The assembled attachment structure of prefabricated bent cap and prefabricated stand column Download PDFInfo
- Publication number
- CN206219974U CN206219974U CN201621294876.2U CN201621294876U CN206219974U CN 206219974 U CN206219974 U CN 206219974U CN 201621294876 U CN201621294876 U CN 201621294876U CN 206219974 U CN206219974 U CN 206219974U
- Authority
- CN
- China
- Prior art keywords
- prefabricated
- bent cap
- stand column
- column
- attachment structure
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Rod-Shaped Construction Members (AREA)
Abstract
The utility model belongs to the technical field of bridge attachment structure design, it is the assembled attachment structure of a kind of prefabricated bent cap and prefabricated stand column, including prefabricated bent cap and prefabricated stand column, the prefabricated bent cap is provided with the big cylinder hole groove being mutually communicated up and down, and the bottom surface of bent cap is prefabricated to be provided with four small columns;A big cylinder is provided with the middle of the prefabricated stand column top, big cylinder is formed around four small column hole grooves.After the completion of the assembly mutually nested with prefabricated stand column of prefabricated bent cap, anchored by the implantation high-strength bolt bar that drills in relevant position, prefabricated bent cap and prefabricated stand column are connected as entirety.
Description
Technical field
The utility model is related to the technical field that bridge attachment structure is designed, more particularly to a kind of prefabricated bent cap to be stood with prefabricated
The assembled attachment structure of post.
Background technology
At present, with the continuous propulsion that Chinese Urbanization is built, people gradually propose green ring to Urban Bridge Construction
Guarantor, the construction requirements of efficient energy-saving.Urban Bridge cast in situs generally requires blocked road when constructing, and the construction period is long, construction
Quality is difficult to control, and support in construction, template consumption are big, and operating expenses is high, directly affects the road of construction point
Ability, and carry out the pollution such as dust, noise to urban belt when concrete material construction and transport, have a strong impact on citizens' activities and life
Bioplasm amount, often results in larger resentment, and the requirement with urban construction and development is incompatible with.
It is one of emphasis of bridge construction that bent cap in bridge is connected with column.If pier column uses precast plant with bent cap
It is prefabricated, after on-site hoisting is in place, the connected mode of assembled bent cap and column, then can parallel construction, greatly shorten the construction period, subtract
It is small concrete shrinkage can be reduced to surrounding traffic, the influence of resident living, and element precast, the deformation for causing of creeping, construction
Quality is guaranteed, there is preferable society, environmental benefit.With cast in situs pier column compared with bent cap, assembly pier stands
Post and bent cap have can scale it is prefabricated, transport and it is easy for installation the advantages of, obtain relatively widely answering in bridge construction field
With.According to being actually needed for bridge modernization construction, need that a kind of bonding strength of invention is high badly, easy construction effectively, economic benefit
Good prefabricated bent cap and the assembled attachment structure of prefabricated stand column.
Utility model content
To meet being actually needed for Urban Bridge modernization construction, the utility model proposes a kind of bonding strength it is high, construction
It is simple and effective, good in economic efficiency for prefabricated bent cap and the assembled attachment structure of prefabricated stand column.
To achieve these goals, the technical solution of the utility model is as follows:
The assembled attachment structure of a kind of prefabricated bent cap and prefabricated stand column, including prefabricated bent cap 1 and prefabricated stand column 2, it is described pre-
Bent cap processed 1 is provided with the big cylinder hole groove 3 being mutually communicated up and down, and the bottom surface of prefabricated bent cap 1 is prefabricated to be provided with four small columns 4;It is described
A big cylinder 5 is provided with the middle of the top of prefabricated stand column 2, big cylinder is formed around four small column hole grooves 6.
Four small columns 4 be cased with FRP pipe, FRP pipes imbedded in advance with the bottom surface junction of prefabricated bent cap 1 it is certain
Depth is in bent cap body;The big cylinder 5 is cased with FRP pipes, and FRP pipes are with the embedment in advance of the top surface junction of prefabricated stand column 2 necessarily
Depth in column.
The size of the big cylinder hole groove 3 of the prefabricated bent cap 1 matches with the size of the big cylinder 5 of the prefabricated stand column 2,
The size of the small column 4 of the prefabricated bent cap 1 matches with the size of the small column hole groove 6 of the prefabricated stand column 2, so that described
Prefabricated bent cap 1 and the mutually nested assembly of prefabricated stand column 2.
It is high-strength by the implantation that drills in relevant position after the completion of the assembly mutually nested with prefabricated stand column 2 of prefabricated bent cap 1
Shank of bolt 7 is anchored, and prefabricated bent cap 1 and prefabricated stand column 2 are connected as into entirety.
In sum, the utility model each several part component is prefabricated in the factory, existing in construction without poured in place concrete
After the hoisting prefabricated bent cap 1 in field and the assembly of prefabricated stand column 2, only need to be by the implantation anchoring of high-strength bolt bar 7, the connection knot of drilling
Structure construction is convenient, and difficulty is low, and prefabricated bent cap 1 and prefabricated stand column 2 are connected as into entirety well.
Brief description of the drawings
Fig. 1 is a kind of structural representation of the present utility model;
Fig. 2 is the plan of the prefabricated bent cap of the utility model;
Fig. 3 is the elevation of the prefabricated bent cap of the utility model;
Fig. 4 is the plan of the utility model prefabricated stand column;
Fig. 5 is the elevation of the utility model prefabricated stand column.
Specific embodiment
The utility model is described further below in conjunction with accompanying drawing:
In figure:The prefabricated bent caps of 1-, 2- prefabricated stand columns, the big cylinder hole grooves of 3-, 4- small columns, the big cylinders of 5-, 6- small columns hole
Groove, 7- high-strength bolt bars.
Embodiment:The assembled attachment structure of prefabricated bent cap and prefabricated stand column, including prefabricated bent cap 1 as shown in the figure is vertical with prefabricated
Post 2, the prefabricated bent cap 1 is provided with the big cylinder hole groove 3 being mutually communicated up and down, the bottom surface of prefabricated bent cap 1 is prefabricated be provided with four it is small
Cylinder 4;A big cylinder 5 is provided with the middle of the top of the prefabricated stand column 2, big cylinder is formed around four small column hole grooves 6.It is described
Four small columns 4 are cased with FRP pipes, and FRP pipes are imbedding certain depth in bent cap body in advance with the bottom surface junction of prefabricated bent cap 1
In;The big cylinder 5 is cased with FRP pipes, and FRP pipes are imbedding certain depth in column in advance with the top surface junction of prefabricated stand column 2
In.The size of the big cylinder hole groove 3 of the prefabricated bent cap 1 matches with the size of the big cylinder 5 of the prefabricated stand column 2, described
The size of the small column 4 of prefabricated bent cap 1 matches with the size of the small column hole groove 6 of the prefabricated stand column 2, so that described prefabricated
Bent cap 1 and the mutually nested assembly of prefabricated stand column 2.After the completion of the assembly mutually nested with prefabricated stand column 2 of prefabricated bent cap 1, in phase
Answer position to pass through drilling implantation high-strength bolt bar 7 to anchor, prefabricated bent cap 1 and prefabricated stand column 2 are connected as entirety.
Implementation steps:
(1) prefabrication bent cap and prefabricated stand column;
(2) the prefabricated bent cap of on-site hoisting assembly mutually nested with prefabricated stand column;
(3) drilled in the relevant position of bent cap and column;
(4) anchored by being implanted into high-strength bolt bar in bore position, prefabricated bent cap and prefabricated stand column are connected as entirety.
Claims (3)
1. the assembled attachment structure of prefabricated bent cap and prefabricated stand column, including prefabricated bent cap (1) and prefabricated stand column (2), its feature exist
In the prefabricated bent cap (1) is provided with big cylinder hole groove (3) being mutually communicated up and down, and the bottom surface of prefabricated bent cap (1) is prefabricated to be provided with four
Root small column (4);A big cylinder (5) is provided with the middle of prefabricated stand column (2) top, big cylinder is formed around four small columns
Hole groove (6).
2. the assembled attachment structure of prefabricated bent cap according to claim 1 and prefabricated stand column, it is characterised in that described four
Small column (4) is cased with FRP pipes, and FRP pipes are imbedding certain depth in bent cap body in advance with prefabricated bent cap (1) bottom surface junction
In;The big cylinder (5) be cased with FRP pipe, FRP pipes with prefabricated stand column (2) top surface junction imbed in advance certain depth in
In column.
3. the assembled attachment structure of prefabricated bent cap according to claim 1 and prefabricated stand column, it is characterised in that described prefabricated
After the completion of bent cap (1) assembly mutually nested with prefabricated stand column (2), by drilling, implantation high-strength bolt bar (7) is anchored.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621294876.2U CN206219974U (en) | 2016-11-22 | 2016-11-22 | The assembled attachment structure of prefabricated bent cap and prefabricated stand column |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621294876.2U CN206219974U (en) | 2016-11-22 | 2016-11-22 | The assembled attachment structure of prefabricated bent cap and prefabricated stand column |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206219974U true CN206219974U (en) | 2017-06-06 |
Family
ID=58786988
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201621294876.2U Expired - Fee Related CN206219974U (en) | 2016-11-22 | 2016-11-22 | The assembled attachment structure of prefabricated bent cap and prefabricated stand column |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206219974U (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108103936A (en) * | 2017-11-03 | 2018-06-01 | 上海公路桥梁(集团)有限公司 | The method that prefabricated bent cap is installed on column |
CN112112052A (en) * | 2020-08-26 | 2020-12-22 | 绍兴文理学院 | Prefabricated bent cap longitudinal connecting system for assembled beam bridge and construction method of prefabricated bent cap longitudinal connecting system |
CN112921796A (en) * | 2021-04-02 | 2021-06-08 | 樊涛 | Reinforced steel structure bridge prefabricated assembly |
-
2016
- 2016-11-22 CN CN201621294876.2U patent/CN206219974U/en not_active Expired - Fee Related
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108103936A (en) * | 2017-11-03 | 2018-06-01 | 上海公路桥梁(集团)有限公司 | The method that prefabricated bent cap is installed on column |
CN112112052A (en) * | 2020-08-26 | 2020-12-22 | 绍兴文理学院 | Prefabricated bent cap longitudinal connecting system for assembled beam bridge and construction method of prefabricated bent cap longitudinal connecting system |
CN112921796A (en) * | 2021-04-02 | 2021-06-08 | 樊涛 | Reinforced steel structure bridge prefabricated assembly |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN207244839U (en) | A kind of Self-resetting precast concrete concrete frame joint | |
CN103741604B (en) | Totally-prefabricated assembling type reinforced concrete bridge splicing structure and attaching method thereof | |
CN203296175U (en) | Rectangular steel pipe column assembly type column foot | |
CN204282199U (en) | Pile-column concrete hollow pile bridge pier structure | |
CN206219974U (en) | The assembled attachment structure of prefabricated bent cap and prefabricated stand column | |
CN103161223A (en) | Anti-pulling embedded-type gate-type steel frame steel-joint column foot and construction method thereof | |
CN202000251U (en) | Cylindrical hollow prefabricated prestressed concrete pier structure | |
CN106869567A (en) | A kind of energy-dissipating type cold-formed thin-walled steel pipe concrete Lateral Resistant System | |
CN105970993A (en) | Underwater connection structure for precast piles and precast bearing platform, and construction method thereof | |
CN200974956Y (en) | Prestressed concrete box girder | |
CN108999281A (en) | A kind of novel precast concrete bean column node and its construction method | |
CN205662838U (en) | Prestressing force joint construction of pier is assembled to prefabricated segment | |
CN202969410U (en) | SCOPE type pipe tower foundation | |
CN202187340U (en) | Socketed pile with concrete-filled steel tube core column | |
CN103741961B (en) | To boost sales after the prefabricated circular hole slab of existing building the dark seismic strengthening of beams method of key | |
CN202989755U (en) | Integral-casting and fabricated prestressing force bridge structure | |
CN202936804U (en) | Prestressed pile based on post-tensioning method | |
CN206035045U (en) | Prefabricated assembled underground granary of endocyst plastics | |
CN209523212U (en) | Assembled isolated footing | |
CN209468856U (en) | A kind of assembly concrete column beam connecting node | |
CN208202343U (en) | A kind of steel core concrete column | |
CN104895190A (en) | Beam column hinge node enabling middle beam to be directly arranged at top of column and construction method thereof | |
CN202324198U (en) | Anti-pulling embedded fixed column base for portal-rigid frame | |
CN205205847U (en) | Frame construction of stake cushion cap | |
CN204356793U (en) | A kind of assembling hollow reinforced concrete independent foundation |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20170606 Termination date: 20191122 |
|