CN206538680U - A kind of Bridge guardrail waterproof construction - Google Patents

A kind of Bridge guardrail waterproof construction Download PDF

Info

Publication number
CN206538680U
CN206538680U CN201720130331.6U CN201720130331U CN206538680U CN 206538680 U CN206538680 U CN 206538680U CN 201720130331 U CN201720130331 U CN 201720130331U CN 206538680 U CN206538680 U CN 206538680U
Authority
CN
China
Prior art keywords
guardrail
bridge
pave
load layer
floorings
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720130331.6U
Other languages
Chinese (zh)
Inventor
梁天霄
王媛
魏建东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhengzhou University
Original Assignee
Zhengzhou University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhengzhou University filed Critical Zhengzhou University
Priority to CN201720130331.6U priority Critical patent/CN206538680U/en
Application granted granted Critical
Publication of CN206538680U publication Critical patent/CN206538680U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)

Abstract

The utility model discloses a kind of Bridge guardrail waterproof construction, including floorings, guardrail, pave-load layer, asphalt surface course and waterproof layer.Guardrail is vertically set on the upper surface of floorings, and the upper surface of floorings is provided with pave-load layer, and the upper surface of guardrail side is provided with coiled material close to the inner surface and pave-load layer of pave-load layer in guardrail.According to existing construction technical requirement, the concreting of bridge main body causes often to form crack between both new-old concretes earlier than guardrail.By the setting of this waterproof construction, bridge and guardrail inside steel bar corrosion and concrete carbonization caused by the infiltration of rainwater are reduced, the stability and durability of bridge and guard bar structure is improved, strengthens the security of bridge structure.And this Bridge guardrail waterproof construction can coordinate asphalt surface course overhaul construction operation, be easy to construction and late maintaining.

Description

A kind of Bridge guardrail waterproof construction
Technical field
The utility model is related to a kind of Waterproof Construction Technique, more particularly to a kind of Bridge guardrail waterproof construction.
Background technology
During the current Bridge Construction of China, the concreting of bridge main body causes both earlier than guardrail Crack is often formed between new-old concrete.For the ease of draining, bridge floor can typically set 2% horizontal slope, and rainwater is along overland flow To guardrail, penetrate into the gap between guardrail and floorings, cause internal steel bar corrosion, concrete carbonization etc..If there is vehicle to hit Upper guardrail, then guardrail be easy to fracture, it is very dangerous.The design of bridge and guardrail waterproof construction is to the stability of bridge, durable Property and security have great significance.
The content of the invention
Main purpose of the present utility model is to provide a kind of Bridge guardrail waterproof construction, to strengthen the durable of bridge structure Property and security, extend Bridge guardrail service life.
The purpose of this utility model and solve its technical problem using following technical scheme to realize.According to this practicality The Bridge guardrail waterproof construction of new proposition, includes floorings, pave-load layer, asphalt surface course, guardrail and waterproof roll;The shield The upper surface for being arranged on floorings of column vertically, the pave-load layer is cast in the upper surface of floorings, in guardrail close to pave-load layer Inner surface and pave-load layer be pasted with one section of waterproof roll close to the upper surface of guardrail side.By setting this section of waterproof to roll up Material, can avoid or reduce the water flowed down from guardrail and penetrate into the gap between guardrail and pave-load layer, while adding bridge floor rain Water penetrates into the path length in gap between guardrail and floorings.
Further, height of the described waterproof roll on the inside of guardrail should be greater than 50 ㎜.
Further, the waterproof layer uses EPDM waterproof rolls, and the pave-load layer uses water-proof concrete.
Further, foregoing Bridge guardrail waterproof construction, described waterproof roll is needed first before paving in base Layer coating polyurethane primer.
Further, foregoing Bridge guardrail waterproof construction, the mixing ratio of polyurethane primer is pressed for polyurethane material First:Second=1:3 (weight ratios), construction can be coated by stirring.
The construction technology of the Bridge guardrail waterproof construction, including following operating procedure,
(1)Guardrail is set on floorings;
(2)Pave-load layer is poured in floorings upper surface;
(3)After pave-load layer concrete strength reaches the 80% of design strength, by design attitude, in guardrail close to pave-load layer Inside bottom and pave-load layer close to guardrail side upper surface be coated with polyurethane primer;
(4)On primer waterproof roll is pasted by design attitude.
By above-mentioned technical proposal, the utility model Bridge guardrail waterproof construction at least has advantages below:It is anti-by this The setting of water-bound, reduces the gap that rainwater is penetrated between guardrail and floorings, it is to avoid or the reinforcing bar reduced through the gap becomes rusty Erosion, concrete carbonization, improve the stability and durability of bridge and guard bar structure, strengthen the security of bridge structure.
The utility model Bridge guardrail waterproof construction, can coordinate asphalt surface course overhauls construction operation, is easy to construction with after Phase conserves, with good application value and economic benefit.
Described above is only the general introduction of technical solutions of the utility model, in order to better understand skill of the present utility model Art means, and can be practiced according to the content of specification, described in detail with preferred embodiment of the present utility model as after.
Brief description of the drawings
Fig. 1 show the utility model Bridge guardrail waterproof construction schematic diagram;
Connotation is marked in figure:1- guardrails, 2- floorings, 3- pave-load layers, 4- waterproof layers, 5- asphalt surface courses.
Embodiment
Further to illustrate that the utility model is to reach technological means and effect that predetermined purpose is taken, to this practicality The Bridge guardrail waterproof construction of new proposition and its embodiment, feature and its effect of construction technology, are described in detail such as Afterwards.
Embodiment 1
The Bridge guardrail waterproof construction of the present embodiment as shown in Figure 1, includes guardrail 1, floorings 2, pave-load layer 3, anti- Water coiled material 4 and asphalt surface course 5.The vertical upper surface for being arranged on floorings 2 of guardrail 1, pave-load layer 3 is arranged on the upper of floorings 2 Surface, is pasted with waterproof close to the upper surface of the side of guardrail 1 close to the inner surface and pave-load layer 2 of pave-load layer 2 in guardrail 1 and rolls up Material.
During construction according to the following steps:
(1)Guardrail 1 is set on floorings 2;
(2)Pave-load layer 3 is poured in the upper surface of floorings 2;
(3)After the concrete strength of pave-load layer 3 reaches the 80% of design strength, by design attitude, in guardrail 1 close to mating formation The inside bottom and pave-load layer 3 of layer 3 are coated with polyurethane primer close to the side upper surface of guardrail 1;
(4)After the polyurethane primer of basic unit is dry, paving EPDM waterproof rolls have often spread a coiled material, should be immediately with dry Net round brush laterally firmly rolling one time since one end of coiled material, so as to which air is discharged.EPDM waterproof rolls are in guardrail 1 one The height of side is 50 ㎜.
Embodiment 2
The difference of the present embodiment and embodiment 1 is to use water-proof concrete when the pave-load layer 3 of bridge floor is poured, can be more Plus effectively reduce rainwater from pave-load layer 3 to the infiltration of floorings 2, protect bridge main body structure.

Claims (4)

1. a kind of Bridge guardrail waterproof construction, it is characterised in that:Include floorings, pave-load layer, asphalt surface course, guardrail and waterproof Layer;The upper surface for being fixed on floorings of the guardrail vertically, the pave-load layer is cast in the upper surface of floorings, leaned in guardrail The inner surface and pave-load layer of nearly pave-load layer are pasted with one section of coiled material close to the upper surface of guardrail side.
2. Bridge guardrail waterproof construction according to claim 1, it is characterised in that:The coiled material is rolled up using EPDM waterproofs Material, the pave-load layer uses water-proof concrete.
3. Bridge guardrail waterproof construction according to claim 1, it is characterised in that:Height of the coiled material on the inside of guardrail It should be greater than 50 ㎜.
4. Bridge guardrail waterproof construction according to claim 2, it is characterised in that:The coiled material needs elder generation before paving Polyurethane primer is coated with basic unit.
CN201720130331.6U 2017-02-14 2017-02-14 A kind of Bridge guardrail waterproof construction Expired - Fee Related CN206538680U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720130331.6U CN206538680U (en) 2017-02-14 2017-02-14 A kind of Bridge guardrail waterproof construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720130331.6U CN206538680U (en) 2017-02-14 2017-02-14 A kind of Bridge guardrail waterproof construction

Publications (1)

Publication Number Publication Date
CN206538680U true CN206538680U (en) 2017-10-03

Family

ID=59946428

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720130331.6U Expired - Fee Related CN206538680U (en) 2017-02-14 2017-02-14 A kind of Bridge guardrail waterproof construction

Country Status (1)

Country Link
CN (1) CN206538680U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108316137A (en) * 2018-01-16 2018-07-24 上海申继交通科技有限公司 New bridge and old bridge beam longitudinal seam waterproof method and waterproof construction

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108316137A (en) * 2018-01-16 2018-07-24 上海申继交通科技有限公司 New bridge and old bridge beam longitudinal seam waterproof method and waterproof construction

Similar Documents

Publication Publication Date Title
CN207987983U (en) A kind of waterproof construction being used for underground engineering main body construction seam and post-cast strip
CN207597441U (en) A kind of basement side wall horizontal construction joint water proof structure
CN206752843U (en) A kind of combination beam for exempting from fireproof coating
CN107605054A (en) A kind of external wall water-proofing anticracking insulation construction
CN203755354U (en) Basement floor post-cast strip
CN107916945A (en) Using the waterproof spray-up structure and its construction method of impervious gunite concrete
CN107152147A (en) A kind of concrete abrasion-resistant terrace construction technique
CN109914448A (en) A kind of composite supporting construction widened for rock matter embankment and construction method
CN108643938A (en) Coal mine deep well tunnel smooth surface concrete spraying support structure and its construction method
CN206538680U (en) A kind of Bridge guardrail waterproof construction
CN206174447U (en) Demolition -free compound insulation template
CN207003685U (en) A kind of connecting node of Side fascia and floor
CN206752527U (en) Basement post-pouring zone waterproof construction
CN106894333A (en) Bridge central partition
CN108867709A (en) A kind of waterproofing for basement method
CN206887981U (en) Basis is built in a kind of new anti-corrosion room
CN211899184U (en) Roofing antiseep structure
CN204609232U (en) A kind of extra-high voltage electric equipment test hall ground shielding
CN109695320A (en) A kind of roof waterproof node
CN106869412B (en) A kind of device for preventing pitched roof waterproof roll and its upper structural layer from falling off
CN107605055A (en) A kind of dash sill and its seepage-proof structure and construction method
CN207812660U (en) Side wall post-cast strip waterproof construction
CN205975356U (en) Cement concrete decking anti -corrosion structure
CN208251335U (en) A kind of external wall water-proofing anticracking insulation construction
CN207211213U (en) One kind enters lithotype anti-floating anchor rod structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20171003

Termination date: 20180214

CF01 Termination of patent right due to non-payment of annual fee