CN206328672U - One kind improvement transition segment structure - Google Patents

One kind improvement transition segment structure Download PDF

Info

Publication number
CN206328672U
CN206328672U CN201621429344.5U CN201621429344U CN206328672U CN 206328672 U CN206328672 U CN 206328672U CN 201621429344 U CN201621429344 U CN 201621429344U CN 206328672 U CN206328672 U CN 206328672U
Authority
CN
China
Prior art keywords
abutment
connector
geotechnical grid
geotechnical
roadbed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201621429344.5U
Other languages
Chinese (zh)
Inventor
刘振楠
郎珉
董轶
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway 18th Bureau Group Co Ltd
Original Assignee
China Railway 18th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway 18th Bureau Group Co Ltd filed Critical China Railway 18th Bureau Group Co Ltd
Priority to CN201621429344.5U priority Critical patent/CN206328672U/en
Application granted granted Critical
Publication of CN206328672U publication Critical patent/CN206328672U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

One kind improvement transition segment structure, the structure includes abutment, geotechnical grid, abutment connector, geotechnical grid connector, coupling bar;Several geotechnical grids are provided between abutment and roadbed bottom surface;The end of geotechnical grid is provided with geotechnical grid connector;Abutment connector is fixed on the side of abutment;Geotechnical grid connector is articulated and connected with abutment connector by coupling bar.Trapezoidal soft patch is the stereochemical structure and reinforcement mechanism using geotechnical grid back-up coat, form the larger flexible structural layer of good integrity, rigidity, using modulus gradual change principle, ground and roadbed two parts settlement factors are considered simultaneously, in road-bridge transition section, trapezoidal stabilization zone is set, one section of flexible structural layer is fixed on abutment, the other end is connected with roadbed, realize the smooth transition of rigid abutment and flexible subgrade modulus, eliminate excessive differential subsidence, smoothly sedimentation changeover portion is formed, reaching prevents the purpose of bump at bridgehead.

Description

One kind improvement transition segment structure
Technical field
The utility model belongs to field of civil engineering, and in particular to a kind of use hazard to bridge's pier eliminates the improvement road and bridge for jumping car The construction method of transition section structure.
Background technology
Road-bridge transition section is the multiple location of road disease, is the problem for perplexing highway construction.Abutment and embankment rigidity phase Poor great disparity, uneven deformation of two kinds of materials inside and out various under the influence of factor is inevitable.By making abutment structures Gradual change is obtained in the certain limit of approach embankment so that modified difference gradual change within the specific limits with the poor rigidity of embankment, it is ensured that Any point poor rigidity after gradual change will not cause jump car, be finally reached the purpose for eliminating bumping at bridge-head.
Utility model content
The purpose of this utility model is to provide a kind of construction method of effective improvement transition segment structure, eliminates because jumping car The traffic safety hidden danger brought and the influence to structure.
The technical scheme that the utility model is used is:One kind improvement transition segment structure, the structure include abutment 1, Geotechnical grid 2, abutment connector 3, geotechnical grid connector 4, coupling bar 5;Several geotechniques are provided between abutment 1 and roadbed bottom surface Cell compartment 2;The end of geotechnical grid 2 is provided with geotechnical grid connector 4;Abutment connector 3 is fixed on the side of abutment 1;Geotechnological lattice Room connector 4 is articulated and connected with abutment connector 3 by coupling bar 5.
The cell compartment of geotechnical grid 2 is trapezoidal.
Each top-down spacing of geotechnical grid 2 gradually increases, and length is gradually shortened.
Geotechnical grid 2 can be replaced with GSZ.
Trapezoidal soft patch be using geotechnical grid back-up coat stereochemical structure and reinforcement mechanism, formed good integrity, just The larger flexible structural layer of degree, using modulus gradual change principle, while ground and roadbed two parts settlement factors are considered, in road and bridge mistake Cross section and trapezoidal stabilization zone be set, one section of flexible structural layer is fixed on abutment, and the other end be connected with roadbed, realization rigidity abutment with it is soft Property subgrade modulus smooth transition, eliminate excessive differential subsidence, form smoothly sedimentation changeover portion, reaching prevents that abutment from jumping The purpose of car.
Brief description of the drawings
Fig. 1 is the schematic diagram of the geotechnical grid structure between abutment and roadbed bottom surface.
Fig. 2 is the application drawing of this structure.
In figure:1st, abutment;2nd, geotechnical grid;3rd, abutment connector;4th, geotechnical grid connector;5 coupling bars;
Embodiment
As shown in Figure 1-2, a kind of improvement transition segment structure, by being set in abutment and roadbed binding site from upper Under the trapezoidal geotechnical grid or GSZ that gradually decrease, realize the rigid-flexibility transition of abutment and roadbed.
Geotechnical grid or GSZ near the roadbed bottom lay, top-down spacing gradually increases, length It is gradually shortened.
Geotechnical grid or GSZ are hinged with abutment by montage device, it is ensured that it keeps continuous with abutment.

Claims (4)

1. one kind improvement transition segment structure, it is characterised in that:The structure includes abutment (1), geotechnical grid (2), abutment and connected Connect device (3), geotechnical grid connector (4), coupling bar (5);Several geotechnical grids (2) are provided between abutment (1) and roadbed bottom surface; The end of geotechnical grid (2) is provided with geotechnical grid connector (4);Abutment connector (3) is fixed on the side of abutment (1);Geotechnique Cell compartment connector (4) is articulated and connected with abutment connector (3) by coupling bar (5).
2. a kind of improvement transition segment structure according to claim 1, it is characterised in that:The cell compartment of geotechnical grid (2) To be trapezoidal.
3. a kind of improvement transition segment structure according to claim 1, it is characterised in that:Each geotechnical grid (2) is certainly Spacing under above gradually increases, and length is gradually shortened.
4. a kind of improvement transition segment structure according to claim 1, it is characterised in that:Geotechnical grid (2) can be used GSZ is replaced.
CN201621429344.5U 2016-12-24 2016-12-24 One kind improvement transition segment structure Expired - Fee Related CN206328672U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621429344.5U CN206328672U (en) 2016-12-24 2016-12-24 One kind improvement transition segment structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621429344.5U CN206328672U (en) 2016-12-24 2016-12-24 One kind improvement transition segment structure

Publications (1)

Publication Number Publication Date
CN206328672U true CN206328672U (en) 2017-07-14

Family

ID=59291904

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621429344.5U Expired - Fee Related CN206328672U (en) 2016-12-24 2016-12-24 One kind improvement transition segment structure

Country Status (1)

Country Link
CN (1) CN206328672U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107059596A (en) * 2016-12-24 2017-08-18 中铁十八局集团有限公司 One kind improvement transition segment structure
CN108149665A (en) * 2017-11-28 2018-06-12 安徽徽风新型合成材料有限公司 A kind of splice type two-way steel-plastic geotechnical grid

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107059596A (en) * 2016-12-24 2017-08-18 中铁十八局集团有限公司 One kind improvement transition segment structure
CN108149665A (en) * 2017-11-28 2018-06-12 安徽徽风新型合成材料有限公司 A kind of splice type two-way steel-plastic geotechnical grid

Similar Documents

Publication Publication Date Title
CN204401444U (en) A kind of high embankment filled soil end of the bridge anti-settling structure
CN103952986B (en) A kind of off-load formula rigid culvert structure
CN204940030U (en) Reconstruction and extension project new-old concrete bond Pavement mosaic structure
CN206328672U (en) One kind improvement transition segment structure
CN106978777A (en) A kind of make-shift bridge device
CN104328730A (en) Construction method for transforming cement concrete pavement with embedded reinforced asphalt layer
CN110258226A (en) The intelligent TGXG captured for road reinforcement, pavement monitoring, traffic information
CN103046446A (en) Treatment structure at joint part of reconstruction and extension project of highway
CN103088833A (en) Assembly-type ecological net face geogrid pulling-opposite-type supporting structure
CN206385411U (en) It is a kind of to prevent the steep embankment ruggedized construction of height of differential settlement
CN103790151A (en) Soft soil roadbed drainage prepressing rear blocking structure and construction method
CN104631268A (en) Concrete road pavement structure
CN106192652A (en) A kind of high steep embankment ruggedized construction preventing differential settlement
CN207017093U (en) New-old concrete bond widens seam-line removal structure
CN107059596A (en) One kind improvement transition segment structure
CN102635104A (en) Wedge-shaped Geocell cement reinforced soil structure for road-bridge connection and construction method thereof
CN202610700U (en) Mounting structure of bridge abutment access board
CN205557205U (en) Low circuit switch area NOT AND switch area changeover portion structure of putting of moderate -low speed magnetic levitation
CN102677584B (en) Mounting structure of abutment butt strap
CN105908618B (en) A kind of mountable double-deck transition slab at bridge head structure and construction method
CN105178128B (en) Force intertransmission type interlocking block and preparation method thereof
CN203741814U (en) Blocking structure used after soft soil roadbed drainage prepressing
CN203866814U (en) Medium-compressibility soil foundation reinforcing structure for high speed railway
CN107269930B (en) Bellows substitutes the construction of sealing-tape machine concrete corridor in sandstone system
CN104264581B (en) Based on the bridge abutment structure and the construction method that eliminate abutment soil pressure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170714