CN106978777A - A kind of make-shift bridge device - Google Patents
A kind of make-shift bridge device Download PDFInfo
- Publication number
- CN106978777A CN106978777A CN201710364044.6A CN201710364044A CN106978777A CN 106978777 A CN106978777 A CN 106978777A CN 201710364044 A CN201710364044 A CN 201710364044A CN 106978777 A CN106978777 A CN 106978777A
- Authority
- CN
- China
- Prior art keywords
- bridge
- bailey
- bailey beam
- bridge pier
- make
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D15/00—Movable or portable bridges; Floating bridges
- E01D15/12—Portable or sectional bridges
- E01D15/133—Portable or sectional bridges built-up from readily separable standardised sections or elements, e.g. Bailey bridges
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D19/00—Structural or constructional details of bridges
- E01D19/005—Piers, trestles, bearings, expansion joints or parapets specially adapted for portable or sectional bridges
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D19/00—Structural or constructional details of bridges
- E01D19/12—Grating or flooring for bridges; Fastening railway sleepers or tracks to bridges
- E01D19/125—Grating or flooring for bridges
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Bridges Or Land Bridges (AREA)
Abstract
The invention discloses a kind of make-shift bridge device, Simple bridge for temporary erection, include the Bailey beam (8) across space under bridge of multiple vertical longitudinally spaced arrangements of runway, Bailey beam (8) lays the road surface distribution beam (9) of I-steel above, cast-in-place concrete floorings (11) on bamboo slab rubber (10), bamboo slab rubber (10) are laid in road surface distribution beam (9) and constitute road surface;The interior embedded U-shaped bolt (16) of concrete slab (11) is connected with Bailey beam (8);Each Bailey beam (8) two ends are provided with end bridge pier, and centre is provided with middle bridge pier, end bridge pier and middle bridge pier support Bailey beam (8).Whole track is arranged in above river course, and more traditional girder is reasonable to arrangement form along bridge, takes full advantage of space on river course, it is to avoid a large amount of expropriations of land, and effectively protection two sides are afforested.The quantity reduced in korneforos pile foundation of Yokogawa road arrangement, reduces difficulty of construction simultaneously, can effectively reduce current obstruction area simultaneously.
Description
Technical field
The present invention relates to mechanical structure and traffic engineering technical field, more particularly to a kind of make-shift bridge device.
Background technology
Make-shift bridge is the Simple bridge of temporary erection.The bridge constructed and set up for convenience, can for construction machinery
It is smoothly convenient current, major trunk roads driving is changed its course, it is necessary to relieve traffic congestion sometimes for heavy construction such as subway station etc. is built.Especially
It is in city may no sufficient space build interim sidewalk, dredge friendship using make-shift bridge structure is built on river course
Logical, general construction requirement is tight.Major urban arterial highway track is more, and vehicle flow is big.How to accomplish economy, safety and easy construction, be
One major issue of required consideration when designing make-shift bridge.
Traditional temporary construction steel suspension bridge is also wide with regard to 4~8m, does not use beams of concrete substantially come as make-shift bridge.In addition
Traditional steel suspension bridge is longitudinally arranged using Bailey beam, i.e., Bailey beam is identical with road arrangement direction.In Urban Metro Construction, especially
Subway station is built under major trunk roads, the wide left and right of the general 30m of engineering make-shift bridge is discongested.Urban Bridge volume of traffic is big, right simultaneously
Noise pollution requirement is strict, especially through school, hospital, resident living area.Traditional steel suspension bridge arrangement form, which is difficult to meet, to be wanted
Ask, influence the actual cross-section of river in river course, next to that noise is inevitable.According to permanent concrete bridge structure, it is invested
Cost is high, speed of application is slow, removal cost is higher.And can not possibly reuse.
Bailey beam combines frame structure by Bailey bracket and horizontal-associate frame by Bei Leixiao, and Bailey bracket and shellfish thunder pin are standards
Commodity fittings, can with it splice be assembled into many components, equipment.As shown in figure 1, being Bailey bracket structure, such as Fig. 2 and Fig. 3
For shellfish thunder latch structure.
Bailey bridge is also referred to as " assembly type steel bridge on highway ", and original name is " 321 " highway steel bridge.It is the combat readiness highway steel of China
Bridge.Bailey bridge is to be widely used in the world, a kind of the most popular bridge, and it has simple in construction, convenient transportation, sets up fast
Speed, the characteristics of decomposing easy.Large carrying capacity is provided simultaneously with, structural rigidity is strong, the advantages of fatigue life is long.It can be according to reality
The different across footpaths composition all kinds and the temporary bridge of various uses needed, meet an urgent need bridge and fixed bridge, weight few with component
Gently, the characteristics of cost is low.
The content of the invention
It is an object of the invention to provide a kind of make-shift bridge device, reasonable in design, easy construction, can effectively reduce construction throw
Enter, shorten the activity duration, and the interim construction suspension bridge in river course space can be made full use of.
The purpose of the present invention is achieved through the following technical solutions:
A kind of make-shift bridge device, for the Simple bridge of temporary erection, including multiple longitudinally spaced cloth of vertical runway
The Bailey beam 8 across space under bridge put, described Bailey beam 8 is laterally including multigroup sub- beam connected by shellfish thunder pin 17 mutually
Frame, every sub- roof beam structure is constituted by three Bailey brackets are arranged in parallel, is connected between three Bailey brackets by horizontal-associate frame 20;
Bailey beam 8 is laid lay bamboo slab rubber 10, bamboo slab rubber 10 in the road surface distribution beam 9 of I-steel, road surface distribution beam 9 above
Upper cast-in-place concrete floorings 11 constitute road surface;Embedded U-shaped bolt 16 is connected with Bailey beam 8 in concrete slab 11
Connect;
Each two ends of Bailey beam 8 are provided with end bridge pier, and centre is provided with middle bridge pier, and end bridge pier supports Bailey beam 8 with middle bridge pier.
The top mark height of described middle bridge pier is high higher than the top mark of end bridge pier, and the middle part of Bailey beam 8 of support is higher than two ends, the gradient
1%.
Described end bridge pier includes end bored concrete pile 1 and the Guan Liang 2 located at the end upper end of bored concrete pile 1, the support Bailey beam 8 of Guan Liang 2
End.
Described middle bridge pier includes middle bored concrete pile 3, casing 4, cover plate 5, ribbed stiffener 6 and shaped steel distribution beam 7;Casing 4 is placed in
The middle top of bored concrete pile 3, pours and welds shaped steel distribution beam 7 after middle bored concrete pile 3 on the top welded cover plate 5 of casing 4, cover plate 5, and set
Ribbed stiffener 6.
The road surface side of described suspension bridge device pontic sets anticollision barrier 12, and opposite side is mated formation pavement 15, pavement
15 inner sides set kerbstone 14, and outside sets people's row railing 13.
Described suspension bridge device end of the bridge gateway road surface one end provided with top cap 22, parados 23, ear wall 24 and attachment strap 25;
Top cap 22 is installed on above the bridge pier of end, and parados 23 is installed in top cap 22 with ear wall 24, and attachment strap 25 is located at ear wall 24
On, paving 26 of mating formation on attachment strap 25.
The described spacer of concrete slab 11 sets multiple transverse expansion joints, the two ends concrete slab at expansion joint
Set in 11 and strengthen channel-section steel 18 and U-shaped reinforcing bar 19;The U-shaped reinforcing bar 19 is welded with strengthening channel-section steel 18, is embedded in concrete bridge deck
In plate 11.Transverse expansion joint is set at spacing intervals
As seen from the above technical solution provided by the invention, a kind of make-shift bridge dress provided in an embodiment of the present invention
Put, reasonable in design, easy construction, can effectively reduce construction input, shorten the activity duration, and river course space can be made full use of
It is interim to build suspension bridge.Avoid a large amount of expropriations of land, and effectively protection two sides greening.
Brief description of the drawings
In order to illustrate the technical solution of the embodiments of the present invention more clearly, being used required in being described below to embodiment
Accompanying drawing be briefly described, it should be apparent that, drawings in the following description are only some embodiments of the present invention, for this
For the those of ordinary skill in field, on the premise of not paying creative work, other can also be obtained according to these accompanying drawings
Accompanying drawing.
Fig. 1 is Bailey bracket structural representation;
Fig. 2 is shellfish thunder latch structure schematic diagram;
Fig. 3 is the structural representation of section at the pontic of make-shift bridge device provided in an embodiment of the present invention;
Fig. 4 is the structural representation of section at the end of the bridge gateway of make-shift bridge device provided in an embodiment of the present invention;
Fig. 5 is the vertical structure schematic diagram of make-shift bridge device provided in an embodiment of the present invention.
Embodiment
With reference to the accompanying drawing in the embodiment of the present invention, the technical scheme in the embodiment of the present invention is carried out clear, complete
Ground is described, it is clear that described embodiment is only a part of embodiment of the invention, rather than whole embodiments.Based on this
The embodiment of invention, the every other implementation that those of ordinary skill in the art are obtained under the premise of creative work is not made
Example, belongs to protection scope of the present invention.
The embodiment of the present invention is described in further detail below in conjunction with accompanying drawing.
Embodiment one
As shown in Fig. 3, Fig. 4 and Fig. 5, a kind of make-shift bridge device for the Simple bridge of temporary erection, including multiple hangs down
The Bailey beam 8 across space under bridge of the longitudinally spaced arrangement of Through Lane, space under bridge is probably road or river, described shellfish
Thunder beam 8 is laterally including multigroup sub- roof beam structure connected by shellfish thunder pin 17 mutually, as shown in figure 5, every sub- roof beam structure is by three shellfish thunders
Frame is arranged in parallel to be constituted, and is connected between three Bailey brackets by horizontal-associate frame 20;Upper and lower chord member is connected by shellfish thunder pin 17 between Bailey beam 8
Connect, specifically using Bailey bracket, three one group, spacing 2X45cm, arrangement spacing is 90cm between longitudinal each group.Bailey beam vertical row
Track arranges that runway is arranged along river course.Bailey beam top laying I-steel distribution beam, floorings are cast-in-place concrete floorings.
Bamboo slab rubber is arranged between floorings and distribution beam, the template of casting concrete is used as.Embedded U-shaped bolt and shellfish in cast-in-place floorings
Thunder beam top boom is connected.
Bailey beam 8 is laid lay bamboo slab rubber 10, bamboo slab rubber 10 in the road surface distribution beam 9 of I-steel, road surface distribution beam 9 above
As the template of casting concrete, cast-in-place concrete floorings 11 constitute road surface on bamboo slab rubber 10;Concrete slab 11
Interior embedded U-shaped bolt 16 is connected with Bailey beam 8;U-bolt is specifically connected with Bailey beam top boom, i.e. top boom shellfish thunder
Rod member below rod member above beam, i.e. corresponding lower boom Bailey beam;The described spacer of concrete slab 11 is set
Multiple transverse expansion joints are put, specifically sets in transverse expansion joint, the two ends floorings 11 at expansion joint and sets at spacing intervals
Strengthen channel-section steel 18 and U-shaped reinforcing bar 19.The U-shaped reinforcing bar 19 is welded with strengthening channel-section steel 18, is embedded in floorings 11.
The two ends of Bailey beam 8 are provided with end bridge pier, and centre is provided with middle bridge pier, and end bridge pier supports Bailey beam 8, and end bridge with middle bridge pier
Stake supports Bailey beam 8 with setting laminated rubber bearing 21 on middle bridge pier.Top of the top mark height higher than end bridge pier of described middle bridge pier
Absolute altitude, the middle part of Bailey beam 8 of support is higher than two ends, the gradient 1% or so.Specific method is the corresponding Bailey beam of bridge pier in releasing
The shellfish thunder pin 17 of 8 top boom junction.By raising jackshaft stake top absolute altitude, while the lower edge of jackshaft pile top position Bailey beam 8
Bar junction is connected with shellfish thunder pin 17, and top boom junction does not install shellfish thunder pin 17, is being raised jackshaft stake top absolute altitude, is being made both sides shellfish
Thunder beam 8 can freely be rotated around korneforos bridge pier top, form the 1% transverse drainage gradient.
Described end bridge pier includes end bored concrete pile 1 and the Guan Liang 2 located at the end upper end of bored concrete pile 1, the support Bailey beam 8 of Guan Liang 2
End.Described middle bridge pier includes middle bored concrete pile 3, casing 4, cover plate 5, ribbed stiffener 6 and shaped steel distribution beam 7;Casing 4 is placed in middle filling
The top of stake 3 is noted, pours and welds shaped steel distribution beam 7 after middle bored concrete pile 3 on the top welded cover plate 5 of casing 4, cover plate 5, and setting is put more energy into
Rib 6.
As shown in figure 1, the road surface side of described suspension bridge device pontic sets anticollision barrier 12, opposite side is mated formation pavement
15, the inner side of pavement 15 sets kerbstone 14, and outside sets people's row railing 13.
As shown in Fig. 2 described suspension bridge device end of the bridge gateway road surface one end be provided with top cap 22, parados 23, ear wall 24
With attachment strap 25;Top cap 22 is installed on above the bridge pier of end, and parados 23 is installed in top cap 22 with ear wall 24, and attachment strap 25 is located at ear wall 24
On, paving 26 of mating formation on attachment strap 25.
The present invention is due to using the lateral arrangement of Bailey beam 8, and horizontal span can reach 15m or more large span.27m's
Make-shift bridge is built along river course on river, three campsheds need to be only set, wherein korneforos sets a campshed base, and two sides respectively set a row in addition
Stake.Korneforos pier arrangement of pile foundation quantity is substantially reduced, current obstruction area is effectively reduced.Traditional Bailey beam indulges bridge to arrangement,
During bridge floor wider (reaching 30m), direction across bridge pile foundation is arranged by 5m spacing, stake diameter 1m, at least 7 campsheds, and 5 rank in korneforos, block water
Area is 5 times of Bailey beam lateral arrangement.
Cross fall is set using korneforos pier top absolute altitude mode is raised to arrangement using Bailey beam horizontal stroke 8 in addition, it is to avoid use
Traditional increase in-situ layer thickness sets cross fall, can effectively reduce in-situ layer concrete works amount, so as to reduce
Dead load.
Simultaneously using the Bailey beam bridge lateral arrangement, vehicle discrepancy bridge section abutment connection and reasonable arrangement, to the stress of Bailey beam 8 more
To be favourable.
The foregoing is only a preferred embodiment of the present invention, but protection scope of the present invention be not limited thereto,
Any one skilled in the art is in the technical scope of present disclosure, the change or replacement that can be readily occurred in,
It should all be included within the scope of the present invention.Therefore, protection scope of the present invention should be with the protection model of claims
Enclose and be defined.
Claims (7)
1. a kind of make-shift bridge device, the Simple bridge for temporary erection, it is characterised in that vertical including multiple vertical runways
To the spaced apart Bailey beam (8) across space under bridge, described Bailey beam (8) laterally passes through Bei Leixiao mutually including multigroup
(17) the sub- roof beam structure of connection, every sub- roof beam structure is constituted by three Bailey brackets are arranged in parallel, and horizontal-associate frame is passed through between three Bailey brackets
(20) connect;
Bailey beam (8) is laid above lays bamboo slab rubber (10), bamboo glue in the road surface distribution beam (9) of I-steel, road surface distribution beam (9)
Cast-in-place concrete floorings (11) constitute road surface on plate (10);The interior embedded U-shaped bolt (16) of concrete slab (11) with
Bailey beam (8) is connected;
Each Bailey beam (8) two ends are provided with end bridge pier, and centre is provided with middle bridge pier, end bridge pier and middle bridge pier support Bailey beam (8).
2. make-shift bridge device according to claim 1, it is characterised in that the top mark height of described middle bridge pier is higher than end bridge
The top mark of stake is high, and two ends, the gradient 1% are higher than in the middle part of the Bailey beam (8) of support.
3. make-shift bridge device according to claim 1 or 2, it is characterised in that described end bridge pier includes end bored concrete pile
(1) with the Guan Liang (2) located at end bored concrete pile (1) upper end, Guan Liang (2) support Bailey beam (8) end.
4. make-shift bridge device according to claim 1 or 2, it is characterised in that described middle bridge pier includes middle bored concrete pile
(3), casing (4), cover plate (5), ribbed stiffener (6) and shaped steel distribution beam (7);Casing (4) is placed at the top of middle bored concrete pile (3), is poured
Shaped steel distribution beam (7) is welded on middle bored concrete pile (3), rear casing (4) top welded cover plate (5), cover plate (5), and ribbed stiffener is set
(6)。
5. make-shift bridge device according to claim 1 or 2, it is characterised in that the road surface of described suspension bridge device pontic
Side sets anticollision barrier (12), and opposite side is mated formation pavement (15), and kerbstone (14) is set on the inside of pavement (15), and outside is set
People's row railing (13).
6. make-shift bridge device according to claim 1 or 2, it is characterised in that described suspension bridge device end of the bridge gateway
Road surface one end provided with top cap (22), parados (23), ear wall (24) and attachment strap (25);
Top cap (22) is installed on above the bridge pier of end, and parados (23) is installed in top cap (22) with ear wall (24), and attachment strap (25) is located at
On ear wall (24), paving (26) of mating formation on attachment strap (25).
7. make-shift bridge device according to claim 1 or 2, it is characterised in that between described concrete slab (11)
Strengthen channel-section steel (18) and U-shaped reinforcing bar every setting to set in many outer transverse expansion joints, the concrete slab (11) at expansion joint two ends
(19);The U-shaped reinforcing bar (19) is welded with strengthening channel-section steel (18), is embedded in concrete slab (11).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710364044.6A CN106978777B (en) | 2017-05-22 | 2017-05-22 | A kind of make-shift bridge device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710364044.6A CN106978777B (en) | 2017-05-22 | 2017-05-22 | A kind of make-shift bridge device |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106978777A true CN106978777A (en) | 2017-07-25 |
CN106978777B CN106978777B (en) | 2018-09-14 |
Family
ID=59342597
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710364044.6A Active CN106978777B (en) | 2017-05-22 | 2017-05-22 | A kind of make-shift bridge device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106978777B (en) |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107700337A (en) * | 2017-11-28 | 2018-02-16 | 北京中铁隧建筑有限公司 | It is a kind of quickly to pacify the light section suspension bridge torn open |
CN109555004A (en) * | 2018-11-08 | 2019-04-02 | 广东省第建筑工程有限公司 | A kind of method of construction of temporary traffic suspension bridge |
CN110872807A (en) * | 2018-09-04 | 2020-03-10 | 宏润建设集团股份有限公司 | A kind of construction method of steel stool bridge and steel stool bridge |
CN111305038A (en) * | 2020-04-09 | 2020-06-19 | 江苏鹏创电力设计有限公司 | A river crossing device for rapid disassembly and assembly of high-voltage transmission line engineering |
CN113737631A (en) * | 2021-09-23 | 2021-12-03 | 中交二公局第三工程有限公司 | Transverse turning connection structure of Bailey steel trestle |
CN114525726A (en) * | 2022-03-21 | 2022-05-24 | 中铁大桥局第七工程有限公司 | Bailey beam construction trestle expansion joint system and construction method |
CN115652772A (en) * | 2022-12-28 | 2023-01-31 | 中冶建筑研究总院有限公司 | Quick connecting system and method for bridge deck of steel temporary bridge |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100936824B1 (en) * | 2007-06-07 | 2010-01-14 | 서옥석 | Truss structure of a hypothetical bridge |
KR101126083B1 (en) * | 2011-10-10 | 2012-03-29 | 주식회사 케이에스씨건설 | A lining board support structure of truss temporary bridge |
CN202530367U (en) * | 2012-03-14 | 2012-11-14 | 中铁二十二局集团第一工程有限公司 | Deepwater complex geology foundation construction system |
CN103410084A (en) * | 2013-08-15 | 2013-11-27 | 中交二航局第三工程有限公司 | Assembly-type steel trestle |
CN203684059U (en) * | 2013-09-29 | 2014-07-02 | 中铁四局集团第四工程有限公司 | Large-span deck Bailey beam steel trestle structure |
CN204039922U (en) * | 2014-07-10 | 2014-12-24 | 中交二航局第四工程有限公司 | A kind of temporary steel trestle |
CN204151662U (en) * | 2014-09-26 | 2015-02-11 | 中建交通建设集团有限公司 | A kind of one across the temporary trestle bridge crossing over river valley |
CN204753354U (en) * | 2015-06-11 | 2015-11-11 | 辽宁紫竹桩基础工程股份有限公司 | Cover worker's board landing stage |
-
2017
- 2017-05-22 CN CN201710364044.6A patent/CN106978777B/en active Active
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100936824B1 (en) * | 2007-06-07 | 2010-01-14 | 서옥석 | Truss structure of a hypothetical bridge |
KR101126083B1 (en) * | 2011-10-10 | 2012-03-29 | 주식회사 케이에스씨건설 | A lining board support structure of truss temporary bridge |
CN202530367U (en) * | 2012-03-14 | 2012-11-14 | 中铁二十二局集团第一工程有限公司 | Deepwater complex geology foundation construction system |
CN103410084A (en) * | 2013-08-15 | 2013-11-27 | 中交二航局第三工程有限公司 | Assembly-type steel trestle |
CN203684059U (en) * | 2013-09-29 | 2014-07-02 | 中铁四局集团第四工程有限公司 | Large-span deck Bailey beam steel trestle structure |
CN204039922U (en) * | 2014-07-10 | 2014-12-24 | 中交二航局第四工程有限公司 | A kind of temporary steel trestle |
CN204151662U (en) * | 2014-09-26 | 2015-02-11 | 中建交通建设集团有限公司 | A kind of one across the temporary trestle bridge crossing over river valley |
CN204753354U (en) * | 2015-06-11 | 2015-11-11 | 辽宁紫竹桩基础工程股份有限公司 | Cover worker's board landing stage |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107700337A (en) * | 2017-11-28 | 2018-02-16 | 北京中铁隧建筑有限公司 | It is a kind of quickly to pacify the light section suspension bridge torn open |
CN110872807A (en) * | 2018-09-04 | 2020-03-10 | 宏润建设集团股份有限公司 | A kind of construction method of steel stool bridge and steel stool bridge |
CN109555004A (en) * | 2018-11-08 | 2019-04-02 | 广东省第建筑工程有限公司 | A kind of method of construction of temporary traffic suspension bridge |
CN111305038A (en) * | 2020-04-09 | 2020-06-19 | 江苏鹏创电力设计有限公司 | A river crossing device for rapid disassembly and assembly of high-voltage transmission line engineering |
CN113737631A (en) * | 2021-09-23 | 2021-12-03 | 中交二公局第三工程有限公司 | Transverse turning connection structure of Bailey steel trestle |
CN114525726A (en) * | 2022-03-21 | 2022-05-24 | 中铁大桥局第七工程有限公司 | Bailey beam construction trestle expansion joint system and construction method |
CN114525726B (en) * | 2022-03-21 | 2024-01-30 | 中铁大桥局第七工程有限公司 | Beehive beam construction trestle bridge expansion joint system and construction method |
CN115652772A (en) * | 2022-12-28 | 2023-01-31 | 中冶建筑研究总院有限公司 | Quick connecting system and method for bridge deck of steel temporary bridge |
Also Published As
Publication number | Publication date |
---|---|
CN106978777B (en) | 2018-09-14 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106978777B (en) | A kind of make-shift bridge device | |
CN205205635U (en) | Stride footpath bailey frame steel suspension bridge structure greatly | |
CN110184950B (en) | Construction method for rebuilding and expanding new bridge at original site of bridge under condition of ensuring communication | |
CN202899015U (en) | Modular highway steel truss bridge | |
CN108374319A (en) | A kind of through tied arch bridge structural unit and arch bridge structure and its construction method | |
CN106480818B (en) | Composite connecting plate structure of simply supported girder bridge and its construction method | |
CN108505405A (en) | A kind of suspension type monorail and highway bridge build structure jointly | |
CN106049289A (en) | Construction method for transforming Bailey beam temporary bridge into reinforced concrete combined permanent bridge | |
CN206538672U (en) | Novel fabricated truss steel trestle | |
CN104775368B (en) | Prefabricated jacking box culvert provided with steel blade corners | |
CN208136705U (en) | A kind of make-shift bridge device | |
CN107905084B (en) | RPC steel truss combined bridge deck and continuous beam bridge | |
CN202081383U (en) | Temporary support used in construction striding over existing line bridge | |
CN108708290A (en) | The case crane span structure hollow structure and cast-in-situ construction method of minor radius railway curve unit | |
CN110184903B (en) | A truss-type prefabricated pipe column assembled bridge pier | |
CN208472473U (en) | A kind of suspension type monorail and highway bridge build structure jointly | |
CN207110599U (en) | A kind of under(-)chassis of up-down cross sliding type multi-storied garage | |
CN215857324U (en) | A road culvert reinforcement system | |
CN102677563A (en) | Modularized direct-moving fast channel system for crossroads of urban main road and construction method | |
CN204370284U (en) | A kind of automobile and light rail are with the intermediate deck arch bridge of layer | |
CN210737255U (en) | Box frame and reinforced concrete box frame road bed for road bed | |
CN214005282U (en) | A waterproof and anti-settling highway subgrade structure | |
CN110184929B (en) | Comprehensive construction method for main and auxiliary lines of public rail co-constructed bridge | |
CN208072458U (en) | A kind of pier sheet-pile engaging portion structure | |
CN206667292U (en) | It is a kind of to justify pile foundation counterfort wall station road structure close to bridge pier |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |