CN108429909A - A kind of NVR power-off cycle automatic test approach - Google Patents

A kind of NVR power-off cycle automatic test approach Download PDF

Info

Publication number
CN108429909A
CN108429909A CN201810113393.5A CN201810113393A CN108429909A CN 108429909 A CN108429909 A CN 108429909A CN 201810113393 A CN201810113393 A CN 201810113393A CN 108429909 A CN108429909 A CN 108429909A
Authority
CN
China
Prior art keywords
nvr
power
terminal control
control unit
test
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810113393.5A
Other languages
Chinese (zh)
Inventor
赵国玲
张文全
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JOVISION TECHNOLOGY Co Ltd
Original Assignee
JOVISION TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JOVISION TECHNOLOGY Co Ltd filed Critical JOVISION TECHNOLOGY Co Ltd
Priority to CN201810113393.5A priority Critical patent/CN108429909A/en
Publication of CN108429909A publication Critical patent/CN108429909A/en
Pending legal-status Critical Current

Links

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04NPICTORIAL COMMUNICATION, e.g. TELEVISION
    • H04N17/00Diagnosis, testing or measuring for television systems or their details
    • H04N17/06Diagnosis, testing or measuring for television systems or their details for recorders

Abstract

The present invention relates to a kind of NVR test methods, more particularly to a kind of NVR power-off cycle automatic test approach.NVR break-make electricity conditions are detected by terminal control unit, and pass through Timer Controlling NVR power on/off;After the NVR is powered, timer is zeroed and starts timing;After the time that the timer reaches setting, terminal control unit statistics hard disk success carry number summation, number of success of reaching the standard grade summation, video source are successfully connected number summation, and power-on and power-off statistics is completed in Timer Controlling NVR power-off at this time;It repeats the above process, loop test 100 times.The present invention may be implemented NVR it is auto-power on and power-off, and then test NVR realize loop test, avoid manually to NVR it is manual energization and power-off, and can to the test data of NVR have high in the clouds store function and according to test data progress interpretation of result.

