CN206219974U - The assembled attachment structure of prefabricated bent cap and prefabricated stand column - Google Patents

The assembled attachment structure of prefabricated bent cap and prefabricated stand column Download PDF

Info

Publication number
CN206219974U
CN206219974U CN201621294876.2U CN201621294876U CN206219974U CN 206219974 U CN206219974 U CN 206219974U CN 201621294876 U CN201621294876 U CN 201621294876U CN 206219974 U CN206219974 U CN 206219974U
Authority
CN
China
Prior art keywords
prefabricated
bent cap
stand column
column
attachment structure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201621294876.2U
Other languages
Chinese (zh)
Inventor
陈颖
王添龙
冯家辉
谭宇华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong University of Technology
Original Assignee
Guangdong University of Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong University of Technology filed Critical Guangdong University of Technology
Priority to CN201621294876.2U priority Critical patent/CN206219974U/en
Application granted granted Critical
Publication of CN206219974U publication Critical patent/CN206219974U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Rod-Shaped Construction Members (AREA)

Abstract

The utility model belongs to the technical field of bridge attachment structure design, it is the assembled attachment structure of a kind of prefabricated bent cap and prefabricated stand column, including prefabricated bent cap and prefabricated stand column, the prefabricated bent cap is provided with the big cylinder hole groove being mutually communicated up and down, and the bottom surface of bent cap is prefabricated to be provided with four small columns;A big cylinder is provided with the middle of the prefabricated stand column top, big cylinder is formed around four small column hole grooves.After the completion of the assembly mutually nested with prefabricated stand column of prefabricated bent cap, anchored by the implantation high-strength bolt bar that drills in relevant position, prefabricated bent cap and prefabricated stand column are connected as entirety.

Description

The assembled attachment structure of prefabricated bent cap and prefabricated stand column
Technical field
The utility model is related to the technical field that bridge attachment structure is designed, more particularly to a kind of prefabricated bent cap to be stood with prefabricated The assembled attachment structure of post.
Background technology
At present, with the continuous propulsion that Chinese Urbanization is built, people gradually propose green ring to Urban Bridge Construction Guarantor, the construction requirements of efficient energy-saving.Urban Bridge cast in situs generally requires blocked road when constructing, and the construction period is long, construction Quality is difficult to control, and support in construction, template consumption are big, and operating expenses is high, directly affects the road of construction point Ability, and carry out the pollution such as dust, noise to urban belt when concrete material construction and transport, have a strong impact on citizens' activities and life Bioplasm amount, often results in larger resentment, and the requirement with urban construction and development is incompatible with.
It is one of emphasis of bridge construction that bent cap in bridge is connected with column.If pier column uses precast plant with bent cap It is prefabricated, after on-site hoisting is in place, the connected mode of assembled bent cap and column, then can parallel construction, greatly shorten the construction period, subtract It is small concrete shrinkage can be reduced to surrounding traffic, the influence of resident living, and element precast, the deformation for causing of creeping, construction Quality is guaranteed, there is preferable society, environmental benefit.With cast in situs pier column compared with bent cap, assembly pier stands Post and bent cap have can scale it is prefabricated, transport and it is easy for installation the advantages of, obtain relatively widely answering in bridge construction field With.According to being actually needed for bridge modernization construction, need that a kind of bonding strength of invention is high badly, easy construction effectively, economic benefit Good prefabricated bent cap and the assembled attachment structure of prefabricated stand column.
Utility model content
To meet being actually needed for Urban Bridge modernization construction, the utility model proposes a kind of bonding strength it is high, construction It is simple and effective, good in economic efficiency for prefabricated bent cap and the assembled attachment structure of prefabricated stand column.
To achieve these goals, the technical solution of the utility model is as follows:
The assembled attachment structure of a kind of prefabricated bent cap and prefabricated stand column, including prefabricated bent cap 1 and prefabricated stand column 2, it is described pre- Bent cap processed 1 is provided with the big cylinder hole groove 3 being mutually communicated up and down, and the bottom surface of prefabricated bent cap 1 is prefabricated to be provided with four small columns 4;It is described A big cylinder 5 is provided with the middle of the top of prefabricated stand column 2, big cylinder is formed around four small column hole grooves 6.
Four small columns 4 be cased with FRP pipe, FRP pipes imbedded in advance with the bottom surface junction of prefabricated bent cap 1 it is certain Depth is in bent cap body;The big cylinder 5 is cased with FRP pipes, and FRP pipes are with the embedment in advance of the top surface junction of prefabricated stand column 2 necessarily Depth in column.
The size of the big cylinder hole groove 3 of the prefabricated bent cap 1 matches with the size of the big cylinder 5 of the prefabricated stand column 2, The size of the small column 4 of the prefabricated bent cap 1 matches with the size of the small column hole groove 6 of the prefabricated stand column 2, so that described Prefabricated bent cap 1 and the mutually nested assembly of prefabricated stand column 2.
It is high-strength by the implantation that drills in relevant position after the completion of the assembly mutually nested with prefabricated stand column 2 of prefabricated bent cap 1 Shank of bolt 7 is anchored, and prefabricated bent cap 1 and prefabricated stand column 2 are connected as into entirety.
In sum, the utility model each several part component is prefabricated in the factory, existing in construction without poured in place concrete After the hoisting prefabricated bent cap 1 in field and the assembly of prefabricated stand column 2, only need to be by the implantation anchoring of high-strength bolt bar 7, the connection knot of drilling Structure construction is convenient, and difficulty is low, and prefabricated bent cap 1 and prefabricated stand column 2 are connected as into entirety well.
Brief description of the drawings
Fig. 1 is a kind of structural representation of the present utility model;
Fig. 2 is the plan of the prefabricated bent cap of the utility model;
Fig. 3 is the elevation of the prefabricated bent cap of the utility model;
Fig. 4 is the plan of the utility model prefabricated stand column;
Fig. 5 is the elevation of the utility model prefabricated stand column.
Specific embodiment
The utility model is described further below in conjunction with accompanying drawing:
In figure:The prefabricated bent caps of 1-, 2- prefabricated stand columns, the big cylinder hole grooves of 3-, 4- small columns, the big cylinders of 5-, 6- small columns hole Groove, 7- high-strength bolt bars.
Embodiment:The assembled attachment structure of prefabricated bent cap and prefabricated stand column, including prefabricated bent cap 1 as shown in the figure is vertical with prefabricated Post 2, the prefabricated bent cap 1 is provided with the big cylinder hole groove 3 being mutually communicated up and down, the bottom surface of prefabricated bent cap 1 is prefabricated be provided with four it is small Cylinder 4;A big cylinder 5 is provided with the middle of the top of the prefabricated stand column 2, big cylinder is formed around four small column hole grooves 6.It is described Four small columns 4 are cased with FRP pipes, and FRP pipes are imbedding certain depth in bent cap body in advance with the bottom surface junction of prefabricated bent cap 1 In;The big cylinder 5 is cased with FRP pipes, and FRP pipes are imbedding certain depth in column in advance with the top surface junction of prefabricated stand column 2 In.The size of the big cylinder hole groove 3 of the prefabricated bent cap 1 matches with the size of the big cylinder 5 of the prefabricated stand column 2, described The size of the small column 4 of prefabricated bent cap 1 matches with the size of the small column hole groove 6 of the prefabricated stand column 2, so that described prefabricated Bent cap 1 and the mutually nested assembly of prefabricated stand column 2.After the completion of the assembly mutually nested with prefabricated stand column 2 of prefabricated bent cap 1, in phase Answer position to pass through drilling implantation high-strength bolt bar 7 to anchor, prefabricated bent cap 1 and prefabricated stand column 2 are connected as entirety.
Implementation steps:
(1) prefabrication bent cap and prefabricated stand column;
(2) the prefabricated bent cap of on-site hoisting assembly mutually nested with prefabricated stand column;
(3) drilled in the relevant position of bent cap and column;
(4) anchored by being implanted into high-strength bolt bar in bore position, prefabricated bent cap and prefabricated stand column are connected as entirety.

Claims (3)

1. the assembled attachment structure of prefabricated bent cap and prefabricated stand column, including prefabricated bent cap (1) and prefabricated stand column (2), its feature exist In the prefabricated bent cap (1) is provided with big cylinder hole groove (3) being mutually communicated up and down, and the bottom surface of prefabricated bent cap (1) is prefabricated to be provided with four Root small column (4);A big cylinder (5) is provided with the middle of prefabricated stand column (2) top, big cylinder is formed around four small columns Hole groove (6).
2. the assembled attachment structure of prefabricated bent cap according to claim 1 and prefabricated stand column, it is characterised in that described four Small column (4) is cased with FRP pipes, and FRP pipes are imbedding certain depth in bent cap body in advance with prefabricated bent cap (1) bottom surface junction In;The big cylinder (5) be cased with FRP pipe, FRP pipes with prefabricated stand column (2) top surface junction imbed in advance certain depth in In column.
3. the assembled attachment structure of prefabricated bent cap according to claim 1 and prefabricated stand column, it is characterised in that described prefabricated After the completion of bent cap (1) assembly mutually nested with prefabricated stand column (2), by drilling, implantation high-strength bolt bar (7) is anchored.
CN201621294876.2U 2016-11-22 2016-11-22 The assembled attachment structure of prefabricated bent cap and prefabricated stand column Expired - Fee Related CN206219974U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621294876.2U CN206219974U (en) 2016-11-22 2016-11-22 The assembled attachment structure of prefabricated bent cap and prefabricated stand column

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621294876.2U CN206219974U (en) 2016-11-22 2016-11-22 The assembled attachment structure of prefabricated bent cap and prefabricated stand column

Publications (1)

Publication Number Publication Date
CN206219974U true CN206219974U (en) 2017-06-06

Family

ID=58786988

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621294876.2U Expired - Fee Related CN206219974U (en) 2016-11-22 2016-11-22 The assembled attachment structure of prefabricated bent cap and prefabricated stand column

Country Status (1)

Country Link
CN (1) CN206219974U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108103936A (en) * 2017-11-03 2018-06-01 上海公路桥梁(集团)有限公司 The method that prefabricated bent cap is installed on column
CN112112052A (en) * 2020-08-26 2020-12-22 绍兴文理学院 Prefabricated bent cap longitudinal connecting system for assembled beam bridge and construction method of prefabricated bent cap longitudinal connecting system
CN112921796A (en) * 2021-04-02 2021-06-08 樊涛 Reinforced steel structure bridge prefabricated assembly

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108103936A (en) * 2017-11-03 2018-06-01 上海公路桥梁(集团)有限公司 The method that prefabricated bent cap is installed on column
CN112112052A (en) * 2020-08-26 2020-12-22 绍兴文理学院 Prefabricated bent cap longitudinal connecting system for assembled beam bridge and construction method of prefabricated bent cap longitudinal connecting system
CN112921796A (en) * 2021-04-02 2021-06-08 樊涛 Reinforced steel structure bridge prefabricated assembly

Similar Documents

Publication Publication Date Title
CN207244839U (en) A kind of Self-resetting precast concrete concrete frame joint
CN103741604B (en) Totally-prefabricated assembling type reinforced concrete bridge splicing structure and attaching method thereof
CN203296175U (en) Rectangular steel pipe column assembly type column foot
CN204282199U (en) Pile-column concrete hollow pile bridge pier structure
CN206219974U (en) The assembled attachment structure of prefabricated bent cap and prefabricated stand column
CN103161223A (en) Anti-pulling embedded-type gate-type steel frame steel-joint column foot and construction method thereof
CN202000251U (en) Cylindrical hollow prefabricated prestressed concrete pier structure
CN106869567A (en) A kind of energy-dissipating type cold-formed thin-walled steel pipe concrete Lateral Resistant System
CN105970993A (en) Underwater connection structure for precast piles and precast bearing platform, and construction method thereof
CN200974956Y (en) Prestressed concrete box girder
CN108999281A (en) A kind of novel precast concrete bean column node and its construction method
CN205662838U (en) Prestressing force joint construction of pier is assembled to prefabricated segment
CN202969410U (en) SCOPE type pipe tower foundation
CN202187340U (en) Socketed pile with concrete-filled steel tube core column
CN103741961B (en) To boost sales after the prefabricated circular hole slab of existing building the dark seismic strengthening of beams method of key
CN202989755U (en) Integral-casting and fabricated prestressing force bridge structure
CN202936804U (en) Prestressed pile based on post-tensioning method
CN206035045U (en) Prefabricated assembled underground granary of endocyst plastics
CN209523212U (en) Assembled isolated footing
CN209468856U (en) A kind of assembly concrete column beam connecting node
CN208202343U (en) A kind of steel core concrete column
CN104895190A (en) Beam column hinge node enabling middle beam to be directly arranged at top of column and construction method thereof
CN202324198U (en) Anti-pulling embedded fixed column base for portal-rigid frame
CN205205847U (en) Frame construction of stake cushion cap
CN204356793U (en) A kind of assembling hollow reinforced concrete independent foundation

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170606

Termination date: 20191122

CF01 Termination of patent right due to non-payment of annual fee