CN206174447U - Demolition -free compound insulation template - Google Patents
Demolition -free compound insulation template Download PDFInfo
- Publication number
- CN206174447U CN206174447U CN201720277753.6U CN201720277753U CN206174447U CN 206174447 U CN206174447 U CN 206174447U CN 201720277753 U CN201720277753 U CN 201720277753U CN 206174447 U CN206174447 U CN 206174447U
- Authority
- CN
- China
- Prior art keywords
- heat
- insulation layer
- layer
- heat preservation
- screed
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Building Environments (AREA)
Abstract
The utility model discloses a demolition -free compound insulation template, including outside layer, heat preservation and a plurality of oblique strengthening rib, wherein, the outside layer is including superimposed first mortar layer, net cloth layer, second mortar layer, steel wire stratum reticulare and third mortar layer in proper order, and slot crisscross is anyhow offered to net cloth layer was kept away from on first mortar layer one side, and third mortar layer keeps away from that one side of steel wire stratum reticulare is fixed to be provided with a plurality of horizontal strengthening ribs, the heat preservation is with the third mortar is range upon range of adds, and a plurality of first recesses are being seted up with a plurality of horizontal strengthening ribs corresponding position departments to the heat preservation, and horizontal strengthening rib is embedded in first recess, and the heat preservation is kept away from the one side on third mortar layer and has still been seted up a plurality of second recesses, the first end steel wire stratum reticulare fixed connection of a plurality of oblique strengthening ribs, the second end extends to the outside of heat preservation. This template pour into the building can be directly behind the mud as the wall face and need not to remove the life and the outer wall body unanimity of heat preservation.
Description
Technical field
This utility model is related to body of wall construction technique field in building trade, more particularly to one kind is exempted to tear complex heat-preservation mould open
Plate.
Background technology
At present external wall is provided with template and forms one and builds in process of construction, typically in the interior outside of exterior wall
Mortar injection cavity is built, then construction slurry is irrigated in the perfusion cavity, after construction slurry is dried, remove inner and outer template, so
Afterwards in the outside paste heat-preserving material of exterior wall, decorative mortar is finally coated on insulation material.In building for traditional external wall
If during, the inner and outer template of exterior wall only plays a part of to form perfusion cavity, is finally both needed to remove, and increased builder's
The amount of labour.Meanwhile, insulation material be also by builder's hand paste up, and it is naked be exposed on the external in environment, be easily subject to
The erosion of the natural environment such as wind and rain is cracking or even the phenomenon such as come off, so as to the service life for causing insulation material declines, most
The heat insulation effect of exterior wall is affected eventually.
Utility model content
The purpose of this utility model is to provide one kind to exempt to tear compound heat preservation die plate open, for improving the use longevity of heat-insulation layer
Life, while outer wall template be able to need not be removed in the process of construction of exterior wall, reduces the labor intensity of workmen.
To solve above-mentioned technical problem, one kind that this utility model is provided exempts to tear open compound heat preservation die plate using following technical side
Case:
One kind is exempted to tear compound heat preservation die plate open, including:
Outer coversheet, the outer coversheet includes the first screed, scrim layer, the second screed, the steel wire being sequentially overlapped
Layer and the 3rd screed, first screed offers groove anyhow staggeredly away from the side of the scrim layer, described
Steel screen layer includes many first steel wires and the steel wires of Duo Gen second, and first steel wire intersects solid with second steel wire
Fixed, the 3rd screed is fixedly installed multiple cross reinforcings away from the side of the steel screen layer;
Heat-insulation layer, the heat-insulation layer is superimposed with the 3rd screed, the heat-insulation layer with multiple horizontal reinforcements
Multiple first grooves are offered at the corresponding position of muscle, the cross reinforcing is embedded in first groove, the guarantor
Warm layer is further opened with multiple second grooves away from the side of the 3rd screed;
Multiple oblique reinforcements, the first end of multiple oblique reinforcements and the friendship of first steel wire and second steel wire
Crunode is fixedly connected, and the second end extends to the outside of the heat-insulation layer.
Exempt from as above to tear compound heat preservation die plate open, these, it is preferred to, also include for increasing the heat-insulation layer and institute
The first interface agent layer of adhesion strength between the 3rd screed is stated, first interface agent layer is located at the 3rd screed and institute
State between heat-insulation layer.
Exempt from as above to tear compound heat preservation die plate open, these, it is preferred to, also include for increase building building cement with it is described
The second contact surface oxidant layer of intensity between heat-insulation layer, the second contact surface oxidant layer is superimposed on the heat-insulation layer away from the 3rd mortar
The side of layer.
Exempt from as above to tear compound heat preservation die plate open, these, it is preferred to, the quantity of the oblique reinforcement is every square meter 5
~20.
Exempt from as above to tear compound heat preservation die plate open, these, it is preferred to, the second end of the oblique reinforcement is L-shaped.
Exempt from as above to tear compound heat preservation die plate open, these, it is preferred to, institute is extended at the second end of the oblique reinforcement
The length for stating the outside of heat-insulation layer is 20~150mm.
Exempt from as above to tear compound heat preservation die plate open, these, it is preferred to, the heat-insulation layer is A level fireproof heated boards.
Exempt from as above to tear compound heat preservation die plate open, these, it is preferred to, the heat-insulation layer is B level fireproof heated boards.
Exempt from as above to tear compound heat preservation die plate open, these, it is preferred to, it is embedded with the B levels fireproof heated board anti-
Fiery isolation strip.
Exempt from as above to tear compound heat preservation die plate open, these, it is preferred to, the outer coversheet thickness be 10~100mm, institute
The thickness for stating heat-insulation layer is 30~150mm, 20~100mm of interval between adjacent first steel wire, adjacent described second
20~100mm is spaced between steel wire.
In this utility model, compound heat preservation die plate is torn open by exempting from of combining of outer coversheet, heat-insulation layer and multiple oblique reinforcements,
Can be directly as wall face without the need for removing, so as to the work for reducing builder is strong after final perfusion construction slurry
Degree.Simultaneously as in advance heat-insulation layer and outer coversheet can be fabricated to into an entirety as outer wall surface template, not only can protect
It is uniform that card heat-insulation layer is laid, and heat-insulation layer is not corroded by external environments such as wind and rain, so that heat-insulation layer
Service life is consistent with exterior wall.And the multiple oblique reinforcement for extending heat-insulation layer is also embedded with outer surface layer, therefore build
When mud is irrigated, multiple oblique reinforcements are nuzzled in construction slurry so that this utility model provide exempt from tear compound open
Heat insulation formwork is combined more firm with inner wall surface.
Description of the drawings
In order to be illustrated more clearly that this utility model embodiment or technical scheme of the prior art, below will be to embodiment
The accompanying drawing to be used needed for description is briefly described, it should be apparent that, drawings in the following description are only that this practicality is new
Some embodiments of type, for those of ordinary skill in the art, on the premise of not paying creative work, can be with root
Other accompanying drawings are obtained according to these accompanying drawings.
Fig. 1 be this utility model embodiment one provide exempt from tear the cross-sectional view of compound heat preservation die plate open;
Fig. 2 be this utility model embodiment one provide exempt from tear the overall structure diagram of compound heat preservation die plate open;
Fig. 3 is the structural representation of the steel wire for exempting to tear compound heat preservation die plate open that this utility model embodiment one is provided;
Fig. 4 be this utility model embodiment two provide exempt from tear the cross-sectional view of compound heat preservation die plate open.
Description of reference numerals:
10- outer coversheets 11- the first screed 111- grooves
12- scrim layers 13- the second screed 14- steel screen layers
The screeds of 141- the first steel wire the second steel wires of 142- 15- the 3rd
151- cross reinforcing 20- heat-insulation layers the second grooves of 21-
The oblique interface agent layers of reinforcement 40- first of 22- fire-blocking belts 30-
50- second contact surface oxidant layer
Specific embodiment
Below in conjunction with the accompanying drawing in this utility model embodiment, the technical scheme in this utility model embodiment is carried out
Clearly and completely describe, it is clear that described embodiment is a part of embodiment of this utility model, rather than the enforcement of whole
Example.Based on the embodiment in this utility model, those of ordinary skill in the art are obtained under the premise of creative work is not made
The every other embodiment for obtaining, belongs to the scope of this utility model protection.
Embodiment one
This utility model embodiment one provides one kind and exempts to tear compound heat preservation die plate (the hereinafter referred to as template) open, and such as Fig. 1 is extremely
Shown in Fig. 3, the template includes outer coversheet 10, heat-insulation layer 20 and multiple oblique reinforcements 30.
Wherein, outer coversheet 10 includes the first screed 11, scrim layer 12, the second screed 13, steel wire being sequentially overlapped
The screed 15 of stratum reticulare 14 and the 3rd, the first screed 11 offers groove 111 anyhow staggeredly away from the side of scrim layer 12,
Steel screen layer 14 includes many first steel wires 141 and the second steel wires of Duo Gen 142, and the first steel wire 141 and the second steel wire 142 are mutually handed over
Fork is fixed, and the 3rd screed 15 is fixedly installed multiple cross reinforcings 151 away from the side of steel screen layer 14;Heat-insulation layer 20 with
3rd screed 15 is superimposed, and it is recessed that heat-insulation layer 20 offers multiple first at the position corresponding with multiple cross reinforcings 151
Groove, cross reinforcing 151 is embedded in the first groove, and heat-insulation layer 20 is further opened with multiple away from the side of the 3rd screed 15
Two grooves 21;The first end of multiple oblique reinforcements 30 is fixedly connected with the cross point of the first steel wire 141 and the second steel wire 142, the
Two ends extend to the outside of heat-insulation layer 20.It will be appreciated by persons skilled in the art that multiple first steel wires 141 and multiple second
Can be to be welded and fixed or pin is fixed between steel wire 142, be preferably in the present embodiment and be welded and fixed, be welded and fixed operation letter
It is single, low cost.Meanwhile, in the present embodiment, the first steel wire 141 intersects as rectangle or parallel four side with the second steel wire 142
Shape, the spacing between the first preferably rectangular in the present embodiment and adjacent steel wire 141 and between adjacent the second steel wire 142
The diameter for being 10~100mm, the first steel wire 141 and the second steel wire 142 is 0.8~10mm, specifically, the first adjacent steel
The selection of the diameter of spacing and the first steel wire 141 and the second steel wire 142 between silk 141 and between adjacent the second steel wire 142,
Selected according to construction demand by those skilled in the art, when the template laying area is less, spacing and diameter can be selected
It is smaller, on the contrary then select larger.In the present embodiment, between the first adjacent steel wire 141 and the second adjacent steel wire 142 it
Between spacing be both preferably the diameter of 50mm, the first steel wire 141 and the second steel wire 142 and be both preferably 5mm.It is horizontal in the present embodiment
It is embedded in the first groove to reinforcement 151, the purpose being arranged such is to ensure that heat-insulation layer 20 is combined jail with outer coversheet 10
Gu, the relative movement of heat-insulation layer 20 is prevented, while being additionally provided with the second groove 21 in heat-insulation layer 20, the second groove 21 is set
Purpose is in order to form new reinforcement with the second groove 21 after construction slurry perfusion, so that what the template was ultimately formed
Exterior wall is more firm.It will be appreciated by persons skilled in the art that the size of the first groove and the second groove 21, shape and number
Amount can be designed according to concrete needs of production, can finally reach desirable strength.Those skilled in the art are also
It is understood that tiltedly reinforcement 30 passes through welding with the first steel wire 141 of steel screen layer 14 and the cross point of the first steel wire 141
It is fixed, and tiltedly the material of reinforcement 30 is preferably steel, the angle between oblique reinforcement 30 and steel screen layer 14 can be any
Angle, the present embodiment is preferably 45 degree.
In the present embodiment, the template being made up of outer coversheet 10, heat-insulation layer 20 and multiple oblique reinforcements 30, is using
When, first using the template as external wall exterior sheathing, and the inner template of the heat-insulation layer 20 by the template and external wall matches
Close and form the die cavity of perfusion construction slurry, then construction slurry is fed in the die cavity, after construction slurry is dried, the template is just
With the exterior wall that construction slurry integrator forms building, exterior sheathing now is just without the need for removing, it is only necessary to remove inner template, therefore
Save the labor intensity of builder.And due to including heat-insulation layer 20 in the template, after exterior wall is formed, heat-insulation layer 20
Equivalent to being embedded in exterior wall, therefore heat-insulation layer 20 will not be corroded by external environments such as wind and rain, so as to reach heat-insulation layer
20 service life is consistent with the service life of exterior wall.And as the template of exterior wall exterior sheathing, can produce in advance, because
This can be accurately controlled the relevant parameters such as thickness, position and the firmness of heat-insulation layer 20 in early stage production process, so as to keep away
Exempt from during traditional architecture by architectural engineering scene paste heat-preserving material cause heat-insulation layer 20 occur crackle, laminating defective tightness it is easy
The defect such as come off.And the template is produced in advance, standardized work can be just formed, so as to improve work efficiency.And in order to ensure this
Template toughness in use, prevents the template cracking in use, and in outer surface layer 10 grid cloth is increased
Layer 12, while the intensity in order to increase the template, also increased steel screen layer 14 in outer surface layer 10, the increase of this two-layer ensures
The toughness and intensity of the template itself.Multiple oblique reinforcements for extending to the outside of heat-insulation layer 20 are additionally provided with the template
30, so as to when construction slurry is irrigated, oblique reinforcement 30 will be embedded in construction slurry, the template is increased with building
The bond strength of mud so that the body of wall that the template is ultimately formed is more firm, is less prone to obscission, extends the longevity of body of wall
Life, while improve the security performance of body of wall.
Further, what this utility model embodiment one was provided exempts to tear compound heat preservation die plate open, also includes for increasing insulation
First interface agent layer 40 of adhesion strength between the screed 15 of layer 20 and the 3rd, the first interface agent layer 40 is located at the 3rd screed 15
Between heat-insulation layer 20.In production process, increasing by the first interface agent layer 40 between the screed 15 of heat-insulation layer 20 and the 3rd can be with
The firmness between the screed 15 of heat-insulation layer 20 and the 3rd is improved, so as to further ensure that heat-insulation layer 20 is filled in construction slurry
Will not come off from the template during note, it is to avoid the heat-insulating property that heat-insulation layer 20 is caused in the building course of exterior wall declines.
Further, what this utility model embodiment was provided exempts to tear compound heat preservation die plate open, also includes for increasing building water
The second contact surface oxidant layer 50 of intensity between mud and heat-insulation layer 20, second contact surface oxidant layer 50 is superimposed on heat-insulation layer 20 away from the 3rd mortar
The side of layer 15.Second contact surface oxidant layer 50 can increase the firmness between heat-insulation layer 20 and construction slurry, be further ensured that
The intensity of the exterior wall that the template is ultimately formed.
Further, the quantity of oblique reinforcement 30 is every square meter 5~20.Specifically, those skilled in the art can be with root
Selected according to specific construction requirement, for the difference of different use environment External Wall intensity requirements oblique reinforcement can be selected
30 particular number, is preferably per square meter 6 in the present embodiment.Preferably, one end (note of the oblique reinforcement 30 away from heat-insulation layer 20
For the second end) it is L-shaped, and the length that tiltedly outside of heat-insulation layer 20 is extended at the second end of reinforcement 30 is 20~150mm.Ability
Field technique personnel it is understood that tiltedly the second end of reinforcement 30 can be the abnormity such as S-shaped or spiral type, in production and construction
In, the shape at the second end selects to be abnormity, primarily to increase the intensity that oblique reinforcement 30 is combined with construction slurry, so as to increase
Plus the intensity of exterior wall, it is reduces cost but when the intensity requirement of the external body of wall in some fields of employment is not very high, the second end
Can be the regular shapes such as linear.Tiltedly the length of exterior wall is extended at the second end of reinforcement 30, it is also possible to according to reality
Construction requirement is selected, but tiltedly the second end of reinforcement 30 is extended the length of exterior wall and is not preferably less than 20mm, less than 20mm
Will the strong influence template and construction slurry bond strength, also no more than 150mm, more than 150mm, be made up of the template
The exterior sheathing of building outer wall may interfere with the inner template of building outer wall, so as to affect construction slurry perfusion die cavity
Formed, the building outer wall intensity decreases that may eventually lead to the formation of.
Further, heat-insulation layer 20 is A level fireproof heated boards.It will be appreciated by persons skilled in the art that the fire prevention of A levels is protected
Warm plate can be polymerization styrofoam, polymer and graphite styrofoam, rock cotton board, vertical hair polymerization rock cotton board, block of glass wool, foamed ceramic or
Cement foaming insulation board etc..Meanwhile, when using A level fireproof heated boards, the reduction that the thickness of outer coversheet 10 can be appropriate, A levels
The fire protecting performance of fireproof heated board is strong, can reduce the economic loss caused due to fire, it is ensured that the lives and properties of people.
Further, the thickness of outer coversheet 10 is 10~100mm, and the thickness of heat-insulation layer 20 is 30~150mm, adjacent first
20~100mm is spaced between steel wire 141,20~100mm is spaced between the second adjacent steel wire 142.Above-mentioned data be through
What test confirmed, structural strength and heat-insulating property had both been can guarantee that, the optimum thickness of waste of materials is avoided that again, certainly, remaining is thick
Degree can also be selected, and be in protection domain of the present utility model.
Embodiment two
Embodiment two is that heat-insulation layer 20 uses B level fireproof heated boards, when some with the difference part of embodiment one
When building is not high to fire protection requirement, B level fireproof heated boards can be adopted, its structure is as shown in figure 4, when heat-insulation layer 20 is anti-for B levels
During fiery warming plate, one layer of fire-blocking belt 22 can be embedded in heat-insulation layer 20, wherein, fire-blocking belt 22 is A level fireproof heat insulatings
Material, so, when a fire, fire-blocking belt 22 can effectively prevent spreading for the intensity of a fire, be that rescue operation is striven for
Time.Those skilled in the art will also be appreciated that B levels fireproof heated board can be extruded sheet, styrofoam, graphite polyphenyl
Plate, phenolic board and polyurethane sheet etc..
The above, specific embodiment only of the present utility model, but protection domain of the present utility model do not limit to
In this, any those familiar with the art can readily occur in change in the technical scope that this utility model is disclosed
Or replace, all should cover within protection domain of the present utility model.Therefore, protection domain of the present utility model should be with the power
The protection domain that profit is required is defined.
Claims (10)
1. one kind is exempted to tear compound heat preservation die plate open, it is characterised in that include:
Outer coversheet, the outer coversheet include be sequentially overlapped the first screed, scrim layer, the second screed, steel screen layer and
3rd screed, first screed offers groove anyhow staggeredly, the steel wire away from the side of the scrim layer
Stratum reticulare includes many first steel wires and the steel wires of Duo Gen second, and first steel wire and second steel wire intersect fixation, institute
The side that the 3rd screed is stated away from the steel screen layer is fixedly installed multiple cross reinforcings;
Heat-insulation layer, the heat-insulation layer is superimposed with the 3rd screed, the heat-insulation layer with multiple cross reinforcing phases
Multiple first grooves are offered at corresponding position, the cross reinforcing is embedded in the groove, the heat-insulation layer away from
The side of the 3rd screed is further opened with multiple second grooves;
Multiple oblique reinforcements, first end and first steel wire and the cross point of second steel wire of multiple oblique reinforcements
It is fixedly connected, the second end extends to the outside of the heat-insulation layer.
2. it is according to claim 1 to exempt to tear compound heat preservation die plate open, it is characterised in that also to include for increasing the heat-insulation layer
The first interface agent layer of adhesion strength between the 3rd screed, first interface agent layer is located at the 3rd screed
Between the heat-insulation layer.
3. it is according to claim 1 to exempt to tear compound heat preservation die plate open, it is characterised in that also include for increase building building cement with
The second contact surface oxidant layer of intensity between the heat-insulation layer, the second contact surface oxidant layer is superimposed on the heat-insulation layer away from the described 3rd
The side of screed.
4. it is according to claim 1 to exempt to tear compound heat preservation die plate open, it is characterised in that the quantity of the oblique reinforcement is often flat
5~20, rice.
5. it is according to claim 1 to exempt to tear compound heat preservation die plate open, it is characterised in that the second end of the oblique reinforcement is L
Shape.
6. it is according to claim 1 to exempt to tear compound heat preservation die plate open, it is characterised in that the second end of the oblique reinforcement extends
The length for going out the outside of the heat-insulation layer is 20~150mm.
7. it is according to claim 1 to exempt to tear compound heat preservation die plate open, it is characterised in that the heat-insulation layer is A level fireproof heat insulatings
Plate.
8. it is according to claim 1 to exempt to tear compound heat preservation die plate open, it is characterised in that the heat-insulation layer is B level fireproof heat insulatings
Plate.
9. it is according to claim 8 to exempt to tear compound heat preservation die plate open, it is characterised in that to embed in the B levels fireproof heated board
There is fire-blocking belt.