Description

A kind of NVR power-off cycle automatic test approach
(One)Technical field
The present invention relates to a kind of NVR test methods, more particularly to a kind of NVR power-off cycle automatic test approach.
(Two)Background technology
Safety problem is the major issue that the whole society pays close attention to jointly, and the demand of security protection industry is increasing, also becomes increasingly to weigh It wants.Monitoring device is made that tremendous contribution for security protection cause, has NVR than more typical monitoring device(Network Video Recorder, that is, network hard disk video recorder), IPC(IP Camera).To ensure that equipment can normally start in use, Test phase we need carry out 100 power up tests;At this stage, start test and use manual power-on and power-off mode, working hour is long, consumption Take manpower.For optimal inspection project, testing efficiency is improved, special open hair is a kind of with test data store function and according to test number According to the NVR power-off cycle automatic test approach for carrying out interpretation of result, manual test is become testing automatically to realize, when saving Between and human cost.
(Three)Invention content
In order to compensate for the shortcomings of the prior art, the present invention provides a kind of NVR to power off cycle automatic test approach.
The present invention is achieved through the following technical solutions:
A kind of NVR power-off cycle automatic test approach, it is characterised in that:Terminal control unit detects NVR break-make electricity conditions, and passes through Timer Controlling NVR power on/off;After the NVR is powered, after terminal control unit detects that the NVR is powered, terminal control unit Time counting is zeroed and starts timing;After the time that the time counting of the terminal control unit reaches setting, terminal control unit system Meter hard disk success carry number summation, number of success of reaching the standard grade summation, video source are successfully connected number summation, Timer Controlling NVR Power-off, terminal control unit detect the NVR power-off, complete power-on and power-off statistics at this time, and test result is carried out high in the clouds Storage;It repeats the above process, loop test 100 times;Be manually entered after test the hard disk number of connection, video source number, The number of starts and the practical number of starts of hardware, can be compared result analysis, provide final result.
Further, the NVR is connect with interchanger, and the NVR is connected with several hard disks, and interchanger is connected with several camera shootings Machine;The interchanger is connected with terminal control unit;The NVR is connected with counter, adapter and timer in turn;The timing Device accesses 220v alternating currents.
Further, it is powered when timer setting output is 1, duration 4min is exported and powered off when being 0, continues Time is 20s, is set as circulation pattern.
Further, the terminal control unit is computer.
The beneficial effects of the invention are as follows:
The present invention may be implemented NVR it is auto-power on and power-off, and then test NVR realize loop test, avoid manually to NVR's It is powered and powers off manually, and can have store function to the test data of NVR and interpretation of result is carried out according to test data.
(Four)Description of the drawings
The present invention will be further described below with reference to the drawings.
Fig. 1:The test method flow chart of NVR power-off cycle automatic test approach of the present invention.Software therein is terminal Control software.
Fig. 2:The device connection diagram of NVR power-off cycle automatic test approach of the present invention, and a kind of specific reality of the invention Apply example.
(Five)Specific implementation mode
Attached drawing 2 is a kind of specific embodiment of the present invention.In the embodiment, terminal control unit detects NVR break-make electricity conditions, and leads to Cross Timer Controlling NVR power on/off;After timer is powered to NVR, after terminal control unit detects that the NVR is powered, terminal control The time counting of device processed is zeroed and starts timing;After the time that the time counting of the terminal control unit reaches setting, terminal control Device processed counts hard disk success carry number summation, number of success of reaching the standard grade summation, video source and is successfully connected number summation, timer control NVR power-off processed, terminal control unit detect the NVR power-off, complete power-on and power-off statistics at this time, and test result is carried out High in the clouds stores;It repeats the above process, loop test 100 times.
It is as follows:
Surveyed NVR is realized automatic upper and lower electrically operated by timer;Counter programming count hardware powers on number.Terminal control Device sends detection to NVR per 10s and reaches the standard grade order, and when NVR hardware has already powered on, NVR can feed back the order and reach the standard grade or offline, As long as there is feedback information, the terminal control unit will be considered that NVR has already powered on, and the equipment state in the terminal control unit becomes For POWER ON, while time counting is defined as zero, and cumulative timing in the terminal control unit.The terminal control unit when Between count the time for reaching setting after, count the hard disk of surveyed NVR successfully carry number summation, number of success of reaching the standard grade summation, regard Frequency source is successfully connected number summation, and test result is carried out high in the clouds storage.When NVR hardware has descended electricity, the terminal control Device sends to NVR and detects order of reaching the standard grade, and NVR will not feed back the order, under the terminal control unit just will be considered that NVR Electricity, the equipment state in the terminal control unit become POWER OFF, and time counting continues cumulative timing, completes at this time primary It is electrically operated up and down, and loop test 100 times.It is manually entered the hard disk number actually connected after test, video source number, opens Dynamic number and the practical number of starts of hardware, can be compared result analysis, provide final result.In different terminal controls The cloud that the equipment is inputted in device regards logical number or IP address, user name password, it can be achieved that remotely checking after being attached with the equipment It is transferred with result.
It is manually entered the hard disk number actually connected, video source number, the number of starts after test and hardware is practical opens Dynamic number, can be compared result analysis, provide final result.Such as:One piece of hard disk of NVR connections, two-path video source, break-make Electricity cycle 64 times after test, is manually entered that the hard disk number actually accessed is 1, video source number is 2, hardware is practical opens Dynamic number 64, software can provide analysis result:The program number of starts 64, is reached the standard grade at statistics hard disk success carry number summation 64 Work(number summation 64, video source are successfully connected number summation 128, and the program number of starts is correct, and hard disk carry number is correct, reaches the standard grade Number is correct, video source connection number is correct, and it is consistent to power on number with hardware.
Further, the NVR is connect with interchanger, and the NVR is connected with several hard disks, and interchanger is connected with several camera shootings Machine;The interchanger is connected with terminal control unit;The NVR is connected with counter, adapter and timer in turn;The timing Device accesses 220v alternating currents.
Further, it is powered when timer setting output is 1, duration 4min is exported and powered off when being 0, continues Time is 20s, is set as circulation pattern.
Wherein, terminal control unit is computer, is equipped in computer and detects reach the standard grade order and reception feedback signal for sending Software, this software be dropPowerTest softwares;This software not within the scope of protection of this application, those skilled in the art The function of this software of programming realization can be realized to computer according to the content recorded in the application;Therefore this software is to this field It can be achieved on for technical staff.
Wherein, timer is the equipment for powering on duration and interruption duration for controlling hardware.Timer is arranged Output is 1(It powers on)Continue 4min, it is 0 to export(Power-off)Duration is 20s, and circulation pattern is arranged.The equipment can be from market Purchase, the model timing treasured DJ-B14M that this equipment uses.
Counter is the equipment for powering on number for counting hardware.
Software is provided with, and click starts, and timer output at this time is 1, and counter+0.5, software detection is powered on to hardware The timing zero of software afterwards;Then timing 180s, statistics hard disk success carry number summation, number of success of reaching the standard grade summation, video Source is successfully connected number summation;Timer output later is 0, counter+0.5, completes power-on and power-off statistics;Loop test 100 times.
The present invention is described by way of example above, but the present invention is not limited to above-mentioned specific embodiment, all to be based on Any changes or modifications that the present invention is done belong to the scope of protection of present invention.

Claims (4)

1. a kind of NVR power-off cycle automatic test approach, it is characterised in that:Terminal control unit detects NVR break-make electricity conditions, and leads to Cross Timer Controlling NVR power on/off;After the NVR is powered, after terminal control unit detects that the NVR is powered, terminal control unit Time counting be zeroed and start timing;After the time that the time counting of the terminal control unit reaches setting, terminal control unit Statistics hard disk success carry number summation, number of success of reaching the standard grade summation, video source are successfully connected number summation, Timer Controlling NVR is powered off, and terminal control unit detects NVR power-off, completes power-on and power-off statistics at this time, and by test result into racking End storage;It repeats the above process, loop test 100 times;Hard disk number, the video source of connection are manually entered after test Number, the number of starts and the practical number of starts of hardware, can be compared result analysis, provide final result.
2. NVR power-off cycle automatic test approach according to claim 1, it is characterised in that:The NVR connects with interchanger It connects, the NVR is connected with several hard disks, and interchanger is connected with several video cameras;The interchanger is connected with terminal control unit;Institute It states NVR and is connected with counter, adapter and timer in turn;The timer accesses 220v alternating currents.
3. NVR power-off cycle automatic test approach according to claim 1, it is characterised in that:The timer setting is defeated Go out and be powered when being 1, duration 4min is exported and powered off when being 0, and duration 20s is set as circulation pattern.
4. NVR power-off cycle automatic test approach according to claim 1, it is characterised in that:The terminal control unit is Computer.
CN201810113393.5A 2018-02-05 2018-02-05 A kind of NVR power-off cycle automatic test approach Pending CN108429909A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810113393.5A CN108429909A (en) 2018-02-05 2018-02-05 A kind of NVR power-off cycle automatic test approach

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810113393.5A CN108429909A (en) 2018-02-05 2018-02-05 A kind of NVR power-off cycle automatic test approach

Publications (1)

Publication Number Publication Date
CN108429909A true CN108429909A (en) 2018-08-21

Family

ID=63156550

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810113393.5A Pending CN108429909A (en) 2018-02-05 2018-02-05 A kind of NVR power-off cycle automatic test approach

Country Status (1)

Country Link
CN (1) CN108429909A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109460330A (en) * 2018-10-23 2019-03-12 江苏华存电子科技有限公司 A kind of storage equipment programmable computer circulation power on/off Auto-Test System
CN111856315A (en) * 2020-07-24 2020-10-30 歌尔科技有限公司 Screen test tool and test method
CN112445669A (en) * 2019-09-05 2021-03-05 中车株洲电力机车研究所有限公司 Storage performance testing method and device and electronic equipment

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103559128A (en) * 2013-10-28 2014-02-05 深圳市宏电技术股份有限公司 Power-on and power-off test circuit and power-on and power-off test device
CN204539285U (en) * 2015-04-27 2015-08-05 浙江宇视科技有限公司 A kind of web camera
CN105807155A (en) * 2016-03-04 2016-07-27 太仓市同维电子有限公司 Testing device and method for power cut and starting of electric devices
CN106294050A (en) * 2016-09-22 2017-01-04 深圳市嘉合劲威电子科技有限公司 The circuit breaking test device of a kind of solid state hard disc and method of testing

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103559128A (en) * 2013-10-28 2014-02-05 深圳市宏电技术股份有限公司 Power-on and power-off test circuit and power-on and power-off test device
CN204539285U (en) * 2015-04-27 2015-08-05 浙江宇视科技有限公司 A kind of web camera
CN105807155A (en) * 2016-03-04 2016-07-27 太仓市同维电子有限公司 Testing device and method for power cut and starting of electric devices
CN106294050A (en) * 2016-09-22 2017-01-04 深圳市嘉合劲威电子科技有限公司 The circuit breaking test device of a kind of solid state hard disc and method of testing

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
吴炬,等: "自动检测与诊断技术在视频监控系统中的应用及发展趋势", 《技术与应用》 *

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109460330A (en) * 2018-10-23 2019-03-12 江苏华存电子科技有限公司 A kind of storage equipment programmable computer circulation power on/off Auto-Test System
CN112445669A (en) * 2019-09-05 2021-03-05 中车株洲电力机车研究所有限公司 Storage performance testing method and device and electronic equipment
CN112445669B (en) * 2019-09-05 2022-08-02 中车株洲电力机车研究所有限公司 Storage performance testing method and device and electronic equipment
CN111856315A (en) * 2020-07-24 2020-10-30 歌尔科技有限公司 Screen test tool and test method
CN111856315B (en) * 2020-07-24 2023-10-20 歌尔科技有限公司 Screen test tool and test method

Similar Documents

Publication Publication Date Title
CN108429909A (en) A kind of NVR power-off cycle automatic test approach
CN107632219A (en) A kind of automatic switching test system and its method of testing
CN202975216U (en) Automatic collector test tool system
CN205750510U (en) A kind of live working tools Intelligent storehouse management system
CN206696144U (en) Airborne dust monitors and automatic dustfall system
CN107688163A (en) A kind of performance detection analytical equipment of user power utilization information acquisition system
CN103412203A (en) Motor variable-frequency driver aging test device and test method thereof
CN104535953A (en) Automatic detection system and method of liquid crystal display screen of intelligent ammeter
CN104614439A (en) Nondestructive detection device and method based on electric-field fingerprinting method
CN103853138A (en) Power management system of wireless smart socket based on RFID
CN205940863U (en) Pointer instrument of transformer substation reading automatic identification equipment
CN203299287U (en) Water heater detection apparatus
CN203616401U (en) Online detection device used for electric reactor
CN109065975A (en) A kind of direct current system management system and its control method
CN107195174A (en) Acquisition terminal on-site calibrator
CN110147299B (en) Method and system for detecting abnormal power failure of SSD (solid State disk) complete machine
CN205228644U (en) Infrared temperature measurement system of substation equipment
CN107991629A (en) A kind of automatic method for rapidly testing of distribution terminal backup power supply
CN206945736U (en) Angular-rate sensor test device and system
CN206075033U (en) A kind of intelligent substation sequence debugging emulation equipment based on anti-misoperation locking
CN110687495B (en) Device, system and method for testing reliability of power failure active reporting function
CN102546053B (en) On-line automatic monitoring recording system and method of short-wave transmitter
CN108804269A (en) A kind of system and method controlling test RAID board stability based on domain
CN202817131U (en) Valve regulated lead acid battery (VRLA) online maintenance monitor
CN205103324U (en) 1553B data bus detector

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20180821

RJ01 Rejection of invention patent application after publication