CN109116141A - A kind of POE interchanger restarts the test method of power supply reliability - Google Patents
A kind of POE interchanger restarts the test method of power supply reliability Download PDFInfo
- Publication number
- CN109116141A CN109116141A CN201810784211.7A CN201810784211A CN109116141A CN 109116141 A CN109116141 A CN 109116141A CN 201810784211 A CN201810784211 A CN 201810784211A CN 109116141 A CN109116141 A CN 109116141A
- Authority
- CN
- China
- Prior art keywords
- time
- poe
- power supply
- power
- access controller
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000010998 test method Methods 0.000 title claims abstract description 14
- 238000012360 testing method Methods 0.000 claims description 47
- 230000002159 abnormal effect Effects 0.000 claims description 6
- 238000007689 inspection Methods 0.000 claims description 3
- 238000000034 method Methods 0.000 description 4
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
Classifications
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01R—MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
- G01R31/00—Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
- G01R31/003—Environmental or reliability tests
Landscapes
- Engineering & Computer Science (AREA)
- Environmental & Geological Engineering (AREA)
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Supply And Distribution Of Alternating Current (AREA)
- Power Sources (AREA)
Abstract
The present invention is suitable for POE interchanger field, provide the test method that a kind of POE interchanger restarts power supply reliability, including AC access controller, connect the POE interchanger of the AC access controller, connect the AP of the POE interchanger, connect the PC machine of the AC access controller or the POE interchanger, it is electrically connected the on-off electric equipment of the AC access controller and the POE interchanger, and it is electrically connected the on-off electric equipment, the power supply of the AP and the PC machine, power-on time and power-off time can be set in the on-off electric equipment, solve interchanger restart after power whether normal technical problem.
Description
Technical field
The invention belongs to the test sides that power supply reliability is restarted in POE interchanger field more particularly to a kind of POE interchanger
Method.
Background technique
Current test method is manually to restart interchanger after interchanger accesses PD, and rear power supply for exchange is restarted in observation
It is whether normal.The defect of this test mode: after a manpower power on/off must be expended, observe whether each port powers to PD
Success and power-on time, the testing time is long, low efficiency.And can not accurate geo-statistic PD power-on time, if desired thousands of times
Restart test, manual testing is difficult to realize.
Summary of the invention
The purpose of the present invention is to provide the test methods that a kind of POE interchanger restarts power supply reliability, it is intended to solve to hand over
Change planes power after restarting whether normal technical problem.
The invention is realized in this way a kind of POE interchanger restarts the test method of power supply reliability, including AC access control
Device processed connects the POE interchanger of the AC access controller, connects the AP of the POE interchanger, connects the AC access control
The PC machine of device or the POE interchanger is electrically connected the on-off electric equipment of the AC access controller and the POE interchanger,
And it is electrically connected the power supply of the on-off electric equipment, the AP and the PC machine, when power supply can be set in the on-off electric equipment
Between and power-off time, the test method the following steps are included:
Step S1: judging whether AC access controller can manage to all AP connected, if so, then by the IP of PC machine network interface card
The management IP address of address and AC access controller is set as same network segment, carries out next step operation, sets if not, being attached
Set inspection and handle, until AC access controller can manage to all AP connected, and by the IP address of PC machine network interface card with
The management IP address of AC access controller is set as same network segment, then carries out next step operation;
Step S2: P1, nominative testing time are denoted as by the AP quantity and nominative testing number of PC machine setting management, and by AP quantity
Number scale is NUM, starts to be tested;
Step S3: POE power supply for exchange test report will be tested out when testing, and POE power supply for exchange is tested and is reported
Result is accused to be saved;
Step S4: when testing time is the power-on time report that the NUM time test will obtain each AP, and by the power supply of each AP
Time report result is saved;
Step S5: being completed, and exports POE power supply for exchange test report and the power-on time report of each AP.
A further technical solution of the present invention is: the step S3 is further comprising the steps of:
Step S31: judging whether it is and test for the first time, if so, then reading the IP address of all AP, save as IP.txt file,
The IP address for carrying out all AP of Ping, saves as Ping log, in the AP quantity for reading the management of AC access controller, is denoted as P2;
If not, no longer reading the IP address of all AP, the IP address of all AP of Ping is directly carried out, Ping log is saved as, read
The AP quantity of AC access controller management, is denoted as P2;
Step S:32: judging whether AP quantity P1 is equal to P2, if so, then POE power supply for exchange is normal, normal number of powering adds
One, if not, POE power supply for exchange is abnormal, abnormal electrical power supply number adds one, records POE power supply for exchange test result, and save
In POE power supply for exchange test report.
A further technical solution of the present invention is: the step S4 is further comprising the steps of:
Step S41: judge whether it is the NUM times test, if so, then reading all Ping logs, and determined with Ping log
Institute's having time that AP starting works normally after POE interchanger is powered down to POE interchanger during entire circulation power on/off, is used
Institute's having time is individually subtracted POE interchanger power-off time and obtains POE interchanger to the power-on time of each AP, records each AP's
Power-on time finds out maximum/minimum/average value of the power-on time of each AP, and is stored in the power-on time report of each AP
In announcement, next step operation is carried out;If not, continuing to test.
The beneficial effects of the present invention are: can accurately count interchanger by such method, whether function is powered successfully,
And it can also obtain specific power-on time, not need manually to be restarted if you need to repeatedly be restarted test, and be not required to
The too long of testing time is spent, and then improves testing efficiency.
Detailed description of the invention
Fig. 1 is the step of a kind of POE interchanger provided in an embodiment of the present invention restarts the test method of power supply reliability stream
Cheng Tu.
Specific embodiment
Fig. 1 shows the test method that a kind of POE interchanger provided by the invention restarts power supply reliability, including AC access
Controller connects the POE interchanger of the AC access controller, connects the AP of the POE interchanger, connects the AC access control
The PC machine of device processed or the POE interchanger, the power on/off for being electrically connected the AC access controller and the POE interchanger are set
It is standby, and it is electrically connected the power supply of the on-off electric equipment, the AP and the PC machine, power supply can be set in the on-off electric equipment
Time and power-off time, the test method the following steps are included:
Step S1: judging whether AC access controller can manage to all AP connected, if so, then by the IP of PC machine network interface card
The management IP address of address and AC access controller is set as same network segment, carries out next step operation, sets if not, being attached
Set inspection and handle, until AC access controller can manage to all AP connected, and by the IP address of PC machine network interface card with
The management IP address of AC access controller is set as same network segment, then carries out next step operation;
Step S2: P1, nominative testing time are denoted as by the AP quantity and nominative testing number of PC machine setting management, and by AP quantity
Number scale is NUM, starts to be tested;
Step S3: POE power supply for exchange test report will be tested out when testing, and POE power supply for exchange is tested and is reported
Result is accused to be saved;
Step S31: judging whether it is and test for the first time, if so, then reading the IP address of all AP, save as IP.txt file,
The IP address for carrying out all AP of Ping, saves as Ping log, in the AP quantity for reading the management of AC access controller, is denoted as P2;
If not, no longer reading the IP address of all AP, the IP address of all AP of Ping is directly carried out, Ping log is saved as, read
The AP quantity of AC access controller management, is denoted as P2;
Step S:32: judging whether AP quantity P1 is equal to P2, if so, then POE power supply for exchange is normal, normal number of powering adds
One, if not, POE power supply for exchange is abnormal, abnormal electrical power supply number adds one, records POE power supply for exchange test result, and save
In POE power supply for exchange test report.
Step S4: testing when testing time for the NUM times will show that the power-on time of each AP is reported, and by each AP's
Power-on time report result is saved;
Step S41: judge whether it is the NUM times test, if so, then reading all Ping logs, and determined with Ping log
Institute's having time that AP starting works normally after POE interchanger is powered down to POE interchanger during entire circulation power on/off, is used
Institute's having time is individually subtracted POE interchanger power-off time and obtains POE interchanger to the power-on time of each AP, records each AP's
Power-on time finds out maximum/minimum/average value of the power-on time of each AP, and is stored in the power-on time report of each AP
In announcement, next step operation is carried out;If not, continuing to test.
Step S5: being completed, and exports POE power supply for exchange test report and the power-on time report of each AP.
Interchanger can accurately be counted by such method, and whether function is powered successfully, and can also be obtained specific
Power-on time does not need manually to be restarted, and does not need to spend the too long of testing time if you need to repeatedly be restarted test,
And then improve testing efficiency.
The foregoing is merely illustrative of the preferred embodiments of the present invention, is not intended to limit the invention, all in essence of the invention
Made any modifications, equivalent replacements, and improvements etc., should all be included in the protection scope of the present invention within mind and principle.
Claims (3)
1. a kind of POE interchanger restarts the test method of power supply reliability, including AC access controller, the AC access control is connected
The POE interchanger of device processed connects the AP of the POE interchanger, connects the PC of the AC access controller or the POE interchanger
Machine is electrically connected the on-off electric equipment of the AC access controller and the POE interchanger, and is electrically connected the power on/off and sets
Power-on time and power-off time can be set in the power supply of standby, the described AP and the PC machine, the on-off electric equipment, and feature exists
In, the test method the following steps are included:
Step S1: judging whether AC access controller can manage to all AP connected, if so, then by the IP of PC machine network interface card
The management IP address of address and AC access controller is set as same network segment, carries out next step operation, sets if not, being attached
Set inspection and handle, until AC access controller can manage to all AP connected, and by the IP address of PC machine network interface card with
The management IP address of AC access controller is set as same network segment, then carries out next step operation;
Step S2: P1, nominative testing time are denoted as by the AP quantity and nominative testing number of PC machine setting management, and by AP quantity
Number scale is NUM, starts to be tested;
Step S3: POE power supply for exchange test report will be tested out when testing, and POE power supply for exchange is tested and is reported
Result is accused to be saved;
Step S4: when testing time is the power-on time report that the NUM time test will obtain each AP, and by the power supply of each AP
Time report result is saved;
Step S5: being completed, and exports POE power supply for exchange test report and the power-on time report of each AP.
2. test method according to claim 1, which is characterized in that the step S3 is further comprising the steps of:
Step S31: judging whether it is and test for the first time, if so, then reading the IP address of all AP, save as IP.txt file,
The IP address for carrying out all AP of Ping, saves as Ping log, in the AP quantity for reading the management of AC access controller, is denoted as P2;
If not, no longer reading the IP address of all AP, the IP address of all AP of Ping is directly carried out, Ping log is saved as, read
The AP quantity of AC access controller management, is denoted as P2;
Step S:32: judging whether AP quantity P1 is equal to P2, if so, then POE power supply for exchange is normal, normal number of powering adds
One, if not, POE power supply for exchange is abnormal, abnormal electrical power supply number adds one, records POE power supply for exchange test result, and save
In POE power supply for exchange test report.
3. test method according to claim 1, which is characterized in that the step S4 is further comprising the steps of:
Step S41: judge whether it is the NUM times test, if so, then reading all Ping logs, and determined with Ping log
Institute's having time that AP starting works normally after POE interchanger is powered down to POE interchanger during entire circulation power on/off, is used
Institute's having time is individually subtracted POE interchanger power-off time and obtains POE interchanger to the power-on time of each AP, records each AP's
Power-on time finds out maximum/minimum/average value of the power-on time of each AP, and is stored in the power-on time report of each AP
In announcement, next step operation is carried out;If not, continuing to test.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810784211.7A CN109116141B (en) | 2018-07-17 | 2018-07-17 | Method for testing power supply reliability of POE switch restart |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810784211.7A CN109116141B (en) | 2018-07-17 | 2018-07-17 | Method for testing power supply reliability of POE switch restart |
Publications (2)
Publication Number | Publication Date |
---|---|
CN109116141A true CN109116141A (en) | 2019-01-01 |
CN109116141B CN109116141B (en) | 2020-12-15 |
Family
ID=64862800
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810784211.7A Expired - Fee Related CN109116141B (en) | 2018-07-17 | 2018-07-17 | Method for testing power supply reliability of POE switch restart |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109116141B (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN115208807A (en) * | 2022-09-14 | 2022-10-18 | 中兴系统技术有限公司 | POE switch test system and method |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2012142710A (en) * | 2010-12-28 | 2012-07-26 | Hitachi Systems Ltd | System and method of lan i/f switchover control, and program |
CN103095505A (en) * | 2013-02-05 | 2013-05-08 | 北京傲天动联技术股份有限公司 | Method and system for controlling power supply of power over Ethernet (POE) exchanger port |
CN105337795A (en) * | 2015-09-24 | 2016-02-17 | 上海斐讯数据通信技术有限公司 | POE switch testing device and detection method thereof |
CN105807155A (en) * | 2016-03-04 | 2016-07-27 | 太仓市同维电子有限公司 | Testing device and method for power cut and starting of electric devices |
US20170195179A1 (en) * | 2013-09-05 | 2017-07-06 | Pismo Labs Technology Limited | Methods and systems for managing a device through a manual information input module |
-
2018
- 2018-07-17 CN CN201810784211.7A patent/CN109116141B/en not_active Expired - Fee Related
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2012142710A (en) * | 2010-12-28 | 2012-07-26 | Hitachi Systems Ltd | System and method of lan i/f switchover control, and program |
CN103095505A (en) * | 2013-02-05 | 2013-05-08 | 北京傲天动联技术股份有限公司 | Method and system for controlling power supply of power over Ethernet (POE) exchanger port |
US20170195179A1 (en) * | 2013-09-05 | 2017-07-06 | Pismo Labs Technology Limited | Methods and systems for managing a device through a manual information input module |
CN105337795A (en) * | 2015-09-24 | 2016-02-17 | 上海斐讯数据通信技术有限公司 | POE switch testing device and detection method thereof |
CN105807155A (en) * | 2016-03-04 | 2016-07-27 | 太仓市同维电子有限公司 | Testing device and method for power cut and starting of electric devices |
Non-Patent Citations (1)
Title |
---|
HAIMENG WU 等: ""50W Power Device (PD) power in Power over Ethernet (PoE) system with input current balance in four-pair architecture with two DC/DC converters"", 《2010 TWENTY-FIFTH ANNUAL IEEE APPLIED POWER ELECTRONICS CONFERENCE AND EXPOSITION (APEC)》 * |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN115208807A (en) * | 2022-09-14 | 2022-10-18 | 中兴系统技术有限公司 | POE switch test system and method |
CN115208807B (en) * | 2022-09-14 | 2022-12-30 | 中兴系统技术有限公司 | POE switch test system and method |
Also Published As
Publication number | Publication date |
---|---|
CN109116141B (en) | 2020-12-15 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP2977770A1 (en) | Leakage current detection method and device | |
CN111585841B (en) | Automatic test method and related device | |
CN110008070A (en) | A kind of AEP memory AC test method powered off at random based on power supervisor | |
CN109240865A (en) | A kind of AC test method, device, terminal and the storage medium of AEP memory | |
CN105743707A (en) | Method for testing BMC log analysis function based on Redhat system | |
CN107273258A (en) | Method of testing and system are restarted in the automation of interchanger built in a kind of blade server | |
CN109116141A (en) | A kind of POE interchanger restarts the test method of power supply reliability | |
CN110767259A (en) | Power failure pressure test method for flash memory device | |
CN110489287B (en) | Method, system and storage medium for testing hot plug through Ipomitool | |
CN113590401B (en) | CPE equipment multifunctional test method, CPE equipment multifunctional test device, computer equipment and storage medium | |
CN109412819A (en) | Method and device for warning device power down | |
CN108599377A (en) | A kind of monitoring method of 230M power load controls communication base station | |
CN113687992B (en) | Method for electrifying and electrifying test of airborne equipment | |
CN102654845B (en) | Power detecting system and method | |
CN110658478A (en) | Testing method and device based on power supply balance signal stability and storage medium | |
CN208257508U (en) | A kind of monitoring device of 230M power load control communication base station | |
CN115437865A (en) | Method, device, equipment and medium for testing abnormal power failure of hard disk | |
CN213585156U (en) | Self-power-off circuit after display screen test | |
CN113589092A (en) | Fatigue machine, equipment power-on and power-off test system and power-on and power-off test method | |
CN210155240U (en) | System for testing high-low temperature power-off restart of Internet of things gateway | |
CN113687993A (en) | Onboard equipment power-on and power-off test system | |
CN107907762B (en) | Test method and system for detecting influence of BBU on stability of whole cabinet | |
CN105515918A (en) | Network awakening test method under SUSE Linux system | |
CN106257305B (en) | One kind obtaining source list automated detection method based on GNSS receiver hardware module | |
CN112904105A (en) | Method, device and system for testing initialization function of transformer substation relay protection device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20201215 |