CN104895190A - Beam column hinge node enabling middle beam to be directly arranged at top of column and construction method thereof - Google Patents

Beam column hinge node enabling middle beam to be directly arranged at top of column and construction method thereof Download PDF

Info

Publication number
CN104895190A
CN104895190A CN201510277049.6A CN201510277049A CN104895190A CN 104895190 A CN104895190 A CN 104895190A CN 201510277049 A CN201510277049 A CN 201510277049A CN 104895190 A CN104895190 A CN 104895190A
Authority
CN
China
Prior art keywords
column
precast concrete
prefabricated concrete
concrete beam
pvc pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510277049.6A
Other languages
Chinese (zh)
Inventor
金林飞
费烜
赵向前
李雪峰
徐春燕
米文杰
胡韦楠
张坚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Changzhou Planning And Design Institute
Original Assignee
Changzhou Planning And Design Institute
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Changzhou Planning And Design Institute filed Critical Changzhou Planning And Design Institute
Priority to CN201510277049.6A priority Critical patent/CN104895190A/en
Publication of CN104895190A publication Critical patent/CN104895190A/en
Pending legal-status Critical Current

Links

Landscapes

  • Joining Of Building Structures In Genera (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The invention relates to a beam column hinge node enabling a middle beam to be directly arranged at the top of a column and a construction method thereof. The beam column hinge node comprises a prefabricated concrete column and a prefabricated concrete beam, wherein anchor bars are arranged at the top end of the prefabricated concrete column. PVC pipe holes are pre-formed in the prefabricated concrete beam, and the anchor bars are arranged in the PVC pipe holes in a sleeved mode. The construction method comprises the steps of reserving the anchor bars at the top end of the prefabricated concrete column, pre-forming the PVC casting pipe holes in the prefabricated concrete beam, arranging the prefabricated concrete beam on the prefabricated concrete column, ensuring that the anchor bars at the top end of the prefabricated concrete column are arranged in PVC casting pipe holes pre-formed in the prefabricated concrete beam in the sleeved mode, conducting grouting in the PVC pipe holes formed in the prefabricated concrete beam, and conducting grouting on the gap between the prefabricated concrete column and the prefabricated concrete beam. The beam column hinge node has the advantages of being definite in stress, better in universality, lower in cost, simple and convenient to construct and the like, structure assembly rate can be greatly improved, an assembly construction period can be shortened, and the advantages including energy saving, environmental protection, high efficiency and the like of a prefabricated assembly type building can be well embodied.

Description

Central sill is directly held on the beam-column hinged node of capital formula and construction method thereof
Technical field
The invention belongs to prefabricated costruction design and construction field, be directly held on the beam-column hinged node of capital formula and construction method thereof in particular to a kind of prefabrication central sill.
Background technology
In some small precast assembled architectures, it is little that prefabricated units have size, and the stressed less feature of bean column node, for this actual conditions, designs a kind of beam-column hinged node.This beam-column hinged node should have stressed clear and definite, versatility is comparatively strong, cost is lower, the feature such as simple and easy of constructing, greatly can improve Standard rate, shorten the assembling construction period, embody prefabrication energy-saving and environmental protection, the advantage such as efficient better.
Summary of the invention
The present invention is directed to the deficiencies in the prior art, provide one have stressed clear and definite, versatility is comparatively strong, cost is lower, the feature such as simple and easy of constructing, greatly can improve Standard rate, shorten the beam-column hinged node of assembling construction period.
For achieving the above object, the present invention adopts following technical scheme: central sill is directly held on the construction method of the beam-column hinged node of capital formula, comprises the following steps:
Step one: in the prefabrication process of precast concrete column, reserves dowel on the top of precast concrete column;
Step 2: in the prefabrication process of precast concrete beam, pre-buried PVC casing pipe hole forming in precast concrete beam;
Step 4: after precast concrete column has been lifted, precast concrete beam is held in precast concrete column, and ensure that pvc pipe borehole jack pre-buried in precast concrete beam is contained on the dowel on precast concrete column top;
Step 5: be in the milk in the reserved pvc pipe hole in precast concrete beam; Be in the milk to the gap between precast concrete column and precast concrete beam.
Further, the grouting material of described grouting adopts the slightly expanded concrete being not less than precast concrete beam column strength grade of concrete.
Present invention also offers central sill and be directly held on the beam-column hinged node of capital formula, comprise precast concrete column and precast concrete beam, wherein, the top of described precast concrete column is provided with dowel; Be embedded with pvc pipe hole in described precast concrete beam, described pvc pipe borehole jack is contained on described dowel.
Further, described pvc pipe hole is perfused with slurry, for spacing to precast concrete beam.
Further, the gap perfusion slurry between described precast concrete column and precast concrete beam.
Further, the grouting material of described grouting adopts the slightly expanded concrete being not less than precast concrete beam column strength grade of concrete.
Beneficial effect of the present invention:
Precast concrete beam is directly held on precast concrete capital, and reserve dowel by capital spacing to precast beam, whole load directly passes to precast concrete column by beam.
This beam-column hinged node have stressed clear and definite, versatility is comparatively strong, cost is lower, the feature such as simple and easy of constructing, greatly can improve Standard rate, shorten the assembling construction period, embody prefabrication energy-saving and environmental protection, the advantage such as efficient better.
Accompanying drawing explanation
Fig. 1 is the structural representation that central sill of the present invention is directly held on the beam-column hinged node of capital formula;
Fig. 2 is the top view of Fig. 1;
Fig. 3 is 1-1 direction sectional view in Fig. 1.
In figure, 1 is precast concrete column, and 2 is precast concrete beam, and 3 is dowel, and 4 is pvc pipe hole, and 5 indulge muscle for beam.
Detailed description of the invention
For making the object of the embodiment of the present invention and technical scheme clearly, below in conjunction with the accompanying drawing of the embodiment of the present invention, the technical scheme of the embodiment of the present invention is clearly and completely described.Obviously, described embodiment is a part of embodiment of the present invention, instead of whole embodiments.Based on described embodiments of the invention, the every other embodiment that those of ordinary skill in the art obtain under without the need to the prerequisite of creative work, all belongs to the scope of protection of the invention.
Those skilled in the art of the present technique are appreciated that unless otherwise defined, and all terms used herein (comprising technical term and scientific terminology) have the meaning identical with the general understanding of the those of ordinary skill in field belonging to the present invention.Should also be understood that those terms defined in such as general dictionary should be understood to have the meaning consistent with the meaning in the context of prior art, unless and define as here, can not explain by idealized or too formal implication.
The implication of the "and/or" described in the present invention refers to respective individualism or both simultaneous situations include interior.
The implication of " inside and outside " described in the present invention refers to relative to equipment itself, in the direction of sensing equipment inside is, otherwise is outward, but not the specific restriction to equipment mechanism of the present invention.
When the implication of " left and right " described in the present invention refers to reader just to accompanying drawing, the left side of reader is a left side, and the right of reader is the right side, but not the specific restriction to equipment mechanism of the present invention.
The indirect connection that can be the direct connection between parts also can be by other parts between parts of the implication of " connection " described in the present invention.
Central sill of the present invention is directly held on the construction method of the beam-column hinged node of capital formula, comprises the following steps:
Step one: in the prefabrication process of precast concrete column 1, reserves dowel 3 on the top of precast concrete column 1;
Step 2: in the prefabrication process of precast concrete beam 2, pre-buried PVC casing pipe hole forming in precast concrete beam 2;
Step 4: after precast concrete column 1 has been lifted, precast concrete beam 2 is held in precast concrete column 1, and ensure that pvc pipe hole 4 pre-buried in precast concrete beam 2 is sleeved on the dowel 3 on precast concrete column 1 top;
Step 5: be in the milk in the reserved pvc pipe hole 4 in precast concrete beam 2; Be in the milk to the gap between precast concrete column 1 and precast concrete beam 2.
As in preferred mode, the grouting material of grouting adopts the slightly expanded concrete being not less than precast concrete beam 2 post strength grade of concrete.
As Figure 1-3, present invention also offers central sill and be directly held on the beam-column hinged node of capital formula, comprise precast concrete column 1 and precast concrete beam 2, wherein, the top of precast concrete column 1 is provided with dowel 3; Be embedded with pvc pipe hole 4 in precast concrete beam 2, pvc pipe hole 4 is sleeved on dowel 3.
In order to carry out spacing to precast concrete beam 2, generally slurry can be perfused with in pvc pipe hole 4.
In order to interfix between precast concrete column 1 and precast concrete beam 2, the gap perfusion slurry between precast concrete column 1 and precast concrete beam 2.
As in preferred mode, the grouting material of grouting adopts the slightly expanded concrete being not less than precast concrete beam 2 post strength grade of concrete.
In order to improve the intensity of precast concrete beam 2, generally can arrange that in precast concrete beam 2 beam indulges muscle 5.
These are only embodiments of the present invention, it describes comparatively concrete and detailed, but therefore can not be interpreted as the restriction to the scope of the claims of the present invention.It should be pointed out that for the person of ordinary skill of the art, without departing from the inventive concept of the premise, can also make some distortion and improvement, these all belong to protection scope of the present invention.

Claims (6)

1. central sill is directly held on the construction method of the beam-column hinged node of capital formula, it is characterized in that, comprises the following steps:
Step one: in the prefabrication process of precast concrete column, reserves dowel on the top of precast concrete column;
Step 2: in the prefabrication process of precast concrete beam, pre-buried PVC casing pipe hole forming in precast concrete beam;
Step 4: after precast concrete column has been lifted, precast concrete beam is held in precast concrete column, and ensure that pvc pipe borehole jack pre-buried in precast concrete beam is contained on the dowel on precast concrete column top;
Step 5: be in the milk in the reserved pvc pipe hole in precast concrete beam; Be in the milk to the gap between precast concrete column and precast concrete beam.
2. central sill according to claim 1 is directly held on the construction method of the beam-column hinged node of capital formula, it is characterized in that, the grouting material of described grouting adopts the slightly expanded concrete being not less than precast concrete beam column strength grade of concrete.
3. central sill is directly held on the beam-column hinged node of capital formula, it is characterized in that, comprises precast concrete column and precast concrete beam, and wherein, the top of described precast concrete column is provided with dowel; Be embedded with pvc pipe hole in described precast concrete beam, described pvc pipe borehole jack is contained on described dowel.
4. central sill according to claim 3 is directly held on the beam-column hinged node of capital formula, it is characterized in that, described pvc pipe hole is perfused with slurry, for spacing to precast concrete beam.
5. central sill according to claim 3 is directly held on the beam-column hinged node of capital formula, it is characterized in that, the gap perfusion slurry between described precast concrete column and precast concrete beam.
6. the central sill according to claim 4 or 5 is directly held on the beam-column hinged node of capital formula, it is characterized in that, the grouting material of described grouting adopts the slightly expanded concrete being not less than precast concrete beam column strength grade of concrete.
CN201510277049.6A 2015-05-27 2015-05-27 Beam column hinge node enabling middle beam to be directly arranged at top of column and construction method thereof Pending CN104895190A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510277049.6A CN104895190A (en) 2015-05-27 2015-05-27 Beam column hinge node enabling middle beam to be directly arranged at top of column and construction method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510277049.6A CN104895190A (en) 2015-05-27 2015-05-27 Beam column hinge node enabling middle beam to be directly arranged at top of column and construction method thereof

Publications (1)

Publication Number Publication Date
CN104895190A true CN104895190A (en) 2015-09-09

Family

ID=54028116

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510277049.6A Pending CN104895190A (en) 2015-05-27 2015-05-27 Beam column hinge node enabling middle beam to be directly arranged at top of column and construction method thereof

Country Status (1)

Country Link
CN (1) CN104895190A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105201078A (en) * 2015-10-29 2015-12-30 常州市规划设计院 Prefabricated building middle beam and column top hinge joint and construction method thereof

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4147009A (en) * 1975-12-04 1979-04-03 Watry C Nicholas Precast panel building construction
US4583336A (en) * 1984-10-29 1986-04-22 The Austin Company Joint of preformed concrete elements
US20080005990A1 (en) * 2003-10-06 2008-01-10 Oscar Marty Modular system of permanent forms for casting reinforced concrete buildings on site
CN201334731Y (en) * 2008-12-17 2009-10-28 贵阳铝镁设计研究院 Connecting structure of supporting member and hinged girder
US20120160087A1 (en) * 2009-08-21 2012-06-28 Ballistics Technology International Ltd. Removable attachment system for buildings
CN103510640A (en) * 2013-09-25 2014-01-15 上海市建工设计研究院有限公司 Fabricated shear wall and assembly method thereof
CN205577106U (en) * 2015-05-27 2016-09-14 常州市规划设计院 Well roof beam is directly shelved in capital formula beam column articulation node

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4147009A (en) * 1975-12-04 1979-04-03 Watry C Nicholas Precast panel building construction
US4583336A (en) * 1984-10-29 1986-04-22 The Austin Company Joint of preformed concrete elements
US20080005990A1 (en) * 2003-10-06 2008-01-10 Oscar Marty Modular system of permanent forms for casting reinforced concrete buildings on site
CN201334731Y (en) * 2008-12-17 2009-10-28 贵阳铝镁设计研究院 Connecting structure of supporting member and hinged girder
US20120160087A1 (en) * 2009-08-21 2012-06-28 Ballistics Technology International Ltd. Removable attachment system for buildings
CN103510640A (en) * 2013-09-25 2014-01-15 上海市建工设计研究院有限公司 Fabricated shear wall and assembly method thereof
CN205577106U (en) * 2015-05-27 2016-09-14 常州市规划设计院 Well roof beam is directly shelved in capital formula beam column articulation node

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105201078A (en) * 2015-10-29 2015-12-30 常州市规划设计院 Prefabricated building middle beam and column top hinge joint and construction method thereof

Similar Documents

Publication Publication Date Title
CN103243817B (en) A kind of assembled beam-column attachment means
CN107143034A (en) A kind of assembly concrete frame structure beam column rigid connection node
CN202627254U (en) Shear wall consisting of vertical mild steel energy consumption belts with horizontal seams arranged among concrete-filled steel tubes
CN108978859A (en) Assembled beam-column connecting node
CN204715221U (en) Sectional type stem grafting seam T web local stiffening structure
CN205046677U (en) Assembled concrete frame nodal connection structure
CN205171690U (en) Roof beam and capital articulation node among prefabricated assembly type structure
CN205577106U (en) Well roof beam is directly shelved in capital formula beam column articulation node
CN102561552A (en) Steel tube concrete shear wall comprising vertical soft steel energy consuming straps with horizontal seams and manufacturing method
CN206219974U (en) The assembled attachment structure of prefabricated bent cap and prefabricated stand column
CN106120542A (en) Can be applicable to assembled pier and the construction technology thereof of seismic fortification intensity upper zone
CN206457955U (en) A kind of oblique close rib composite wall board structure
CN203296203U (en) Reinforced-concrete-fitted seismic isolation node and fitted seismic isolation structure with reinforced-concrete-fitted seismic isolation node
CN104895190A (en) Beam column hinge node enabling middle beam to be directly arranged at top of column and construction method thereof
CN204401881U (en) A kind of steel concrete-profile steel concrete column combined special-shaped column
CN104652608A (en) Assembly type exterior wall and beam connecting structure
CN205116400U (en) Steel construction beam column mosaic structure
CN203846660U (en) Prefabricated assembled type open-web net rack for reinforced concrete
CN103741961B (en) To boost sales after the prefabricated circular hole slab of existing building the dark seismic strengthening of beams method of key
CN203559598U (en) Side-sticking reinforcing column
CN104895196A (en) Hidden steel corbel type beam column hinged node and construction method thereof
CN106013421B (en) A kind of method of construction of the compound assembled fiber concrete building of steel wood
CN204983213U (en) Dark big board shear wall structure that supports in prefabricated assembled area
CN204609002U (en) Profile steel concrete column and prestressed girder frame joint
CN109184031B (en) Horizontal structure of assembled structure and mounting method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20150909