10. exempting from according to any one of claim 1~9 tears compound heat preservation die plate open, it is characterised in that the outer coversheet thickness
For 10~100mm, the thickness of the heat-insulation layer is 30~150mm, and 20~100mm is spaced between adjacent first steel wire,
20~100mm is spaced between adjacent second steel wire.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720277753.6U CN206174447U (en) | 2017-03-21 | 2017-03-21 | Demolition -free compound insulation template |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720277753.6U CN206174447U (en) | 2017-03-21 | 2017-03-21 | Demolition -free compound insulation template |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206174447U true CN206174447U (en) | 2017-05-17 |
Family
ID=60241914
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720277753.6U Active CN206174447U (en) | 2017-03-21 | 2017-03-21 | Demolition -free compound insulation template |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206174447U (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111877607A (en) * | 2020-08-09 | 2020-11-03 | 郭可伍 | Heat-preservation and decoration integrated disassembly-free template for building and manufacturing method thereof |
CN112064835A (en) * | 2020-09-14 | 2020-12-11 | 郭可伍 | Disassembly-free heat-preservation and decoration integrated template and production process thereof |
CN115306058A (en) * | 2022-09-13 | 2022-11-08 | 中交第四公路工程局有限公司 | Disassembly-free heat preservation template and installation method |
-
2017
- 2017-03-21 CN CN201720277753.6U patent/CN206174447U/en active Active
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111877607A (en) * | 2020-08-09 | 2020-11-03 | 郭可伍 | Heat-preservation and decoration integrated disassembly-free template for building and manufacturing method thereof |
CN111877607B (en) * | 2020-08-09 | 2022-07-26 | 昭通高速装配式建筑有限公司 | Heat-preservation and decoration integrated disassembly-free template for building and manufacturing method thereof |
CN112064835A (en) * | 2020-09-14 | 2020-12-11 | 郭可伍 | Disassembly-free heat-preservation and decoration integrated template and production process thereof |
CN115306058A (en) * | 2022-09-13 | 2022-11-08 | 中交第四公路工程局有限公司 | Disassembly-free heat preservation template and installation method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN100572710C (en) | The non-net polyphenyl plate cast-in-place concrete exterior wall heat-preserving job practices | |
CN101413326B (en) | Flat roof structure and construction method thereof | |
CN207499403U (en) | A kind of FS composite thermal-insulating exterior formworks system | |
CN206174447U (en) | Demolition -free compound insulation template | |
CN207376869U (en) | The high fireproof thermal insulation wall board of flexible connection | |
CN205242731U (en) | Modular fire prevention heat preservation cast in situ concrete -in -place mould | |
CN103255845B (en) | Coated rock wool board heat-preservation system for building curtain walls | |
CN206956959U (en) | Light composite heat insulation outer wall plate | |
CN206396956U (en) | The band permanent composite thermal-insulating exterior formwork of fire-blocking belt cast-in-place concrete | |
CN201190339Y (en) | Insulation structure for outer wall of building | |
CN104631650B (en) | Screen plate outer wall with heat insulation layer and construction method | |
CN103266676B (en) | Preparation method of film-coated rock wool board heat insulation system for building curtain wall | |
CN107366385A (en) | A kind of thermal insulation structure post and its construction method | |
CN205046698U (en) | Integration heat preservation template | |
CN203878857U (en) | Lightweight fireproof energy-saving type prefabricated exterior wall cladding plate | |
CN103669746B (en) | The construction method of inverted roof heat-insulation system | |
CN211647002U (en) | Steel ingot milling steel fiber concrete roof bottom plate rigid anti-cracking and anti-seepage structure | |
CN107386556A (en) | Light composite heat insulation outer wall plate | |
CN207260352U (en) | A kind of exterior-wall heat insulation template | |
CN207131069U (en) | One kind is without cavity isolation fireproof heat insulating component | |
CN203284898U (en) | Film-coated rock wool board heat insulation system used for building curtain wall | |
CN204703363U (en) | Energy-saving wall heat insulation building block | |
CN103696530B (en) | Method for manufacturing multifunctional composite insulating wall plate | |
CN206753033U (en) | Insulation construction integration exempts to tear exterior sheathing open | |
CN206205218U (en) | Structure and heat insulation integrated non-dismantling formwork |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20170524 Address after: 062450 Hejian Economic Development Zone, Cangzhou, Hebei Patentee after: Hebei Tong Tong thermal insulation material Co., Ltd. Address before: 101108 Tongzhou District textile, clothing and accessories Park, Beijing Patentee before: Beijing Tong Tong foam products Co., Ltd. |