CN206301028U - A kind of automatic checkout system of intelligent switch - Google Patents

A kind of automatic checkout system of intelligent switch Download PDF

Info

Publication number
CN206301028U
CN206301028U CN201620989804.3U CN201620989804U CN206301028U CN 206301028 U CN206301028 U CN 206301028U CN 201620989804 U CN201620989804 U CN 201620989804U CN 206301028 U CN206301028 U CN 206301028U
Authority
CN
China
Prior art keywords
test
intelligent switch
tested
automatic
instruction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201620989804.3U
Other languages
Chinese (zh)
Inventor
马绪宗
吴剑
叶益舟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hangzhou Hongyan Intelligent Technology Co Ltd
Original Assignee
Hangzhou Hongyan Intelligent Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hangzhou Hongyan Intelligent Technology Co Ltd filed Critical Hangzhou Hongyan Intelligent Technology Co Ltd
Priority to CN201620989804.3U priority Critical patent/CN206301028U/en
Application granted granted Critical
Publication of CN206301028U publication Critical patent/CN206301028U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Data Exchanges In Wide-Area Networks (AREA)

Abstract

The utility model provide firstly a kind of automatic checkout system of intelligent switch, and it includes test system terminal, tests gateway and test fixture automatically.The utility model additionally provides the detection method that a kind of automatic checkout system based on the intelligent switch is realized, it comprises the following steps:S1 installs tested intelligent switch on the station of test fixture, and test fixture powers to the station for installing tested intelligent switch;The test parameter that S2 test systems terminal receives setting is configured and test event configuration, and follows test command to be sent to automatic test gateway related parameter and execution order;S3 tests gateway and sends the facility information that broadcasting command reads tested intelligent switch automatically;Test fixture detects the execution state of tested intelligent switch all the time in S4 test process.The utility model realizes the system to intelligent switch detection of full automatic, more efficientization, more summary, cost degradation.It is detection method improve production efficiency, easy to use, flexible, with great market application value and promotional value.

Description

A kind of automatic checkout system of intelligent switch
Technical field
The utility model is related to field of electrical control, the automatic checkout system of more particularly to a kind of intelligent switch and based on this The intelligent switch detection method of system.
Background technology
In field of intelligent control, there are many intelligent switch using wireless communication mode.Intelligent switch is intelligent now Important component in household, compared to traditional switching function increase, using safer and attractive in fashion.
Meanwhile, Based Intelligent Control proposes requirement higher for the safe handling of product and product quality, before dispatching from the factory for The inspection of intelligent switch is particularly important, is to ensure enterprise's public image, the basis of quality impression.
But, intelligent switch can only use manual type in exfactory inspection due to the variation of product function and index, And be one-to-one to test one by one, it is clear that this kind of method inefficiency, time cost and human cost are high.
Meanwhile, artificial bust rate is higher, usually can cause part bad products or not due to artificial carelessness The product with debugging comes into the market after testing, easily causes the public to have a negative impact the product quality of enterprise, and then reduces Enterprise product competitiveness commercially, or even influence the reputation of enterprise.
Utility model content
Problem in view of the above, the utility model technical problem to be solved first is to provide a kind of intelligent switch Automatic checkout system, the system realizes full automatic detection, and more rapidly, efficient test atmosphere and accurate result, therefore, The technical solution adopted in the utility model is as follows:
In one embodiment, the automatic checkout system of the intelligent switch includes:
Control unit, is disposed of and is tested automatically for sending instruction;And
Test cell, is disposed of reception control unit and sends instruction and tested by instruction, and test result is returned It is fed to control unit;And
Test fixture, is disposed of the installation position and supply power supply for providing intelligent switch.
Further, in another embodiment, the automatic checkout system of the intelligent switch is specifically included:
Described control unit is test system terminal, is disposed of the intelligent terminal and quilt of built-in testing control program Carry out the parameter testing instruction of real-time setting or tested by default default parameters to instruct for sending control test cell, it is described Instruction is including but not limited to the parameter and test event being applied in test process.
The test cell is automatic test gateway, is connected with described control unit and tested intelligent switch, and receive Instruction that control unit sends simultaneously is tested by instruction, and the automatic test gateway is sentenced after test result feedback information is received The working condition of disconnected tested intelligent switch.
The another embodiment of the test cell, it is to test gateway automatically, and the test system terminal and is received The intelligent switch of survey is connected, and the real-time parameter testing for setting of carrying out that acceptance test system terminal sends is instructed or by default Default parameters test instruction is simultaneously tested by instruction, and the automatic test gateway judges after acceptance test result feedback information The working condition of tested intelligent switch.
The test fixture includes one or more test stations, and the detecting system can as needed carry out one or one The automatic test of the intelligent switch of group.
Further, the test station is provided with the terminal of electrical connection, and the terminal includes:
Power supply terminal, the test station is powered after tested intelligent switch is connected with power supply terminal;And
Load wiring terminal, for the tested intelligent switch being connected with the test station provides work after being loaded for connection Load.
Further, the automatic checkout system also includes:
Load unit, is configured as one or more individual loads units, one or more of individual loads units with Test station is electrically connected, for providing workload for tested intelligent switch.
Further, each individual loads unit of the load wiring terminal of the test station and the load unit Binding post is used and is joined directly together or switching matrix succession.
The automatic test gateway is provided with processor module, and the module is built the treatment journey of control intelligent switch action Sequence, the automatic test gateway can preferentially using the test parameter for the sending instruction of the test system terminal and/or test item Mesh instruction is tested, and test system terminal does not send test parameter instruction or test event instruction or only sends test instruction When, tested using test executive set in advance.
The processor module is additionally provided with and stores part, the test data for preserving each batch, and by the test System terminal controls to choose test data and return.
The test cell shows the result of each test, and is saved for reading inquiry at any time.
The automatic test gateway includes:
One communication interface of the connection test system terminal, the interface is disposed of wireless communication interface or cable modem Communication interface;
The communication interface of another connection automatic test gateway, the interface is disposed of wireless communication interface.
The beneficial effects of the utility model are:Realize full automatic, more efficientization, more summary, cost degradation to intelligence The system of the detection that can be switched, the system operatio is simple, simple and clear, designs ingenious.
Brief description of the drawings
Fig. 1 is system topology schematic diagram of the present utility model.
Fig. 2 be embodiment disclosed in the utility model automatic checkout system in the topological framework of automatic test gateway show It is intended to.
Fig. 3 be embodiment disclosed in the utility model automatic checkout system in test fixture topological framework illustrate Figure.
Fig. 4 is that test system terminal uses process in automatic checkout system according to embodiment disclosed in the utility model Flow chart.
Fig. 5 is that automatic test gateway uses process in automatic checkout system according to embodiment disclosed in the utility model Flow chart.
Fig. 6 is the stream that test fixture uses process in automatic checkout system according to embodiment disclosed in the utility model Cheng Tu.
In figure, 1- test system terminals, 2- tests gateway automatically, and 3- test fixtures, 4- load units, the tested intelligence of 5- is opened Close;201- tests the communication interface of gateway and tested intelligent switch automatically;202- tests gateway and test system terminal automatically Communication interface;203- tests the processing unit of gateway automatically;The controlled source of 301- test fixtures;The treatment of 302- test fixtures Unit;The power interface of 303- test fixtures and tested intelligent switch;The interface of 304- test fixtures and load unit;305- is surveyed The station indicator of trial work dress.
Specific embodiment
The utility model is further elaborated below in conjunction with accompanying drawing.The term or definition occurred in this specification are only places In description particular form feature or the purpose of embodiment, without being intended to limit its scope.
Fig. 1 gives the topological structure schematic diagram of detecting system described in the utility model.Fig. 2 gives the utility model A specific embodiment test automatically intra-gateway topology framework map.Fig. 3 gives a specific implementation of the present utility model Example test fixture inner topology framework map.Test system terminal, automatic test gateway and test work when Fig. 4, Fig. 5, Fig. 6, difference The course of work flow chart of dress.
System described in the utility model is specifically addressed with reference to Fig. 1, accompanying drawing 1 is illustrated for the topological structure of detecting system Figure.
Embodiment one:
Detecting system described in the utility model includes control unit, test cell, test fixture, used as topmost work( Energy part, control instruction to test cell is sent in control unit, and test cell carries out execution operation, the life after receiving instruction Order can include but is not limited to for the configuration-direct required for test, perform order, the configuration-direct be operator or its His operable object it is real-time to test cell setting or program setting the parameter command operated for intelligent switch and The parameter of test event, but, no matter whether the configuration-direct issues the order for being required for the execution of issue to be tested(Perform life Order), i.e., " start test " or " stopping test ".
In addition, also include stopping test, terminate, and other functional instructions.Specifically, functional instructions can be wrapped Include but be not limited to extract the computer-managed instructions such as test record, storage operation, deletion action, described control unit is by intelligence Equipment is operated for operator, and the smart machine carries display unit, and the display unit can in real time show all parameter settings, survey Examination items selection, result etc., therefore, detecting system realizes visualized operation, data visualization operation, digitization operation etc..
Wherein, test result is also fed back to control unit by test cell.
Wherein, test fixture provides installation position and the supply electricity of intelligent switch as the indispensable part of the present embodiment Source.After intelligent switch is arranged on test fixture, electrical connection is realized.
Embodiment two:
The detecting system includes test system terminal 1, automatic test gateway 2, test fixture 3, load unit 4 and receives Survey intelligent switch 5(The object intelligent switch of system testing).
Wherein, test system terminal 1 includes all-purpose computer or other universal intelligent equipment(Cell phone intelligent machine, palm electricity Brain, microcomputer, panel computer etc.)And a set of control program software of the operation in this equipment, the software is by equipment Interactive interface assigned for user provides test command and modification test parameter and modification test event function, while The communication interface and automatic test gateway 2 having by equipment carry out communication connection, and corresponding command parameter is issued and received Test result, can show user to consult by equipment interactive interface upon receipt of the test results.
Test system terminal is disposed of built-in testing control program(Software)Intelligent terminal and be used to send Control test cell carries out the parameter testing instruction of real-time setting or is tested by default default parameters to instruct, and the instruction is included But it is not limited to the parameter and test event being applied in test process.
Specifically, described control unit is test system terminal, the intelligent terminal of built-in testing control program is disposed of Equipment and being used for sends control test cell and carries out the parameter testing instruction of real-time setting or tested by default default parameters Instruction, the instruction is including but not limited to the parameter and test event being applied in test process.
Specifically, except the instruction of above-mentioned test command and test parameter and modification test event, the instruction (Order)Can also include but is not limited to for the configuration-direct required for test, perform order, the configuration-direct is operation Person or the parameter life operated for intelligent switch of the setting real-time to test cell of other operable objects or program setting Order and the parameter of test event, but, no matter whether the configuration-direct issues the order for being required for the execution of issue to be tested (Perform order), i.e., " start test " or " stopping test ".
In addition, also include stopping test, terminate, and other functional instructions.Specifically, functional instructions can be wrapped Include but be not limited to extract the computer-managed instructions such as test record, storage operation, deletion action, described control unit is by intelligence Equipment is operated for operator, and the smart machine carries display unit, and the display unit can in real time show all parameter settings, survey Examination items selection, result etc., therefore, detecting system realizes visualized operation, data visualization operation, digitization operation etc..
A kind of implementation method in the present embodiment, the test cell is automatic test gateway, with described control unit and Tested intelligent switch connection, and the instruction that sends of reception control unit and tested by instruction, the automatic test gateway The working condition of tested intelligent switch is judged after test result feedback information is received.
Also have another embodiment in the present embodiment, when control unit is test system terminal, automatic test gateway with The test system terminal and tested intelligent switch connection, and the real-time ginseng for setting of carrying out that acceptance test system terminal sends Number test instruction is tested instruction and is tested by instruction by default default parameters, and the automatic test gateway is receiving survey The working condition of tested intelligent switch is judged after test result feedback information.
Meanwhile, in above two implementation method, test system terminal 1 is built-in with database can be by per batch test record Preserve, so as to user recalled referring to, it is also possible to and QIS systems connection using factory testing data as product full life Cycle basis data are uploaded;
Wherein, automatic test gateway 2 mainly includes that tested intelligent switch communication interface 201, test system terminal called connect Mouth 202 and processor module 203, processor module 203 are built-in with the processing routine for meeting intelligent switching control mode.
When configuration parameter or test event that the communication interface 202 of test system terminal 1 has transmission are instructed, by newest Parameter configuration and test event are tested;When test system terminal communications interface 202 only have sent test command just by acquiescence Configuration parameter and project tested.The configuration parameter and test event of the acquiescence are also default default setting.
Test data and test result between processor module 203 and tested intelligent switch all pass through tested intelligent switch Communication interface 201 is transmitted.Processor module 203 also has storage part, per batch test result by test system end End communication interface 202 is also stored in and is locally stored in part outside uploading;
Wherein, load unit 4 includes that the load of multigroup independent different capacity specification is constituted.Every group of load has individually The load wiring terminal of wiring and the station of test fixture 3 is attached by direct or rectangular cross mode.
Specifically, the main test process of the utility model is as follows:Wherein test fixture 3 mainly includes controlled source 301st, tested intelligent switch power source interface 303, tested intelligent switch loading interfaces 304 and indicator 305 are constituted, by processor Module 203 is controlled.The built-in method of processor module 302 processes logic, according to the intelligent switch presence of each station of test fixture 3 Whether information come determine control controlled source 301 whether the station is powered, when there is intelligent switch, station is supplied Electricity, when no intelligent switch, station closes power supply.Processor module 302 is also by detecting tested intelligent switch loading interfaces 304, determine whether intelligent switch completes the load break-make of a cycle, so as to judge whether intelligent switch completes test, referring to Show the relevant position display station detection case of device 305, be divided into completion test is indicated, unfinished test is indicated etc..
The utility model additionally provides a kind of method of the automatic detection of intelligent switch, and the method presses default detection project Or carried out according to the test event of interim setting.
In one embodiment on the method, the method is carried out by following steps:
S1, tested intelligent switch is installed on the station of test fixture, test fixture is opened to connecting and install tested intelligence The station of pass is powered;
S2, test parameter and/or test event are not set in test system terminal profile or, test system terminal is by correlation Parameter and the instruction of/test event follow execution order to be sent to automatic test gateway;
S3, automatic test gateway send the facility information that broadcasting command reads tested intelligent switch, and according to test system Terminal sends command-execution operation, and the operation is included but is not limited to open, closes intelligent switch;
Test fixture detects the execution state of tested intelligent switch all the time in S4, test process, and lights completion indicator lamp Or malfunction indicator lamp.
Further, in the step S2, if not tested in test system terminal configuration testing parameter and test event System terminal sends and performs order to automatic test gateway according to the default configuration being preset in automatic test gateway processing routine Perform test action.
Further, in the step S3, the test operation of the execution is specifically including but not limited to:
Automatic test gateway sends to tested intelligent switch one by one opens order;And
Automatic test gateway sends shutdown command to tested intelligent switch one by one;And
Automatic test gateway sends special test event order to tested intelligent switch;
Automatic test gateway record dependence test information and result after the completion of test, and test system terminal is fed back to, survey Test system terminal preserves the feedback information to database and shows this test information.
Further, in step s3, after broadcasting command sends or after independent execution order transmission, do not fed back Controlled intelligent switch can all be recorded malfunction in this test record, and by every group of survey after the completion of last test Trial record is preserved in the automatic test gateway, and is sent to test system terminal.
Further, in step S4, after tested intelligent switch completes the switch motion that 1 circulates, corresponding station is surveyed Examination completes indicator lamp and lights;If until the tested intelligent switch for removing this station does not all complete 1 switch motion of circulation, Then the test failure indicator lamp of corresponding station is lighted, and simultaneously closes off the power supply output of corresponding station.
In second embodiment on the method, the method is mainly carried out by following steps:
A)Tested intelligent switch is installed on test fixture, and determines to connect loading condition;After confirming load connection, test Frock is powered for intelligent switch, and is entered cycle detection test and adjusted station instruction situation according to detection case;
B)Tester test system end carry out test process parameter and test event with postponing, test system Terminal sends test command or directly transmits test command, and return data is gone forward side by side after then waiting automatic test gateway to complete test Row is preserved and shown;
C)Test parameter of the automatic test gateway according to test system terminal transmission or the parameter using acquiescence are tested, And the abnormal conditions that will occur in test process and equipment are recorded.A test record is counted into after the completion of last test to protect In the presence of local and return to test system terminal;
D)Test completes each several part and terminates flow operations recovery default conditions.
In another embodiment on the method, the method is mainly carried out by following steps:
S1, tested intelligent switch is installed on the station of test fixture, test fixture is to being installed tested intelligent switch Station is powered;
S2, test system terminal receive the test parameter configuration and test event configuration of setting, and by related parameter and Performing order follows test command to be sent to automatic test gateway;If the non-configuration testing parameter of test system terminal and test item Mesh, then its transmission performs order to automatic test gateway execution test action;
S3, automatic test gateway send the facility information that broadcasting command reads tested intelligent switch, and according to test system Station command performs following test operation:
Automatic test gateway sends to tested intelligent switch one by one opens order;
Automatic test gateway sends shutdown command to tested intelligent switch one by one;
Automatic test gateway sends special test event order to tested intelligent switch;
Dependence test information and result are recorded after the completion of test, test system terminal is fed back to, test system terminal is preserved The feedback information shows this test information to database and in display unit;
Test fixture detects the execution state of tested intelligent switch all the time in S4, test process, when tested intelligent switch is complete Into after 1 switch motion of circulation, corresponding station test completes indicator lamp and lights;If the tested intelligence until removing this station The switch motion for all not completing 1 circulation can be switched, then the test failure indicator lamp of corresponding station is lighted, simultaneously closed off corresponding The power supply output of station.
In this embodiment, after the broadcasting command described in step S3 sends or after independent order transmission, do not obtain anti- The controlled intelligent switch of feedback can all be recorded malfunction in this test record, and by every group after the completion of last test Test record is preserved in the automatic test gateway, and is sent to test system terminal.
In addition, the step S1 and step S4 is an overall process, tested intelligence is detected in test fixture After switch is mounted well, detecting system just constantly detects the situation of the intelligent switch being mounted, and is just lighted after detection is completed Indicator lamp is completed until tested intelligent switch is removed or breaks down and malfunction indicator lamp is lighted.
Below in conjunction with the accompanying drawings 4, the execution flow chart in Fig. 5, Fig. 6, provides a kind of specific embodiment of the above method, with The method is further described.
The implementation method includes the execution step of following each several part:
As shown in figure 4, test system terminal part job step:
Step S110, test system terminal 1 receives test parameter and the test event that user configures by interactive interface, It is transferred to S120 steps;
The parameter of configuration is handed down to automatic test gateway 2 by step S120, test system terminal 1, is transferred to S130 steps;
Step S130, test system terminal 1 waits the test result of automatic test gateway 2, and S140 is transferred to after obtaining data Step;If not then continue to wait test result in S130 steps;
Simultaneously be saved in test result in database by step S130, the display test result of test system terminal 1;And wait makes User triggers into S110 steps next time;
As shown in figure 5, testing gateway portion job step automatically:
Step S210, after automatic test gateway 2 receives the test command of the transmission of test system terminal 1, starts transmitting wide The inner parameter that tested intelligent switch is read in instruction is broadcast, S220 steps are transferred to;
Step S220, the intelligent switch parameter that automatic test gateway 2 record is received, and the intelligent switch transmission to not feeding back Individually read instruction to be read out, be transferred to S230 steps;
Step S230, the intelligent switch recording exceptional information that automatic test gateway 2 pairs does not feed back, is transferred to S240 steps;
Step S240, the normal feedback intelligent switch of automatic test gateway 2 pairs sends all kinds of opening test commands, and receives anti- Feedback, is transferred to S250 steps;
Step S250, the intelligent switch of automatic test 2 pairs of non-feedback informations of gateway or the intelligent switch for returning operation failure Recording exceptional information, is transferred to S260 steps;
Step S260, the normal feedback intelligent switch of automatic test gateway 2 pairs sends all kinds of closing test commands, and receives anti- Feedback, is transferred to S270 steps;
Step S270, the intelligent switch of automatic test 2 pairs of non-feedback informations of gateway or the intelligent switch for returning operation failure Recording exceptional information, is transferred to S280 steps;
Step S280, automatic test gateway 2 sends combine scenes control or the Special controlling order of other provisional configurations simultaneously Verification intelligent switch feedack, is transferred to S290 steps;
Step S290, automatic test gateway 2 judges the whether normal of intelligent switch, improves and preserves test record, then Test record is fed back into test system terminal 1, S210 steps are transferred to, wait is transferred to and is tested next time;
As shown in fig. 6, test fixture part job step:
Step S310, test fixture 3 detects the connection of the intelligent switch of each station after being initialized, be transferred to S320 Step;
Step S320, the control controlled source unit of test fixture 3 is powered to being mounted with the station of intelligent switch, It is transferred to S330 steps;
Step S330, test fixture 3 determines whether that test station has removed intelligent switch, if being transferred to S360 steps Suddenly, if not being transferred to S340 steps;
Step S340, test fixture 3 detects the load energization situation of each intelligent switch, if completing 1 complete cycle Make and break process, S350 steps are transferred to, if not being transferred to S310 steps;
Step S350, the station of test fixture 3 pairs of completions, 1 make and break process in cycle lights completion indicator lamp, is transferred to S310 steps;
Step S360, the detection station that test fixture 3 removes intelligent switch closes power supply output, is transferred to S370 steps;
Step S370, test fixture 3 judges whether that the intelligent switch of all test stations has all been removed, if complete remove , test fixture 3 complete work, exit wait trigger work next time;If without whole dismountings, being transferred to S310 steps.
The explanation of above example is only intended to help and understands method of the present utility model and its core concept.Should refer to Go out, for those skilled in the art, on the premise of the utility model principle is not departed from, can also be to this Utility model carries out some improvement and modification, and these are improved and modification also falls into the utility model scope of the claims It is interior.

Claims (8)

1. a kind of automatic checkout system of intelligent switch, it is characterised in that it includes:
Control unit, is disposed of and is tested automatically for sending instruction;And
Test cell, is disposed of reception control unit and sends instruction and tested by instruction, and test result is fed back to Control unit;And
Test fixture, is disposed of the installation position and supply power supply for providing intelligent switch;
The test fixture includes one or more test stations, and the detecting system can as needed carry out one or one group The automatic test of intelligent switch;
The test station is provided with the terminal of electrical connection, and the terminal includes:
Power supply terminal, the test station is powered after tested intelligent switch is connected with power supply terminal;And
Load wiring terminal, for being born for the tested intelligent switch being connected with the test station provides work after connection load Carry;
The automatic checkout system also includes:
Load unit, is configured as one or more individual loads units, one or more of individual loads units and test Station is electrically connected, for providing workload for tested intelligent switch;
The binding post of the load wiring terminal of the test station and each individual loads unit of the load unit is used It is joined directly together or switching matrix succession.
2. the automatic checkout system of a kind of intelligent switch according to claim 1, it is characterised in that described control unit is Test system terminal, is disposed of the intelligent terminal of built-in testing control program and being used for and sends control test cell and The parameter testing instruction of row setting in real time or tested by default default parameters is instructed, and the instruction was including but not limited to testing The parameter and test event being applied in journey.
3. the automatic checkout system of a kind of intelligent switch according to claim 1, it is characterised in that the test cell is Automatic test gateway, is connected with described control unit and tested intelligent switch, and the instruction that sends of reception control unit and by Instruction is tested, and the automatic test gateway judges the work of tested intelligent switch after test result feedback information is received State.
4. the automatic checkout system of a kind of intelligent switch according to claim 2, it is characterised in that the test cell is Automatic test gateway, be connected with the test system terminal and tested intelligent switch, and acceptance test system terminal sends Carry out the parameter testing instruction of real-time setting or test instruction by default default parameters and tested by instruction, it is described automatic Test gateway judges the working condition of tested intelligent switch after acceptance test result feedback information.
5. a kind of automatic checkout system of intelligent switch according to claim 3, it is characterised in that the automatic Test Network Pass is provided with processor module, and the module is built the processing routine of control intelligent switch action, the automatic test gateway meeting Preferentially tested using the test parameter for the sending instruction and/or test event instruction of the test system terminal, test system When system terminal does not send test parameter instruction or test event instruction or only sends test instruction, held using test set in advance Line program is tested.
6. a kind of automatic checkout system of intelligent switch according to claim 5, it is characterised in that the processor module Storage part, the test data for preserving each batch are additionally provided with, and are chosen test by the test system terminal control Data are simultaneously returned.
7. the automatic checkout system of a kind of intelligent switch according to claim 1, it is characterised in that the test cell shows Show the result of each test, and be saved for reading inquiry at any time.
8. a kind of automatic checkout system of intelligent switch according to claim 4, it is characterised in that the automatic Test Network Pass includes:
One communication interface of the connection test system terminal, the interface is disposed of wireless communication interface or wire communication connects Mouthful;
The communication interface of another connection automatic test gateway, the interface is disposed of wireless communication interface.
CN201620989804.3U 2016-08-29 2016-08-29 A kind of automatic checkout system of intelligent switch Active CN206301028U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620989804.3U CN206301028U (en) 2016-08-29 2016-08-29 A kind of automatic checkout system of intelligent switch

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620989804.3U CN206301028U (en) 2016-08-29 2016-08-29 A kind of automatic checkout system of intelligent switch

Publications (1)

Publication Number Publication Date
CN206301028U true CN206301028U (en) 2017-07-04

Family

ID=59203086

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620989804.3U Active CN206301028U (en) 2016-08-29 2016-08-29 A kind of automatic checkout system of intelligent switch

Country Status (1)

Country Link
CN (1) CN206301028U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108632786A (en) * 2018-04-12 2018-10-09 中国神华能源股份有限公司 Method, system, control terminal and the test lead of railway communication network optimal inspection
CN108919784A (en) * 2018-07-25 2018-11-30 重庆长安汽车股份有限公司 A kind of detection system and method for new-energy automobile remote monitoring system terminal
CN109302331A (en) * 2018-09-18 2019-02-01 郑州云海信息技术有限公司 A kind of system and method for automatic test storage network switch
CN116184802A (en) * 2023-04-26 2023-05-30 成都量子时频科技有限公司 Automatic debugging and testing device and method for atomic clock electrical parameters based on FPGA

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108632786A (en) * 2018-04-12 2018-10-09 中国神华能源股份有限公司 Method, system, control terminal and the test lead of railway communication network optimal inspection
CN108919784A (en) * 2018-07-25 2018-11-30 重庆长安汽车股份有限公司 A kind of detection system and method for new-energy automobile remote monitoring system terminal
CN109302331A (en) * 2018-09-18 2019-02-01 郑州云海信息技术有限公司 A kind of system and method for automatic test storage network switch
CN116184802A (en) * 2023-04-26 2023-05-30 成都量子时频科技有限公司 Automatic debugging and testing device and method for atomic clock electrical parameters based on FPGA

Similar Documents

Publication Publication Date Title
CN106249138A (en) The automatic checkout system of a kind of intelligent switch and detection method
CN206301028U (en) A kind of automatic checkout system of intelligent switch
CN102147607B (en) Flexible general production line and production method of electronic product
CN109507464B (en) Automatic detection method and device for real-time reporting function of power-down event of electric energy meter
CN101907666B (en) Automatic test system for energy consumption of electrical product and automatic test method thereof
CN103630849A (en) Automatic household appliance power supply test device and test method
CN105807155A (en) Testing device and method for power cut and starting of electric devices
CN105318502A (en) Program updating system, method and device for air conditioning unit controller
CN109541463A (en) Motor performance testing method and device and motor performance testing system
CN109388410A (en) A kind of automatic key code data programming system and its method for burn-recording
CN101865970B (en) Automatic voltage-withstanding grounding test system for display and voltage-withstanding grounding test method thereof
CN105704484B (en) Analog subscriber operates the test device and method of TV
CN107170218A (en) A kind of remote assistance method debugged for fire protection alarm system and system
CN104268044A (en) Method and device for performing loop test on normal startup and shutdown of server system
CN103544104B (en) Testing method for power distribution terminal remote control functional software module
CN109766291A (en) automatic configuration method and system of I/O port
CN207623767U (en) An a kind of key switch machine system
CN110833996B (en) One-stop full-automatic BMS intelligent test system
CN106980561B (en) Power-on and power-off test system and method thereof
CN206560992U (en) One kind automation Systems for optical inspection
CN109187061A (en) Air conditioner testing system and air conditioner testing method
CN114826993A (en) Electric energy meter module simulation test system
CN202110249U (en) Automatic testing system for air-conditioning control mainboard
CN103559064B (en) A kind of single-deck buckle program batch download equipment and method
CN108089986A (en) A kind of version updating test method and system based on robot

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant