CN206375642U - Nacelle device - Google Patents
Nacelle device Download PDFInfo
- Publication number
- CN206375642U CN206375642U CN201621452639.4U CN201621452639U CN206375642U CN 206375642 U CN206375642 U CN 206375642U CN 201621452639 U CN201621452639 U CN 201621452639U CN 206375642 U CN206375642 U CN 206375642U
- Authority
- CN
- China
- Prior art keywords
- steel wire
- wire rope
- protection steel
- fixed
- weight
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Emergency Lowering Means (AREA)
Abstract
The utility model discloses a kind of nacelle device; including being used as the hitch of support, the suspension platform of bearing goods and the hoisting mechanism for lifting hanging basket; the hoisting mechanism includes the boom hoist cable that top is fixed on hitch and the safety lock protected steel wire rope, the elevator of power is provided for boom hoist cable and is coordinated with protection steel wire rope; the bottom of the protection steel wire rope is connected with a weight, there is spacing between the weight and ground.It can make protection steel wire rope ensure tensioning state, and when safety lock is with its, locking can play relatively reliable fixation to hanging basket, increase security.
Description
Technical field
The utility model is related to the realm of building construction, in particular, and it is related to a kind of nacelle device.
Background technology
In construction project, it is often necessary to which some building materials are transported into eminence, manpower goes handling workload to be very huge
, so most of building sites are all carried using goliath, so it is greatly improved operating efficiency.Due to using large-scale
Job costs are higher carry for crane, therefore when building relatively low building, often carried using hanging basket
Work.
At present, the nacelle device commonly used in work progress includes hitch and hanging basket, in work progress, current institute
The nacelle device used includes hitch, hoisting mechanism and hanging basket, and the hitch of hanging basket is the steel pipe frame of steel-pipe welding, is hung
Basket is usually a square floor, in bottom plate surrounding vertical welding railing, and hitch needs to be transported to eminence before lifting
It is fixed, goods is put into hanging basket, with the effect of hoisting mechanism by handling up and down.During being operated above and below hanging basket, have
When occur hanging basket tilt or work fracture of rope, relaxation situations such as, for ensure construction operation security, hitch is often
It is provided for the boom hoist cable, the protection steel wire rope shielded and the peace used cooperatively with protection steel wire rope for lifting hanging basket
Quan Suo, when above-mentioned abnormal conditions occurs in hanging basket, safety lock locking protection steel wire rope fixes hanging basket.Yet with protection steel wire
Rope is needed through safety lock, during safety lock is with cage lifting, and protection steel wire rope is easily rubbed and relaxed,
When safety lock is pinned with protection steel wire rope, hanging basket can not be fixed in time for loose protection steel wire rope, there is safety hidden
Suffer from.
Utility model content
The purpose of this utility model is to provide a kind of nacelle device, and it can make protection steel wire rope ensure tensioning state,
Relatively reliable fixation can be played to hanging basket when safety lock is locked, increases security.
Above-mentioned technical purpose of the present utility model technical scheme is that:
A kind of nacelle device, including hitch as support, the suspension platform of bearing goods and hung for being lifted
The hoisting mechanism of basket, boom hoist cable and protect steel wire rope, be that the hoisting mechanism is fixed on hitch including top
The safety lock that boom hoist cable provides the elevator of power and coordinated with protection steel wire rope, the bottom of the protection steel wire rope connects
A weight is connected to, there is spacing between the weight and ground.
By using above-mentioned technical proposal, there is spacing between weight and ground, weight is applied all the time to protection steel wire rope
Plus downward pulling force, play a part of stretching protection steel wire rope, the protection steel wire moment is kept tensioning state, when safety lock and its
Relatively reliable fixation can be played during locking to hanging basket, increases security.
The utility model is further arranged to:The weight is set in tubbiness, including staving and is threadedly coupled with staving
Bung, the protection steel wire rope is fixed on the bung.
Can gather materials on the spot the weight increase weight such as loading water, sandstone by using above-mentioned technical proposal, in staving, complete
Weight is taken out into construction is enough, weight own wt is reduced, is easy to carry.
The utility model is further arranged to:A threaded rod, the bottom connection of the threaded rod are equipped with the bung
There are a nut, top to be fixed with the connection ring for being connected with protection steel wire rope.
By using above-mentioned technical proposal, nut and connection ring set up separately in the both sides up and down of bung, and threaded rod is passed through into bucket
Nut is screwed on threaded rod after lid and completes being detachably connected for protection steel wire rope and weight, it is simple in construction, it is easy to operation,
And it is detachably connected and is easy to protection steel wire rope and weight separately to carry, is easy to construction.
The utility model is further arranged to:An annular gasket is provided between the nut and the bung.
By using above-mentioned technical proposal, the contact area between increase nut and bung, so as to increase the stress of bung
Area makes it not allow yielding or even breakage.
The utility model is further arranged to:The threaded rod is arranged on the center of the bung.
By using above-mentioned technical proposal, staving is conducive to keep straight up, being more uniformly stressed its entirety.
The utility model is further arranged to:The protection steel wire rope bypasses the connection ring and fixed by some steel wire ropes
It is fixed
By using above-mentioned technical proposal, the length of the protection steel wire rope of connection ring can be bypassed by regulation, to adjust
Weight is apart from the height of bottom surface, and the protection device for constituting weight and protection steel wire rope can adapt to the operation ring of different height
Border.
In summary, the utility model has the advantages that:The protection steel wire moment is kept tensioning state, work as safety
Lock can play relatively reliable fixation to hanging basket when being locked, increase security;Weight own wt is reduced, is easy to
Carry;It is easy to protection steel wire rope and weight separately to carry, is easy to construction.
Brief description of the drawings
Fig. 1 is the structural representation of embodiment one;
Fig. 2 is the local exploded-view of suspension platform in embodiment one;
Fig. 3 is the structural representation of pin assemblies in embodiment one;
Fig. 4 is the B portions enlarged drawing in Fig. 1;
Fig. 5 is the C portions enlarged drawing in Fig. 2;
The structural representation of hitch in Fig. 6 embodiments one;
The exploded perspective view of hitch in Fig. 7 embodiments one;
Fig. 8 is the D portions enlarged drawing in Fig. 6;
Fig. 9 is the A portions enlarged drawing in Fig. 1;
The sectional view of weight in Figure 10 embodiments one;
Vertical direction sectional view in Figure 11 embodiments one at limiting plate;
Horizontal direction sectional view in Figure 12 embodiments one at limiting plate.
Reference:1st, suspension platform;11st, underframe;111st, square plate;12nd, lateral rail;121st, coaming plate;122nd, laterally
Square tube;123rd, longitudinal square tube;1231st, clamping plate;13rd, preceding railing;131st, longitudinal steel pipe;132nd, square tube tenon;1321st, projection;
14th, rear railing;141st, wheel assembly is supported;1411st, fixed plate;1412nd, U-board;14121st, side plate;14122nd, bottom plate;1413rd, prop up
Support wheel;142nd, spring;15th, base;151st, tongue-and-groove;1511st, boss;1512nd, snap ring;152nd, universal wheel;153rd, flanged plate;2nd, hang
Suspension mechanism;201st, perforate;21st, fore-stock;211st, the first bearing;2111st, the first vertical pole;2112nd, the first cross bar;2113rd, it is fixed
Bar;212nd, the first inserted link;213rd, the first connecting tube;22nd, after-poppet;221st, the second inserted link;222nd, the second connecting tube;223rd, second
Bearing;2231st, the second vertical pole;2232nd, the second cross bar;2233rd, weight linear meter;23rd, beam;231st, front-axle beam;2311st, baffle plate;232nd, in
Beam;233rd, the back rest;234th, connecting square pipes;24th, steel wire rope is strengthened;241st, nose is tensed;2411st, U-shaped steel plate;2412nd, parallel-plate;
25th, upper supporting column;251st, neck;252nd, rope sheave grip block;253rd, rope sheave;26th, balancing weight;3rd, hoisting mechanism;31st, steel wire is lifted
Rope;32nd, steel wire rope is protected;321st, limiting plate;3211st, arc-like sheet;3212nd, raised line;3213rd, fixed cover;3214th, cone tank;
3215th, fixing groove;3216th, buckle;32161st, chuck;32162nd, slide block;322nd, weight;3221st, staving;3222nd, bung;
3223rd, threaded rod;3224th, connection ring;3225th, nut;3226th, pad;33rd, elevator;34th, distribution box;35th, safety lock;
351st, limiter;352nd, roll assembly;3521st, disk roller;3522nd, grip block;35221st, arcuate socket;3523rd, small disk roller;3524、
Small grip block;353rd, safety lock installing plate;4th, pin assemblies;41st, latch;42nd, steady pin;43rd, draw ring;44th, chain;5th, triangle steel
Plate;6th, wire line shoe.
Embodiment
The utility model is described further referring to the drawings.
Embodiment one:
As shown in figure 1, a kind of nacelle device, include for ship material suspension platform 1, two be used to support and hold
The hitch 2 of power and the hoisting mechanism 3 for lifting suspension platform 1.
Reference picture 2, specifically, the underframe 11 for loading that the bottom of suspension platform 1 is provided with, the both sides of underframe 11 are welded with
The preceding column as main railing is respectively arranged with before and after two lateral rails 12 for providing hard point for suspension platform 1, underframe 11
Bar 13 and the rear railing 14 by wall, wherein, the square plate 111 for load-bearing is welded with the middle of underframe 11.
Two structures of lateral rail 12 are identical, and the bottom of lateral rail 12 is welded with coaming plate 121, and lateral rail 12 is provided with some
Horizontal square tube 122 and two longitudinal square tubes 123 in the both sides of lateral rail 12 for reinforcing lateral rail 12, the upper end of lateral rail 12 is set
Trapezium structure is set to increase stability when suspension platform 1 is lifted, the centre and upper end of both sides longitudinal direction square tube 123 are provided with
The clamping plate 1231 of preceding railing 13 and rear railing 14 is fixed for clamping, being used for provided with insertion of clamping plate 1231 fixes preceding column
The screw of bar 13 and rear railing 14.
Preceding railing 13 is identical with the rear frame structure of railing 14 be square tubes soldering steel frame construction, the preceding both sides of railing 13 are perpendicular
The longitudinal steel pipe 131 directly set, longitudinal steel pipe 131 be provided with the corresponding screw of clamping plate 1231, longitudinal lower end of steel pipe 131 is prolonged
Railing 13 is provided with square tube tenon 132 before stretching out.
Pin assemblies 4 can be fixed preceding railing 13 and rear railing 14 by the screw of clamping plate 1231 and longitudinal steel pipe 131.Ginseng
According to accompanying drawing 3, pin assemblies 4 include the latch 41 and the steady pin being plugged in the jack of the one end of latch 41 for non-floating rail
42, latch 41 is provided with draw ring 43 on one end of steady pin 42 and steady pin 42 and pulled pin with facilitating, and leads between two draw rings 43
Chain 44 is crossed to connect in order to the use of latch 41 first being inserted into screw when pin assemblies 4 are used, then steady pin 42 is inserted in into latch
To prevent latch 41 from deviating from from screw on 41 jack.
Fig. 2 and Fig. 1 are reviewed, the bottom of longitudinal square tube 123 of the both sides of lateral rail 12 is welded with for supporting suspension platform 1
Base 15, referring to the drawings 4, specifically, base 15 is provided with the tongue-and-groove 151 for grafting square tube tenon 132, tongue-and-groove 151
The universal wheel 152 for supporting suspension platform 1 and the flanged plate 153 for fixing universal wheel 152 are fixed with, universal wheel 152 is consolidated
It is a flange arrangement to determine face, and flanged plate 153 is provided with to be used to fix universal wheel 152 with the corresponding flange arrangement of universal wheel 152,
Flanged plate 153 and tongue-and-groove 151 are the integrative-structures of steel plate welding.Be welded with the outer wall of tongue-and-groove 151 two it is horizontally arranged convex
The snap ring 1512 of a strip is rotatably connected between platform 1511, two boss 1511, two relative faces of boss 1511 are set to
Lozenges, makes spacing of two boss 1511 closer to the two sides relative both it of tongue-and-groove 151 bigger, blocks in the presence of lozenges
Ring 1512 keeps fitting and is not easy to rotate sideways with tongue-and-groove 151, and the top of snap ring 1512 extends to the upper of tongue-and-groove 151
Side, and can engage with being welded on the side wall upper protruding block 1321 of square tube tenon 132, so as to play limitation square tube tenon 132 from tenon
The effect of abjection in groove 151, the connection of railing 13 and base 15 is relatively reliable before making.
Fig. 1 and Fig. 2 are reviewed, to prevent that suspension platform 1 is scratched with metope during hanging object, the rear upper lateral of railing 14
Side is provided with several support wheel assemblies 141, referring to the drawings 5, specifically, support wheel assembly 141 is provided with a fixation
The U-board 1412 that plate 1411 and one use cooperatively with fixed plate 1411, U-board 1412 includes two side plates 14121 and one
Individual bottom plate 14122, U-board 1412 be by steel plate bending into integrative-structure, being fixed with by screw rod between biside plate 14121 can
The support wheel 1413 of rotation.Two springs 142 for playing connection function, spring are welded between fixed plate 1411 and bottom plate 14122
142 are respectively positioned on the top of rear railing 14, are easy to fixed plate 1411 and bottom plate 14122 being clamped in the steel pipe on the rear top of railing 14
On, then it is bolted.Support wheel 1413 is supported in metope and rear railing 14 during the raising and lowering of suspension platform 1
Between and roll with the lifting and decline of suspension platform 1 with the friction of railing after reduction 14 and metope while it also avoid after
Railing 14 is scratched to metope.And after loosering a bolt, in the presence of spring 142 between fixed plate 1411 and bottom plate 14122
It is big away from becoming, it can be supported according to the position adjustment of flat pathway on the width and metope of metope behind the position of wheel assembly 141,
Support wheel assembly 141 is fixedly clamped again, so that more different construction sites can be applied to, and suspension platform 1
Raising and lowering is more steady.
Reference picture 6 and Fig. 7, hitch 2 include the fore-stock 21 played a supportive role and after-poppet 22, connection fore-stock
21 and the beam 23 of after-poppet 22, the reinforcement steel wire rope 24 of rigidity for improving beam 23 and it is supported on beam 23 and strengthens steel wire rope
24 upper supporting column 25.
Fore-stock 21 include the first bearing 211, the first bearing of grafting 211 top, for coordinate the first bearing 211 adjust
The first inserted link 212 of the height of fore-stock 21 is saved, and is welded on the first company at the top of the first inserted link 212, for fixed beam 23
Adapter 213.First bearing 211 includes the first cross bar 2112, is vertically welded in first vertical pole 2111 at the middle part of the first cross bar 2112
And two root bead be connected on the fix bars 2113 of the both sides of the first vertical pole 2111, the two ends of fix bar 2113 are respectively welded at and first is horizontal
The two ends of bar 2112 and the top of the first vertical pole 2111, to improve the stability of the first bearing 211.
After-poppet 22 includes the second bearing 223, the second inserted link 221 for being plugged on the top of the second bearing 223 and is welded on
Second connecting tube 222 at the top of the second inserted link 221.Second bearing 223 includes the second cross bar 2232, is vertically welded in the second cross bar
Second vertical pole 2231 and some weight linear meters 2233 being vertically welded on the second cross bar 2232 at 2232 middle parts, weight linear meter 2233
The both sides of the second vertical pole 2231 are symmetricly set on, and are equipped with some balancing weights 26 being pressed on the second cross bar 2232.
First inserted link 212 with the corresponding position of the first vertical pole 2111, the second inserted link 221 it is corresponding with the second vertical pole 2231
Some perforation 201 for being used to adjust height are equipped with position.First inserted link 212 and the second inserted link 221 are respectively in the first vertical pole
2111 and second slide up and down behind suitable position in vertical pole 2231, and the relative connection of corresponding perforation 201 is simultaneously solid by bolt
It is fixed, you can to complete the regulation to height.
The lower end of upper supporting column 25 is welded with the neck 251 with the clamping of the first connecting tube 213, and neck 251 is what section was inverted U shape
Channel-section steel, and fixed by bolt with the first connecting tube 213;The upper end of upper supporting column 25 is welded with two parallel rope sheave grip blocks 252,
Rotatable rope sheave 253 has been bolted in rope sheave grip block 252.
The junction at the first connecting tube 213 and the top of the first inserted link 212, the junction of neck 251 and upper supporting column 25, second
The junction of the inserted link 221 of connecting tube 222 and second is welded with the triangular steel plate 5 of reinforcing.
Beam 23 includes end to end front-axle beam 231, central sill 232, the back rest 233 and connection central sill 232 and the back rest successively
233 connecting square pipes 234.The front end of front-axle beam 231 has been bolted a U-shaped baffle plate 2311.The end of front-axle beam 231 and central sill
The 232 interior, end of central sill 232 of the first connecting tube of front end insertion 213 and the back rest 233 are inserted in connecting square pipes 234, the back rest 233
End is inserted in the second connecting tube 222, is then bolted.
Strengthen the two ends that the two ends of steel wire rope 24 are fixed on beam 23 by tensing nose 241.It is by a U-shaped steel to tense nose 241
What the parallel-plate 2412 that plate 2411 and two are welded in the bottom surface of U-shaped steel plate 2411 was constituted.The U-shaped steel plate of two tension noses 241
2411 clamp outside U-shaped baffle plate 2311 and the second connecting tube 222 and are bolted respectively, are equipped between two parallel-plates 2412
For the fixed screw rod for strengthening steel wire rope 24.Strengthen the two ends of steel wire rope 24 to bypass after above-mentioned screw rod, it is solid by some wire line shoes 6
It is scheduled on tension nose 241.Reference picture 8, strengthens the raised sub-fraction of steel wire rope 24 by the part of wraparound between wire line shoe 6, uses
Strengthen whether steel wire rope 24 is slided to judge the stability of hitch 2 in observation.Strengthen riding over rope sheave 253 in the middle of steel wire rope 24
On, and tensed between the two ends of beam 23.
Review Fig. 1 and Fig. 2, hoisting mechanism 3 is included for coordinating the boom hoist cable 31 of lifting, to be provided using process
Protection protection steel wire rope 32, two offer power elevator 33, control elevator 33 distribution box 34 and for lock protect
Protect the cradle safety lock 35 of 32 braking actions of steel wire rope.Elevator 33 is arranged on lateral rail 12, and distribution box 34 is arranged on
On preceding railing 13.
The centre position of the trapezium structure upper bottom edge of lateral rail 12 is provided with cradle safety lock 35 by bolt.Hanging basket safety
Lock 35 tops and a roll assembly 352 for being used to detect the angle of boom hoist cable 31, lifting are fixed with bolt close to hanging basket side
Steel wire rope 31 passes through bottom after roll assembly 352 to be connected with elevator 33, wherein being the hoist engine of elevator 33, protects steel wire rope 32
It is fixedly connected with the top of boom hoist cable 31 by wire line shoe 6 with baffle plate 2311, fixed form is with strengthening steel wire rope 24
It is identical with the fixed form for tensing nose 241.During hanging object, two groups of elevators 33 are by coordinating boom hoist cable 31 to suspension platform 1
Produce upward power.
Referring to the drawings 9, specifically, roll assembly 352 includes the grip block 3522 for clamping disk roller 3521, clamping
The bottom of plate 3522 is clamped and is fixed on cradle safety lock 35, and grip block 3522, which is provided with, to be used to limit the rotation model of grip block 3522
The arcuate socket 35221 enclosed, arcuate socket 35221 is on a circumference using the fixing point of grip block 3522 as the center of circle to limit roller
The angular range of wheel assembly 352, on the top of two grip block 3522 provided with some screws for being used to adjust the fixed position of disk roller 3521,
Grip block 3522, the small grip block 3524 for detecting the angle of boom hoist cable 31 and cradle safety lock 35 are fixed by screw rod,
Small disk roller 3523 is set on small grip block 3524 to coordinate regulation disk roller 3521 to reduce rubbing for roll assembly 352 and boom hoist cable 31
Wipe power.
Protection steel wire rope 32 close to upper end position be fixed with for limit the hoisting depth of suspension platform 1 limiting plate 321, in
Between be fixed with weight 322 for stretching protection steel wire rope 32 through cradle safety lock 35, bottom, weight 322 is close to ground
But it is above the ground level to play a part of stretching protection steel wire rope 32, the moment of protection steel wire rope 32 is kept tensioning state.
Reference picture 10, weight 322 is set in tubbiness, including staving 3221 and the bung that is threadedly coupled with staving 3221
3222, the center of bung 3222 is equipped with a threaded rod 3223, and the top of threaded rod 3223 is welded with a connection ring 3224,
The bottom of protection steel wire rope 32 is fixedly connected with connection ring 3224, and fixed form is with strengthening steel wire rope 24 with tensing consolidating for nose 241
Determine mode identical;The bottom of threaded rod 3223 is connected with a nut 3225, and one is provided between nut 3225 and bung 3222
Annular gasket 3226 makes to increase the contact area between nut 3225 and bung 3222, the lifting surface area of increase bung 3222
It does not allow yielding or even breakage.Staving 3221 can load the weights such as water, sandstone increase weight.
Reference picture 11 and Figure 12, limiting plate 321 are set in protection steel wire rope 32 and can be along protection steel wire ropes about 32
Mobile, the bottom surface of limiting plate 321 is fixed with four arc-like sheets 3211, and four arc-like sheets 3211, which are enclosed, is set in protection steel wire rope
There is certain gap between up big and down small frustum outside 32, and adjacent arc-like sheet 3211, arc-like sheet 3211 it is small
Periphery is held provided with a circle raised line 3212.The lower section of limiting plate 321 is additionally provided with a fixed cover being set in outside protection steel wire rope 32
3213, the top of fixed cover 3213 offers the cone tank 3214 that the taper platform shape enclosed with arc-like sheet 3211 is adapted, Gu
Surely cover 3213 outer walls and offer four and be uniformly distributed and fixing groove 3215 that at right angles triangle is set, fixing groove 3215 pushes up
Face and the outer wall vertical of fixed cover 3213;The bottom surface of limiting plate 321 is further fixed on the strip of four and the clamping of fixing groove 3215
Buckle 3216, the right angled triangle card that the bottom of buckle 3216 is set to engage with fixing groove 3215 towards the side of arc-like sheet 3211
Platform 32161, the slide block 32162 for being set to away from the side of arc-like sheet 3211 strip.When adjusting 321 height of limiting plate, on
Lower mobile limiting plate 321 is to after specified location, and movable fixed cover 3213 makes it close with limiting plate 321, four arc-like sheets 3211
Cone tank 3214 is stretched into, raised line 3212 is made four arc-like sheets 3211 close to each other and clamped and protect by the extruding of the inwall of cone tank 3214
Steel wire rope 32;Fixed cover 3213 is to during the activity of limiting plate 321, and the corner of its top surface and side wall is to chuck 32161
Inclined-plane is extruded, and is deformed buckle 3216 and is bent to the direction away from arc-like sheet 3211, subsequent buckle 3216 is along fixed cover
3213 outer wall is slided until engage with fixing groove 3215, that is, is completed 3213 pairs of fixed cover and the fixation of limiting plate 321, made arc
Piece 3211 keeps clamping the fixation protected steel wire rope 32 and realize limiting plate 321.When the movable limiting plate 321 of needs, mobile striking
Motion block 32162 makes buckle 3216 deform to the direction bending away from arc-like sheet 3211, and now chuck 32161 is out of fixing groove 3215
Skid off and release the fixation to fixed cover 3213, you can movable fixed cover 3213 makes it away from arc-like sheet 3211 and releases arc-like sheet
The clamping of 3211 pairs of protection steel wire ropes 32, so as to movable limiting plate 321.
In the uphill process of suspension platform 1, when hanging basket run-off the straight or work fracture of rope, relaxation, its roll assembly 352
Occurs change in angular position, driving the executive component of safety lock 35 makes lock rope mechanism action, by safety lock 35 and protection steel wire
Rope 32, hanging basket is pinned, and the executive component of safety lock 35 and Suo Sheng mechanisms are the disclosed knot in existing safety lock 35 here
Structure, therefore repeat no more here.
The upper outside of cradle safety lock 35 is vertically installed with on-off action limiter 351, the connection elevator 33 of limiter 351
It is interior can be as one of elevator 33 switch, during hanging object, when suspension platform 1 reaches specified altitude assignment and workman fails to stop in time
When only being lifted, the limiter 351 set on the triggering lateral rail 12 of limiting plate 321 makes elevator 33 carry out forced brake.
The application method of pin-connected panel electrical suspension platform:
S1:Supporting construction is installed
Selected lifting place, place cleaning sets the spacing of two groups of hitches 2 according to the specification of suspension platform 1 used,
The first bearing 211 and the second bearing 223 are laid respectively, and two group of first bearing 211 is pressed close into parapet is set, the knot in embodiment
Structure assembles hitch 2, then lays boom hoist cable 31 and protection steel wire rope 32, and limiting plate is installed on protection steel wire rope 32
321, appropriate number of balancing weight 26 is laid according to the weight of institute's hanging object, balancing weight 26 is uniformly distributed along the both sides of the second vertical pole 2231
To lift the stability of the second bearing 223.
S2:Suspension platform 1 and hoisting mechanism 3 are installed
Suspension platform 1 is installed by said structure, cradle safety lock 35 is installed, fixed lifting is installed on suspension platform 1
Machine 33 and distribution box 34, are worn on elevator 33 by said structure connect boom hoist cable 31 afterwards, worn on cradle safety lock 35
Protection steel wire rope 32 is connect, weight 322, connection line are installed in protection steel wire rope 32 end.
S3:Hanging object
After confirming that connection is errorless, two groups of positions of hitch 2 are adjusted again and check whether hitch 2 is firm, three groups
The projection of steel wire rope bearing has fricton-tight, and the position of limited block is adjusted again, is then electrified to check circuit.After confirmation is errorless,
With the pin assemblies 4 in the securing plate of lateral rail 12 on railing 13 before extracting, railing 13 before unloading retightens preceding column after loading material
Bar 13, starts elevator 33 and is lifted to suspension platform 1 at 30cm in advance, observe the perpendicularity of suspension platform 1, supporting construction and steel wire
Rope junction projection has without exception, confirms the normal rear normal hanging object of progress.
Described above is only preferred embodiment of the present utility model, and protection domain of the present utility model is not limited merely to
Above-described embodiment, all technical schemes belonged under the utility model thinking belong to protection domain of the present utility model.It should refer to
Go out, for those skilled in the art, some improvement under the premise of the utility model principle is not departed from and
Retouching, these improvements and modifications also should be regarded as protection domain of the present utility model.
Claims (6)
1. a kind of nacelle device, including hitch (2) as support, the suspension platform (1) of bearing goods and for carrying
The hoisting mechanism (3) of suspension platform (1) is risen, the hoisting mechanism (3) includes the lifting steel that top is fixed on hitch (2)
Cord (31) and protection steel wire rope (32), for boom hoist cable (31) provide power elevator (33) and with protection steel wire rope
(32) safety lock (35) coordinated, it is characterised in that:The bottom of the protection steel wire rope (32) is connected with a weight (322), institute
State weight (322) and there is spacing between ground.
2. nacelle device according to claim 1, it is characterised in that:The weight (322) is set in tubbiness, including staving
(3221) bung (3222) and with staving (3221) being threadedly coupled, the protection steel wire rope (32) is fixed on the bung
(3222) on.
3. nacelle device according to claim 2, it is characterised in that:A threaded rod is equipped with the bung (3222)
(3223), the bottom of the threaded rod (3223) is connected with a nut (3225), top and is fixed with for protecting steel wire rope
(32) connection ring (3224) of connection.
4. nacelle device according to claim 3, it is characterised in that:The nut (3225) and the bung (3222) it
Between be provided with an annular gasket (3226).
5. nacelle device according to claim 3, it is characterised in that:The threaded rod (3223) is arranged on the bung
(3222) center.
6. nacelle device according to claim 3, it is characterised in that:The protection steel wire rope (32) bypasses the connection ring
(3224) it is fixed by some wire line shoes (6).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621452639.4U CN206375642U (en) | 2016-12-27 | 2016-12-27 | Nacelle device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621452639.4U CN206375642U (en) | 2016-12-27 | 2016-12-27 | Nacelle device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206375642U true CN206375642U (en) | 2017-08-04 |
Family
ID=59408090
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201621452639.4U Expired - Fee Related CN206375642U (en) | 2016-12-27 | 2016-12-27 | Nacelle device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206375642U (en) |
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108560896A (en) * | 2018-05-31 | 2018-09-21 | 江苏三浦电子科技有限公司 | Working at height anti-falling safe hanging basket |
CN109138466A (en) * | 2018-09-01 | 2019-01-04 | 江西瑞耐德新材料有限公司 | A kind of vertical face of outer wall of building curtain protective device |
CN109812007A (en) * | 2019-02-25 | 2019-05-28 | 泉州市华祥工业设计有限公司 | A kind of construction of high security anti-shake hanging basket |
CN111441566A (en) * | 2020-04-29 | 2020-07-24 | 白海山 | Hanging basket for construction machinery |
CN112576024A (en) * | 2020-12-15 | 2021-03-30 | 重庆电子工程职业学院 | Protection stabilizing equipment for high-rise building construction |
CN112878658A (en) * | 2021-03-15 | 2021-06-01 | 沈旭峰 | High-stability protection device for high-rise building construction |
CN115110748A (en) * | 2022-06-27 | 2022-09-27 | 中建八局西南建设工程有限公司 | Self-locking type hanging basket heavy hammer |
CN115504413A (en) * | 2022-09-22 | 2022-12-23 | 广东博智林机器人有限公司 | Hanging flower basket mechanism and outer wall construction robot |
CN115110748B (en) * | 2022-06-27 | 2024-05-24 | 中建八局西南建设工程有限公司 | Self-locking hanging basket heavy hammer |
-
2016
- 2016-12-27 CN CN201621452639.4U patent/CN206375642U/en not_active Expired - Fee Related
Cited By (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108560896A (en) * | 2018-05-31 | 2018-09-21 | 江苏三浦电子科技有限公司 | Working at height anti-falling safe hanging basket |
CN109138466A (en) * | 2018-09-01 | 2019-01-04 | 江西瑞耐德新材料有限公司 | A kind of vertical face of outer wall of building curtain protective device |
CN109812007A (en) * | 2019-02-25 | 2019-05-28 | 泉州市华祥工业设计有限公司 | A kind of construction of high security anti-shake hanging basket |
CN109812007B (en) * | 2019-02-25 | 2021-02-12 | 泉州市华祥工业设计有限公司 | High-safety anti-shaking hanging basket for building construction |
CN111441566A (en) * | 2020-04-29 | 2020-07-24 | 白海山 | Hanging basket for construction machinery |
CN112576024A (en) * | 2020-12-15 | 2021-03-30 | 重庆电子工程职业学院 | Protection stabilizing equipment for high-rise building construction |
CN112878658A (en) * | 2021-03-15 | 2021-06-01 | 沈旭峰 | High-stability protection device for high-rise building construction |
CN115110748A (en) * | 2022-06-27 | 2022-09-27 | 中建八局西南建设工程有限公司 | Self-locking type hanging basket heavy hammer |
CN115110748B (en) * | 2022-06-27 | 2024-05-24 | 中建八局西南建设工程有限公司 | Self-locking hanging basket heavy hammer |
CN115504413A (en) * | 2022-09-22 | 2022-12-23 | 广东博智林机器人有限公司 | Hanging flower basket mechanism and outer wall construction robot |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206376515U (en) | High-lift operation hanging cradle device | |
CN206375642U (en) | Nacelle device | |
CN206521197U (en) | A kind of adjustable balance hoisting beam | |
CN200999456Y (en) | Safety self-locking electric up-down scaffold | |
CN106429791B (en) | A kind of the Special-purpose hanger rigging and hanging method of nuclear power station CR10 and reinforcing bar composite module | |
CN207844890U (en) | A kind of hoisting fixture for building curtain wall | |
CN206376513U (en) | Pin-connected panel nacelle device | |
CN207497895U (en) | Use steel carrier to a kind of construction | |
CN205892588U (en) | Hoisting equipment | |
CN206375644U (en) | A kind of driven hanging basket device | |
CN204418629U (en) | A kind of integrated form climbing frame | |
CN206554524U (en) | A kind of construction discharging platform | |
CN206375643U (en) | Movable hanging basket device | |
CN205527435U (en) | Installation and device of dismantling jib loading boom | |
CN105110205B (en) | A kind of reverse method for dismounting of derrick crane | |
CN111549662A (en) | Planetary walking trolley for detecting and maintaining main cable and sling of suspension bridge | |
CN101804944A (en) | Device for exchanging wire rope of gantry crane | |
CN216109906U (en) | Device for replacing and installing curtain wall stone | |
CN204529090U (en) | Electric precipitation anode plate hanging apparatus | |
CN207144446U (en) | A kind of construction Skidproof hanging cradle | |
CN109378767A (en) | A kind of lifting engineering method of hoist engine to skyscraper electricity well inner cable | |
CN202754699U (en) | Overlong steel plate balance hoisting beam | |
CN212533725U (en) | Planetary walking trolley for detecting and maintaining main cable and sling of suspension bridge | |
CN212223029U (en) | Blast furnace down pipe spraying construction device | |
CN207513137U (en) | Building engineering construction builder's jack |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20170804 Termination date: 20211227 |