, pages: 42 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109322373A (en) * 2018-12-10 2019-02-12 天津天建设集团有限公司 Segmented combined floor drain double-layer drainage moisture discharge device and construction method
CN109811870A (en) * 2019-03-21 2019-05-28 四川奥翔圣铭建设工程有限公司 A kind of segmented combined floor drain double-layer drainage moisture discharge device and construction method

Similar Documents

Publication Publication Date Title
CN103469815B (en) A kind of reinforced concrete retaining wall slope protection construction method
CN101906768B (en) Panel construction method of concrete faced rock-fill dam
CN106351105A (en) Porous pavement for sponge city
CN104929365B (en) Refuse of refuse burning generating plant discharging platform combined type surface construction technology
CN109338842A (en) Colorful water-permeable road surface and construction method
CN102776897A (en) Wash apron anti-settling anti-cracking construction method and structure
CN103015721A (en) Leakage prevention construction method of reserved holes in kitchen and toilet
CN108867822A (en) A kind of constructing device and its construction method of anti-water Double-layer floor drain
CN103306439B (en) Roof construction layer pouring technology implanted by a kind of high impervious cracking resistance topping
CN108193572A (en) A kind of method recycled to precast beam precasting yard hardened layer
CN110424226A (en) Kerbstone precast assembly side form and its construction technology
CN108638322B (en) Prefabricated post concreting method in a kind of assembled architecture
CN110042723A (en) The construction method of the permeable road of full precast splice type
CN113898056A (en) Construction method of traffic lane inspection well
CN212129250U (en) Construction structure for additionally arranging collecting groove on post-cast strip of high-water-level foundation
CN111042310A (en) Basement bottom plate structure and construction method thereof
CN204418691U (en) A kind of for cast-in-place vertical member and horizontal member junction concrete blocking apparatus
CN208023406U (en) A kind of asphalt bridge floor discharge structure
CN111501959B (en) Combined cast-in-situ drainage ditch and construction method
CN109113298A (en) A kind of toilet backfill construction technology
CN114837038A (en) Construction method of barrier pedestrian path permeable base layer by adopting paver
CN114319875A (en) Seamless construction process for super-large-area concrete ground
CN102535493A (en) Method for constructing inverted type foundation beam
CN208578085U (en) A kind of hills rich water area basement guarded drainage pipe network near a river
CN113417310A (en) Construction method for foundation of column cap type elevator

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination