CN206475291U - A kind of foam concrete block production line - Google Patents
A kind of foam concrete block production line Download PDFInfo
- Publication number
- CN206475291U CN206475291U CN201621125147.4U CN201621125147U CN206475291U CN 206475291 U CN206475291 U CN 206475291U CN 201621125147 U CN201621125147 U CN 201621125147U CN 206475291 U CN206475291 U CN 206475291U
- Authority
- CN
- China
- Prior art keywords
- bottom plate
- blank
- mould
- plate car
- ferry bus
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
Abstract
The utility model provides a kind of foam concrete block production line, and the foam concrete block production line includes mould, bottom plate car, transhipment ferry bus, goes out to be put in storage pipeline, demoulding pipeline, ingot stripper, bottom plate release agent spraying, cast and hang and transfer line sending, blank and hang overturning machine.Above-mentioned technical proposal provides a kind of foam concrete block production system, the transhipment of the mould after cast, conveying, storage maintenance, the demoulding, matched moulds, bottom plate release agent spraying, blank can be automatically finished hang turn etc. and operate, so coordinate existing feedstock transportation, metering, stirring system, and blank post processing cutting palletizing system, it can just realize that whole-course automation is produced, the production efficiency of foam concrete block is improved, labor strength and production cost is reduced.
Description
Technical field
The utility model is related to construction material machinery manufacturing technology field, particularly relates to a kind of foam concrete block production
Line.
Background technology
The production of foam concrete block in the prior art, the mould that pours is needed by easy instrument and substantial amounts of
Be accomplished manually transhipment, the demoulding, brush releasing agent, matched moulds, and after the demoulding blank transhipment, and production scene it is often disorderly and unsystematic,
Stack unordered.Foam concrete block is a kind of New Building Materials, and it has intensity height, light weight, heat insulation and preservation effect good
Advantage, meet country building advocate energy-saving heat preserving requirement.Because foam concrete block has above advantage, therefore now
Great effort has been put into the manufacture formula of foam concrete block, and the production equipment for foam concrete block is also located
It is consummate, it is necessary to a large amount of backwardness levels manually produced in not enough specialty.Be thought as always in the production of foam concrete block by
Caused properties of product are not ideal enough in the reason for formula, and have ignored influence of the production equipment to properties of product.
In the production technology of existing foam concrete block, the manufacture raw material of building block can be conveyed automatically, be counted
Amount, stirring, cast;And back segment processing (such as blank cutting, stacking) can be automatically performed to the blank taken out after maintenance.But
Mould transhipment after being cast, conveying, storage maintenance, the demoulding, matched moulds, release agent spraying, blank hang turn these process flows, then without
Method is combined with front and rear automated production, it is necessary to manually be completed with a large amount of, such as artificial form removal, brush releasing agent, manually
Carry out the transhipment of mould by fork truck or improved fork truck, the upset of blank, the scene of mould and blank is chaotic to place, manually
Uncontrollable, artificial placement blank to the inaccuracy for cutting material preparing table position etc. of brush demoulding agent dose, causes workman's labor
Fatigue resistance is big, low production efficiency, the low each side inferior position of yield rate.
Utility model content
The technical problems to be solved in the utility model is to provide a kind of foam concrete block production line rational in infrastructure.
In order to solve the above problems, the utility model embodiment proposes a kind of foam concrete block production line, including
Mould, bottom plate car, transhipment ferry bus, go out to be put in storage pipeline, demoulding pipeline, ingot stripper, bottom plate release agent spraying, cast and hang and transfer
Line sending, blank hang overturning machine;
The two panels submodule tool that wherein described mould is adapted, the inner chamber of the two panels submodule tool is adapted;The mould connects
Locating piece group and locking spring group are provided with conjunction;The mould can be combined into full die with bottom plate car wildcard;The mould is
Combined annular, upper and lower side uncovered structure;The mould can realize that manipulator spreading mechanism lifts the demoulding after strutting, and move to another logical
Closed with again automatic on bottom plate car.
Wherein described bottom plate car upper surface be plate plane, can with die bottom plate wildcard seal combination, and the bottom plate car
Have the wheel that can walk, mould can be transported under pushing mechanism promotion, the bottom plate car each can place two moulds, the bottom plate
Car carries two blocks of blanks after mold releasability is hung;The bottom plate car is after blank is hung, and empty wagons carries out the upper surface spray demoulding
Agent, afterwards the mould matched moulds again with shifting and coming after the demoulding;
Wherein described ferry bus can carrying mould and bottom plate car, blank and bottom plate car fit transhipment, the ferry bus adopts
Use the Frequency Converter Control speed of travel, using starting at a slow speed, it is middle at the uniform velocity, back segment control at a slow speed, the ferry bus travel distance is adopted
Gathered and calculated with encoder, the ferry bus encoder realizes that encoder rotates using rack and pinion mechanism, prevents encoder from revolving
Rotation mechanism skids with track;
Wherein described discrepancy storehouse pipeline turns for storage transhipment ferry bus, track storehouse and pushing mechanism, outbound from left to right
Ferry bus is transported, described to go out to be put in storage pipeline after anteroposterior position transports ferry bus in place, pushing mechanism operation is intended to storage maintenance mould
Tool is hooked into bottom plate car or blank with bottom plate car, while the mould and bottom plate car or blank and bottom plate car conserved is released, it is described
It is longitudinally running to go out to be put in storage ferry bus before and after pipeline, and track storehouse pushing mechanism described goes out to be put in storage pipeline laterally to run
On have the maintaining body that many molds and bottom plate car or blank are in series with bottom plate car, therefore described go out to be put in storage conveyor line rail maintenance
Storehouse in parallel can conserve the Large Copacity maintenance storehouse that place is combined by many height;
Wherein described demoulding pipeline is outbound transhipment ferry bus (carrying is intended to demoulding mould and bottom plate car) from left to right, taken off
Mould track and pushing mechanism, storage transhipment ferry bus (carrying blank to be rested and bottom plate car), the demoulding pipeline is front and rear
After ferry bus is transported in place in position, pushing mechanism operation is intended to demoulding mould and hooked into bottom plate car, while being intended to rest after releasing the demoulding
Blank and bottom plate car, ferry bus is longitudinally running before and after the demoulding pipeline, and track pushing mechanism is described laterally to run
The demoulding pipeline for 6 meters of a segment length track pushing mechanism carry mould and bottom plate car or blank connected with bottom plate car and
Into conveying body;
Wherein described ingot stripper is across being stripped and pouring into a mould transportation section, and the mould after the demoulding can be transferred to and pour by the ingot stripper
The empty bottom plate car matched moulds on transportation section is noted, the ingot stripper has can be by the mechanism that mould is strutted and is lifted, the demoulding equipment
There is middle part pressure head, blank can be pushed down, and the middle part pressure head equips automatic release agent spraying mechanism, can decline in mould and place empty bottom
Automatic release agent spraying during wooden handcart;
Wherein described bottom plate release agent spraying possesses liquid reserve tank, oil across empty bottom plate car transportation section, the bottom plate release agent spraying
Pump, switch electromagnetic valve, pipeline and low discharge angle level shower nozzle, the bottom plate release agent spraying can when bottom plate car is advanced through,
Control oil pump and pipeline switch are to bottom plate car upper surface release agent spraying;
It is that (mould and bottom plate being poured in are poured in carrying to storage transhipment ferry bus from left to right that wherein described cast, which is hung and transfers line sending,
Car), track pushing mechanism, outbound transhipment ferry bus (blank and bottom plate car that carrying has been rested), described pour into a mould hang and transfer line sending
After anteroposterior position transports ferry bus in place, pushing mechanism operation hooks into the blank rested with bottom plate car, while releasing cast
Good mould and bottom plate car, it is longitudinally running that the cast, which is hung and transfers ferry bus before and after line sending, and track pushing mechanism is laterally transports
OK, it is that one section of total length is equal to slurry maintenance storehouse, demoulding pipeline, blank maintenance storehouse end to end that the cast, which is hung and transfers line sending,
Track pushing mechanism conveys body, the cast hang transfer line sending outbound transhipment ferry bus be after casting complete carrying mould with
The ferry bus of bottom plate car, it is that blank and bottom plate are carried after blank is rested that the cast, which is hung and transfers the storage transhipment ferry bus of line sending,
The ferry bus of car, the cast is hung to transfer and blank and bottom plate car are carried in line sending overturns transhipment section, empty bottom plate car section, mould to hanging
The conveying body being in series with to be cast section of bottom plate car matched moulds;
Wherein described blank, which hangs overturning machine and is across cast and hangs, transfers line sending and cutting material preparing table, and the blank hangs overturning machine
Blank can be hung and go to cutting material preparing table, described hang after blank can be customized to overturning machine clamping force and bi-directional synchronization clamping blank carries
Rise, it is described hang overturning machine can by the 90 degree of overturnings of the blank that lifts, to material preparing table after decline and place;
Wherein, the mould again automatic after the automatic form removal of manipulator spreading mechanism can be closed.
Wherein, the mould has after locating piece group and form removal and the locking spring group of automatic die assembly return.
Wherein, the bottom plate car can carry two molds or two blocks of blanks.
Wherein, the transhipment ferry bus is equipped with encoder walking detection means, and encoder uses the rack tooth of anti-slip
Take turns rotating mechanism.
Wherein, have can be by the mechanism that mould is strutted and is lifted for the ingot stripper, and can decline in mould and place empty bottom plate
Automatic release agent spraying during car.
Wherein, the ingot stripper has middle part pressure head, can push down blank, and the middle part pressure head equips automatic release agent spraying
Mechanism.
Wherein, the blank hangs after blank can be customized to overturning machine clamping force and bi-directional synchronization clamping blank and lifted, and will
The overturning of 90 degree of the blank lifted, to material preparing table after decline and place.
Meanwhile, the utility model embodiment also proposed a kind of foam concrete block life using described in foregoing any one
The method that producing line produces foam concrete block, including:
By stirring main building slurry storage bucket discharging, the mould combined on cast transportation section with bottom plate car is entered
Row cast;Mould slurry and bottom plate car after cast are transferred line sending pushing mechanism and are forced into transhipment ferry bus by pouring into a mould to hang, and are turned
Transport ferry bus lengthwise rows to support after the son maintenance storehouse contraposition of storehouse to first, conserved as going out to be put in storage at the beginning of pipeline pushing mechanism hooks into storehouse, simultaneously
The die blank just conserved and bottom plate car are released;
The die blank and bottom plate car just conserved enters outbound and transports ferry bus, ferry bus lengthwise rows to the demoulding after releasing
After pipeline contraposition, hooked into, while the blank after the demoulding and bottom plate car are released, be across de- by demoulding pipeline pushing mechanism
Ingot stripper above mould pipeline then when being intended to demoulding mould and bottom plate car in place, is stripped by manipulator spreading mechanism,
Blank is pushed down by middle part pressure head and stayed on bottom plate car, and mould is then lifted by elevating mechanism to be disengaged to more than blank height, is transferred to
The empty bottom plate car section top transferred in line sending is hung in cast;The blank just supported enters storage transhipment ferry-boat after being released with bottom plate car
After car, transhipment ferry bus lengthwise rows to storehouse son maintenance storehouse contraposition of resting, storehouse is hooked into by going out to be put in storage pipeline pushing mechanism and is rested shield,
Simultaneously by the blank protected and the release of bottom plate car of resting;
The blank protected of resting transports ferry bus, transhipment ferry bus lengthwise rows to cast with entering outbound after the release of bottom plate car
Hang and transfer after line sending contraposition, hung to transfer line sending pushing mechanism and hook into hang by cast and turn transportation section, while by the mould after casting complete
Tool is released with bottom plate car, is hung when cast and is transferred the blank row of line sending blank and bottom plate car section to when hanging overturning machine and hanging indexing, by hanging
Overturning machine slings blank clamping, and 90 degree are overturned afterwards, moves to line of cut material preparing table, and empty bottom plate car then continues row and enters sky bottom plate
Car section, after bottom plate release agent spraying, with having sprayed after ingot stripper form removal and automatically the empty mould fallen after releasing agent, is combined into complete
Mould row enters mould and bottom plate car section etc. is to be cast.
Whole production system forms one and closed end to end, and circulation is orderly, progressively runs, and takes up an area compact foamed concrete
Block production line.
Above-mentioned technical proposal of the present utility model has the beneficial effect that:Above-mentioned technical proposal provides a kind of foaming coagulation
Earth building blocks production system, can be automatically finished the mould transhipment after cast, conveying, storage maintenance, the demoulding, matched moulds, bottom plate spray
Releasing agent, blank, which are hung, the operation such as turns, and so coordinates existing feedstock transportation, metering, stirring system, and blank post processing cutting
Palletizing system, it is possible to realize that whole-course automation is produced, improve the production efficiency of foam concrete block, reduce workman's labor
Fatigue resistance and production cost.
Brief description of the drawings
Fig. 1 is the process schematic representation of the production line of the utility model embodiment;
Fig. 2 is that production line is stripped area's schematic diagram;
Fig. 3 is production line blank Diao Zhuan areas schematic diagram;
Description of reference numerals:
A:Pour into a mould position;
B:Ferry bus (the mould slurry and bottom plate car being poured in are poured in transhipment);
C:Chu Yang areas;
D:Ferry bus (die blank that transhipment has just been supported and bottom plate car);
E:It is stripped position;
F:It is stripped pipeline;
G:Ferry bus (blank and bottom plate car after the transhipment demoulding);
H:Rest area;
I:Ferry bus (blank that transhipment has been rested and bottom plate car);
J:Hang and turn transportation section;
K:Hang overturning machine
L:Line of cut;
M:Bottom plate release agent spraying;
N:Bottom plate car section
O:Matched moulds position
P:Pour into a mould transportation section
1:Ferry bus;
2:Track storehouse pushing mechanism;
3:Bottom plate car;
4:Blank;
5:Mould;
6:Manipulator spreading mechanism (ingot stripper);
7:Hoisting mechanism (ingot stripper);
8:Middle part pressure head (ingot stripper);
9:Shift moving trolley (ingot stripper);
10:Shift moving trolley (hanging overturning machine);
11:Hoisting mechanism (hangs overturning machine);
12:Overturn mechanism (hanging overturning machine);
13:Clamp system (hangs overturning machine).
Embodiment
To make the technical problems to be solved in the utility model, technical scheme and advantage clearer, below in conjunction with accompanying drawing
And specific embodiment is described in detail.
The utility model embodiment proposes a kind of foam concrete block production line as shown in Figure 1, including mould, bottom
Wooden handcart, transhipment ferry bus, go out to be put in storage pipeline, demoulding pipeline, ingot stripper, bottom plate release agent spraying, cast and hang and transfer line sending, base
Material hangs overturning machine.
Production line demoulding area as shown in Figure 2, when the ferry bus 1D of the mould 5 to be stripped and bottom plate car 3 is just supported in transhipment
After contraposition, demoulding pipeline F pushing mechanism 2, which is retreated, enters position after ferry bus 1D, after after the ferry bus 1G contrapositions of right side, promotes machine
Mould 5 and bottom plate car 3 are hooked into half of the bottom plate parking stall in a mould position by structure 2, and pressure head 8 declines in the middle part of ingot stripper afterwards, pushes down mould
Has blank 4 in 5, ingot stripper manipulator spreading mechanism 6 is lowered in mould 5 in the drive of elevating mechanism 7 afterwards, spreading mechanism 6
Cylinder action, driving pars contractilis stretches out, micro- to strut mould 5, the two panels submodule of mould 5 is had relative displacement, mould inner wall and blank 4
Depart from or loosen, caught on while the claw of spreading mechanism 6 is propped up with the inwall of mould 5, ingot stripper elevating mechanism 7 rises afterwards, will
Mould 5 is sling, and is departed from more than the height of blank 4, and pressure head 8 is slightly risen in the middle part of ingot stripper, and ingot stripper moving trolley 9 is driven by variable-frequency motor
It is dynamic, mould 5 is moved into bottom plate car section top, declines be positioned on sky bottom plate car afterwards, is declined in the middle part of ingot stripper simultaneously on pressure head 8
Release agent spraying mechanism it is automatic to dies cavity release agent spraying, ingot stripper moving trolley 9 move moulds 5 while, be stripped pipeline
Pushing mechanism 2 continue to promote mould position, half of bottom plate parking stall proceeds the action of second leg after wait.Such as
Production line blank Diao Zhuan areas shown in Fig. 3, wait hang the blank 4 turned on the bottom plate car of transportation section run to hang indexing and put when, hang overturning
Machine clamp system 13 is under hydraulic oil cylinder driving, to customize power and synchronous clamping blank 4, is hanging the drive of overturning machine elevating mechanism 11 afterwards
Under dynamic, blank 4 is sling, overturning machine moving trolley 10 is hung afterwards under variable-frequency motor driving on transfer stock to line of cut material preparing table
Side, while walking, hangs overturning machine switching mechanism 12 and is acted under hydraulic oil cylinder driving, blank 4 is carried out into 90 degree of overturnings, finally hangs and turns over
The elevating mechanism of falling machine 11 declines, and the blank 4 after will fall over slowly is positioned on material preparing table, hangs overturning machine clamp system 13 and unclamps,
Elevating mechanism 11 is risen, and overturns mechanism 12 times original states, and moving trolley 10, which is sailed back, to be hung indexable rear lifting mechanism 11 and decline, under progress
The blank of one wheel, which is hung, to be turned.
As shown in Figure 1, the mould again automatic after the automatic form removal of manipulator spreading mechanism can be closed;The mould
Have after locating piece group and form removal and the locking spring group of automatic die assembly return;The bottom plate car can carry two molds or two pieces of bases
Material;The transhipment ferry bus is equipped with encoder walking detection means, and encoder uses the rack pinion rotating mechanism of anti-slip;
The ingot stripper has can be by the mechanism that mould is strutted and is lifted, and can automatically be sprayed during mould declines the empty bottom plate car of placement
Releasing agent;The ingot stripper has middle part pressure head, can push down blank, and the middle part pressure head equips automatic release agent spraying mechanism;
The blank hang overturning machine can will blank customization clamping force and bi-directional synchronization clamp blank after lift, and by 90 degree of the blank lifted
Upset, to material preparing table after decline place.
As exemplary illustration, the foam concrete block production line that the utility model embodiment is proposed, its work
Include as flow:
By stirring main building slurry storage bucket discharging, the mould combined on cast transportation section with bottom plate car is entered
Row cast A;Mould slurry and bottom plate car after cast are transferred line sending pushing mechanism and are forced into transhipment ferry bus B by pouring into a mould to hang,
Transport ferry bus B lengthwise rows to support after the son maintenance storehouse contraposition of storehouse to first, C conserved as going out to be put in storage at the beginning of pipeline pushing mechanism hooks into storehouse,
The die blank conserved and bottom plate car are released simultaneously;
Enter outbound transhipment ferry bus D after just the die blank that conserve is released with bottom plate car, ferry bus D lengthwise rows are to taking off
After the contraposition of mould pipeline, hooked into, while the blank after the demoulding and bottom plate car are released, be across by demoulding pipeline pushing mechanism
Ingot stripper above demoulding pipeline F then when being intended to demoulding mould with bottom plate car E in place, is taken off by manipulator spreading mechanism
Mould, blank is pushed down by middle part pressure head and stayed on bottom plate car, and mould is then lifted more than disengaging blank height by elevating mechanism, is transferred to
The empty bottom plate car section top transferred in line sending is hung in cast;The blank just supported enters storage transhipment ferry bus after being released with bottom plate car
After G, transhipment ferry bus G lengthwise rows to storehouse son maintenance storehouse contraposition of resting, storehouse is hooked into by going out to be put in storage pipeline pushing mechanism and is rested shield
H, while will the rest blank protected and the release of bottom plate car;
Rest after the blank bottom plate car protected is released and carry out outbound transhipment ferry bus I, transport ferry bus I lengthwise rows and extremely pour into a mould
Hang and transfer after line sending contraposition, hung to transfer line sending pushing mechanism and hook into hang by cast and turn transportation section J, while by the mould after casting complete
Tool is released with bottom plate car, is hung when cast and is transferred the blank row of line sending blank and bottom plate car section to when hanging overturning machine and hanging indexing, by hanging
Overturning machine K slings blank clamping, and 90 degree are overturned afterwards, moves to line of cut L material preparing tables, and empty bottom plate car then continues row and enters bottom plate
Car section N, after bottom plate release agent spraying M, with having sprayed after ingot stripper form removal and automatically the empty mould fallen after releasing agent, has been combined into
Reshaping die O rows enter mould and bottom plate car section P etc. is to be cast.
Whole production system forms one and closed end to end, and circulation is orderly, progressively runs, and takes up an area compact foamed concrete
Block production line.
Described above is preferred embodiment of the present utility model, it is noted that for the ordinary skill of the art
For personnel, on the premise of principle described in the utility model is not departed from, some improvements and modifications can also be made, these improvement
Protection domain of the present utility model is also should be regarded as with retouching.
Claims (8)
1. a kind of foam concrete block production line, it is characterised in that including mould, bottom plate car, transhipment ferry bus, go out to be put in storage it is defeated
Line sending, demoulding pipeline, ingot stripper, bottom plate release agent spraying, cast are hung and transfer line sending, blank and hang overturning machine;
Wherein described mould includes the two panels submodule tool being adapted, and the inner chamber of the two panels submodule tool is adapted;The mould connects
Locating piece group and locking spring group are provided with conjunction;The mould can be combined into full die with bottom plate car wildcard;The mould is
Combined annular, upper and lower side uncovered structure;
Wherein described bottom plate car upper surface is plate plane, the plate plane and die bottom plate wildcard seal combination, and the bottom plate
Underbody portion is provided with walking wheel to transport mould under the promotion of pushing mechanism;Each described bottom plate car each can place two
Mould or two blocks of blanks;
Wherein described ferry bus is used for the fit transhipment of carrying mould and bottom plate car, blank and bottom plate car, and the ferry bus is used
The Frequency Converter Control speed of travel, the ferry bus travel distance is gathered using encoder and calculated, and the ferry bus encoder is used
Rack and pinion mechanism realizes that encoder rotates;
Wherein described discrepancy storehouse pipeline is from left to right storage transhipment ferry bus, track storehouse and pushing mechanism, outbound transhipment pendulum
Cross car, it is described go out be put in storage pipeline anteroposterior position transhipment ferry bus in place after, pushing mechanism operation, be intended to storage maintenance mould with
Bottom plate car or blank are hooked into bottom plate car, while releasing the mould and bottom plate car or blank and bottom plate car, the discrepancy conserved
Ferry bus is longitudinally running before and after the pipeline of storehouse, and track storehouse pushing mechanism described goes out to be put in storage on pipeline and have laterally to run
The maintaining body that many molds and bottom plate car or blank are in series with bottom plate car, thus it is described go out be put in storage conveyor line rail maintenance storehouse can
It is in parallel to conserve the Large Copacity maintenance storehouse that place is combined by many height;
Wherein described demoulding pipeline is intended to outbound transhipment ferry bus, the demoulding rail of demoulding mould and bottom plate car for carrying from left to right
The storage transhipment ferry bus of road and pushing mechanism, carrying blank to be rested and bottom plate car, the demoulding pipeline turns in anteroposterior position
After transporting ferry bus in place, pushing mechanism operation is intended to demoulding mould and hooked into bottom plate car, while releasing the base to be rested after the demoulding
Ferry bus is longitudinally running before and after material and bottom plate car, the demoulding pipeline, and track pushing mechanism is laterally runs, the demoulding
It is defeated that mould and bottom plate car or blank and the bottom plate car that pipeline carries for the track pushing mechanism of 6 meters of a segment length are in series
Send body;
Wherein described ingot stripper is across being stripped and pouring into a mould transportation section, and the mould after the demoulding can be transferred to and pour infusion by the ingot stripper
The empty bottom plate car matched moulds in section is sent, the ingot stripper has can be by the mechanism that mould is strutted and is lifted, during the ingot stripper has
Portion's pressure head, can push down blank, and the middle part pressure head equips automatic release agent spraying mechanism, can decline in mould and place empty bottom plate car
During automatic release agent spraying;
Wherein described bottom plate release agent spraying possesses liquid reserve tank, oil pump, opened across empty bottom plate car transportation section, the bottom plate release agent spraying
Powered-down magnet valve, pipeline and low discharge angle level shower nozzle, the bottom plate release agent spraying can control oil when bottom plate car is advanced through
Pump and pipeline switch are to bottom plate car upper surface release agent spraying;
Wherein it is described cast hang transfer line sending from left to right for carrying pour mould and the bottom plate car being poured in storage transport ferry bus,
The outbound transhipment ferry bus of track pushing mechanism, the blank that carrying has been rested and bottom plate car, the cast, which is hung, transfers line sending preceding
After ferry bus is transported in place in position afterwards, the blank rested is hooked into, pours what is be poured in while releasing by pushing mechanism operation with bottom plate car
Mould and bottom plate car, the cast is hung transfer line sending before and after ferry bus be longitudinally running, track pushing mechanism is laterally runs, institute
State cast and hang and transfer line sending and be equal to slurry maintenance storehouse, demoulding pipeline, blank maintenance storehouse track end to end for one section of total length
Pushing mechanism convey body, the cast hang transfer line sending outbound transhipment ferry bus be carrying mould and bottom plate after casting complete
The ferry bus of car, it is that blank and bottom plate car are carried after blank is rested that the cast, which is hung and transfers the storage transhipment ferry bus of line sending,
Ferry bus, the cast is hung to transfer and blank and bottom plate car are carried in line sending overturns transhipment section, empty bottom plate car section, mould and bottom to hanging
The conveying body that to be cast section of wooden handcart matched moulds is in series;
Wherein described blank, which hangs overturning machine and is across cast and hangs, transfers line sending and cutting material preparing table, and the blank hangs overturning machine can be by
Blank, which is hung, goes to cutting material preparing table, and described hang after blank can be customized to overturning machine clamping force and bi-directional synchronization clamping blank lifts,
It is described hang overturning machine can by the 90 degree of overturnings of the blank that lifts, to material preparing table after decline and place.
2. foam concrete block production line according to claim 1, it is characterised in that can be by manipulator with unique
The mould closed automatically again after the automatic form removal of spreading mechanism.
3. foam concrete block production line according to claim 2, it is characterised in that the mould have locating piece group and
After form removal again automatic die assembly return locking spring group.
4. foam concrete block production line according to claim 1, it is characterised in that the bottom plate car can carry two sets
Mould or two blocks of blanks.
5. foam concrete block production line according to claim 1, it is characterised in that the transhipment ferry bus is equipped with volume
Code device walking detection means, and encoder uses the rack pinion rotating mechanism of anti-slip.
6. foam concrete block production line according to claim 1, it is characterised in that the ingot stripper has can be by mould
Have the mechanism that struts and lift, and can decline in mould and place automatic release agent spraying during empty bottom plate car.
7. foam concrete block production line according to claim 6, it is characterised in that the ingot stripper has middle part pressure
Head, can push down blank, and the middle part pressure head equips automatic release agent spraying mechanism.
8. foam concrete block production line according to claim 1, it is characterised in that the blank hangs overturning machine can be by
Blank customization clamping force and bi-directional synchronization lift after clamping blank, and by the 90 degree of overturnings of the blank that lifts, to material preparing table after decline
Place.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621125147.4U CN206475291U (en) | 2016-10-17 | 2016-10-17 | A kind of foam concrete block production line |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621125147.4U CN206475291U (en) | 2016-10-17 | 2016-10-17 | A kind of foam concrete block production line |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206475291U true CN206475291U (en) | 2017-09-08 |
Family
ID=59757182
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201621125147.4U Expired - Fee Related CN206475291U (en) | 2016-10-17 | 2016-10-17 | A kind of foam concrete block production line |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206475291U (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107932709A (en) * | 2017-09-19 | 2018-04-20 | 荆门市意祥机械有限公司 | A kind of non-evaporating foamed bricks production line |
CN111376383A (en) * | 2020-03-04 | 2020-07-07 | 福建群峰机械有限公司 | Automatic production line of prefabricated reinforced concrete hollow template with internal crossed holes |
CN113021600A (en) * | 2019-12-25 | 2021-06-25 | 集佳绿色建筑科技有限公司 | Full-automatic mold opening machine |
CN114009730A (en) * | 2021-11-30 | 2022-02-08 | 芜湖辉东自动化科技有限公司 | Mold opening assembly of hot pot seasoning mold box and mold opening method thereof |
-
2016
- 2016-10-17 CN CN201621125147.4U patent/CN206475291U/en not_active Expired - Fee Related
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107932709A (en) * | 2017-09-19 | 2018-04-20 | 荆门市意祥机械有限公司 | A kind of non-evaporating foamed bricks production line |
CN113021600A (en) * | 2019-12-25 | 2021-06-25 | 集佳绿色建筑科技有限公司 | Full-automatic mold opening machine |
CN111376383A (en) * | 2020-03-04 | 2020-07-07 | 福建群峰机械有限公司 | Automatic production line of prefabricated reinforced concrete hollow template with internal crossed holes |
CN111376383B (en) * | 2020-03-04 | 2021-08-31 | 福建群峰机械有限公司 | Automatic production line of prefabricated reinforced concrete hollow template with internal crossed holes |
CN114009730A (en) * | 2021-11-30 | 2022-02-08 | 芜湖辉东自动化科技有限公司 | Mold opening assembly of hot pot seasoning mold box and mold opening method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107953446A (en) | A kind of foam concrete block production line and method | |
CN206475291U (en) | A kind of foam concrete block production line | |
CN104057537B (en) | The production system of concrete component | |
CN105235062B (en) | The vertical production line of full-automatic light cellular partition board | |
CN202411412U (en) | Box-available double-layer sand mould casting and cooling transporter | |
CN203919337U (en) | The production system of concrete component | |
EA004445B1 (en) | Method and apparatus for casting metal | |
CN209521061U (en) | Assembled architecture concrete component tunnel maintenance system | |
CN104097256B (en) | Aerated block blank auxiliary demoulding and conveying device | |
CN204182909U (en) | A kind of novel casting workshop | |
CN104786346A (en) | High-pressure automatic forming device for producing large-scaled washing basin | |
CN103171050B (en) | For the treatment of the method and apparatus of concrete product | |
CN104369266B (en) | A kind of leakage dropping-board automatic production line and production technology thereof | |
CN202439103U (en) | Self-heat-preserving building block production line | |
CN102555053A (en) | Porous foaming concrete block production line | |
CN202498624U (en) | High-pressure integrated toilet production line | |
CN108638315B (en) | Automatic production line and production method for refractory bricks | |
CN111531700B (en) | Section of jurisdiction assembly line convenient to remote concrete transportation | |
CN206011434U (en) | Rebar cylinder mould suspension bracket cyclic delivery system | |
CN104526862A (en) | Integrated prefabricated part demolding machine | |
CN204054319U (en) | A kind of aerated blocks idiosome assisted demoulding conveying device | |
CN110143433A (en) | A kind of transfer robot arm for transhipment gypsum mold between parallel conveyer | |
CN209521031U (en) | Ceramic cup handle pouring molding equipment | |
CN203726613U (en) | Vertical pouring large basin blank removing machine | |
CN202037308U (en) | Automatic slip flask molding production device for castings |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20170908 Termination date: 20191017 |
|
CF01 | Termination of patent right due to non-payment of annual fee |