support frame
vertical
reinforcing skeleton
concrete beam
vertical rod
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201621109865.2U
Other languages
Chinese (zh)
Inventor
杨锋
孙晓阳
曹浩
李贇
汤敏
曹刘明
朱小林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Eighth Engineering Division Co Ltd
Original Assignee
China Construction Eighth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Eighth Engineering Division Co Ltd filed Critical China Construction Eighth Engineering Division Co Ltd
Priority to CN201621109865.2U priority Critical patent/CN206233599U/en
Application granted granted Critical
Publication of CN206233599U publication Critical patent/CN206233599U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model provides a kind of concrete beam reinforcing skeleton constructing device, including the first support frame, second support frame, hanging beam and lifting driver part, first and second support frames it is longitudinally disposed and each other interval setting so as between the first and second support frames formed concrete beam reinforcing skeleton construction space, hanging beam laterally wears concrete beam reinforcing skeleton construction space and two ends are located in the first and second support frames respectively, lifting driver part is provided with first and second support frames, the two ends that lifting driver part in first and second support frames connects hanging beam respectively are used to lift hanging beam.It is preferred that also shelving longitudinal cross bar and the horizontal cross bar of middle part connection etc. including hanging beam.Additionally provide concrete beam reinforcing skeleton construction method.Concrete beam reinforcing skeleton constructing device of the present utility model causes concrete beam reinforcing skeleton short construction period, and efficiency of construction is high, and low cost, construction quality is good, designs ingenious, simple for structure, sets up simplicity, is suitable to large-scale promotion application.

Description

Concrete beam reinforcing skeleton constructing device
Technical field
The utility model is related to architectural engineering construction technique field, more particularly to concrete beam reinforcing skeleton construction technology neck Domain, specifically refers to a kind of concrete beam reinforcing skeleton constructing device.
Background technology
In architectural engineering, beams of concrete is generally used for frame structure, frame-shear-wall structure, and frame column falls within concrete It is most basic supporting member in the engineering structures such as building construction, bridge construction on beam or on beams of concrete crosspoint.
, limb number intensive for stirrup is more, steel area is big, closely spaced overlength super large beams of concrete, conventional construction method It is the welding angle bar frame spacer bar colligation in beam, long construction period, welding capacity is big, and work efficiency is low, high cost, and weld job breaks Bad waterproof and it is difficult to ensure that reinforcing bar dense part construction quality.
Accordingly, it is desirable to provide a kind of concrete beam reinforcing skeleton construction method, its short construction period, efficiency of construction is high, into This is low, and construction quality is good.
Utility model content
In order to overcome above-mentioned shortcoming of the prior art, a purpose of the present utility model is to provide a kind of beams of concrete Framework of steel reinforcement constructing device, it causes concrete beam reinforcing skeleton short construction period, and efficiency of construction is high, low cost, construction quality It is good, it is suitable to large-scale promotion application.
Another object of the present utility model is to provide a kind of concrete beam reinforcing skeleton constructing device, and its design is ingenious, It is simple for structure, simplicity is set up, it is suitable to large-scale promotion application.
To achieve the above objectives, in first aspect of the present utility model, there is provided a kind of concrete beam reinforcing skeleton construction dress Put, be characterized in, including the first support frame, the second support frame, hanging beam and lifting driver part, first support frame and described Second support frame it is longitudinally disposed and each other interval setting so as in first support frame and second support frame Between form concrete beam reinforcing skeleton construction space, the hanging beam laterally wears the concrete beam reinforcing skeleton construction space And two ends are located in first support frame and in second support frame respectively, with described second in first support frame The lifting driver part is provided with support, the lifting driver part in first support frame and described second The two ends that the lifting driver part in support connects described hanging beam respectively are used to lift the hanging beam.
It is preferred that the hanging beam is I-steel hanging beam.
It is preferred that the number of the hanging beam is many, many hanging beams are parallel to each other interval setting, and the lifting drives The number of part is the twice of the number of the hanging beam, the lifting driver part, described second in first support frame The lifting driver part and the hanging beam in support frame connect one to one.
It is preferred that first support frame and second support frame include some vertical vertical rods, some longitudinal cross bars With some horizontal cross bars, some vertical vertical rods be parallel to each other interval setting and formed the first vertical rod group and the second vertical rod group, The described vertical vertical rod in described vertical vertical rod and the second vertical rod group in the first vertical rod group along longitudinal arrangement, if Do longitudinal cross bar to be parallel to each other interval setting, every longitudinal cross bar connects described vertical in the first vertical rod group Described vertical vertical rod in vertical rod or the second vertical rod group, the horizontal cross bar is parallel to each other and interval setting and connects institute respectively The wherein one vertical vertical rod in the wherein one vertical vertical rod and the second vertical rod group in the first vertical rod group is stated, The lifting driver part is arranged on the horizontal cross bar, and the concrete beam reinforcing skeleton construction space is located at described first Between the first vertical rod group in the first vertical rod group and second support frame in support frame, the two of described hanging beam End is located between two adjacent vertical vertical rods of the first vertical rod group in first support frame and described the respectively Between two adjacent vertical vertical rods of the first vertical rod group in two support frames.
More preferably, first support frame and second support frame also include vertical hound, the vertical diagonal brace The top and bottom of bar connect two horizontal cross bars respectively, and this two horizontal cross bars are vertically setting up and down, described The connection that lifting driver part is arranged on this two described horizontal cross bars above of the horizontal cross bar is described vertical oblique On the position of strut.
More preferably, first support frame and second support frame also include vertical reinforcement vertical rod, described first First vertical rod in two adjacent vertical vertical rods and second support frame of the first vertical rod group in support Two adjacent vertical vertical rods of group are respectively connected with the vertical reinforcement vertical rod.
It is preferred that the concrete beam reinforcing skeleton constructing device also include vertical bridging, first support frame and Second support frame is respectively connected with the vertical bridging.
It is preferred that the concrete beam reinforcing skeleton constructing device also includes vertical throwing strut and transverse support bar, it is described Vertical one end for throwing strut connects one end of the transverse support bar, the upper and lower part of first support frame and described the The upper and lower part of two support frames be respectively connected with it is described it is vertical throw strut the other end and the transverse support bar it is another End.
It is preferred that the concrete beam reinforcing skeleton constructing device also includes top drawknot transverse direction cross bar, the top is drawn The horizontal cross bar of knot is located at the top of the concrete beam reinforcing skeleton construction space and two ends connect first support frame respectively With second support frame.
It is preferred that being detachably provided with hanging beam in first support frame and second support frame shelves longitudinal horizontal stroke Bar, the hanging beam shelves longitudinal cross bar in the lifting travel of the hanging beam, and the two ends of described hanging beam are respectively rested on institute State the hanging beam in the first support frame shelve on longitudinal cross bar and second support frame in the hanging beam shelve longitudinal horizontal stroke On bar.
It is preferred that being provided with spacing longitudinal cross bar, the coagulation in first support frame and second support frame Native beam reinforcement cages construction space is located in the described spacing longitudinal cross bar and second support frame in first support frame Described spacing longitudinal cross bar between.
It is preferred that the concrete beam reinforcing skeleton constructing device also includes that middle part connects horizontal cross bar, the middle part connects Connect horizontal cross bar laterally wear the concrete beam reinforcing skeleton construction space and two ends respectively be located at first support frame in Be detachably connected in second support frame and respectively first support frame and second support frame.
It is preferred that the lifting driver part includes Manual hoisting cucurbit and drawstring, it is in first support frame and described The Manual hoisting cucurbit is provided with second support frame, the Manual hoisting cucurbit connects the drawstring, described first The drawstring in the drawstring and second support frame in support connects the two ends of described hanging beam respectively.
It is preferred that the concrete beam reinforcing skeleton constructing device also includes riser guide, first support frame is neutralized The riser guide is provided with second support frame, the two ends of described hanging beam are located in first support frame respectively The riser guide in and second support frame in the riser guide in, the lifting driver part and the lifting Guide rail is equipped with for making the hanging beam be lifted along the riser guide.
In second aspect of the present utility model, a kind of concrete beam reinforcing skeleton construction method is passed through, has been characterized in, institute Concrete beam reinforcing skeleton construction method is stated using above-mentioned concrete beam reinforcing skeleton constructing device and is comprised the following steps:
(1) first support frame and second support are placed on the two of concrete beam reinforcing skeleton riding position Side, the concrete beam reinforcing skeleton construction space is located at the top of the concrete beam reinforcing skeleton riding position;
(2) in the concrete beam reinforcing skeleton construction space, concrete beam reinforcing skeleton is made on the hanging beam It is hung on the hanging beam with the concrete beam reinforcing skeleton that will be made;
(3) lifting driver part is operated by the hanging beam and the concrete joist steel being hung on the hanging beam Muscles and bones frame declines until the concrete beam reinforcing skeleton falls in the concrete beam reinforcing skeleton riding position;
(4) the concrete beam reinforcing skeleton constructing device is removed.
It is preferred that the concrete beam reinforcing skeleton constructing device in-site installation, the step (1) is also including step:Will First support frame and second support frame it is longitudinally disposed and each other interval setting so as at described first The concrete beam reinforcing skeleton construction space is formed between support and second support frame, the hanging beam is laterally worn into institute State concrete beam reinforcing skeleton construction space and two ends are located in first support frame and in second support frame respectively, In first support frame and the lifting driver part is respectively provided with second support frame, by first support frame The lifting driver part in the lifting driver part and second support frame connects the two ends of described hanging beam respectively For lifting the hanging beam.
It is preferred that the concrete beam reinforcing skeleton include beams of concrete on arrange longitudinal reinforcement, beams of concrete vertical stirrup, Arrange longitudinal reinforcement, beams of concrete lateral tie and beams of concrete longitudinal direction waist muscle under beams of concrete, the step (2) is hung described The operation that concrete beam reinforcing skeleton is made on beam specifically includes following steps:
(21) reinforcing bar position line is drawn on the hanging beam, will arranges vertical on the beams of concrete according to the reinforcing bar position line It is placed on the hanging beam to reinforcing bar;
(22) the beams of concrete vertical stirrup is articulated on the beams of concrete and is arranged on longitudinal reinforcement;
(23) bottom that longitudinal reinforcement connects the beams of concrete vertical stirrup will be arranged under the beams of concrete;
(24) the beams of concrete lateral tie vertically interval setting and is connected into the beams of concrete vertical stirrup;
(25) on the beams of concrete vertical stirrup of first support frame and in second support frame Beams of concrete longitudinal direction waist muscle is all connected with the beams of concrete vertical stirrup.
More preferably, the concrete beam reinforcing skeleton constructing device also includes that middle part connects horizontal cross bar, and the middle part connects Connect horizontal cross bar laterally wear the concrete beam reinforcing skeleton construction space and two ends respectively be located at first support frame in Be detachably connected in second support frame and respectively first support frame and second support frame;
After the step (24) and before the step (25), the system on the hanging beam of the step (2) The operation for making concrete beam reinforcing skeleton specifically also includes step:Beams of concrete longitudinal direction waist muscle is placed in the middle part connection On horizontal cross bar;
After the step (25), the work that concrete beam reinforcing skeleton is made on the hanging beam of the step (2) Sequence specifically also includes step:The middle part is connected into horizontal cross bar to remove.
It is preferred that in the concrete beam reinforcing skeleton constructing device, the number of the hanging beam is many, described in many Hanging beam is parallel to each other interval setting, and the number of the lifting driver part is the twice of the number of the hanging beam, described first The lifting driver part in the lifting driver part, second support frame and the hanging beam in support are corresponded Connection, the decline operation of the step (3) specifically includes step:Under operating the lifting driver part and making the hanging beam several times Drop, every time decline a segment distance, and along the concrete beam reinforcing skeleton centre to the hanging beam on the direction of both sides successively Delay once declines.
It is preferred that in the concrete beam reinforcing skeleton constructing device, first support frame and described second is supported Hanging beam is provided with frame and shelves longitudinal cross bar, the two ends of described hanging beam are respectively rested on described in first support frame The hanging beam that hanging beam shelves on longitudinal cross bar and in second support frame is shelved on longitudinal cross bar;The step (2) it Afterwards and before the step (3), the concrete beam reinforcing skeleton construction method also includes step:The operation lifting is driven Dynamic component makes the hanging beam rising shelve longitudinal cross bar so as to leave the hanging beam, the hanging beam then is shelved into longitudinal cross bar and is torn open Remove.
More preferably, after the step (1) and before the step (2), the concrete beam reinforcing skeleton is applied Work method also includes step:Operate the lifting driver part hanging beam is increased and shelve longitudinal horizontal stroke so as to leave the hanging beam Bar is until reach suitable construction location.
It is preferred that the step (4) specifically includes:
(41) hanging beam is removed from the lifting driver part;
(42) by first support frame and second support frame from described concrete beam reinforcing skeleton riding position Both sides remove;
(43) hanging beam is taken away from the concrete beam reinforcing skeleton.
The beneficial effects of the utility model are essentially consisted in:
1st, concrete beam reinforcing skeleton constructing device of the present utility model includes the first support frame, the second support frame, hanging beam And lifting driver part, the first support frame and the second support frame it is longitudinally disposed and each other interval setting so as to first Concrete beam reinforcing skeleton construction space is formed between support frame and the second support frame, hanging beam laterally wears concrete beam reinforcing bone Frame construction space and two ends are located at during the first support frame neutralizes the second support frame respectively, and the first support frame is neutralized in the second support frame Lifting driver part is provided with, the lifting driver part in lifting driver part and the second support frame in the first support frame point Not Lian Jie hanging beam two ends be used for lift hanging beam, so as to by hanging beam make concrete beam reinforcing skeleton and by lifting drive Dynamic component lifts hanging beam and concrete beam reinforcing skeleton is dropped into concrete beam reinforcing skeleton riding position, therefore so that it is mixed Solidifying soil beam reinforcement cages short construction period, efficiency of construction is high, and low cost, construction quality is good, is suitable to large-scale promotion application.
2nd, concrete beam reinforcing skeleton constructing device of the present utility model includes the first support frame, the second support frame, hanging beam And lifting driver part, the first support frame and the second support frame it is longitudinally disposed and each other interval setting so as to first Concrete beam reinforcing skeleton construction space is formed between support frame and the second support frame, hanging beam laterally wears concrete beam reinforcing bone Frame construction space and two ends are located at during the first support frame neutralizes the second support frame respectively, and the first support frame is neutralized in the second support frame Lifting driver part is provided with, the lifting driver part in lifting driver part and the second support frame in the first support frame point Not Lian Jie hanging beam two ends be used for lift hanging beam, so as to by hanging beam make concrete beam reinforcing skeleton and by lifting drive Dynamic component lifts hanging beam and concrete beam reinforcing skeleton is dropped into concrete beam reinforcing skeleton riding position, therefore, design is skilful It is wonderful, it is simple for structure, simplicity is set up, it is suitable to large-scale promotion application.
3rd, concrete beam reinforcing skeleton construction method of the present utility model is constructed using above-mentioned concrete beam reinforcing skeleton Device is simultaneously comprised the following steps:(1) the first support frame and the second support are placed on concrete beam reinforcing skeleton riding position Both sides, concrete beam reinforcing skeleton construction space is located at the top of concrete beam reinforcing skeleton riding position;(2) in beams of concrete In framework of steel reinforcement construction space, the concrete beam reinforcing skeleton for making concrete beam reinforcing skeleton that will make on hanging beam is hung It is located on hanging beam;(3) operation lifting driver part declines hanging beam and the concrete beam reinforcing skeleton being hung on hanging beam straight Fall in concrete beam reinforcing skeleton riding position to concrete beam reinforcing skeleton;(4) concrete beam reinforcing skeleton is constructed Device is removed, therefore, short construction period, efficiency of construction is high, low cost, and construction quality is good, is suitable to large-scale promotion application.
4th, concrete beam reinforcing skeleton construction method of the present utility model is constructed using above-mentioned concrete beam reinforcing skeleton Device is simultaneously comprised the following steps:(1) the first support frame and the second support are placed on concrete beam reinforcing skeleton riding position Both sides, concrete beam reinforcing skeleton construction space is located at the top of concrete beam reinforcing skeleton riding position;(2) in beams of concrete In framework of steel reinforcement construction space, the concrete beam reinforcing skeleton for making concrete beam reinforcing skeleton that will make on hanging beam is hung It is located on hanging beam;(3) operation lifting driver part declines hanging beam and the concrete beam reinforcing skeleton being hung on hanging beam straight Fall in concrete beam reinforcing skeleton riding position to concrete beam reinforcing skeleton;(4) concrete beam reinforcing skeleton is constructed Device is removed, therefore, design ingenious, it is easy to operate, it is suitable to large-scale promotion application.
These and other objects of the present utility model, feature and advantage, by following detailed descriptions, accompanying drawing and right will Try to achieve to fully demonstrate, and can be achieved by means, device and the combinations thereof specially pointed out in appended claims.
Brief description of the drawings
Fig. 1 is to be fabricated to coagulation using a specific embodiment of concrete beam reinforcing skeleton constructing device of the present utility model The schematic perspective view of native beam reinforcement cages.
Fig. 2 is the concrete beam reinforcing bone for using the specific embodiment shown in Fig. 1 to make the specific embodiment shown in Fig. 1 The schematic perspective view of concrete beam reinforcing skeleton riding position is dropped down onto under frame, wherein hanging beam shelves longitudinal cross bar and middle part connection Horizontal cross bar is first removed.
Fig. 3 is the schematic side view of the specific embodiment shown in Fig. 1, wherein not showing lifting driver part and middle part connection Horizontal cross bar.
Fig. 4 is the schematic front view of the specific embodiment shown in Fig. 1, wherein not showing lifting driver part and middle part connection Horizontal cross bar.
Fig. 5 is to use the specific embodiment shown in Fig. 1 to install the schematic side view that longitudinal reinforcement is arranged on beams of concrete.
Fig. 6 is to use the specific embodiment shown in Fig. 1 to install the schematic front view that longitudinal reinforcement is arranged on beams of concrete.
Fig. 7 is beams of concrete longitudinal direction stirrup to be installed on the basis of Fig. 5 and Fig. 6, longitudinal reinforcement is arranged under beams of concrete and mixed The schematic side view of solidifying soil beam lateral tie.
Fig. 8 is beams of concrete longitudinal direction stirrup to be installed on the basis of Fig. 5 and Fig. 6, longitudinal reinforcement is arranged under beams of concrete and mixed The schematic front view of solidifying soil beam lateral tie.
Fig. 9 is the schematic side view that horizontal cross bar is connected in the middle part of being installed on the basis of Fig. 7 and Fig. 8.
Figure 10 is the schematic front view that horizontal cross bar is connected in the middle part of being installed on the basis of Fig. 7 and Fig. 8.
Figure 11 is the schematic side view that beams of concrete longitudinal direction waist muscle is installed on the basis of Fig. 9 and Figure 10.
Figure 12 is the schematic front view that beams of concrete longitudinal direction waist muscle is installed on the basis of Fig. 9 and Figure 10.
Figure 13 is to install lifting driver part on the basis of Figure 11 and Figure 12 and middle part is connected into horizontal cross bar to remove Schematic side view.
Figure 14 is to install lifting driver part on the basis of Figure 11 and Figure 12 and middle part is connected into horizontal cross bar to remove Schematic front view.
Figure 15 is to shelve after longitudinal cross bar is removed hanging beam on the basis of Figure 13 and Figure 14 to decline hanging beam and beams of concrete The schematic side view of framework of steel reinforcement.
Figure 16 is to shelve after longitudinal cross bar is removed hanging beam on the basis of Figure 13 and Figure 14 to decline hanging beam and beams of concrete The schematic front view of framework of steel reinforcement.
Figure 17 is shown hanging beam and concrete beam reinforcing skeleton along the side-looking that longitudinal sequencing declines in Figure 15 and Figure 16 It is intended to.
Figure 18 is to decline in place afterwards to tear concrete beam reinforcing skeleton constructing device open in hanging beam and concrete beam reinforcing skeleton Schematic perspective view after removing.
Figure 19 is the main view close-up schematic view of the structure shown in Figure 18.
(symbol description)
11 concrete beam reinforcing skeletons;Longitudinal reinforcement is arranged on 111 beams of concretes;Longitudinal steel is arranged under 112 beams of concretes Muscle;113 beams of concrete vertical stirrups;114 beams of concrete lateral ties;115 beams of concretes longitudinal direction waist muscle;12 beams of concretes Framework of steel reinforcement constructing device;121 vertical vertical rods;122 longitudinal cross bars;The 123 horizontal cross bars of middle part connection;124 vertical diagonal braces Bar;125 vertical bridgings;126 vertical throwing struts;127 fasteners;128 Manual hoisting cucurbits;129 hanging beams;130 drawstrings; 131 top drawknot transverse direction cross bars;132 riser guides;133 spacing longitudinal cross bars;134 horizontal cross bars;135 first supports Frame;136 second support frames;137 lifting driver parts;138 concrete beam reinforcing skeleton construction spaces;139 first vertical rods Group;140 second vertical rod groups;141 vertical reinforcement vertical rods;142 transverse support bars;143 hanging beams shelve longitudinal cross bar;Under 201 Recess;202 concrete pad bars;203 bed courses;204 wooden springboards;205 steel plates;206 concrete beam reinforcing skeletons lay position Put.
Specific embodiment
In order to be more clearly understood that technology contents of the present utility model, described in detail especially exemplified by following examples.
Refer to shown in Fig. 1-Fig. 4, in concrete beam reinforcing skeleton constructing device 12 of the present utility model is specific real In applying example, concrete beam reinforcing skeleton constructing device 12 of the present utility model include the first support frame 135, the second support frame 136, Hanging beam 129 and lifting driver part 137, first support frame 135 and second support frame 136 is longitudinally disposed and phase Interval setting between first support frame 135 and second support frame 136 so that form concrete beam reinforcing between mutually Skeleton construction space 138, the hanging beam 129 laterally wears the concrete beam reinforcing skeleton construction space 138 and two ends are distinguished In first support frame 135 and in second support frame 136, with described second in first support frame 135 The lifting driver part 137, the lifting driver part 137 in first support frame 135 are provided with support 136 The two ends for connecting described hanging beam 129 respectively with the lifting driver part 137 in second support frame 136 are used to lift The hanging beam 129.It is preferred that the two ends of the hanging beam 129 extend through first support frame 135 and second support frame 136。
The hanging beam 129 can be any suitable hanging beam, refer to shown in Fig. 1-Fig. 4, in coagulation of the present utility model In one specific embodiment of native beam reinforcement cages constructing device 12, the hanging beam 129 is I-steel hanging beam.Such as 16# I-steel Hanging beam.
The number of the hanging beam 129 can determine as needed, it is preferred that the number of the hanging beam 129 is many, many The hanging beam 129 is parallel to each other interval setting, and the number of the lifting driver part 137 is the two of the number of the hanging beam 129 Times, the lifting in the lifting driver part 137, second support frame 136 in first support frame 135 drives Part 137 and the hanging beam 129 connect one to one.Refer to shown in Fig. 1-Fig. 4, in concrete beam reinforcing of the present utility model In one specific embodiment of skeleton constructing device 12, the number of the hanging beam 129 is 3.Spacing between the hanging beam 129 can Being such as 3000mm.
First support frame 135 and second support frame 136 can have any suitable structure, can with identical or Difference, it is preferred that first support frame 135 and second support frame 136 include some vertical vertical rods 121, some vertical To cross bar 122 and some horizontal cross bars 134, some vertical vertical rods 121 be parallel to each other interval setting and formed the first vertical rod The vertical rod group 140 of group 139 and second, described vertical vertical rod 121 and the second vertical rod group 140 in the first vertical rod group 139 In described vertical vertical rod 121 along longitudinal arrangement, some longitudinal cross bars 122 are parallel to each other interval setting, described in every Longitudinal cross bar 122 connects the described vertical vertical rod 121 in the first vertical rod group 139 or the institute in the second vertical rod group 140 State vertical vertical rod 121, the horizontal cross bar 134 is parallel to each other and interval setting and connects the first vertical rod group 139 respectively The wherein one vertical vertical rod 121 in the wherein one vertical vertical rod 121 and the second vertical rod group 140, the liter Drop driver part 137 is arranged on the horizontal cross bar 134, and the concrete beam reinforcing skeleton construction space 138 is located at described The the first vertical rod group 139 in the first vertical rod group 139 and second support frame 136 in first support frame 135 it Between, the two ends of described hanging beam 129 are located at two phases of the first vertical rod group 139 in first support frame 135 respectively Two of the first vertical rod group 139 between the adjacent vertical vertical rod 121 and in second support frame 136 are adjacent described perpendicular To between vertical rod 121.Refer to shown in Fig. 1-Fig. 4, the one of concrete beam reinforcing skeleton constructing device 12 of the present utility model In specific embodiment, first support frame 135 and second support frame 136 include that 16 vertical vertical rods 121,10 are indulged To cross bar 122 and 40 horizontal cross bars 134.It is preferred that the two ends of described hanging beam 129 are also located at first support frame 135 respectively In the second vertical rod group 140 two adjacent vertical vertical rods 121 between and second support frame 136 in it is described Between two adjacent vertical vertical rods 121 of the second vertical rod group 140.Positioned at the institute of the both sides at the two ends of described hanging beam 129 The longitudinal pitch for stating vertical vertical rod 121 can be such as 300mm, and the longitudinal pitch of other vertical vertical rods 121 can be example Such as 1350mm.
Vertical vertical rod 121 described above, longitudinal cross bar 122 and the horizontal cross bar 134 are by the vertical vertical rod 121 link together, i.e., described longitudinal cross bar 122 is connected with the vertical vertical rod 121, and the horizontal cross bar 134 is perpendicular with described Connected to vertical rod 121, so as to link together, it is clear that the vertical vertical rod 121, longitudinal cross bar 122 and the laterally horizontal stroke Can also be linked together by longitudinal cross bar 122 or the horizontal cross bar 134 between bar 134.
Can be using any suitable between the vertical vertical rod 121, longitudinal cross bar 122 and the horizontal cross bar 134 Structure be attached, refer to shown in Fig. 1-Fig. 4, the one of concrete beam reinforcing skeleton constructing device 12 of the present utility model In specific embodiment, fastener 127 is passed through between the vertical vertical rod 121, longitudinal cross bar 122 and the horizontal cross bar 134 It is attached.
In order to ensure first support frame 135 and second support frame 136 rear Equalsettlement loaded, described first The elongated wooden springboard of two-layer is laid between column group 139 and bed course 203 and between the second column group 140 and bed course 203 204 and one layer of steel plate 205, steel plate 205 is placed on wooden springboard 204.The thickness of steel plate 205 can be such as 2mm.
In order to strengthen the intensity of first support frame 135 and second support frame 136, more preferably, described first Support 135 and second support frame 136 also include vertical hound 124, the top and bottom of the vertical hound 124 Two horizontal cross bars 134 are connected respectively, this two horizontal cross bars 134 are vertically setting up and down, the lifting drives The connection that part 137 is arranged on this two described horizontal cross bars 134 above of the horizontal cross bar 134 is described vertical oblique On the position of strut 124.Refer to shown in Fig. 1-Fig. 4, in concrete beam reinforcing skeleton constructing device 12 of the present utility model In one specific embodiment, the upper end of the vertical hound 124 connects this two institutes above of the horizontal cross bar 134 The middle part of horizontal cross bar 134 is stated, the lower end of the vertical hound 124 is connected under this two being located at of the horizontal cross bar 134 The end of the described horizontal cross bar 134 of side, specifically away from the end of the concrete beam reinforcing skeleton construction space 138.
In order to strengthen the intensity of first support frame 135 and second support frame 136, more preferably, described first Support 135 and second support frame 136 also include it is vertical strengthen vertical rod 141, in first support frame 135 described the The first vertical rod group 139 in two adjacent vertical vertical rods 121 of one vertical rod group 139 and second support frame 136 Two adjacent vertical vertical rods 121 be respectively connected with it is described it is vertical reinforcement vertical rod 141.Refer to shown in Fig. 1-Fig. 4, in this reality In a specific embodiment with new concrete beam reinforcing skeleton constructing device 12, not only in first support frame 135 First vertical rod in two adjacent vertical vertical rods 121 of the first vertical rod group 139 and second support frame 136 Two adjacent vertical vertical rods 121 of group 139 are respectively connected with the vertical reinforcement vertical rod 141, and first support frame It is described in two adjacent vertical vertical rods 121 and second support frame 136 of the second vertical rod group 140 in 135 Two adjacent vertical vertical rods 121 of the second vertical rod group 140 are also respectively connected with the vertical reinforcement vertical rod 141.That is, Four vertical vertical rods 121 of the both sides at the two ends of hanging beam 129 are respectively connected with the vertical reinforcement vertical rod 141, so as to strengthen The bearing capacity of the vertical vertical rod 121, and then strengthen holding for the described horizontal cross bar 134 being connected with the vertical vertical rod 121 Loading capability, such that it is able to be driven on hanging beam 129 by the lifting driver part 137 on the horizontal cross bar 134 More weight concrete beam reinforcing skeleton 11.
In order to strengthen the intensity of first support frame 135 and second support frame 136, it is preferred that the concrete Beam reinforcement cages constructing device 12 also includes vertical bridging 125, first support frame 135 and second support frame 136 It is respectively connected with the vertical bridging 125.Refer to shown in Fig. 1-Fig. 4, applied in concrete beam reinforcing skeleton of the present utility model Frock is put in 12 specific embodiment, is included in first support frame 135 and second support frame 136 some vertical Vertical rod 121, some longitudinal cross bars 122 and some horizontal cross bars 134 and some vertical vertical rods 121 interval that is parallel to each other set In the case of putting and being formed the first vertical rod group 139 and the second vertical rod group 140, second vertical rod of first support frame 135 The described vertical vertical rod 121 of the second vertical rod group 140 of the described vertical vertical rod 121 and second support frame 136 of group 140 It is respectively connected with the vertical bridging 125.
In order to strengthen the intensity of first support frame 135 and second support frame 136, it is preferred that the concrete Beam reinforcement cages constructing device 12 also includes vertical throwing strut 126 and transverse support bar 142, the one of the vertical throwing strut 126 One end of the end connection transverse support bar 142, the upper and lower part of first support frame 135 and second support frame 136 upper and lower part be respectively connected with it is described it is vertical throw strut 126 the other end and the transverse support bar 142 it is another End.Refer to shown in Fig. 1-Fig. 4, in a specific embodiment of concrete beam reinforcing skeleton constructing device 12 of the present utility model In, include some vertical vertical rods 121, some longitudinal cross bars in first support frame 135 and second support frame 136 122 and some horizontal cross bars 134 and some vertical vertical rods 121 be parallel to each other and interval setting and form the first vertical rod group 139 and second in the case of vertical rod group 140, the described vertical vertical rod of the second vertical rod group 140 of first support frame 135 The described vertical vertical rod 121 of the second vertical rod group 140 of 121 upper and lower part and second support frame 136 it is upper Portion and bottom are respectively connected with the other end of the vertical other end and the transverse support bar 142 for throwing strut 126.Change sentence Talk about, described vertical one end for throwing strut 126 connects one end of the transverse support bar 142, it is described vertical to throw the another of strut 126 The other end of one end and the transverse support bar 142 connects the second vertical rod group 140 of first support frame 135 respectively The upper and lower part of the vertical vertical rod 121;It is another to have vertical throwing strut 126 and the transverse support bar 142, Described vertical one end for throwing strut 126 connects one end of the transverse support bar 142, the vertical other end for throwing strut 126 Connected respectively with the other end of the transverse support bar 142 described in the second vertical rod group 140 of second support frame 136 The upper and lower part of vertical vertical rod 121.
In order to strengthen the intensity of first support frame 135 and second support frame 136, it is preferred that the concrete Beam reinforcement cages constructing device 12 also includes top drawknot transverse direction cross bar 131, and the top drawknot transverse direction cross bar 131 is located at described The top and two ends of concrete beam reinforcing skeleton construction space 138 connect first support frame 135 and described second respectively Support 136.Refer to shown in Fig. 1-Fig. 4, in concrete beam reinforcing skeleton constructing device 12 of the present utility model is specific real Apply in example, include that some vertical vertical rods 121, some longitudinal directions are horizontal in first support frame 135 and second support frame 136 Bar 122 and some horizontal cross bars 134 and some vertical vertical rods 121 be parallel to each other interval setting and formed the first vertical rod group 139 and second in the case of vertical rod group 140, and the two ends of the top drawknot transverse direction cross bar 131 not only connect described first respectively The vertical upright column 121 of the first column group 139 of support frame 135 and described the first of second support frame 136 stands The vertical upright column 121 of post group 139, and the institute of the second column group 140 of first support frame 135 is connected respectively State the vertical upright column 121 of the second column group 140 of vertical upright column 121 and second support frame 136.
For the ease of operation, it is preferred that detachably being set in first support frame 135 and second support frame 136 It is equipped with hanging beam and shelves longitudinal cross bar 143, the hanging beam is shelved longitudinal cross bar 143 and is located in the lifting travel of the hanging beam 129, institute The hanging beam that the two ends of the hanging beam 129 stated are respectively rested in first support frame 135 is shelved on longitudinal cross bar 143 and institute The hanging beam stated in the second support frame 136 is shelved on longitudinal cross bar 143.Refer to shown in Fig. 1-Fig. 4, of the present utility model In one specific embodiment of concrete beam reinforcing skeleton constructing device 12, in first support frame 135 and second support Frame 136 includes some vertical vertical rods 121, some longitudinal cross bars 122 and some horizontal cross bars 134 and some described vertical vertical Bar 121 is parallel to each other interval setting and in the case of forming the first vertical rod group 139 and the second vertical rod group 140, and not only described first The described vertical vertical rod 121 of the first vertical rod group 139 of support frame 135 and described the first of second support frame 136 is stood The described vertical vertical rod 121 of bar group 139 is removably connected with the hanging beam and shelves longitudinal cross bar 143, and described first The described vertical vertical rod 121 and second vertical rod of second support frame 136 of the second vertical rod group 140 of support 135 The described vertical vertical rod 121 of group 140 is also removably connected with the hanging beam and shelves longitudinal cross bar 143.
In order to spacing to the concrete beam reinforcing skeleton 11 being made, it is preferred that first support frame 135 and described second It is provided with spacing longitudinal cross bar 133 in support frame 136, the concrete beam reinforcing skeleton construction space 138 is located at described the The described spacing longitudinal cross bar 133 in described spacing longitudinal cross bar 133 and second support frame 136 in one support frame 135 Between.Refer to shown in Fig. 1-Fig. 4, in a specific embodiment of concrete beam reinforcing skeleton constructing device 12 of the present utility model In, include some vertical vertical rods 121, some longitudinal cross bars in first support frame 135 and second support frame 136 122 and some horizontal cross bars 134 and some vertical vertical rods 121 be parallel to each other and interval setting and form the first vertical rod group 139 and second in the case of vertical rod group 140, the described vertical vertical rod of the first vertical rod group 139 of first support frame 135 121 and second support frame 136 the first vertical rod group 139 described vertical vertical rod 121 be respectively connected with it is described spacing vertical To cross bar 133.
For the ease of operation, it is preferred that the concrete beam reinforcing skeleton constructing device 12 also includes that middle part connects laterally Cross bar 123, the horizontal cross bar 123 of middle part connection laterally wears the concrete beam reinforcing skeleton construction space 138 and two ends Respectively be located at first support frame 135 in and second support frame 136 in and be detachably connected respectively it is described first support Frame 135 and second support frame 136.Refer to shown in Fig. 1-Fig. 4, in concrete beam reinforcing skeleton of the present utility model construction In one specific embodiment of device 12, include in first support frame 135 and second support frame 136 some vertical vertical Bar 121, some longitudinal cross bars 122 and some horizontal cross bars 134 and some vertical vertical rods 121 are parallel to each other interval setting And in the case of forming the first vertical rod group 139 and the second vertical rod group 140, the two ends of the horizontal cross bar 123 of middle part connection are not only The vertical upright column 121 and described second of the first column group 139 of first support frame 135 is detachably connected respectively The vertical upright column 121 of the first column group 139 of support frame 136, and first support is detachably connected respectively The vertical upright column 121 and the second column group of second support frame 136 of the second column group 140 of frame 135 140 vertical upright column 121.
The lifting driver part 137 can be suitably composed with any, it is preferred that the lifting driver part 137 Including Manual hoisting cucurbit 128 and drawstring 130, it is provided with first support frame 135 and in second support frame 136 The Manual hoisting cucurbit 128, the Manual hoisting cucurbit 128 connects the drawstring 130, in first support frame 135 The drawstring 130 in the drawstring 130 and second support frame 136 connects the two ends of described hanging beam 129 respectively.Please join As shown in Fig. 1-Fig. 4, in a specific embodiment of concrete beam reinforcing skeleton constructing device 12 of the present utility model, described First support frame 135 and second support frame 136 include some vertical vertical rods 121, some longitudinal cross bars 122 and some horizontal strokes In the case of to cross bar 134 and also including vertical hound 124, the Manual hoisting calabash in first support frame 135 Reed 128 is arranged on the described horizontal cross bar 134 in first support frame 135 position for connecting the vertical hound 124, The Manual hoisting cucurbit 128 in second support frame 136 is arranged on the laterally horizontal stroke in second support frame 136 The position of the vertical hound 124 is connected on bar 134.
The drawstring 130 can be any suitable drawstring, constructed in concrete beam reinforcing skeleton of the present utility model and filled Put in 12 specific embodiment, the drawstring 130 is steel wire rope, for example 14# steel wire ropes (four strands).
For the ease of being oriented to the hanging beam 129, it is preferred that the concrete beam reinforcing skeleton constructing device 12 also includes rising Drop guide rail 132, in first support frame 135 and is provided with the riser guide 132, institute in second support frame 136 The two ends of the hanging beam 129 stated are located in the riser guide 132 in first support frame 135 and the described second support respectively In the riser guide 132 in frame 136, the lifting driver part 137 is equipped with for making with the riser guide 132 The hanging beam 129 is lifted along the riser guide 132.Refer to shown in Fig. 1-Fig. 4, in concrete beam reinforcing of the present utility model In one specific embodiment of skeleton constructing device 12, if including in first support frame 135 and second support frame 136 Dry vertical vertical rod 121, some longitudinal cross bars 122 and some horizontal cross bars 134 and some vertical vertical rods 121 are parallel to each other In the case of interval setting and the first vertical rod group 139 of formation and the second vertical rod group 140, the riser guide 132 is not only by described Two adjacent vertical upright columns 121 of the first vertical rod group 139 are formed, but also by two phases of the second vertical rod group 140 The adjacent vertical upright column 121 is formed.Include the situation of Manual hoisting cucurbit 128 and drawstring 130 in the lifting driver part 137 Under, the Manual hoisting cucurbit 128 is located at the top of the riser guide 132.
Above-mentioned rod member can be any suitable rod member, in concrete beam reinforcing skeleton constructing device 12 of the present utility model A specific embodiment in, above-mentioned rod member is steel pipe.The diameter of steel pipe can be such as 48mm.
Refer to shown in Fig. 5-Figure 19, in a specific implementation of concrete beam reinforcing skeleton construction method of the present utility model In example, the concrete beam reinforcing skeleton construction method carried out using concrete beam reinforcing skeleton constructing device 12 of the present utility model May comprise steps of:
(1) first support frame 135 and second support frame 136 are placed in concrete beam reinforcing skeleton riding position 206 both sides, the concrete beam reinforcing skeleton construction space 138 is located at the concrete beam reinforcing skeleton riding position 206 Top;
(2) in the concrete beam reinforcing skeleton construction space 138, concrete joist steel is made on the hanging beam 129 Muscles and bones frame 11 is hung on the hanging beam 129 with the concrete beam reinforcing skeleton 11 that will be made;
(3) operate the lifting driver part 137 by the hanging beam 129 and described in being hung on the hanging beam 129 Concrete beam reinforcing skeleton 11 declines until the concrete beam reinforcing skeleton 11 falls in concrete beam reinforcing skeleton peace Put on position 206;
(4) the concrete beam reinforcing skeleton constructing device 12 is removed.
The size of the concrete beam reinforcing skeleton 11 can as needed determine that the concrete beam reinforcing skeleton is constructed The size of device 12 determines according to the size of the concrete beam reinforcing skeleton 11, it is ensured that the concrete beam reinforcing skeleton construction Size of the size in space 138 more than the concrete beam reinforcing skeleton 11.The size of the concrete beam reinforcing skeleton 11 can Being that such as 70m is long, 1.6m is high, 3.84m is wide.
Due to the absolute altitude 600mm of the absolute altitude less than bed course 203 of usual concrete beam reinforcing skeleton riding position 206, formed Lower recess 201, to reduce reinforcement installation difficulty, the height of hanging beam 129 should mix the distance from bottom of concrete beam reinforcing skeleton 11 The solidifying at least 600mm of soil beam reinforcement cages riding position 206, so that beams of concrete vertical stirrup 113, beams of concrete horizontal stroke is left in bottom To the installing space of stirrup 114.
Because the weight of concrete beam reinforcing skeleton 11 is overweight, the single weight of concrete beam reinforcing skeleton 11 about 60t, mixed Concrete pad bar 202 is set along the longitudinal direction used as concrete cover, coagulation in solidifying soil beam reinforcement cages riding position 206 The spacing 1000mm of native cushion block bar 202 is set together.Concrete pad bar 202 can be that for example C40 concrete pads bar is wide 300mm, 100mm high, length with the concrete beam reinforcing skeleton 11 width.
The concrete beam reinforcing skeleton constructing device 12 can in advance be installed and then lifted to correct position, it is also possible to existing Field is installed, and is referred to shown in Fig. 5-Figure 19, in a specific implementation of concrete beam reinforcing skeleton construction method of the present utility model In example, the in-site installation of concrete beam reinforcing skeleton constructing device 12, the step (1) also includes step:By described first Support frame 135 and second support frame 136 it is longitudinally disposed and each other interval setting so as to described first support The concrete beam reinforcing skeleton construction space 138 is formed between frame 135 and second support frame 136, by the hanging beam 129 Laterally wear the concrete beam reinforcing skeleton construction space 138 and two ends are located in first support frame 135 and institute respectively State in the second support frame 136, the lifting is respectively provided with first support frame 135 and in second support frame 136 and is driven Dynamic component 137, by the institute in the lifting driver part 137 in first support frame 135 and second support frame 136 State lifting driver part 137 and connect the two ends of described hanging beam 129 respectively for lifting the hanging beam 129.
The concrete beam reinforcing skeleton 11 can be suitably composed with any, refer to shown in Fig. 5-Figure 19, at this In one specific embodiment of the concrete beam reinforcing skeleton construction method of utility model, the concrete beam reinforcing skeleton 11 includes Row's longitudinal reinforcement 112, beams of concrete under longitudinal reinforcement 111, beams of concrete vertical stirrup 113, beams of concrete is arranged on beams of concrete Lateral tie 114 and beams of concrete longitudinal direction waist muscle 115, the step (2) make concrete beam reinforcing on the hanging beam 129 The operation of skeleton 11 specifically includes following steps:
(21) reinforcing bar position line (not shown) is drawn on the hanging beam 129, according to the reinforcing bar position line by institute Row's longitudinal reinforcement 111 on beams of concrete is stated to be placed on the hanging beam 129 (see Fig. 5-Fig. 6);
(22) the beams of concrete vertical stirrup 113 is articulated on the beams of concrete and is arranged on longitudinal reinforcement 111 (see figure 7- Fig. 8);
(23) by under the beams of concrete arrange longitudinal reinforcement 112 connect the beams of concrete vertical stirrup 113 bottom (see Fig. 7-Fig. 8);
(24) the beams of concrete lateral tie 114 vertically interval setting and is connected into the beams of concrete vertical stirrup 113 (see Fig. 7-Fig. 8);
(25) on the beams of concrete vertical stirrup 113 of first support frame 135 and at described second Beams of concrete longitudinal direction waist muscle 115 is all connected with the beams of concrete vertical stirrup 113 of support 136 (see Figure 11-Figure 12).
For the ease of operation, the concrete beam reinforcing skeleton constructing device 12 also includes that middle part connects horizontal cross bar 123, When the concrete beam reinforcing skeleton constructing device 12 also includes that middle part connects horizontal cross bar 123, of the present utility model mixed In one specific embodiment of solidifying soil beam reinforcement cages construction method, after the step (24) and the step (25) it Before, the operation that concrete beam reinforcing skeleton 11 is made on the hanging beam 129 of the step (2) specifically also includes step:Will The beams of concrete longitudinal direction waist muscle 115 is placed on the horizontal cross bar 123 of middle part connection;It is described after the step (25) The operation that concrete beam reinforcing skeleton 11 is made on the hanging beam 129 of step (2) specifically also includes step:By the middle part The horizontal cross bar 123 of connection is removed (see shown in Figure 11-Figure 14).
The horizontal cross bar 123 of middle part connection can installed at the very start, it is also possible to be installed when needing to use, please Referring to shown in Fig. 7-Figure 10, in a specific embodiment of concrete beam reinforcing skeleton construction method of the present utility model, middle part The horizontal cross bar 123 of connection is installed after the step (24) and before the step (25), specifically, described first Support frame 135 and second support frame 136 include some vertical vertical rods 121, some longitudinal cross bars 122 and some laterally horizontal strokes Bar 134 and some vertical vertical rods 121 be parallel to each other interval setting and formed the first vertical rod group 139 and the second vertical rod group In the case of 140, the two ends of the horizontal cross bar 123 of middle part connection not only connect described the first of first support frame 135 respectively The described vertical of the first column group 139 of the vertical upright column 121 of column group 139 and second support frame 136 stands Post 121, and the vertical upright column 121 of the second column group 140 of first support frame 135 and described is connected respectively The vertical upright column 121 of the second column group 140 of the second support frame 136.
For the installation site for ensureing the longitudinal waist muscle 115 of beams of concrete is accurate, vertically averagely at interval of three beams of concretes Longitudinal waist muscle 115 sets one horizontal cross bar 123 of middle part connection to be used for the placement of the longitudinal waist muscle 115 of beams of concrete and is easy to coagulation The installation of the longitudinal waist muscle 115 of Tu Liang.
The number of the hanging beam 129 can determine as needed, shown in Figure 17, in concrete of the present utility model In one specific embodiment of beam reinforcement cages construction method, when the number of the hanging beam 129 is many, the step (3) Decline operation and specifically include step:Operating the lifting driver part 137 makes the hanging beam 129 decline several times, declines every time One segment distance, and centre along the concrete beam reinforcing skeleton 11 postpones one successively to the hanging beam 129 on the direction of both sides Secondary decline.That is, as shown in figure 17, being fallen before once positioned at middle hanging beam 129, decline a segment distance;Then in the middle of Hanging beam 129 decline again once, decline a segment distance, the hanging beam 129 of the both sides of the hanging beam 129 declines once respectively, declines one Segment distance;Then the hanging beam 129 in the middle of declines once again, declines a segment distance, and the hanging beam 129 of the both sides of the hanging beam 129 is distinguished Decline again once, decline a segment distance, the hanging beam 129 in the outside of the hanging beam 129 of the both sides of the hanging beam 129 declines one respectively It is secondary, decline a segment distance, by that analogy, until the concrete beam reinforcing skeleton 11 is put in place.The distance of decline can be Such as 100mm.Graduation mark can be indicated on vertical upright column 121.
For the ease of installing, in the concrete beam reinforcing skeleton constructing device 12, first support frame 135 and institute State and be provided with hanging beam in the second support frame 136 and shelve longitudinal cross bar 143, the two ends of described hanging beam 129 are respectively rested on institute State the hanging beam in the first support frame 135 shelve on longitudinal cross bar 143 and second support frame 136 in the hanging beam put Put on longitudinal cross bar 143, in this case, as described above, before the step (1) is started, the concrete beam reinforcing Lifting driver part 137 can be installed in skeleton constructing device 12, certainly, lifting driver part 137 can also not installed first, Installed again until needing, referred to shown in Fig. 5-Figure 14, in concrete beam reinforcing skeleton construction method of the present utility model In one specific embodiment, lifting driver part 137 is not installed first, and lifting is needed after the completion of concrete beam reinforcing skeleton 11 Installed again before the preceding i.e. step (3).Shelving longitudinal cross bar 143 due to hanging beam hinders hanging beam 129 to decline, therefore under needs Removed, it is necessary to hanging beam is shelved into longitudinal cross bar 143 during drop hanging beam 129, referred to shown in Figure 15-Figure 16, of the present utility model In one specific embodiment of concrete beam reinforcing skeleton construction method, after the step (2) and the step (3) it Before, the concrete beam reinforcing skeleton construction method also includes step:Operating the lifting driver part 137 makes the hanging beam 129 risings shelve longitudinal cross bar 143 so as to leave the hanging beam, the hanging beam then is shelved into longitudinal cross bar 143 and is removed.Rise Distance can determine as needed, such as 50-100mm.After the dismounting hanging beam shelves longitudinal cross bar 143, the lifting Guide rail 132 is unobstructed, the two ends of the hanging beam 129 can oscilaltion wherein, foregoing concrete beam reinforcing bone can be carried out Frame 11 is progressively from centre to two ends segmental hoisting decentralization, in place.
If the hanging beam that two ends are respectively rested in first support frame 135 is shelved on longitudinal cross bar 143 and institute The hanging beam 129 that the hanging beam in the second support frame 136 shelved on longitudinal cross bar 143 is stated in making concrete The correct position of beam reinforcement cages 11, at this moment needs first to install the lifting driver part 137, example before the step (2) Lifting driver part 137 has been installed in concrete beam reinforcing skeleton constructing device 12 as described, so that, in the step (1) after and before the step (2), the concrete beam reinforcing skeleton construction method also includes step:Operation is described Lifting driver part 137 rises the hanging beam 129 to shelve longitudinal cross bar 143 until reaching suitable so as to leave the hanging beam Construction location.
After the completion of the concrete beam reinforcing skeleton 11 is transferred, and in the concrete beam reinforcing skeleton constructing device Before 12 remove, can further check whether the position of concrete beam reinforcing skeleton 11 is accurate, protective layer thickness is to meet the requirements.
The concrete beam reinforcing skeleton constructing device 12 is removed can be adopted in any suitable manner, be based primarily upon institute The structure of concrete beam reinforcing skeleton constructing device 12 is stated, the one of concrete beam reinforcing skeleton construction method of the present utility model In specific embodiment, the step (4) specifically includes:
(41) hanging beam 129 is removed from the lifting driver part 137;
(42) first support frame 135 and second support frame 136 are pacified from described concrete beam reinforcing skeleton Remove the both sides for putting position 206;
(43) hanging beam 129 is taken away from the concrete beam reinforcing skeleton 11.
If the two ends of the hanging beam 129 extend through first support frame 135 and second support frame 136, First the hanging beam 129 can be removed from the lifting driver part 137, then by the hanging beam 129 from described first Taken away in support 135, the concrete beam reinforcing skeleton 11 and second support frame 136, then by first support frame 135 Removed from the both sides of described concrete beam reinforcing skeleton riding position 206 with second support frame 136.And, assembling is mixed It is also more convenient during solidifying soil beam reinforcement cages constructing device 12, first can respectively assemble the first support frame 135 and the second support frame 136, hanging beam 129 is then worn into mixing between the first support frame 135, the first support frame 135 and the second support frame 136 successively again Solidifying soil beam reinforcement cages construction space 138 and the second support frame 136.
Concrete beam reinforcing skeleton 11 after the concrete beam reinforcing skeleton constructing device 12 is removed refers to Figure 18 With shown in Figure 19.
Therefore, concrete beam reinforcing skeleton construction method of the present utility model can directly using of the present utility model advance The concrete beam reinforcing skeleton constructing device for assembling is constructed, it is also possible to assemble concrete joist steel of the present utility model on demand The associated components of muscles and bones frame constructing device carry out the correlation step of concrete beam reinforcing skeleton construction.
The utility model provides concrete beam reinforcing skeleton constructing device and construction method, it is adaptable to which stirrup is intensive, limb Number is more, and steel area is big, the construction of closely spaced large span heavy in section beams of concrete.The utility model is a kind of suitable for large span The construction technology that heavy in section concrete beam reinforcing skeleton integral hoisting is installed, two are set up using concrete beam reinforcing skeleton both sides Support frame, upper lateral connects hanging beam and lifts on hanging beam across hanging beam, concrete beam reinforcing skeleton carry by lifting driver part Mode adjust concrete beam reinforcing skeleton upper-lower position, be easy to the colligation of cage bar and stirrup.
Concrete beam reinforcing skeleton constructing device of the present utility model and construction method are in mounting platform design, Lift-on/Lift-off System The aspects such as making, procedure arrangement and quality control have the creativeness and referentiability of uniqueness.Reinforcement construction difficulty is reduced, is improved Efficiency of construction, reinforcing bar accurate positioning, concrete formation quality is good, and single beam steel is installed and shortens more than 35 days duration, is obtained Preferable economic and social benefit.
Using framework of steel reinforcement integral hoisting installation Technology, overlength super large concrete beam reinforcing has not only been smoothly completed Construction, more have accumulated large span heavy in section high density major diameter beam steel semi-finished product construction technology, be similar engineering construction product Tire out rich experience, also provide new method and think of to solve overlength super large beams of concrete high density reinforcing bar installation question Road, with certain application value.
To sum up, concrete beam reinforcing skeleton constructing device of the present utility model causes concrete beam reinforcing skeleton construction period Short, efficiency of construction is high, low cost, and construction quality is good, designs ingenious, simple for structure, sets up simplicity, and being suitable to large-scale promotion should With.
As can be seen here, the purpose of this utility model is achieved completely and effectively.Function of the present utility model and Structural principle is shown and is illustrated in embodiment, and under without departing substantially from the principle, implementation method can make any modification.Institute So that the utility model includes all variant embodiments based on claim spirit and right.

Claims (7)

1. a kind of concrete beam reinforcing skeleton constructing device, it is characterised in that including the first support frame, the second support frame, hanging beam And lifting driver part, first support frame and second support frame it is longitudinally disposed and each other interval setting from And concrete beam reinforcing skeleton construction space is formed between first support frame and second support frame, the hanging beam is horizontal To wear the concrete beam reinforcing skeleton construction space and two ends respectively be located at first support frame in and described second In support, in first support frame and the lifting driver part, described first are provided with second support frame The lifting driver part in the lifting driver part and second support frame in support connects described hanging respectively The two ends of beam are used to lift the hanging beam.
2. concrete beam reinforcing skeleton constructing device as claimed in claim 1, it is characterised in that the number of the hanging beam is many Root, many hanging beams are parallel to each other interval setting, and the number of the lifting driver part is the twice of the number of the hanging beam, The lifting driver part in the lifting driver part, second support frame in first support frame and described hang Beam connects one to one.
3. concrete beam reinforcing skeleton constructing device as claimed in claim 1, it is characterised in that first support frame and institute Stating the second support frame includes some vertical vertical rods, some longitudinal cross bars and some horizontal cross bars, some vertical vertical rod phases Mutual parallel interval sets and forms the first vertical rod group and the second vertical rod group, described vertical vertical rod and institute in the first vertical rod group The described vertical vertical rod in the second vertical rod group is stated along longitudinal arrangement, some longitudinal cross bars are parallel to each other interval setting, often It is described vertical in described vertical vertical rod or the second vertical rod group in longitudinal cross bar connection the first vertical rod group described in root Vertical rod, the horizontal cross bar be parallel to each other interval setting and connect respectively wherein one in the first vertical rod group it is described vertical The wherein one vertical vertical rod in vertical rod and the second vertical rod group, the lifting driver part is arranged on described laterally horizontal On bar, the concrete beam reinforcing skeleton construction space is located at the first vertical rod group and described the in first support frame Between the first vertical rod group in two support frames, the two ends of described hanging beam are described in first support frame respectively Two of the first vertical rod group between two adjacent vertical vertical rods of the first vertical rod group and in second support frame Between the adjacent vertical vertical rod.
4. concrete beam reinforcing skeleton constructing device as claimed in claim 1, it is characterised in that first support frame and institute State and be detachably provided with the second support frame hanging beam and shelve longitudinal cross bar, the hanging beam shelves longitudinal cross bar positioned at the hanging beam Lifting travel in, the hanging beam that the two ends of described hanging beam are respectively rested in first support frame shelves longitudinal cross bar The hanging beam in upper and second support frame is shelved on longitudinal cross bar.
5. concrete beam reinforcing skeleton constructing device as claimed in claim 1, it is characterised in that first support frame and institute State and be provided with the second support frame spacing longitudinal cross bar, the concrete beam reinforcing skeleton construction space is located at described first Between the described spacing longitudinal cross bar in described spacing longitudinal cross bar and second support frame in support.
6. concrete beam reinforcing skeleton constructing device as claimed in claim 1, it is characterised in that the concrete beam reinforcing bone Frame constructing device also includes that middle part connects horizontal cross bar, and the horizontal cross bar of middle part connection laterally wears the concrete beam reinforcing Skeleton construction space and two ends are located in first support frame and are detachably connected in second support frame and respectively respectively First support frame and second support frame.
7. concrete beam reinforcing skeleton constructing device as claimed in claim 1, it is characterised in that the concrete beam reinforcing bone Frame constructing device also includes riser guide, the lifting is provided with first support frame and in second support frame and is led Rail, the two ends of described hanging beam are located in the riser guide in first support frame and in second support frame respectively The riser guide in, the lifting driver part is equipped with for making the hanging beam along the liter with the riser guide Drop lifting rail.
CN201621109865.2U 2016-10-10 2016-10-10 Concrete beam reinforcing skeleton constructing device Expired - Fee Related CN206233599U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621109865.2U CN206233599U (en) 2016-10-10 2016-10-10 Concrete beam reinforcing skeleton constructing device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621109865.2U CN206233599U (en) 2016-10-10 2016-10-10 Concrete beam reinforcing skeleton constructing device

Publications (1)

Publication Number Publication Date
CN206233599U true CN206233599U (en) 2017-06-09

Family

ID=58982118

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621109865.2U Expired - Fee Related CN206233599U (en) 2016-10-10 2016-10-10 Concrete beam reinforcing skeleton constructing device

Country Status (1)

Country Link
CN (1) CN206233599U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106639328A (en) * 2016-10-10 2017-05-10 中国建筑第八工程局有限公司 Concrete beam steel reinforcement framework construction device and method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106639328A (en) * 2016-10-10 2017-05-10 中国建筑第八工程局有限公司 Concrete beam steel reinforcement framework construction device and method

Similar Documents

Publication Publication Date Title
CN102493346A (en) Upper air anti-collision guardrail module transfer hanging bracket and construction method
CN205742991U (en) A kind of truss-like hydraulic pressure integral steel platform jumping formwork
CN110528402B (en) Construction method of ultra-wide box girder multi-truss-piece combined hanging basket
CN107905114B (en) A kind of construction method of large span Successive interference cancellation
CN105839543B (en) Bridge High-pier rises outrigger over-form construction technique certainly
CN105568870B (en) For the triangle hanging basket method cantilever device and its construction method of cross-line bridge construction
CN104120877B (en) A kind of hydraulic climbing die block system and climbing form method
CN101672013A (en) Cable-stayed bailey hanging bracket without balance weight
CN106522112A (en) Cable-stayed bridge side span beam section erecting system and method thereof
CN206902566U (en) A kind of arch rib bridge girder cantilever construction Hanging Basket
CN107761571A (en) Needle beam combined steel plate beam bridge panel cast-in-place construction sliding form frame system and its application
CN105239510A (en) Dismounting beam support used for high pier small-radius curve cast-in-situ box beam and construction method
CN105781101A (en) Truss type hydraulic entire steel platform climbing formwork
CN106639328A (en) Concrete beam steel reinforcement framework construction device and method
CN106042173B (en) Bridge production system
CN206233600U (en) Overlength super large beams of concrete installs the apparatus capable of fluctuating of reinforcing bar
CN205954489U (en) Stride cast -in -place space of business line steel structure construction protection on bridge and move movable support
CN206467991U (en) The operation platform that a kind of building main body construction protection and exterior wall finishing are integrated
CN206233599U (en) Concrete beam reinforcing skeleton constructing device
CN105484165B (en) Integrated prestress tensioning frame structure and manufacturing and using methods thereof
CN207498835U (en) Needle beam combined steel plate beam bridge panel cast-in-place construction sliding form frame system
CN106758868A (en) End bay cast-in-place section construction structure and construction method based on Hanging Basket Yu truss-like nose girder
CN206157569U (en) Protective platform is construct to portable bridge
CN108252218A (en) A kind of large span cable-carried arch bridge steel lagging jack external wrapping concrete bed die slide device
CN206646795U (en) Housing construction is greatly across double-deck moving operation car device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170609

CF01 Termination of patent right due to non-payment of annual fee