CN109507464B - Automatic detection method and device for real-time reporting function of power-down event of electric energy meter - Google Patents

Automatic detection method and device for real-time reporting function of power-down event of electric energy meter Download PDF

Info

Publication number
CN109507464B
CN109507464B CN201811108016.9A CN201811108016A CN109507464B CN 109507464 B CN109507464 B CN 109507464B CN 201811108016 A CN201811108016 A CN 201811108016A CN 109507464 B CN109507464 B CN 109507464B
Authority
CN
China
Prior art keywords
electric energy
energy meter
executing
list
relay
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201811108016.9A
Other languages
Chinese (zh)
Other versions
CN109507464A (en
Inventor
李松浓
郑可
叶君
程小明
曾妍
谢广成
侯兴哲
孙洪亮
刘型志
陈文礼
杨芾藜
宫林
胡晓锐
籍勇亮
李中泽
何佳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Electric Power Research Institute of State Grid Chongqing Electric Power Co Ltd
State Grid Corp of China SGCC
Original Assignee
Electric Power Research Institute of State Grid Chongqing Electric Power Co Ltd
State Grid Corp of China SGCC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Electric Power Research Institute of State Grid Chongqing Electric Power Co Ltd, State Grid Corp of China SGCC filed Critical Electric Power Research Institute of State Grid Chongqing Electric Power Co Ltd
Priority to CN201811108016.9A priority Critical patent/CN109507464B/en
Publication of CN109507464A publication Critical patent/CN109507464A/en
Application granted granted Critical
Publication of CN109507464B publication Critical patent/CN109507464B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R11/00Electromechanical arrangements for measuring time integral of electric power or current, e.g. of consumption
    • G01R11/02Constructional details
    • G01R11/25Arrangements for indicating or signalling faults
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R35/00Testing or calibrating of apparatus covered by the other groups of this subclass
    • G01R35/04Testing or calibrating of apparatus covered by the other groups of this subclass of instruments for measuring time integral of power or current

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)

Abstract

The invention discloses an automatic detection method and a device for real-time reporting function of a power failure event of an electric energy meter, wherein the automatic detection method comprises the following steps: the system comprises a relay array, a control unit, a routing module interface, an ammeter mounting platform body, an upper computer, an electric energy meter, a broadband carrier module and a broadband routing module; the relay array is connected with the ammeter mounting platform body and the routing module interface through an alternating current power line and is connected with the control unit through a direct current signal line; the control unit is also connected with the upper computer and the routing module interface; the electric meter mounting platform body is also connected with an electric energy meter; the electric energy meter is also connected with the broadband carrier module; the broadband routing module is connected with the routing module interface. The invention can detect the power failure event aiming at the electric energy meter with the function of reporting the power failure event in real time after the power failure of the electric energy meter and before the power failure of the electric energy meter.

Description

Automatic detection method and device for real-time reporting function of power-down event of electric energy meter
Technical Field
The invention relates to the technical field of power communication, in particular to a method and a device for automatically detecting a real-time reporting function of a power failure event of an electric energy meter.
Background
Currently, a great deal of intelligent electric energy meters based on a DL/T645-2007 multifunctional electric energy meter communication protocol have the following processing modes for power failure events: the intelligent electric energy meter enters a low-power-consumption working mode after detecting the power failure of alternating current, a communication module (which can be a narrow-band carrier module, a wide-band carrier module, a micro-power wireless module and the like) of the intelligent electric energy meter immediately loses power and stops working, after power supply is recovered, the intelligent electric energy meter returns to a normal working mode, a state word instruction containing power failure information is actively reported to a concentrator, the concentrator reads detailed power failure information (such as power failure occurrence time, power failure times and the like) of the intelligent electric energy meter after receiving the instruction, and then the read power failure information is fed back to a master station. The processing method has the disadvantages that when the power failure occurs in the home of the user due to the fault of the line between the concentrator and the user electric energy meter, the master station cannot timely acquire the power failure information of the electric energy meter, and the power company cannot provide line emergency repair service for the user at the first time of the power failure accident, and even know that the power failure occurs in the home of the user after the complaint of the user. With the development of communication technology and the increasing demand of people on the quality of power service, an electric energy meter with a function of reporting power failure events in real time and a concentrator with a function of reporting power failure events in real time are produced.
In the prior art, CN201510193470, "a method for testing a power failure event of an electricity information acquisition terminal in a simulation field", is used for detecting a common electric energy meter, and a power failure event can be detected only by powering on the electric energy meter or the acquisition terminal again after power failure.
If the implementation form of an electric energy meter inserted with a broadband carrier module is one of the following three, the electric energy meter can be called as an electric energy meter with a power failure event real-time reporting function: 1. the electric energy meter has all or part of functions of a common intelligent electric energy meter, an energy storage unit is contained in the electric energy meter main body, when the electric energy meter works under normal conditions, the energy storage unit is charged until the energy storage unit is fully charged, after an alternating current power supply is disconnected, the energy storage unit discharges to maintain circuits such as a single chip circuit and a carrier communication circuit of the electric energy meter to continue working for a period of time, in the period of time, the electric energy meter organizes a status word message containing power failure information and sends the status word message to a broadband carrier module, and the broadband carrier module converts the status word message into a broadband carrier signal and then sends the broadband carrier signal; 2. the broadband carrier module inserted on the electric energy meter has all or part of functions of a common broadband carrier module, the broadband carrier module comprises an energy storage unit, when the broadband carrier module works under normal conditions, the broadband carrier acquires information such as communication addresses of the electric energy meter, the energy storage unit is charged until the broadband carrier module is full of the energy storage unit, after an alternating current power supply is disconnected, the energy storage unit discharges electricity to maintain the broadband carrier module to work continuously for a period of time, and in the period of time, the broadband carrier module organizes status word messages containing power failure information according to the information such as the communication addresses of the electric energy meter acquired before power failure and sends the status word messages outwards in the form of broadband carrier signals; 3. the broadband carrier module inserted on the electric energy meter has all or partial functions of a common broadband carrier module, the broadband carrier module comprises an energy storage unit, when the broadband carrier module works under normal conditions, the broadband carrier acquires information such as communication addresses of the electric energy meter, the energy storage unit is charged until the broadband carrier module is full of the information, after an alternating current power supply is disconnected, the energy storage unit discharges to maintain circuits such as a single chip circuit and a carrier communication circuit of the electric energy meter to work continuously for a period of time, in the period of time, the electric energy meter organizes status word messages containing power failure information and sends the status word messages to the broadband carrier module, and the broadband carrier module sends the status word messages outwards after converting the broadband carrier signals into broadband carrier signals.
The "concentrator with the power failure event real-time reporting function" is different from a general concentrator in that: and after receiving the state word message containing the power failure information sent by the electric energy meter through the broadband routing module, the concentrator immediately reports the power failure information to the master station.
Detecting whether the real-time reporting function of the power failure event of the electric energy meter (including the broadband carrier module) is normal or not is an important process in the production process of the electric energy meter, but a method, a device and a patent for detecting the function are not found.
Disclosure of Invention
In view of the above defects in the prior art, an object of the present invention is to provide an automatic detection method and apparatus for reporting a power-down event of an electric energy meter in real time, which can detect a power-down event of an electric energy meter having a function of reporting a power-down event in real time after the power-down of the electric energy meter is completed and before the electric energy meter is powered on again.
One of the purposes of the invention is realized by the technical scheme, the automatic detection device for the real-time reporting function of the power failure event of the electric energy meter comprises the following components:
the device comprises: the system comprises a relay array, a control unit, a routing module interface, an ammeter mounting platform body, an upper computer, an electric energy meter, a broadband carrier module and a broadband routing module;
the relay array is connected with the ammeter mounting platform body and the routing module interface through an alternating current power line and connected with the control unit through a direct current signal line;
the control unit is also connected with the upper computer and the routing module interface;
the electric meter mounting platform body is also connected with the electric energy meter;
the electric energy meter is also connected with the broadband carrier module;
the broadband routing module is connected with the routing module interface.
Further, the relay array comprises a plurality of relay units; each relay unit comprises 2 relays which are respectively a live wire relay and a zero line relay.
Furthermore, the electric energy meter mounting platform body comprises a plurality of epitopes, and each epitope comprises a clamping unit for fixing the electric energy meter and a power-on unit for powering on the electric energy meter;
the power-on unit comprises a live line and a zero line;
each meter position is also provided with an electric energy meter, and each electric energy meter is inserted with a broadband carrier module.
Further, the power-on unit is connected with the relay units in the relay array;
and the live wire relay and the zero wire relay respectively control the power supply connection state of the live wire line and the zero wire line of the power-on unit.
The other purpose of the invention is realized by the technical scheme, and the automatic detection method for the real-time reporting function of the power failure event of the electric energy meter comprises the following steps: recording the total number of all electric energy meters to be detected as Z, recording the number of the remaining electric energy meters to be detected as S, recording the number of idle meter positions of the detection device as K, and recording a file list of the current electric energy meters to be detected as a list A;
the method comprises the following steps:
s1: inserting a broadband carrier module into all electric energy meters to be detected, and inserting a broadband routing module into a detection device;
s2: counting the number S of the remaining electric energy meters to be detected, judging whether the number S is zero, executing S11 when the judgment result is yes, and executing S3 otherwise;
s3: judging whether K is zero, if so, executing S7, otherwise, executing S4;
s4: judging whether S is larger than or equal to K, executing S5 when the judgment result is yes, and executing S6 otherwise;
s5: taking out K meters from the remaining S meters to be detected and mounting the K meters on the idle epitope of the detection device, and then executing S7;
s6: mounting the S electric energy meters on an idle epitope of the detection device, and then executing S7;
s7: adding the newly mounted electric energy meter file to the list A, and then executing S8;
s8: executing an automatic detection process, and then executing S9;
s9: judging whether any file in the list A is deleted in the automatic detection process, if so, executing S10, otherwise, executing S9;
s10: taking the electric energy meters corresponding to the deleted files down from the detection device, removing the electric energy meters from the queue of 'remaining electric energy meters to be detected', and then executing S2;
s11: and counting the detection result according to the qualified product list.
Further, the automatic detection process of step S8 further includes:
s801: adding the electric energy meter file newly added to the list A into the list B and the broadband routing module, and controlling the relay array to switch on the relay of the circuit where the electric energy meter corresponding to the list B is located;
s802: waiting for a period of time, networking the broadband router, controlling the router module to read each electric energy meter corresponding to the list B for X times, regarding any electric energy meter, as long as Y times of reading are successful, regarding the electric energy meter to be in normal communication, deleting files corresponding to the electric energy meters in abnormal communication from the router module, the list A and the list B, judging whether the number of the electric energy meters in normal communication is zero (namely the list B is empty), executing S803 when the judgment result is 'no', otherwise finishing the current automatic detection process;
s803: waiting for the electric energy meters or the energy storage units of the broadband carrier module corresponding to the list B to be charged completely, judging whether the electric energy meters have been executed or not S804, if the judgment result is 'no', executing S804, otherwise, continuously judging whether the electric energy meters have been executed or not S805, if the judgment result is 'no', executing S805, otherwise, executing S806;
s804: and (3) carrying out fire line breaking detection: controlling a live wire relay in the relay array to be switched off, recording the time of power failure, and then executing S807;
s805: and (3) carrying out zero line breaking detection: controlling a zero line relay in the relay array to be switched off, recording the time of power failure, and then executing S807;
s806: and (3) carrying out double-line breakage detection: controlling a live wire relay and a zero line relay (namely all relays) in the relay array to be switched off, recording the time of power failure, and then executing S807;
s807: monitoring the real-time reporting condition of the power failure event of each electric energy meter until all the electric energy meters meet the test ending condition: after the report is finished or the energy storage unit is discharged (each electric energy meter only needs to meet one of the two conditions), deleting the electric energy meter files which do not report the power failure event from the list A, the list B and the broadband routing module, then judging whether the list B is empty, and executing S808 when the judgment result is 'no', otherwise, finishing the current automatic detection process;
s808: controlling the relay array to switch on the relay of the line where the electric energy meter corresponding to the list B is located, reading the last 1 time of power failure occurrence time of the electric energy meter in the list B after waiting for a period of time, deleting files of the electric energy meter, the power failure occurrence time of which is inconsistent with the recorded time of power failure (indicating that the recording function of the power failure event of the electric energy meter is abnormal), from the list A, the list B and the broadband routing module, then judging whether the list B is empty, executing S809 when the judgment result is 'no', otherwise finishing the current automatic detection process;
s809: judging whether the electric energy meter corresponding to the list B is executed S806, if not, executing S802, otherwise, executing S810;
s810: and adding the archives of the electric energy meters in the list B into the qualified product list, emptying the list B, and finishing the current automatic detection process.
Due to the adoption of the technical scheme, the invention has the following advantages:
(1) the device and the method aim at the electric energy meter with the function of reporting the power failure event in real time, and the power failure event can be detected after the electric energy meter is powered down and before the electric energy meter is powered up again.
(2) The detection device provided by the invention can respectively execute live wire power-off, zero line power-off and two-wire power-off operations on the electric energy meter so as to more comprehensively simulate the power-off situation which may occur in the application field of the electric energy meter and further comprehensively detect the real-time reporting function of the power-off event of the electric energy meter;
(3) the invention provides a feasible, efficient and objective mode for batch detection of the electric energy meter with the real-time reporting function of the power failure event, and is beneficial to improving the quality detection efficiency of the electric energy meter in the links of production, acceptance inspection and the like.
Additional advantages, objects, and features of the invention will be set forth in part in the description which follows and in part will become apparent to those having ordinary skill in the art upon examination of the following or may be learned from practice of the invention.
Drawings
The drawings of the invention are illustrated as follows:
fig. 1 is a schematic connection diagram of an automatic detection device with a function of reporting a power-down event of an electric energy meter in real time.
Fig. 2 is a schematic flow chart of an automatic detection method for real-time reporting of a power-down event of an electric energy meter.
Fig. 3 is a schematic flow chart of automated detection.
Description of the drawings: in the connection lines between the modules in fig. 1, the thick lines represent alternating current power lines, and the thin lines represent direct current signal lines.
Detailed Description
The invention is further illustrated by the following figures and examples.
Example 1, as shown in fig. 1 to 3; an automatic detection device with a function of reporting power-down events of an electric energy meter in real time comprises: the system comprises a relay array, a control unit, a routing module interface, an ammeter mounting platform body, an upper computer, an electric energy meter, a broadband carrier module and a broadband routing module;
the relay array is connected with the ammeter mounting platform body and the routing module interface through an alternating current power line and is connected with the control unit through a direct current signal line;
the control unit is also connected with the upper computer and the routing module interface;
the electric meter mounting platform body is also connected with an electric energy meter;
the electric energy meter is also connected with the broadband carrier module;
the broadband routing module is connected with the routing module interface.
The relay array comprises a plurality of relay units; each relay unit comprises 2 relays which are respectively a live wire relay and a zero line relay.
The electric energy meter mounting platform body comprises a plurality of epitopes, and each epitope comprises a clamping unit for fixing the electric energy meter and a power-on unit for powering on the electric energy meter;
the power-on unit comprises a live wire line and a zero line;
each meter position is also provided with an electric energy meter, and each electric energy meter is inserted with a broadband carrier module.
The power-on unit is connected with the relay units in the relay array;
and the live wire relay and the zero wire relay respectively control the power supply connection state of the live wire line and the zero wire line of the power-on unit.
An automatic detection method for real-time reporting function of power failure events of an electric energy meter comprises the following steps: recording the total number of all electric energy meters to be detected as Z, recording the number of the remaining electric energy meters to be detected as S, recording the number of idle meter positions of the detection device as K, and recording a file list of the current electric energy meters to be detected as a list A;
the method comprises the following steps:
s1: inserting a broadband carrier module into all electric energy meters to be detected, and inserting a broadband routing module into a detection device;
s2: counting the number S of the remaining electric energy meters to be detected, judging whether the number S is zero, executing S11 when the judgment result is yes, and executing S3 otherwise;
s3: judging whether K is zero, if so, executing S7, otherwise, executing S4;
s4: judging whether S is larger than or equal to K, executing S5 when the judgment result is yes, and executing S6 otherwise;
s5: taking out K meters from the remaining S meters to be detected and mounting the K meters on the idle epitope of the detection device, and then executing S7;
s6: mounting the S electric energy meters on an idle epitope of the detection device, and then executing S7;
s7: adding the newly mounted electric energy meter file to the list A, and then executing S8;
s8: executing an automatic detection process, and then executing S9;
s9: judging whether any file in the list A is deleted in the automatic detection process, if so, executing S10, otherwise, executing S9;
s10: taking the electric energy meters corresponding to the deleted files down from the detection device, removing the electric energy meters from the queue of 'remaining electric energy meters to be detected', and then executing S2;
s11: and counting the detection result according to the qualified product list.
The automatic detection process of step S8 further includes:
s801: adding the electric energy meter file newly added to the list A into the list B and the broadband routing module, and controlling the relay array to switch on the relay of the circuit where the electric energy meter corresponding to the list B is located;
s802: waiting for a period of time, networking the broadband router, controlling the router module to read each electric energy meter corresponding to the list B for X times, regarding any electric energy meter, as long as Y times of reading are successful, regarding the electric energy meter to be in normal communication, deleting files corresponding to the electric energy meters in abnormal communication from the router module, the list A and the list B, judging whether the number of the electric energy meters in normal communication is zero (namely the list B is empty), executing S803 when the judgment result is 'no', otherwise finishing the current automatic detection process;
s803: waiting for the electric energy meters or the energy storage units of the broadband carrier module corresponding to the list B to be charged completely, judging whether the electric energy meters have been executed or not S804, if the judgment result is 'no', executing S804, otherwise, continuously judging whether the electric energy meters have been executed or not S805, if the judgment result is 'no', executing S805, otherwise, executing S806;
s804: and (3) carrying out fire line breaking detection: controlling a live wire relay in the relay array to be switched off, recording the time of power failure, and then executing S807;
s805: and (3) carrying out zero line breaking detection: controlling a zero line relay in the relay array to be switched off, recording the time of power failure, and then executing S807;
s806: and (3) carrying out double-line breakage detection: controlling a live wire relay and a zero line relay (namely all relays) in the relay array to be switched off, recording the time of power failure, and then executing S807;
s807: monitoring the real-time reporting condition of the power failure event of each electric energy meter until all the electric energy meters meet the test ending condition: after the report is finished or the energy storage unit is discharged (each electric energy meter only needs to meet one of the two conditions), deleting the electric energy meter files which do not report the power failure event from the list A, the list B and the broadband routing module, then judging whether the list B is empty, and executing S808 when the judgment result is 'no', otherwise, finishing the current automatic detection process;
s808: controlling the relay array to switch on the relay of the line where the electric energy meter corresponding to the list B is located, reading the last 1 time of power failure occurrence time of the electric energy meter in the list B after waiting for a period of time, deleting files of the electric energy meter, the power failure occurrence time of which is inconsistent with the recorded time of power failure (indicating that the recording function of the power failure event of the electric energy meter is abnormal), from the list A, the list B and the broadband routing module, then judging whether the list B is empty, executing S809 when the judgment result is 'no', otherwise finishing the current automatic detection process;
s809: judging whether the electric energy meter corresponding to the list B is executed S806, if not, executing S802, otherwise, executing S810;
s810: and adding the archives of the electric energy meters in the list B into the qualified product list, emptying the list B, and finishing the current automatic detection process.
The device and the method aim at the electric energy meter with the function of reporting the power failure event in real time, and the power failure event can be detected after the electric energy meter is powered down and before the electric energy meter is powered up again. The detection device provided by the invention can respectively execute live wire power-off, zero line power-off and two-wire power-off operations on the electric energy meter so as to more comprehensively simulate the power-off situation which may occur in the application field of the electric energy meter and further comprehensively detect the real-time reporting function of the power-off event of the electric energy meter; the invention provides a feasible, efficient and objective mode for batch detection of the electric energy meter with the real-time reporting function of the power failure event, and is beneficial to improving the quality detection efficiency of the electric energy meter in the links of production, acceptance inspection and the like.
Example 2, as shown in fig. 1 to 3; an automatic detection device with a function of reporting power-down events of an electric energy meter in real time comprises:
the detection device is a single-phase meter detection device,
the relay array comprises a plurality of relay units, each relay unit comprises 2 relays which are respectively a live line relay and a zero line relay;
the electric energy meter mounting platform body comprises a plurality of meter positions, each meter position comprises a clamping unit for fixing the electric energy meter and an electrifying unit for electrifying the electric energy meter, each electrifying unit comprises a live wire circuit and a zero line circuit, the electrifying units are connected with the relay units in the relay array in a one-to-one correspondence mode, and the live wire relay and the zero line relay respectively control the power supply on-off of the live wire circuit and the zero line circuit of the electrifying units;
each meter position is provided with an electric energy meter, and each electric energy meter is plugged with a broadband carrier module;
the detection software in the upper computer controls the action of the relay through the control unit, so that the on-off of the live wire and the zero line power supply of the electric energy meter is controlled;
the broadband routing module interface is used for plugging a broadband routing module, the broadband routing module corresponds to a broadband carrier module plugged on the electric energy meter, and the meaning of the correspondence includes but is not limited to: the broadband routing module can normally communicate with the broadband carrier module;
the control unit realizes the forwarding of a communication instruction between the broadband routing module and an upper computer through a broadband routing module interface, wherein the communication instruction comprises an electric energy meter file issued by the upper computer to the broadband routing module, a meter reading instruction sent by the upper computer to the broadband routing module, a response instruction made by the broadband routing module to the upper computer instruction, power failure information reported by the broadband routing module to the upper computer by the electric energy meter, and the like;
the broadband routing module receives the carrier signals from the power line and sends the carrier signals to the outside through the routing module interface, and the broadband carrier module receives the carrier signals from the power line and sends the carrier signals to the outside through the electric energy meter, the electric energy meter mounting platform body and the relay array, so that a complete carrier communication link is arranged between the broadband carrier module and the broadband routing module.
When the relay is disconnected, the electric energy meter is powered off, the broadband carrier module inserted in the electric energy meter is powered off, at the moment, if the electric quantity of an energy storage unit of the electric energy meter or the broadband carrier module is sufficient, the energy storage unit discharges outwards, a carrier communication related circuit is maintained to work continuously for a period of time, the broadband carrier module sends a status word instruction containing power-off information outwards, and because a signal sent by the broadband carrier module can cross a breakpoint of a transmission line under a certain condition, the broadband carrier module alone or in cooperation with the electric energy meter can realize a real-time reporting function of a power-off event.
It should be noted that the detection device includes the components shown in the dashed line in fig. 1, but is not limited to the components (e.g., the power supply unit may also be included).
An automatic detection method for real-time reporting function of power failure events of an electric energy meter comprises the following steps:
recording the total quantity of all electric energy meters to be detected as Z, the quantity of the remaining electric energy meters to be detected as S, the quantity of idle meter positions of the detection device as K, and the current archive list of the electric energy meters to be detected as list A, wherein the detection method comprises the following steps:
step 1: inserting a broadband carrier module into all electric energy meters to be detected, and inserting a broadband routing module into a detection device;
step 2: counting the number S of the remaining electric energy meters to be detected, judging whether the number S is zero, executing the step 11 when the judgment result is yes, and otherwise executing the step 3;
and step 3: judging whether K is zero, if so, executing a step 7, otherwise, executing a step 4;
and 4, step 4: judging whether S is larger than or equal to K, if so, executing the step 5, otherwise, executing the step 6;
and 5: taking K meters out of the S meters to be detected out and mounting the K meters on the idle meter position of the detection device, and then executing the step 7;
step 6: mounting the S electric energy meters on an idle meter position of the detection device, and then executing the step 7;
and 7: adding the newly mounted electric energy meter file into the list A, and then executing the step 8;
and 8: executing an automatic detection process, and then executing a step 9;
and step 9: judging whether a file in the list A is deleted in the automatic detection process, if so, executing a step 10, otherwise, executing a step 9;
step 10: taking the electric energy meters corresponding to the deleted files down from the detection device, removing the electric energy meters from the queue of 'remaining electric energy meters to be detected', and then executing the step 2;
step 11: and counting the detection result according to the qualified product list.
The details of the automated detection process in step 8 are as follows:
step 801: adding the electric energy meter file newly added to the list A into the list B and the broadband routing module, and controlling the relay array to switch on the relay of the circuit where the electric energy meter corresponding to the list B is located;
step 802: waiting for a period of time, networking the broadband router, controlling the router module to read each electric energy meter corresponding to the list B for X times, regarding any electric energy meter, as long as Y times of reading are successful, regarding the electric energy meter to be in normal communication, deleting files corresponding to the electric energy meters in abnormal communication from the router module, the list A and the list B, judging whether the number of the electric energy meters in normal communication is zero (namely the list B is empty), executing a step 803 when the judgment result is 'no', otherwise finishing the current automatic detection process;
step 803: waiting for the electric energy meters or the energy storage units of the broadband carrier module corresponding to the list B to be charged completely, judging whether the steps 804 have been executed for the electric energy meters, if the judgment result is "no", executing the step 804, otherwise, continuously judging whether the steps 805 have been executed for the electric energy meters, if the judgment result is "no", executing the step 805, otherwise, executing the step 806;
step 804: and (3) carrying out fire line breaking detection: controlling a live wire relay in the relay array to be switched off, recording the time when the power is off, and then executing the step 807;
step 805: and (3) carrying out zero line breaking detection: controlling a zero line relay in the relay array to be switched off, recording the time of power failure, and then executing the step 807;
step 806: and (3) carrying out double-line breakage detection: the live wire relays and the zero line relays (i.e. all relays) in the relay array are controlled to be switched off, the time of power failure is recorded, and then step 807 is executed;
step 807: monitoring the real-time reporting condition of the power failure event of each electric energy meter until all the electric energy meters meet the test ending condition: after the report is finished or the energy storage unit is discharged (each electric energy meter only needs to meet one of the two conditions), deleting the electric energy meter files which do not report the power failure event from the list A, the list B and the broadband routing module, then judging whether the list B is empty, if the judgment result is 'no', executing a step 808, otherwise, finishing the current automatic detection process;
step 808: controlling the relay array to switch on the relay of the line where the electric energy meter corresponding to the list B is located, reading the last 1 time of power failure occurrence time of the electric energy meter in the list B after waiting for a period of time, deleting files of the electric energy meter, the power failure occurrence time of which is inconsistent with the recorded time of power failure (indicating that the recording function of the power failure event of the electric energy meter is abnormal), from the list A, the list B and the broadband routing module, then judging whether the list B is empty, if the judgment result is 'no', executing a step 809, otherwise, finishing the current automatic detection process;
step 809: judging whether the electric energy meter corresponding to the list B has already executed the step 806, if the judgment result is 'no', executing the step 802, otherwise, executing the step 810;
step 810: and adding the archives of the electric energy meters in the list B into the qualified product list, emptying the list B, and finishing the current automatic detection process.
The device and the method aim at the electric energy meter with the function of reporting the power failure event in real time, and the power failure event can be detected after the electric energy meter is powered down and before the electric energy meter is powered up again. The detection device provided by the invention can respectively execute live wire power-off, zero line power-off and two-wire power-off operations on the electric energy meter so as to more comprehensively simulate the power-off situation which may occur in the application field of the electric energy meter and further comprehensively detect the real-time reporting function of the power-off event of the electric energy meter; the invention provides a feasible, efficient and objective mode for batch detection of the electric energy meter with the real-time reporting function of the power failure event, and is beneficial to improving the quality detection efficiency of the electric energy meter in the links of production, acceptance inspection and the like.
(1) Increasing and reducing the loading quantity of the electric energy meters, and regarding the electric energy meters as the same scheme;
(2) the electric energy meter and the broadband carrier module inserted in the electric energy meter are collectively called as the electric energy meter and are regarded as the same scheme;
(3) adjusting the sequence of some or all steps in the invention, and regarding as the same scheme;
(4) the same scheme is considered as if the concentrator is used for replacing the control unit in fig. 1, or the concentrator is added in the three dimensions in fig. 1, because the concentrator can play a role through the control unit in the application scene of 'detecting the real-time reporting function of the power-down event of the electric energy meter'.
As will be appreciated by one skilled in the art, embodiments of the present application may be provided as a method, system, or computer program product. Accordingly, the present application may take the form of an entirely hardware embodiment, an entirely software embodiment or an embodiment combining software and hardware aspects. Furthermore, the present application may take the form of a computer program product embodied on one or more computer-usable storage media (including, but not limited to, disk storage, CD-ROM, optical storage, and the like) having computer-usable program code embodied therein.
The present application is described with reference to flowchart illustrations and/or block diagrams of methods, apparatus (systems), and computer program products according to embodiments of the application. It will be understood that each flow and/or block of the flow diagrams and/or block diagrams, and combinations of flows and/or blocks in the flow diagrams and/or block diagrams, can be implemented by computer program instructions. These computer program instructions may be provided to a processor of a general purpose computer, special purpose computer, embedded processor, or other programmable data processing apparatus to produce a machine, such that the instructions, which execute via the processor of the computer or other programmable data processing apparatus, create means for implementing the functions specified in the flowchart flow or flows and/or block diagram block or blocks.
These computer program instructions may also be stored in a computer-readable memory that can direct a computer or other programmable data processing apparatus to function in a particular manner, such that the instructions stored in the computer-readable memory produce an article of manufacture including instruction means which implement the function specified in the flowchart flow or flows and/or block diagram block or blocks.
These computer program instructions may also be loaded onto a computer or other programmable data processing apparatus to cause a series of operational steps to be performed on the computer or other programmable apparatus to produce a computer implemented process such that the instructions which execute on the computer or other programmable apparatus provide steps for implementing the functions specified in the flowchart flow or flows and/or block diagram block or blocks.
Finally, it should be noted that: the above embodiments are only for illustrating the technical solutions of the present invention and not for limiting the same, and although the present invention is described in detail with reference to the above embodiments, those of ordinary skill in the art should understand that: modifications and equivalents may be made to the embodiments of the invention without departing from the spirit and scope of the invention, which is to be covered by the claims.

Claims (4)

1. The automatic detection method is characterized in that the automatic detection method records the total quantity of all electric energy meters to be detected as Z, the quantity of the remaining electric energy meters to be detected as S, the quantity of idle meter positions of a detection device as K, and a file list of the current electric energy meters to be detected as a list A; the method comprises the following steps:
s1: inserting a broadband carrier module into all electric energy meters to be detected, and inserting a broadband routing module into a detection device;
s2: counting the number S of the remaining electric energy meters to be detected, judging whether the number S is zero, executing S11 when the judgment result is yes, and executing S3 otherwise;
s3: judging whether K is zero, if so, executing S7, otherwise, executing S4;
s4: judging whether S is larger than or equal to K, executing S5 when the judgment result is yes, and executing S6 otherwise;
s5: taking K electric energy meters out of the remaining S electric energy meters to be detected and mounting the K electric energy meters on the idle epitope of the detection device, and then executing S7;
s6: mounting the S electric energy meters on an idle epitope of the detection device, and then executing S7;
s7: adding the newly mounted electric energy meter file to the list A, and then executing S8;
s8: executing an automatic detection process;
s801: adding the electric energy meter file newly added to the list A into the list B and the broadband routing module, and controlling the relay array to switch on the relay of the circuit where the electric energy meter corresponding to the list B is located;
s802: waiting for a period of time, networking the broadband router, controlling the router module to read each electric energy meter corresponding to the list B for X times, regarding any electric energy meter, as long as Y times of reading are successful, regarding the electric energy meter to be normal in communication, deleting files corresponding to the electric energy meters with abnormal communication from the router module, the list A and the list B, judging whether the number of the electric energy meters with normal communication is zero, executing S803 when the judgment result is 'no', otherwise, finishing the current automatic detection process;
s803: waiting for the electric energy meters or the energy storage units of the broadband carrier module corresponding to the list B to be charged completely, judging whether the electric energy meters have been executed or not S804, if the judgment result is 'no', executing S804, otherwise, continuously judging whether the electric energy meters have been executed or not S805, if the judgment result is 'no', executing S805, otherwise, executing S806;
s804: and (3) carrying out fire line breaking detection: controlling a live wire relay in the relay array to be switched off, recording the time of power failure, and then executing S807;
s805: and (3) carrying out zero line breaking detection: controlling a zero line relay in the relay array to be switched off, recording the time of power failure, and then executing S807;
s806: and (3) carrying out double-line breakage detection: controlling a live wire relay and a zero line relay in the relay array to be disconnected, recording the time of power failure, and then executing S807;
s807: monitoring the real-time reporting condition of the power failure event of each electric energy meter until all the electric energy meters meet the test ending condition: after the report is finished or the energy storage unit discharges, deleting the electric energy meter files of which the power failure events are not reported from the list A, the list B and the broadband routing module, then judging whether the list B is empty, and executing S808 when the judgment result is 'no', otherwise, finishing the current automatic detection process;
s808: controlling the relay array to switch on the relay of the line where the electric energy meter corresponding to the list B is located, reading the last power failure occurrence time of the electric energy meter in the list B after waiting for a period of time, deleting the files of the electric energy meter, of which the power failure occurrence time is inconsistent with the recorded time of power failure, from the list A, the list B and the broadband routing module, then judging whether the list B is empty, and executing S809 when the judgment result is 'no', otherwise, finishing the current automatic detection process;
s809: judging whether the electric energy meter corresponding to the list B is executed S806, if not, executing S802, otherwise, executing S810;
s810: adding the file of the electric energy meter in the list B into the qualified product list, emptying the list B, and finishing the current automatic detection process;
s9: judging whether any file in the list A is deleted in the automatic detection process, if so, executing S10, otherwise, executing S9;
s10: taking the electric energy meters corresponding to the deleted files down from the detection device, removing the electric energy meters from the queue of 'remaining electric energy meters to be detected', and then executing S2;
s11: counting the detection result according to the qualified product list;
the device comprises: the system comprises a relay array, a control unit, a routing module interface, an electric energy meter mounting platform body, an upper computer, an electric energy meter, a broadband carrier module and a broadband routing module;
the relay array is connected with the electric energy meter mounting platform body and the routing module interface through an alternating current power line and is connected with the control unit through a direct current signal line;
the control unit is also connected with the upper computer and the routing module interface;
the electric energy meter mounting platform body is also connected with the electric energy meter;
the electric energy meter is also connected with the broadband carrier module;
the broadband routing module is connected with the routing module interface.
2. The automatic detection method for real-time reporting of power-down events of an electric energy meter according to claim 1, wherein the relay array comprises a plurality of relay units; each relay unit comprises 2 relays which are respectively a live wire relay and a zero line relay.
3. The automatic detection method for real-time reporting function of power-down event of electric energy meter according to claim 1, characterized in that the electric energy meter mounting table body comprises a plurality of epitopes, each epitope comprises a clamping unit for fixing the electric energy meter and a power-on unit for powering on the electric energy meter;
the power-on unit comprises a live line and a zero line;
each meter position is also provided with an electric energy meter, and each electric energy meter is inserted with a broadband carrier module.
4. The automatic detection method for real-time reporting of the power-down event of the electric energy meter according to claim 3, characterized in that the power-up unit is connected with a relay unit in a relay array;
and the live wire relay and the zero wire relay respectively control the power supply connection state of the live wire line and the zero wire line of the power-on unit.
CN201811108016.9A 2018-09-21 2018-09-21 Automatic detection method and device for real-time reporting function of power-down event of electric energy meter Active CN109507464B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811108016.9A CN109507464B (en) 2018-09-21 2018-09-21 Automatic detection method and device for real-time reporting function of power-down event of electric energy meter

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811108016.9A CN109507464B (en) 2018-09-21 2018-09-21 Automatic detection method and device for real-time reporting function of power-down event of electric energy meter

Publications (2)

Publication Number Publication Date
CN109507464A CN109507464A (en) 2019-03-22
CN109507464B true CN109507464B (en) 2021-01-29

Family

ID=65746191

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811108016.9A Active CN109507464B (en) 2018-09-21 2018-09-21 Automatic detection method and device for real-time reporting function of power-down event of electric energy meter

Country Status (1)

Country Link
CN (1) CN109507464B (en)

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110514886B (en) * 2019-05-14 2022-02-18 国网浙江省电力有限公司嘉兴供电公司 Electric energy meter power-down information centralized reporting device
CN110297205B (en) * 2019-05-14 2021-12-28 国网浙江省电力有限公司嘉兴供电公司 User electric energy meter power-down reporting system
CN110687495B (en) * 2019-11-05 2021-01-22 广东电网有限责任公司 Device, system and method for testing reliability of power failure active reporting function
CN111082836B (en) * 2019-11-18 2021-07-27 国网河北省电力有限公司电力科学研究院 Intelligent detection device and method for power failure of HPLC communication unit
CN110726966B (en) * 2019-12-03 2022-05-31 积成电子股份有限公司 Device and method for monitoring whether non-contact electric energy meter has electricity or not
CN113595591B (en) * 2021-07-29 2023-04-28 宁波三星医疗电气股份有限公司 Method for processing abnormal self-recovery of module terminal file parameter synchronous business
CN116430300B (en) * 2023-06-08 2023-08-25 石家庄科林电气股份有限公司 Method, device and system for identifying clock faults of electric energy meter

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103760515A (en) * 2014-02-19 2014-04-30 青岛乾程电子科技有限公司 Automatic multi-electricity-meter-position parameter setting and detecting method
CN204613384U (en) * 2015-04-21 2015-09-02 国家电网公司 A kind of proving installation stopping the event of powering on for power information acquisition terminal
CN105279952A (en) * 2015-11-30 2016-01-27 国网江西省电力科学研究院 Whole-event acquisition testing system of intelligent ammeter based on virtual ammeter module
CN106125036A (en) * 2016-08-08 2016-11-16 国家电网公司 A kind of automatic calibration of electric energy meter system and method
CN108020809A (en) * 2017-12-04 2018-05-11 珠海中慧微电子有限公司 Communication module and the detection alarm method that has a power failure with have a power failure detection and alarm function

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2018035035A1 (en) * 2016-08-13 2018-02-22 Borleske Andrew J Systems, devices, and methods for a wide dynamic range current measurement with consumption event analysis

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103760515A (en) * 2014-02-19 2014-04-30 青岛乾程电子科技有限公司 Automatic multi-electricity-meter-position parameter setting and detecting method
CN204613384U (en) * 2015-04-21 2015-09-02 国家电网公司 A kind of proving installation stopping the event of powering on for power information acquisition terminal
CN105279952A (en) * 2015-11-30 2016-01-27 国网江西省电力科学研究院 Whole-event acquisition testing system of intelligent ammeter based on virtual ammeter module
CN106125036A (en) * 2016-08-08 2016-11-16 国家电网公司 A kind of automatic calibration of electric energy meter system and method
CN108020809A (en) * 2017-12-04 2018-05-11 珠海中慧微电子有限公司 Communication module and the detection alarm method that has a power failure with have a power failure detection and alarm function

Also Published As

Publication number Publication date
CN109507464A (en) 2019-03-22

Similar Documents

Publication Publication Date Title
CN109507464B (en) Automatic detection method and device for real-time reporting function of power-down event of electric energy meter
CN110212645B (en) Power consumption information acquisition terminal power failure event reporting method and device
CN101980418B (en) System for detecting secondary wiring of relay protection system in transformer substation on line
CN102355368B (en) Fault processing method of network equipment and system
CN104166119B (en) A kind of intelligent electric energy meter program Detection of Stability system based on error injection
CN103227662A (en) Safety detection method and system of electric power communication equipment based on state control
CN206301028U (en) A kind of automatic checkout system of intelligent switch
CN105094120A (en) Testing device capable of simulating action behaviors of primary equipment
CN104795796A (en) Motor fault monitoring device and method of intelligent ring main unit
CN108053633A (en) The method and device of copy reading metering module electric energy indicating value data
CN109633332B (en) Automatic regular inspection method for equipment in power system and fault recording device
CN111799889A (en) Debugging method for general efficient processing of urban network distribution network automatic terminal
CN104142472A (en) Intelligent high-voltage switch interlocking logic testing method supporting IEC61850 stipulations
CN105676119A (en) Power distribution network switch state testing method and device
CN108063671A (en) A kind of transparent plug-in type telecommunication network rebooting device and method
CN112565436A (en) Acquisition terminal, equipment monitoring method and system
CN109585945B (en) Feeder terminal storage battery pack online maintenance device and method
CN113098698A (en) Communication recovery method, equipment, storage medium and communication interruption restarting device
CN102571519B (en) Intelligent scheduling device suitable for carrier communication of ring distribution network and method therefor
CN218585221U (en) Testing device and testing system of controller
CN106709158B (en) Performance improvement method of power grid feeder automation system
CN217213463U (en) Power supply monitoring control system
CN110097702A (en) A kind of electric vehicle self-filling electro-detection control method
CN104104144A (en) System and method for debugging spare power automatic switching equipment of intelligent substation, and intelligent substation
CN116112390A (en) Intelligent fusion terminal online test platform

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant