CN106429791B - A kind of the Special-purpose hanger rigging and hanging method of nuclear power station CR10 and reinforcing bar composite module - Google Patents

A kind of the Special-purpose hanger rigging and hanging method of nuclear power station CR10 and reinforcing bar composite module Download PDF

Info

Publication number
CN106429791B
CN106429791B CN201610991611.6A CN201610991611A CN106429791B CN 106429791 B CN106429791 B CN 106429791B CN 201610991611 A CN201610991611 A CN 201610991611A CN 106429791 B CN106429791 B CN 106429791B
Authority
CN
China
Prior art keywords
hoist cable
plate
reinforcing bar
composite module
cover plate
Prior art date
Application number
CN201610991611.6A
Other languages
Chinese (zh)
Other versions
CN106429791A (en
Inventor
李豪
白朝阳
魏兴
徐金帅
孙绍琳
李超
孟和苏乐德
王诗柔
贾磊
Original Assignee
大连益利亚工程机械有限公司
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 大连益利亚工程机械有限公司 filed Critical 大连益利亚工程机械有限公司
Priority to CN201610991611.6A priority Critical patent/CN106429791B/en
Publication of CN106429791A publication Critical patent/CN106429791A/en
Application granted granted Critical
Publication of CN106429791B publication Critical patent/CN106429791B/en

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C1/00Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles
    • B66C1/10Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles by mechanical means
    • B66C1/12Slings comprising chains, wires, ropes, or bands; Nets
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C13/00Other constructional features or details
    • B66C13/16Applications of indicating, registering, or weighing devices

Abstract

The present invention relates to the Special-purpose hanger riggings and hanging method of a kind of nuclear power station CR10 and reinforcing bar composite module.The Special-purpose hanger rigging includes bridging beam, main hoist cable, hoist cable distributor, outside pair hoist cable, inside pair hoist cable and adjustable drawbar.The present invention is using Special-purpose hanger rigging as the connection between crane and CR10 and reinforcing bar composite module;The connection Special-purpose hanger rigging, transition beam is connect with crane, adjustable drawbar is connect with CR10 with the interior outside lug on reinforcing bar composite module before lifting.By the position of centre of gravity for applying counterweight, adjusting adjustable drawbar adjustment CR10 and reinforcing bar composite module, guarantee the levelness of lower mouth.It hooks up, rotate, walk, off the hook by what is formally lifted, keep CR10 and reinforcing bar composite module in place.Special-purpose hanger rigging of the invention and hanging method can effectively reduce the deformation of CR10 and reinforcing bar composite module in hoisting process, guarantee the levelness of mouth under CR10 and reinforcing bar composite module, it is ensured that the safety of construction.

Description

A kind of the Special-purpose hanger rigging and hanging method of nuclear power station CR10 and reinforcing bar composite module

Technical field

The present invention relates to nuclear powers to build technical field of construction more particularly to a kind of nuclear power station CR10 and reinforcing bar composite module Special-purpose hanger rigging and hanging method.

Background technique

CAP1000 type pressurized-water reactor nuclear power plant is in digestion, absorption, grasps the US Westinghouse company introduced in China comprehensively On the basis of AP1000 heap-type, pass through the large-scale advanced pressurized water reactor nuclear power with China's independent intellectual property right of innovative development again out Unit.The CR10 and reinforcing bar composite module of CAP1000 heap-type are by CR10 steel frame and external basic multistory reinforced and reinforcement bar support Frame collectively constitutes, and is used to support steel containment vessel (CV).Wherein, CR10 steel frame is the annulus being assemblied to form by 32 Pin subelements Shape truss structure, the steel bracket being made of the fashioned iron such as seamless steel pipe, H profile steel, T-steel and steel plate, outer ring radius are 21.031m, inner ring radius are 10.668m, a height of 5.486m.External basis is multistory reinforced to be connected and fixed on by Steel bar rack On CR10 steel frame, each layer reinforcing bar is with longitudinal and circumferential alternation method binding on Steel bar rack.CR10 and reinforcing bar composite module Gross mass about 349t.

CR10 has the following characteristics that 1) weight is big with reinforcing bar composite module, and volume is big;2) module outer ring radius and inner ring half Diameter difference is big, and it is platypelloid type structure that height is small, and outside and inside discontinuity equalization easily occurs in module, when lifting, if only arranged One circle Current Collector Sleave module is easily-deformable;3) position of centre of gravity and module centers are inconsistent, and offset is larger, and module is easily inclined in hoisting process Tiltedly (lower mouth is not horizontal) and cause deformation, unstability.Occur locally or globally deforming all after CR10 and the lifting of reinforcing bar composite module Meeting generates significant impact to the subsequent construction of steel containment vessel (CV).Therefore, it is necessary to design science, reasonable hanging method and specially With Current Collector Sleave, with prevent CR10 and reinforcing bar composite module occurs in hoisting process inclination, deform, unstability the problems such as, it is ensured that apply The safety of work.

Summary of the invention

The present invention provides aiming at the problem that existing suspender is unable to satisfy nuclear power station CR10 and the lifting of reinforcing bar composite module needs A kind of Special-purpose hanger rigging of nuclear power station CR10 and reinforcing bar composite module, the suspender can effectively reduce CR10 and reinforcing bar in hoisting process The deformation of composite module guarantees the levelness of mouth under CR10 and reinforcing bar composite module, it is ensured that the safety of construction.

To achieve the above object, the technical solution adopted by the present invention is that: a kind of nuclear power station CR10 and reinforcing bar composite module Special-purpose hanger rigging includes transition beam and the multiple hoist cable units connecting respectively with transition beam;The hoist cable unit include main hoist cable, Hoist cable distributor, outside pair hoist cable, inside pair hoist cable and two adjustable drawbars;Described main hoist cable one end is fixed on transition beam; The other end, outside pair hoist cable and the inside pair hoist cable of main hoist cable are connect with hoist cable distributor respectively, and the outside pair hoist cable is separate One end of hoist cable distributor is connect with an adjustable drawbar, one end far from hoist cable distributor of the inside pair hoist cable and another Adjustable drawbar connection.

Further, the transition beam is circle, including upper shackle plate, the first gusset, the second gusset, upper cover plate, circular arc Plate, long connecting plate, short connecting plate, lower lifting lug long slab, lower lifting lug short slab and lower cover plate;The upper cover plate fluting, two pieces of upper lifting lugs Plate is stretched out from slot, and two pieces of upper shackle plate tops and upper cover plate weld, and lower part and lower cover plate weld;Two pieces of arc plates are located at upper cover It between plate and lower cover plate, and is welded with upper cover plate, lower cover plate and upper shackle plate, two pieces of arc plate openings are oppositely arranged and surround Annular shape, annulus outer diameter are less than upper cover plate outer diameter and lower cover plate outer diameter;Two pieces of lower lifting lug long slabs and 14 pieces of lower lifting lug short slab edges The circumference uniform distribution of arc plate, two pieces of lower lifting lug long slabs and upper cover plate, lower cover plate, arc plate, upper shackle plate lower weld, 14 pieces Lower lifting lug short slab and upper cover plate, lower cover plate, arc plate weld;Four pieces of long connecting plates be arranged in parallel in upper cover plate and lower cover plate it Between, on the inside of arc plate, welded with lower lifting lug long slab, arc plate, upper cover plate, lower cover plate;One piece of short connecting plate is in upper cover plate under Between cover board, two pieces of upper shackle plates are connected, are welded with upper shackle plate, upper cover plate;Four piece of first gusset and two piece of second gusset position In upper cover plate top, four piece of first gusset is fixed on the outside of two shackle plates;Two piece of second gusset is fixed on two shackle plates Inside.

Further, the part that described two pieces upper shackle plates are located above upper cover plate is equipped with connecting hole, under described Lifting lug long slab, lower lifting lug short slab offer connecting hole respectively;Wherein, the connecting hole of upper shackle plate is used to carry suspender with crane and connect Connect, the lower lifting lug long slab, lower lifting lug short slab connecting hole for being connect with main hoist cable.

Further, the main hoist cable be casting rigging, quantity totally 16;The main hoist cable top passes through connecting shaft and mistake Bridging beam connection, lower part are connect by connecting shaft with hoist cable distributor.

Further, the hoist cable distributor includes two pieces of set square and two pieces of connecting plates disposed in parallel, and described two pieces Connecting plate is arranged between two pieces of set squares, for connecting two pieces of set squares;The hoist cable distributor is equipped with a pair of of upper ear plate Hole and two pairs of lower ear plate holes, the lug plate holes are made of whole method for boring hole;The upper ear plate hole can pass through connecting shaft and master Hoist cable connection, the lower ear plate hole can be connect by connecting shaft with outside pair hoist cable and inside pair hoist cable respectively.

Further, the outside pair hoist cable and inside pair hoist cable are casting rigging.Including the secondary hoist cables in 16 outsides and The secondary hoist cable in 16 insides.The pair hoist cable passes through connecting shaft and connect with adjustable drawbar.

Further, the adjustable drawbar includes adjusting sleeve, the u shaped connector for adjusting sleeve both ends being arranged in and is set in The nut of u shaped connector spiro rod section;The screw thread at the adjustable drawbar both ends is reversed.

Another object of the present invention additionally provides the hanging method of a kind of nuclear power station CR10 and reinforcing bar composite module, including Following steps:

(1) the main hoist cable of 16 hoist cable units is connect with transition beam respectively;

(2) each hoist cable unit is proceeded as follows:

The main hoist cable of hoist cable unit is connect by (2-1) with hoist cable distributor;

Outside pair hoist cable, inside pair hoist cable are connect by (2-2) with hoist cable distributor respectively;

On the outside of (2-2) secondary hoist cable connect with an adjustable drawbar, inside pair hoist cable and another is adjustable

Pull rod connection;

(2-4) adjusts the length of adjustable drawbar, makes it on intermediate length;

(3) crane suspender is carried to connect with transition beam, by hoist cable unit be hung to CR10 and reinforcing bar composite module just on Side;

(4) 2 adjustable drawbars of each hoist cable unit are connect with outside lug, inside lug respectively, the outside is hung Ear, inside lug are welded on CR10 and reinforcing bar composite module in advance, and quantity, angle are consistent with Current Collector Sleave;

(5) apply counterweight on CR10 and reinforcing bar composite module, weight, position, the applying mode of the counterweight are to pass through Finite element modeling calculates analysis, analytical Calculation technology obtains, it is therefore an objective to the position of centre of gravity of CR10 Yu reinforcing bar composite module are adjusted, To prevent the situation that module bias is excessive, adjustable drawbar adjustment amount is inadequate;

(6) on each adjustable drawbar, foil gauge is pasted in advance, is detected the stress of adjustable drawbar in hoisting process, is prevented Stress is more than its rated load;

(7) examination for carrying out CR10 and reinforcing bar composite module lifts, and during examination is hung, controls CR10 using cable rope is tensed With the rotation of reinforcing bar composite module, the levelness of mouth under total station detection CR10 and reinforcing bar composite module is utilized;

(8) 16 inside adjustable drawbars and 16 outside adjustable drawbars are adjusted respectively, are made under CR10 and reinforcing bar composite module The levelness of mouth reaches construction requirement, while guaranteeing that the stress of adjustable drawbar is no more than its rated load, then starts formally to hang Dress;

(9) when formal lifting, crane is slowly hooked up, speed≤400mm/min, keeps CR10 and reinforcing bar composite module liftoff 200mm, it is static 10 minutes hanging, above-mentioned Special-purpose hanger rigging, outside lug, the deformation of inside lug and crane are checked by visual observation The settlement of foundation value in chassis region;

(10) after above-mentioned visual inspection is qualified, suspension hook is slowly hooked up, and speed≤400mm/min combines CR10 with reinforcing bar Module is liftoff to target range, stops hooking up, and keeps hanging;

(11) loop wheel machine principal arm rotates clockwise, rotational speed≤0.033r/min, reaches unified direction to boom and crawler belt Afterwards, it stops rotating;

(12) crane is laid with direction along subgrade case and moves forward, and the speed of travel≤2m/min reaches crane lifting erect-position point Stop walking;Boom fine tuning rotation, makes CR10 and reinforcing bar composite module center and center centering in place;

(13) the slow off the hook of crane, speed≤400mm/min keep CR10 and reinforcing bar composite module in place.

The Special sling lamps structure of nuclear power station CR10 of the present invention and reinforcing bar composite module is simple, reasonable, hanging method science, It is easy, it has the advantage that compared with prior art

(1) present invention devises reasonable secondary hoist cable arrangement and connects according to the design feature of CR10 and reinforcing bar composite module Connect scheme: separating two circle hoist cables using hoist cable distributor: the secondary hoist cable in a circle outside and a secondary hoist cable in circle inside, respectively with CR10 with Outside lug on reinforcing bar composite module is connected with inside lug, ensure that CR10 and reinforcing bar composite module outside and inside stress Equilibrium, when controlling lifting on the outside of CR10 and reinforcing bar composite module and the relative deformation of inside;

(2) present invention has used counterweight and adjustable drawbar in the levelness of mouth under adjusting CR10 and reinforcing bar composite module Two ways.The position of centre of gravity of CR10 Yu reinforcing bar composite module first can be roughly adjusted by applying counterweight, when examination lifts again The position of centre of gravity that accurate adjustment CR10 and reinforcing bar composite module are finely tuned by adjustable drawbar, keeps module center of gravity consistent with its center. The comprehensive of two ways uses, and ensure that the levelness of CR10 and mouth under reinforcing bar composite module in hoisting process;

(3) on the transition beam in Special-purpose hanger rigging shackle plate structure and shape, the knot of suspender can be carried according to crane Structure and shape and design, so that special hanger of the invention be made to can be adapted for various cranes;

(4) Special sling lamps structure is simple, easy to connect, is easy to construct;

(5) in CR10 and reinforcing bar composite module hoisting process, using Special-purpose hanger rigging of the invention and hanging method, and Analytical technology is calculated in conjunction with finite element modeling, strain dynamometry technology, total station detection technique, adjusts a variety of skills such as adjustable drawbar Art can effectively reduce the deformation and stress of CR10 Yu reinforcing bar composite module, meet the lifting requirements of CR10 Yu reinforcing bar composite module, Reduce the risk factor of lifting.

Detailed description of the invention

Fig. 1 is the perspective view of Special-purpose hanger rigging of the present invention;

Fig. 2 is the cross-sectional view of Special-purpose hanger rigging of the present invention;

Fig. 3 is the perspective view of Current Collector Sleave transition beam of the present invention;

Fig. 4 is the top view of Current Collector Sleave transition beam of the present invention;

Fig. 5 is the bottom view of Current Collector Sleave transition beam of the present invention;

Fig. 6 is the perspective view of distributor of the present invention;

Fig. 7 is the schematic diagram of adjustable drawbar of the present invention.

Detailed description of the invention: 1-transition beam;2-main hoist cables;3-hoist cable distributors;4-outside pair hoist cables;5-inside pairs are hung Rope;6-adjustable drawbars;7-CR10 and reinforcing bar composite module;8-outside lugs;9-inside lugs;11-upper shackle plates; 12-the first gusset;13-the second gusset;14-upper cover plates;15-arc plates;16-long connecting plates;17-short connecting plates; 18-lower lifting lug long slabs;19-lower lifting lug short slabs;31-set squares;32-connecting plates;61-u shaped connectors;62-nuts;63— Adjust sleeve;191-lower cover plates.

Specific embodiment

Now in conjunction with drawings and examples, the present invention is described in further detail.

Present embodiment discloses the Special-purpose hanger riggings of a kind of nuclear power station CR10 and reinforcing bar composite module, as shown in figs. 1-7, packet The multiple hoist cable units for including transition beam 1 and being connect respectively with transition beam;The hoist cable unit includes main hoist cable 2, hoist cable distributor 3, outside pair hoist cable 4, inside pair hoist cable 5 and two adjustable drawbars 6;Described 2 one end of main hoist cable is fixed on transition beam;Main hoist cable 2 other end, outside pair hoist cable 4 and inside pair hoist cable 5 is connect with hoist cable distributor 3 respectively, and the outside pair hoist cable 4 is separate to be hung One end of rope distributor 3 is connect with an adjustable drawbar 6, the one end of the inside pair hoist cable 5 far from hoist cable distributor 3 with it is another A adjustable drawbar 6 connects.

The transition beam 1 is circle, by upper shackle plate 11, the first gusset 12, the second gusset 13, upper cover plate 14, arc plate 15, ten kinds of components such as long connecting plate 16, short connecting plate 17, lower lifting lug long slab 18, lower lifting lug short slab 19 and lower cover plate 191 are constituted; Wherein, upper cover plate 14 is slotted, and two pieces of upper shackle plates 11 are stretched out from slot, and two pieces of upper 11 tops of shackle plate and upper cover plate 14 weld, Lower part and lower cover plate 191 weld;Two pieces of arc plates 15 are between upper cover plate 14 and lower cover plate 191, with upper cover plate 14, lower cover plate 191, upper shackle plate 11 welds;Two pieces of lower lower lifting lug short slabs 19 of lifting lug long slab 18 and 14 piece are uniformly distributed along the circumference, two pieces of lower lifting lugs Long slab 18 and upper cover plate 14, lower cover plate 191, arc plate 15,11 lower weld of upper shackle plate, 14 pieces of lower lifting lug short slabs 19 with it is upper Cover board 14, lower cover plate 191, arc plate 15 weld;Four pieces long connecting plate 16 is between upper and lower cover plates, on the inside of arc plate 15, It is welded with lower lifting lug long slab 18, arc plate 15, upper cover plate 14, lower cover plate 191;One piece short connecting plate 17 is below upper cover plate 14 Middle position connects two pieces of upper shackle plates 11, welds with upper shackle plate 11, upper cover plate 14;Four piece of first gusset 12 and two piece Two gussets 13 are located at 14 top of upper cover plate, weld with upper cover plate 14 and upper shackle plate 11, play booster action.

The upper shackle plate 11 of the transition beam 1, lower lifting lug long slab 18, lower lifting lug short slab 19 offer connecting hole.Wherein, Upper shackle plate 11 carries suspender by connecting shaft and crane and connect, lower lifting lug long slab 18, lower lifting lug short slab 19 pass through connecting shaft and 16 main hoist cables 2 connect.

The main hoist cable 2 be casting rigging, quantity totally 16.The main hoist cable 2 is connected by connecting shaft top and transition beam 1 It connects, lower part is connect with hoist cable distributor 3.

The hoist cable distributor 3 is made of two pieces of set squares 31 and two pieces of connecting plates 32;The hoist cable distributor 3 is equipped with one To upper ear plate hole and two pairs of lower ear plate holes, the lug plate holes are made of whole method for boring hole.Upper ear plate hole by connecting shaft with Main hoist cable 2 connects, and lower ear plate hole passes through connecting shaft respectively and connect with outside pair hoist cable 4 and inside pair hoist cable 5.

The pair hoist cable is secondary hoist cable 5 on the inside of casting rigging, including the secondary hoist cable 4 and 16 piece in 16 outsides.The pair is hung Suo Jun is connect by connecting shaft with adjustable drawbar 6.

The adjustable drawbar 6 is made of two u shaped connectors, 61, two special nuts 62 and an adjusting sleeve 63.It is described The screw thread at 6 both ends of adjustable drawbar is reversed.

On the CR10 and reinforcing bar composite module 7, it is equably disposed with 16 outside lug 8 and 16 inside lugs 9.Institute It states outside lug 8 to connect by connecting shaft with adjustable drawbar 6,61.6 ° of 6 angle with horizontal plane of adjustable drawbar.The inside lug 9 It is connect by connecting shaft with adjustable drawbar 6,90 ° of 6 angle with horizontal plane of adjustable drawbar.

The hoisting process of the CR10 and reinforcing bar composite module 7, comprising the following steps:

(1) 16 main hoist cables 2 are connect with transition beam 1 respectively;

(2) 16 main hoist cables 2 are connect with 16 hoist cable distributors 3 respectively again;

(3) the secondary hoist cable 5 in 16 outsides, 4,16 insides of secondary hoist cable is connect with hoist cable distributor 3 respectively;

(4) 32 adjustable drawbars 6 are connect with outside pair hoist cable 4, inside pair hoist cable 5 respectively;

(5) length for adjusting adjustable drawbar 6, makes it on intermediate length;

(6) crane is carried suspender to connect with transition beam 1, and the above-mentioned Current Collector Sleave having connected is hung to CR10 and reinforcing bar group Mold the surface of block 7;

(7) 32 adjustable drawbars 6 are connect with 16 outside lugs, 8,16 inside lugs 9 respectively, the outside lug 8, inside lug 9 is welded on CR10 and reinforcing bar composite module 7 in advance, and quantity, angle are consistent with Current Collector Sleave;

(8) apply counterweight on CR10 and reinforcing bar composite module 7, weight, position, the applying mode of the counterweight are to pass through Finite element modeling calculates what the technologies such as analysis, analytical Calculation obtained, it is therefore an objective to adjust the center of gravity position of CR10 Yu reinforcing bar composite module 7 It sets, to prevent the situation that module bias is excessive, 6 adjustment amount of adjustable drawbar is inadequate;

(9) on each adjustable drawbar 6, foil gauge is pasted in advance, detects the stress of adjustable drawbar 6 in hoisting process, is prevented Only stress is more than its rated load;

(10) after the completion of above-mentioned work, the examination for carrying out CR10 and reinforcing bar composite module 7 is lifted, and during examination is hung, utilizes drawing Tight cable rope controls the rotation of CR10 Yu reinforcing bar composite module 7, and total station detection CR10 and reinforcing bar composite module 7 is utilized to descend mouth Levelness;

(11) adjustable drawbar 6 on the outside of 16 inside adjustable drawbars 6 and 16 is adjusted respectively, makes CR10 and reinforcing bar composite module The levelness of 7 lower mouths reaches construction requirement, while guaranteeing that the stress of adjustable drawbar 6 is no more than its rated load, then starts just Formula lifting;

(12) when formal lifting, crane is slowly hooked up, speed≤400mm/min, keeps CR10 and reinforcing bar composite module 7 liftoff 200mm, hanging static 10 minutes, check by visual observation above-mentioned Special-purpose hanger rigging, outside lug 8, inside lug 9 deformation and hang The settlement of foundation value in chassis region;

(13) after above-mentioned visual inspection is qualified, suspension hook is slowly hooked up, and speed≤400mm/min combines CR10 with reinforcing bar Module 7 is liftoff to target range, stops hooking up, and keeps hanging;

(14) loop wheel machine principal arm rotates clockwise, rotational speed≤0.033r/min, reaches unified direction to boom and crawler belt Afterwards, it stops rotating;

(15) crane is laid with direction along subgrade case and moves forward, and the speed of travel≤2m/min reaches crane lifting erect-position point Stop walking.Boom fine tuning rotation, makes CR10 and 7 center of reinforcing bar composite module and center centering in place;

(16) the slow off the hook of crane, speed≤400mm/min keep CR10 and reinforcing bar composite module 7 in place.

Finally, it should be noted that the examples are only for explaining the invention, rather than its limitations;Although embodiment is to the present invention It is described in detail, those skilled in the art should understand that: it carries out technical solution documented by embodiment Modification, or equivalent substitution of some or all of the technical features, should be included within protection category of the present invention.

Claims (4)

1. the Special-purpose hanger rigging of a kind of nuclear power station CR10 and reinforcing bar composite module, which is characterized in that including transition beam (1) and respectively The multiple hoist cable units being connect with transition beam;
The hoist cable unit includes main hoist cable (2), hoist cable distributor (3), outside pair hoist cable (4), inside pair hoist cable (5) and two Adjustable drawbar (6);Described main hoist cable (2) one end is fixed on transition beam;The other end of main hoist cable (2), outside pair hoist cable (4) and Inside pair hoist cable (5) is connect with hoist cable distributor (3) respectively, the one end of the outside pair hoist cable (4) far from hoist cable distributor (3) It is connect with an adjustable drawbar (6), the inside pair hoist cable (5) one end and another adjustable drawing far from hoist cable distributor (3) Bar (6) connection;
The transition beam (1) is circle, including upper shackle plate (11), the first gusset (12), the second gusset (13), upper cover plate (14), arc plate (15), long connecting plate (16), short connecting plate (17), lower lifting lug long slab (18), lower lifting lug short slab (19) and lower cover Plate (191);
Upper cover plate (14) fluting, two pieces upper shackle plate (11) are stretched out from slot, two pieces of upper shackle plate (11) tops and upper cover Plate (14) welding, lower part and lower cover plate (191) are welded;Two pieces of arc plates (15) be located at upper cover plate (14) and lower cover plate (191) it Between, and welded with upper cover plate (14), lower cover plate (191) and upper shackle plate (11), two pieces of arc plate (15) openings are opposite to be set It sets and surrounds annular shape, annulus outer diameter is less than upper cover plate (14) outer diameter and lower cover plate (191) outer diameter;Two pieces of lower lifting lug long slabs (18) and Circumference uniform distribution of 14 pieces of lower lifting lug short slabs (19) along arc plate, two pieces of lower lifting lug long slabs (18) and upper cover plate (14), lower cover plate (191), arc plate (15), upper shackle plate (11) lower weld, 14 pieces of lower lifting lug short slabs (19) and upper cover plate (14), lower cover plate (191), arc plate (15) welds;Four pieces long connecting plate (16) is arranged in parallel between upper cover plate (14) and lower cover plate (191), circle On the inside of arc plate (15), welded with lower lifting lug long slab (18), arc plate (15), upper cover plate (14), lower cover plate (191);One piece of short company Fishplate bar (17) connects two pieces upper shackle plate (11) between upper cover plate (14) and lower cover plate (191), with upper shackle plate (11), on Cover board (14) welding;Four piece of first gusset (12) and two piece of second gusset (13) are located at upper cover plate (14) top, four piece of first muscle Plate is fixed on the outside of two shackle plates (11);Two piece of second gusset is fixed on the inside of two shackle plates (11);
Described two pieces upper shackle plate (11) are located at the part above upper cover plate (14) and are equipped with connecting hole, and the lower lifting lug is long Plate (18), lower lifting lug short slab (19) offer connecting hole respectively;Wherein, the connecting hole of upper shackle plate (11) is used for included with crane Suspender connection, the lower lifting lug long slab (18), lower lifting lug short slab (19) connecting hole for being connect with main hoist cable (2);
The hoist cable distributor (3) includes two pieces of set squares (31) disposed in parallel and two pieces of connecting plates (32), two pieces of companies Fishplate bar (32) is arranged between two pieces of set squares, for connecting two pieces of set squares;The hoist cable distributor (3) is equipped in a pair Lug plate holes and two pairs of lower ear plate holes, the lug plate holes are made of whole method for boring hole;The upper ear plate hole can pass through connecting shaft It is connect with main hoist cable (2), the lower ear plate hole can be connected by connecting shaft and outside pair hoist cable (4) and inside pair hoist cable (5) respectively It connects;
The adjustable drawbar (6) is adjusting the u shaped connector (61) at sleeve (63) both ends and is being arranged including adjusting sleeve (63), being arranged In the nut (62) of u shaped connector spiro rod section;The screw thread at adjustable drawbar (6) both ends is reversed.
2. the Special-purpose hanger rigging of nuclear power station CR10 according to claim 1 and reinforcing bar composite module, it is characterised in that: described Main hoist cable (2) be casting rigging, quantity totally 16;Main hoist cable (2) top is connect by connecting shaft with transition beam (1), under Portion is connect by connecting shaft with hoist cable distributor (3).
3. the Special-purpose hanger rigging of nuclear power station CR10 according to claim 1 and reinforcing bar composite module, it is characterised in that: described Outside pair hoist cable (4) and inside pair hoist cable (5) are casting rigging.
4. a kind of side that the Special-purpose hanger rigging using nuclear power station CR10 and reinforcing bar composite module described in claim 1 is lifted Method, which comprises the following steps:
(1) the main hoist cable (2) of 16 hoist cable units is connect with transition beam (1) respectively;
(2) each hoist cable unit is proceeded as follows:
The main hoist cable (2) of hoist cable unit is connect by (2-1) with hoist cable distributor (3);
Outside pair hoist cable (4), inside pair hoist cable (5) are connect by (2-2) with hoist cable distributor (3) respectively;
Secondary hoist cable (4) connect with an adjustable drawbar (6) on the outside of (2-2), inside pair hoist cable and another adjustable drawbar (6) connect It connects;
(2-4) adjusts the length of adjustable drawbar (6), makes it on intermediate length;
(3) crane is carried suspender to connect with transition beam (1), hoist cable unit is being hung to CR10 and reinforcing bar composite module (7) just Top;
(4) 2 adjustable drawbars (6) of each hoist cable unit are connect with outside lug (8), inside lug (9) respectively, it is described outer Side lifting lug (8), inside lug (9) have been welded in advance on CR10 and reinforcing bar composite module (7), quantity, angle and Current Collector Sleave Unanimously;
(5) apply counterweight on CR10 and reinforcing bar composite module (7), weight, position, the applying mode of the counterweight are by having Limit Meta Model calculates analysis, analytical Calculation technology obtains, it is therefore an objective to adjust the center of gravity position of CR10 Yu reinforcing bar composite module (7) It sets, to prevent the situation that module bias is excessive, adjustable drawbar (6) adjustment amount is inadequate;
(6) on each adjustable drawbar (6), foil gauge is pasted in advance, detects the stress of adjustable drawbar (6) in hoisting process, is prevented Only stress is more than its rated load;
(7) examination for carrying out CR10 and reinforcing bar composite module (7) lifts, and during examination is hung, controls CR10 using cable rope is tensed With the rotation of reinforcing bar composite module (7), the levelness of mouth under total station detection CR10 and reinforcing bar composite module (7) is utilized;
(8) 16 inside adjustable drawbars (6) and 16 outside adjustable drawbars (6) are adjusted respectively, make CR10 and reinforcing bar composite module (7) levelness of mouth reaches construction requirement under, while guaranteeing that the stress of adjustable drawbar (6) is no more than its rated load, then opens Begin formally to lift;
(9) when formal lifting, crane is slowly hooked up, speed≤400mm/min, keeps CR10 and reinforcing bar composite module (7) liftoff 200mm, it is static 10 minutes hanging, the deformation of above-mentioned Special-purpose hanger rigging, outside lug (8), inside lug (9) is checked by visual observation With the settlement of foundation value in crane chassis region;
(10) after above-mentioned visual inspection is qualified, suspension hook is slowly hooked up, and speed≤400mm/min makes CR10 and reinforcing bar composite module (7) liftoff to stop hooking up to after target range, keep hanging;
(11) loop wheel machine principal arm rotates clockwise, rotational speed≤0.033r/min, after boom and crawler belt reach unified direction, stops Spin-ended turn;
(12) crane is laid with direction along subgrade case and moves forward, the speed of travel≤2m/min, reaches crane lifting erect-position point and stops Walking;Boom fine tuning rotation, makes CR10 and reinforcing bar composite module (7) center and center centering in place;
(13) the slow off the hook of crane, speed≤400mm/min keep CR10 and reinforcing bar composite module (7) in place.
CN201610991611.6A 2016-11-10 2016-11-10 A kind of the Special-purpose hanger rigging and hanging method of nuclear power station CR10 and reinforcing bar composite module CN106429791B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610991611.6A CN106429791B (en) 2016-11-10 2016-11-10 A kind of the Special-purpose hanger rigging and hanging method of nuclear power station CR10 and reinforcing bar composite module

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610991611.6A CN106429791B (en) 2016-11-10 2016-11-10 A kind of the Special-purpose hanger rigging and hanging method of nuclear power station CR10 and reinforcing bar composite module

Publications (2)

Publication Number Publication Date
CN106429791A CN106429791A (en) 2017-02-22
CN106429791B true CN106429791B (en) 2019-07-26

Family

ID=58206843

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610991611.6A CN106429791B (en) 2016-11-10 2016-11-10 A kind of the Special-purpose hanger rigging and hanging method of nuclear power station CR10 and reinforcing bar composite module

Country Status (1)

Country Link
CN (1) CN106429791B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108275559B (en) * 2017-11-09 2020-03-27 中国核工业第五建设有限公司 Nuclear power steel containment hoisting distributor
CN108675132A (en) * 2018-04-16 2018-10-19 中国二十冶集团有限公司 A kind of steel construction purlin and Accessory Members method for rapidly mounting
CN110054078A (en) * 2019-04-08 2019-07-26 中交一航局第一工程有限公司 A kind of component Current Collector Sleave

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102659019A (en) * 2012-06-01 2012-09-12 中国核工业第五建设有限公司 Special lifting appliance for steel containment cover head in nuclear power station nuclear island and lifting method thereof
CN203728393U (en) * 2014-01-24 2014-07-23 浙江大学 Distributor for lifting large thin-wall secure shell and passive water tank
CN104418229A (en) * 2013-08-28 2015-03-18 中国核工业第五建设有限公司 Special lifting device for cooling water storage tank of nuclear power station containment and lifting method of lifting device
CN104843582A (en) * 2015-04-01 2015-08-19 中国核工业华兴建设有限公司 Method for hoisting steel safe bottom seal head at nuclear power station and special-purpose sling tool thereof

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101967886B (en) * 2010-11-16 2013-06-05 中国核工业第五建设有限公司 Assembly and installation methods of steel containment vessel of nuclear power station

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102659019A (en) * 2012-06-01 2012-09-12 中国核工业第五建设有限公司 Special lifting appliance for steel containment cover head in nuclear power station nuclear island and lifting method thereof
CN104418229A (en) * 2013-08-28 2015-03-18 中国核工业第五建设有限公司 Special lifting device for cooling water storage tank of nuclear power station containment and lifting method of lifting device
CN203728393U (en) * 2014-01-24 2014-07-23 浙江大学 Distributor for lifting large thin-wall secure shell and passive water tank
CN104843582A (en) * 2015-04-01 2015-08-19 中国核工业华兴建设有限公司 Method for hoisting steel safe bottom seal head at nuclear power station and special-purpose sling tool thereof

Also Published As

Publication number Publication date
CN106429791A (en) 2017-02-22

Similar Documents

Publication Publication Date Title
CN101967886B (en) Assembly and installation methods of steel containment vessel of nuclear power station
CN101328746B (en) Steel structure high altitude mounting method
CN101830392B (en) Special lifting tool for steel containment vessel of nuclear power station and lifting method
CN100549348C (en) Construction method for hanging wide span arcuated open-web beam
CN100526000C (en) Combination method mounting technique for ultra-large type steel converter
CN102267664B (en) Method for installing bridge crane using load-supporting roof beam for hoisting and usage thereof
CN102359302B (en) Extra-high voltage large-span iron tower assembling method
CN101323418B (en) Huge deformed steel member single machine turnover hoisting method
CN102328881B (en) Device and method for hoisting entire oversized steel reinforcement cage in one step
CN101966965A (en) Special hanger with guide cover wheel hub and turning and hanging method
CN106087752B (en) Multispan cable-carried arch bridge construction method
CN104843582B (en) A kind of steel containment vessel of nuclear power station bottom (head) hanging method and Special-purpose hanger rigging thereof
CN206376515U (en) High-lift operation hanging cradle device
CN201825671U (en) Hoisting trolley for track plate
CN104444762B (en) Wind power foundation ring overturning device and method for overturning foundation ring by using same
CN202785258U (en) Hoisting device for air overturn of large-sized steel column
CN202358849U (en) Small-size suspension crane
CN102070071A (en) Hoisting method of steel reinforcement cage
CN205114903U (en) Demolition structure of tower crane counter weight
CN103449301B (en) Overturning and lifting method for major-diameter superheavy end socket
CN102659019B (en) Special lifting appliance for steel containment cover head in nuclear power station nuclear island and lifting method thereof
CN101761071B (en) Manufacturing method of reinforcement cage of pouring pile with large diameter
CN103243930A (en) System and method for modularized construction of super high-rise steel structures
CN103510541B (en) In a kind of mast-up hole, the device of steel pipe column is installed in lifting
CN104261246A (en) Hoisting tool of rectangular pipe-jacking section and use method of hoisting tool

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant