CN105807155A - Testing device and method for power cut and starting of electric devices - Google Patents

Testing device and method for power cut and starting of electric devices Download PDF

Info

Publication number
CN105807155A
CN105807155A CN201610123905.7A CN201610123905A CN105807155A CN 105807155 A CN105807155 A CN 105807155A CN 201610123905 A CN201610123905 A CN 201610123905A CN 105807155 A CN105807155 A CN 105807155A
Authority
CN
China
Prior art keywords
test
devices
tool
testing
power
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610123905.7A
Other languages
Chinese (zh)
Inventor
唐传志
朱明辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Taicang T&W Electronics Co Ltd
Original Assignee
Taicang T&W Electronics Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Taicang T&W Electronics Co Ltd filed Critical Taicang T&W Electronics Co Ltd
Priority to CN201610123905.7A priority Critical patent/CN105807155A/en
Publication of CN105807155A publication Critical patent/CN105807155A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R31/00Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Test And Diagnosis Of Digital Computers (AREA)

Abstract

The invention relates to a field of electric product testing and discloses a testing device and method for repeated power cut and starting of a plurality of electric devices. The system includes a testing computer, a tool, a switchboard, a multi-machine server, a power strip and the to-be-tested devices. The testing computer is connected with the tool through a cable and the testing computer controls the tool. The tool supplies power for the power strip through a wire. All the to-be-tested devices are supplied with power through the power strip, namely, the tool can control circuit switches of all the to-be-tested devices. The testing computer is connected with an Ethernet interface of the multi-machine server. The multi-machine server is connected with an Ethernet interface of the switch board. The switch board is connected with all the to-be-tested devices through Ethernet interfaces. According to the invention, unmanned testing can be realized during repeated power cut and starting of the devices and all the testing results can be recorded. Manual operation is reduced, the testing efficiency is improved and the testing cost is reduced.

Description

A kind of electronic equipment power-off starts device and the method for testing thereof of test
Technical field
The present invention relates to electronic product field tests, disclose a kind of method that multiple stage electronic product power-off repeatedly of test simultaneously starts;
Background technology
User is more and more higher to the performance requirement of electronic product, especially requirement can power-off repeatedly and repeatedly starting, to avoid equipment to occur at routine use process interrupt electricity and the abnormal failure started.So it is in electronic equipment R&D process, the test of power-off repeatedly and startup is just particularly necessary.
Power-off startup test is often repeatedly tested with multiple stage as basic test principle repeatedly, existing method of testing needs manually input power to be carried out switching manipulation repeatedly, and to carry out checking by platform after the Devices to tests such as each opening power start completely, confirm whether Devices to test has normally started all;Existing method of testing not only needs too much manual intervention, and testing efficiency is low, and cost is high, and complicated operation is not convenient;
Summary of the invention
It is an object of the invention to provide a kind of electronic equipment power-off and start device and the method for testing thereof of test, reduce manual operation, improve testing efficiency;
The present invention is concrete by the following technical solutions:
A kind of electronic equipment power-off starts the device of test and includes test computer, tool, switch, multiple machine servicer, power extension socket and Devices to test;Described test computer is connected by netting twine with tool, and tool is controlled;Described tool is powered to power extension socket by electric wire, and all Devices to tests are powered all through power extension socket, and namely tool can control the contactor of all Devices to tests;Described test computer is connected by netting twine with multiple machine servicer, and multiple machine servicer is connected with the Ethernet interface of switch, and switch is attached by netting twine and all Devices to tests;
As preferred technical scheme, the test computer relay output switch by programming Control tool, the power supply to realize device under test inputs and controls;
As preferred technical scheme, when relay output switch is opening, all Devices to test normal power supplies;
As preferred technical scheme, when relay output switch is closed mode, all Devices to tests and power-off shutdown;
As preferred technical scheme, test computer expert crosses and calls system time, and that splits the powered-down time carries out timing;
As preferred technical scheme, after tool relay output switch is opened every time, all Devices to tests can be communicated detection by Ethernet interface by test computer, to judge whether Devices to test normally starts;
As preferred technical scheme, the communication message of test computer can be made a distinction by multiple machine servicer, send to switch, the Ethernet interface to every Devices to test is sent by each port by switch, with realize test computer can the signal intelligence of independent judgment every Devices to test, in Preset Time, Devices to test is normally with test compunlcation and starts successfully, and communication abnormality then starts failure;
As preferred technical scheme, test computer can be shown that the startup situation of the time of test, duration and every Devices to test every time;
Accompanying drawing explanation
Fig. 1 is the system connection figure of one embodiment of the invention.
Fig. 2 is testing procedure flow chart of the present invention.
Detailed description of the invention
In order to make the purpose of the present invention, technical scheme and advantage clearly understand, below in conjunction with drawings and Examples, the present invention is further elaborated.Should be appreciated that specific embodiment described herein is only in order to explain the present invention, is not intended to limit the present invention.
Fig. 1 illustrates that the present invention a kind of electronic equipment power-off starts one embodiment of device of test: a kind of electronic equipment power-off starts device and the method for testing thereof of test, comprises the following steps:
Step one, sets available machine time and power-off time in advance in test computer, and cycle-index and testing time;
Step 2, starts test, opens the switch of tool, and Devices to test energising starts;
Step 3, waits that presetting the startup time (Devices to test normally starts required time) terminates, and test main frame can pass through multiple machine servicer and switch realizes the communication check to every Devices to test, such as ping detection;
Step 4, the Devices to test of every normal startup all can respond the communication of test main frame, and test connecting computer receives back message and namely judges that this equipment normally starts.If not receiving back message, judge to start unsuccessfully;
Step 5, corresponding judged result is recorded and shows by test computer;
Step 6, default power-off time arrives, and test computer can control tool and disconnect Devices to test power supply, waits Preset Time, carries out next round test;
All take turns test and terminate, the startup situation of all Devices to tests during the recordable often wheel test of test computer, without artificial post, also log server can be added in this test system, the startup log of device under test is recorded and preserves, when being easy to break down, research staff is to the location of problem and analysis.
Although reference be made herein to invention has been described for the explanatory embodiment of the present invention, but, it should be understood that those skilled in the art can be designed that a lot of other amendments and embodiment, these amendments and embodiment will drop within spirit disclosed in the present application and spirit.More specifically, disclosure, drawings and claims scope in, it is possible to building block and/or layout to theme composite configuration carry out multiple modification and improvement.Except the deformation that building block and/or layout are carried out and improving, to those skilled in the art, other purposes also will be apparent from.

Claims (9)

1. electronic equipment power-off starts a test system, including test computer, tool, switch, multiple machine servicer, power extension socket and Devices to test.
2. include relay in tool according to claims 1 and process chip.
3. relay according to claims 2 has electric current input and current output interface, it may be achieved the input of electric current and output.
4. according to claims 2, process chip able to programme, the input/output switching of programming Control relay can be passed through.
5. power extension socket according to claims 1 is powered by tool current output interface, and is transferred on Devices to test by circuit, and the circuit to reach Devices to test inputs.
6. according to claims 1, Devices to test is connected with switch by netting twine, and switch is connected with multiple machine servicer by netting twine, and multiple machine servicer is connected with test computer, and having reached test computer can intercom mutually with Devices to test.
7. Devices to test according to claims 1 can be one or more.
8. according to claims 1, test computer to be communicated by the process chip of Ethernet interface Yu tool.
9. according to claims 8, test computer can the process chip in tool be programmed, support open relay current output and close relay current output;Support the opening time to set and the shut-in time sets;Support repeatedly to open and close.
CN201610123905.7A 2016-03-04 2016-03-04 Testing device and method for power cut and starting of electric devices Pending CN105807155A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610123905.7A CN105807155A (en) 2016-03-04 2016-03-04 Testing device and method for power cut and starting of electric devices

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610123905.7A CN105807155A (en) 2016-03-04 2016-03-04 Testing device and method for power cut and starting of electric devices

Publications (1)

Publication Number Publication Date
CN105807155A true CN105807155A (en) 2016-07-27

Family

ID=56467662

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610123905.7A Pending CN105807155A (en) 2016-03-04 2016-03-04 Testing device and method for power cut and starting of electric devices

Country Status (1)

Country Link
CN (1) CN105807155A (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106294043A (en) * 2016-08-04 2017-01-04 浪潮电子信息产业股份有限公司 Method for testing automatic startup and shutdown
CN107167162A (en) * 2017-07-07 2017-09-15 深圳市路畅科技股份有限公司 A kind of method of testing of vehicle mounted guidance, apparatus and system
CN108429909A (en) * 2018-02-05 2018-08-21 济南中维世纪科技有限公司 A kind of NVR power-off cycle automatic test approach
CN109116141A (en) * 2018-07-17 2019-01-01 深圳市吉祥腾达科技有限公司 A kind of POE interchanger restarts the test method of power supply reliability
CN113219945A (en) * 2021-04-29 2021-08-06 上海星融汽车科技有限公司 Vehicle ECU data flashing pressure measurement system and pressure measurement method
CN113721125A (en) * 2021-05-31 2021-11-30 荣耀终端有限公司 Logistics device and test system
CN115174455A (en) * 2022-06-29 2022-10-11 中国航空无线电电子研究所 ARINC664 switch starting time testing method based on asynchronous clock

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202230162U (en) * 2011-09-28 2012-05-23 四川卫士通信息安全平台技术有限公司 Power-on and power-off testing equipment for continuously turning on and turning off electronic equipment
CN202455371U (en) * 2011-09-30 2012-09-26 深圳市共进电子股份有限公司 Multi-machine testing system
CN102854423A (en) * 2012-09-14 2013-01-02 上海斐讯数据通信技术有限公司 Method for testing starting reliability of equipment
CN103364650A (en) * 2012-04-06 2013-10-23 鸿富锦精密工业(深圳)有限公司 Testing system and testing method
CN104111390A (en) * 2014-07-03 2014-10-22 北京京东方专用显示科技有限公司 Device for realizing automatic powering-on/off test
CN104486162A (en) * 2014-12-22 2015-04-01 上海斐讯数据通信技术有限公司 Automatic on-off test system and test method thereof
CN104901848A (en) * 2015-06-02 2015-09-09 上海斐讯数据通信技术有限公司 Automated testing system and method for startup and shutdown of router

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202230162U (en) * 2011-09-28 2012-05-23 四川卫士通信息安全平台技术有限公司 Power-on and power-off testing equipment for continuously turning on and turning off electronic equipment
CN202455371U (en) * 2011-09-30 2012-09-26 深圳市共进电子股份有限公司 Multi-machine testing system
CN103364650A (en) * 2012-04-06 2013-10-23 鸿富锦精密工业(深圳)有限公司 Testing system and testing method
CN102854423A (en) * 2012-09-14 2013-01-02 上海斐讯数据通信技术有限公司 Method for testing starting reliability of equipment
CN104111390A (en) * 2014-07-03 2014-10-22 北京京东方专用显示科技有限公司 Device for realizing automatic powering-on/off test
CN104486162A (en) * 2014-12-22 2015-04-01 上海斐讯数据通信技术有限公司 Automatic on-off test system and test method thereof
CN104901848A (en) * 2015-06-02 2015-09-09 上海斐讯数据通信技术有限公司 Automated testing system and method for startup and shutdown of router

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106294043A (en) * 2016-08-04 2017-01-04 浪潮电子信息产业股份有限公司 Method for testing automatic startup and shutdown
CN107167162A (en) * 2017-07-07 2017-09-15 深圳市路畅科技股份有限公司 A kind of method of testing of vehicle mounted guidance, apparatus and system
CN108429909A (en) * 2018-02-05 2018-08-21 济南中维世纪科技有限公司 A kind of NVR power-off cycle automatic test approach
CN109116141A (en) * 2018-07-17 2019-01-01 深圳市吉祥腾达科技有限公司 A kind of POE interchanger restarts the test method of power supply reliability
CN109116141B (en) * 2018-07-17 2020-12-15 深圳市吉祥腾达科技有限公司 Method for testing power supply reliability of POE switch restart
CN113219945A (en) * 2021-04-29 2021-08-06 上海星融汽车科技有限公司 Vehicle ECU data flashing pressure measurement system and pressure measurement method
CN113721125A (en) * 2021-05-31 2021-11-30 荣耀终端有限公司 Logistics device and test system
CN115174455A (en) * 2022-06-29 2022-10-11 中国航空无线电电子研究所 ARINC664 switch starting time testing method based on asynchronous clock
CN115174455B (en) * 2022-06-29 2023-09-08 中国航空无线电电子研究所 ARINC664 switch starting time test method based on asynchronous clock

Similar Documents

Publication Publication Date Title
CN105807155A (en) Testing device and method for power cut and starting of electric devices
CN100369410C (en) Method and apparatus for supplying power to external device via Ethernet
CN111475357A (en) Bus fault injection system
CN105866604B (en) A kind of automatic switching test system and method
CN110501998B (en) BMS hardware in-loop test system and test method
CN104459566A (en) Secondary electric power supply testing system and method
CN105704484B (en) Analog subscriber operates the test device and method of TV
CN110908359B (en) Function test equipment, method and device
CN206301028U (en) A kind of automatic checkout system of intelligent switch
CN105022467A (en) Board reset method and device
CN106850237A (en) The management method and device of terminal supplying power in a kind of active Ethernet
CN107069935A (en) The power switching device controlled based on PLC
CN102411114B (en) Device and method for automatically detecting short circuit and disconnection of wire harnesses of rotary drilling rig
CN103544104B (en) Testing method for power distribution terminal remote control functional software module
CN112783702A (en) Method for repairing abnormal USB connection based on mobile phone recovery machine
CN114397528B (en) Logic action test method and device for remote spare power automatic switching device
CN110726928A (en) Testing device for equipment mainboard
CN111884329B (en) Unified operation and maintenance method and system for secondary equipment of power distribution network
CN111551800A (en) Test device and test method
CN221224981U (en) Testing device
CN216622550U (en) Power-on and power-off testing device
CN109687389A (en) Circuit protection method and device
CN109450653B (en) Ethernet power supply protection method and device
CN117792436B (en) Detection device of broadband carrier module
CN110650237B (en) Power consumption testing device and system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20160727