CN206189505U - Rainwater is collected and is recycled landscape system - Google Patents
Rainwater is collected and is recycled landscape system Download PDFInfo
- Publication number
- CN206189505U CN206189505U CN201621134288.2U CN201621134288U CN206189505U CN 206189505 U CN206189505 U CN 206189505U CN 201621134288 U CN201621134288 U CN 201621134288U CN 206189505 U CN206189505 U CN 206189505U
- Authority
- CN
- China
- Prior art keywords
- rainwater
- water
- landscape
- collecting
- water tower
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02A—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
- Y02A20/00—Water conservation; Efficient water supply; Efficient water use
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02A—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
- Y02A20/00—Water conservation; Efficient water supply; Efficient water use
- Y02A20/30—Relating to industrial water supply, e.g. used for cooling
Landscapes
- Sewage (AREA)
Abstract
The utility model discloses a rainwater is collected and is recycled landscape system, including the rainwater system that stores that stores precipitation, wherein the rainwater collect to store headtotail pressurized equipment, pressurized equipment connect one -level water tower and second grade water tower respectively, the head pressure of one -level water tower is greater than the head pressure of second grade water tower, the one -level water tower connect big flood peak developments water scenery, the second grade water tower connect urine head developments water scenery and greenery patches irrigation system, just be equipped with an at least connecting tube between one -level water tower and the second grade water tower. A rainwater is collected and is recycled landscape system, this rainwater is collected and is recycled landscape system can collect the rainwater to recycle the rainwater of collecting in plant landscape's irrigation maintenance. When the collection was recycled, it can produce beautiful dynamic water scenery, beautifies living environment.
Description
Technical field
The utility model is related to rainwater-collecting to recycle field, more particularly to a kind of rainwater-collecting to recycle landscape system.
Background technology
With the continuous improvement of people's material and culture level, the continuous enhancing of environmental consciousness, people want to urban environment
Seek also more and more higher.In order to adapt to the demand of society and people, the Garden Greenland of various styles is continued to bring out in city.Gardens
Greenery patches gives city the graceful appearance of the city, gives the enjoyment of people's back to nature, and it is as indispensable in people's Working Life
A part.
In Garden Greenland plantation, construction and the irrigation in the later stage maintenance of plants landscape need to consume great lot of water resources.
Current plants landscape irrigate maintenance with using running water pour and flood irrigation based on.Pour is usually to be poured using artificial trombone slide
Water or waterwheel are watered, and irrigation effect is poor, and water for irrigation is easily overflowed to outside Garden Greenland, waste a large amount of valuable water moneys
Source.When using flood irrigation when, due to urban green space landform limitation etc. reason, often occur the Chang Yin such as lawn, nursery stock water not in time,
Uneven, insufficient irrigation is excessively poured water and withered phenomenon occurs.This plants landscape is irrigated maintenance process and had both been wasted largely
Originally water resource, can not play preferable plants landscape maintenance effect again.
And at the same time, a large amount of waterproof hard produced in urban construction is mated formation face, such as road, square etc. cause
When natural precipitation occurs, the rainwater for being gathered oozes back in soil under being difficult directly.Most precipitation is in a short time through ground
Waterproof hard mat formation face quick collecting then, through the urban operating mechanisms such as inlet for stom water enter municipal drainage pipe network, cause city to be arranged
Big vast pressure increases, and often sees that urban waterlogging phenomenon occur in the big cities such as Beijing, Guangzhou, Shenzhen, make recent years in news
Into the influence such as huge of traffic impact, casualties, economic loss.
In sum, if can be retained to natural precipitation in urban area and profit is carried out in terms of the irrigation of urban green space
With preferable Social benefit and economic benefit can be played.
Utility model content
The purpose of this utility model is to provide a kind of rainwater-collecting to recycle landscape system, and it can be received to rainwater
Collection, and the rainwater of collection is reused in the irrigation maintenance of plants landscape.While recycling is collected, it can produce drift
Bright dynamic water scenery, beautifies the living environment.
To reach above-mentioned utility model purpose, the technical solution adopted in the utility model is as follows:
A kind of rainwater-collecting recycles landscape system, including the rain water storage system for storing precipitation, it is characterised in that:It is described
Rainwater-collecting stocking system connection pressurized equipment, described pressurized equipment connects one-level water tower and two grades of water towers respectively, described
Head pressure of the head pressure of one-level water tower more than two grades of water towers;Described one-level water tower connects big head Dynamic Water
Scape, described two grades of water towers connect small head dynamic water scenery and Greenland Irrigation system, and the one-level water tower and two grades of water towers it
Between be provided with least one connecting pipe.
The rainwater stored in rain water storage system is the rainwater after being processed through preliminary purification.Although being generally not present in rainwater
Too many solid impurity and suspended impurity, but there are other pollutants that principal component is oxidable thing.In Static Water, pollutant
Oxidation rate it is very low, lead to not decompose.In order that the rainwater in stocking system is more efficiently obtained oxidation, this practicality
New rainwater-collecting recycles landscape system to set pressurized equipment and rainwater is pressurizeed and lifted, and is made by dynamic water scenery
Rainwater dynamic landscape;Rainwater is sufficiently aoxidized and is purified in dynamic movement process, can also make water scenery
Landscape effect is greatly improved.
In rainwater-collecting of the present utility model recycles landscape system, rainwater in rain water storage system is stored in first
Into pressurized equipment(Such as water pump), pressurized equipment pressurizes to rainwater immediately.Pressurized equipment is installed in place should be with rainwater
Storage part is combined closely, and convenient is water tower water-feeding.Rainwater after pressurized enters in water tower to keep hydraulic pressure.Passed through in water tower
The rainwater of pressurization may be conveniently used the dynamic water scenery of creation or be introduced into Greenland Irrigation system as irrigation water.This practicality
One-level water tower and two grades of water towers are provided with new scheme.The head pressure of one-level water tower is higher, therefore the rain stored by it
Water is mainly used in the big head Dynamic Water scape higher to head pressure requirement.Specifically, the head pressure of one-level water tower is relative
The minimum point of described rainwater landscape Collection utilization system should reach more than five meters, and the total amount of the pressurization rainwater stored by it should
Ensure that all of use water spot water consumption of 8 hours in whole place.
Rainwater inside two grades of water towers can be directed to pressurized equipment or come from one-level water tower.Due to two grades of water towers
It is relatively low for head pressure versus primary water tower, therefore rainwater stored by it is mainly used in Garden Greenland and irrigates dynamic with small head
State water scenery.Small head dynamic water scenery can also simultaneously undertake the moisturizing of the flood irrigation water or gardens artificial swamp in greenery patches, that is, set
The artificial streams in part or artificial overflow carry out the pouring of cover type to Garden Greenland or gardens artificial swamp are slowly mended
Water.Two grades of head pressures of water tower should determine according to actual conditions.Preferably, the head pressure of the one-level water tower is two grades of water
Less than more than 2 times 4 times of tower head pressure.If the head pressure of one-level water tower is for two grades of head pressures of water tower
Too small, then the flow velocity of water is inadequate when being easily caused one-level water tower to two grades of water tower water-feedings;Head pressure such as one-level water tower is excessive
The lifting of pipe-line system cost or pipeline are then easily caused because pressure is excessive and destroyed.Pressurization rainwater stored by two grades of water towers
Total amount should be able to ensure its supply the useful water spot water consumption of 8 hours.
Due to the process very power consumption that water body pressurizes and lifted, therefore in practice preferably by the working time of pressurized equipment
City electricity consumption slack hours section is selected in, the electricity charge are saved by the principle used electricity in off-peak hours.In order that the time that dynamic water scenery occurs protects
Hold in the daytime, the system is provided with one or more water towers, to store rain during electricity consumption ebb by pressurized equipment pressurization lifting
Water, and discharged in the daytime.
One of the present utility model preferred embodiment in, described rain water storage system connection municipal water supply pipe
Net, municipal drainage pipe network and municipal Storm Sewer Network.Rain water storage system is preferentially introduced into the rainwater collected in municipal rain pipe.When
When dry season rainwater amount of rainfall is inadequate, then supplement is introduced into the water in municipal water supply pipe network.When natural precipitation is excessive, its energy
Unnecessary rainwater is emitted into municipal drainage pipe network.
Preferably, described big head Dynamic Water scape is artificial waterfall or fountain, described small head dynamic water scenery
It is artificial streams or artificial overflow.
The utility model can also make following improvement:Described rain water storage system is connected with rain water collecting system, described
Rain water collecting system include rainwater-collecting groove and the rainwater purification system that is connected with the rainwater-collecting groove.
Rainwater-collecting groove collects the rainwater from roof drain gully, ground rainwater mouth, storm drain etc., and is introduced into rain
Processed in water purification system, to remove leaf, rubbish, oils and suspended solid that rainwater brings from roof, road surface etc.
Deng pollutant.Prefabricated combined septic tank can be set in rainwater purification system or the isolation of special scum silica frost, precipitation cut dirty well etc., it is also possible to will
Rainwater purification system is designed as greenery patches buffer strip, such as sets sunk type greenery patches, to retain purification pavement runoff pollutant.
Preferably, described rain water storage system is landscape pond or landscape impoundments.
Rain water storage system may be constructed the static water scenery during rainwater-collecting recycles landscape system in itself, with to natural drop
Water carries out landscape disposal, further beautifies the environment.
Specifically, described Greenland Irrigation system includes sprinkling irrigation equipment and underground moisturizing pipe network on ground.
Sprinkling irrigation equipment used as delivery port, as irrigation water originate, and greenery patches is irrigated jointly by beneath moisturizing pipe network.
In rainwater-collecting of the present utility model recycles landscape system, water tower, Greenland Irrigation system, dynamic water scenery, rain
Can not only be connected by pipe-line system between water stocking system, can also connected otherwise.For example, described water tower
Between described Greenland Irrigation system and can be same between described rain water collecting system and described rainwater purification system
When be connected with rainwash or artificial streams by pipe-line system.Described big head Dynamic Water scape and described small head dynamic
Between system, between described small head dynamic water scenery and described Greenland Irrigation system and described big head Dynamic Water scape
Can be connected by rainwash or artificial streams and described rain water storage system between.By setting rainwash, can be with
Increase the aesthetic property of whole landscape system, the pressure of pipe-line system is also reduced simultaneously.
Beneficial effect:
1. effectively rainwater is recycled, considerably reduce the originally water consumption for plant irrigation, save water
Resource, and discharge pressure will not be increased for municipal storm sewer;
2. make full use of the low-price electricity of city low power consumption period to be irrigated, both reduce the cost for irrigating maintenance, and
Can use electricity in off-peak hours, reduce the pressure of urban distribution network;
3. a large amount of dynamics and static water scenery are created while being recycled to rainwater, and water landscape effect is good;Meanwhile,
Because the appearance of a large amount of running water in dynamic water scenery, the evaporated quantity of water in whole landscape system are big, the air quality of surrounding enviroment is obtained
To improvement, rainwater also can sufficiently be aoxidized and purified in dynamic movement process;
4. irrigating plant is carried out by rainwash and pipeline simultaneously, without excessive manual watering, without being sprayed
Fill, reduce interference of the sprinkling irrigation to pedestrian.
Brief description of the drawings
Below in conjunction with Figure of description and specific embodiment, the utility model is further described.
Fig. 1 is the connection diagram of the utility model embodiment 1.
Brief description of the drawings:1- rain water storage systems;2- pressurized equipments;3- one-level water towers;Bis- grades of water towers of 4-;The big head dynamics of 5-
Water scenery;The small head dynamic water sceneries of 6-;7- Greenland Irrigation systems;8- rainwater purification systems;9- rainwater-collecting grooves.
Specific embodiment
Embodiment 1
Fig. 1 shows that the rainwater-collecting of the present embodiment recycles landscape system.Landscape system is recycled in the rainwater-collecting
In, rain water storage system 1 collects the rainwater from municipal Storm Sewer Network and rainwater-collecting groove 9;Specifically, rainwater-collecting groove 9
The rainwater from roof drain gully, ground rainwater mouthful and storm drain etc. is collected, collected rainwater sets Prefabricated combined septic tank in, cuts
The rainwater purification system 8 of dirty woven bag, scum silica frost isolation well and the dirty well of precipitation section enters rain water storage system 1 after filtering.Rain water storage
Deposit system 1 is landscape pond, and it is also connected with municipal water supply pipe network simultaneously, and rainwater-collecting is ensured with when rainwater-collecting amount is inadequate
Recycle the water in landscape system.
The delivery port of rain water storage system 1 is connected with pressurized equipment 2.Pressurized equipment 2 is water pump, and it will be from rainwater storage
The rainwater pressurization of system 1, and one-level water tower 3 and two grades of water towers 4 entered by pipeline respectively, the head pressure of one-level water tower is
Two grades the 2 of water tower head pressure times, and one-level water tower the relatively described rainwater landscape Collection utilization system of head pressure most
Low spot reaches 10 meters.A connecting pipe is provided between one-level water tower 3 and two grades of water towers 4.One-level water tower 3 connects big head dynamic
Water scenery 5, two grades of water towers 4 connect small head dynamic water scenery 6 and Greenland Irrigation system 7, and the Greenland Irrigation system 7 is included on ground
Sprinkling irrigation equipment and underground moisturizing pipe network.Big head Dynamic Water scape 5 is artificial waterfall, and small head dynamic water scenery 6 is artificial streams;Greatly
Also by ground between head dynamic water scenery 5 and small head dynamic water scenery 6, between small head dynamic water scenery 6 and Greenland Irrigation system 7
Table runoff is connected.It is simultaneously logical between two grades of water towers 4 and Greenland Irrigation system 7, between rainwater-collecting groove 9 and rainwater purification system 8
Underground piping system is crossed to be connected with rainwash.Big head Dynamic Water scape 5 is connected with rain water storage system 1 by rainwash.
The course of work of the rainwater landscape collection system of the present embodiment is as follows:
(1)When natural precipitation occurs, by rainwater such as the rain pipe of rain water storage system 9, rainwater-collecting mouth, rain rills
After collection facility collects to precipitation, rainwater purification system 8 is entered by underground piping system and rainwash;
(2)Prefabricated combined septic tank, section dirty woven bag, scum silica frost isolation well and precipitation in rainwater purification system 2 cut dirt well to collecting
Rainwater carry out the removal of visible foreign and suspended impurity;
(3)Rainwater through preliminary purification enters rain water storage system 1 by pipeline;
(4)Rainwater in rain water storage system 1 is pressurizeed by pipeline into pressurized equipment 2;
(5)Pressurized rainwater is entered in one-level water tower 3 and two grades of water towers 4 by pipeline;
(6)Rainwater in one-level water tower 3 enters among big head Dynamic Water scape 5 and two grades of water towers 4 through pipeline.Into flood
The rainwater of the dynamic water scenery 5 of head is again introduced into rain water storage system 1 or small head dynamic water scenery after through release by rainwash
Among 6.
(7)Two grades of water sources of water tower 4 come from pressurized equipment 2 and one-level water tower 3.Two grades of water towers 4 discharge rainwater, by pipeline
Enter Greenland Irrigation system 7 with rainwash, small head dynamic water scenery 6 is entered by pipeline.Rain in small head dynamic water scenery 6
Water can also enter in Greenland Irrigation system 7 through the mode of rainwash.
Embodiment 2
The rainwater-collecting of the present embodiment recycles the difference between landscape system and the system of embodiment 1 to be:One
The head pressure of level water tower is two grades the 3 of water tower head pressure times, and one-level water tower the relatively described rainwater scape of head pressure
The minimum point for seeing Collection utilization system reaches seven meters.
Embodiment 3
The rainwater-collecting of the present embodiment recycles the difference between landscape system and the system of embodiment 1 to be:One
The head pressure of level water tower is two grades the 4 of water tower head pressure times, and one-level water tower the relatively described rainwater scape of head pressure
The minimum point for seeing Collection utilization system reaches five meters.
Claims (9)
1. a kind of rainwater-collecting recycles landscape system, including the rain water storage system for storing precipitation, it is characterised in that:Described
Rainwater-collecting stocking system connects pressurized equipment, and described pressurized equipment connects one-level water tower and two grades of water towers, described one respectively
The head pressure of the head pressure more than two grades of water towers of level water tower;Described one-level water tower connects big head Dynamic Water scape,
Two grades of described water towers are connected and set between small head dynamic water scenery and Greenland Irrigation system, and the one-level water tower and two grades of water towers
There is at least one connecting pipe.
2. rainwater-collecting according to claim 1 recycles landscape system, it is characterised in that:Described rain water storage system
Connection municipal water supply pipe network, municipal drainage pipe network and municipal Storm Sewer Network.
3. rainwater-collecting according to claim 1 recycles landscape system, it is characterised in that:The head of the one-level water tower
The minimum point of the relatively described rainwater landscape Collection utilization system of pressure reaches more than five meters.
4. the rainwater-collecting according to claim 1 or 3 recycles landscape system, it is characterised in that:The one-level water tower
Head pressure is two grades more than the 2 of water tower head pressure times less than 4 times.
5. rainwater-collecting according to claim 1 recycles landscape system, it is characterised in that:Described big head Dynamic Water
Scape is artificial waterfall or fountain.
6. rainwater-collecting according to claim 1 recycles landscape system, it is characterised in that:Described small head Dynamic Water
Scape is artificial streams or artificial overflow.
7. rainwater-collecting according to claim 1 recycles landscape system, it is characterised in that:Described rain water storage system
It is connected with rain water collecting system, the rain that described rain water collecting system includes rainwater-collecting groove and is connected with the rainwater-collecting groove
Water purification system.
8. rainwater-collecting according to claim 1 recycles landscape system, it is characterised in that:Described rain water storage system
It is landscape pond or landscape impoundments.
9. rainwater-collecting according to claim 1 recycles landscape system, it is characterised in that:Described Greenland Irrigation system
Including the sprinkling irrigation equipment on ground and underground moisturizing pipe network.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621134288.2U CN206189505U (en) | 2016-10-19 | 2016-10-19 | Rainwater is collected and is recycled landscape system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621134288.2U CN206189505U (en) | 2016-10-19 | 2016-10-19 | Rainwater is collected and is recycled landscape system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206189505U true CN206189505U (en) | 2017-05-24 |
Family
ID=58731416
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201621134288.2U Expired - Fee Related CN206189505U (en) | 2016-10-19 | 2016-10-19 | Rainwater is collected and is recycled landscape system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206189505U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN116530392A (en) * | 2023-05-24 | 2023-08-04 | 景古环境建设股份有限公司 | Ecological landscape with circulation system |
-
2016
- 2016-10-19 CN CN201621134288.2U patent/CN206189505U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN116530392A (en) * | 2023-05-24 | 2023-08-04 | 景古环境建设股份有限公司 | Ecological landscape with circulation system |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN208235696U (en) | Rainwater garden system based on sponge ecosystem water purification | |
CN202374807U (en) | Solar rainwater irrigation device for green belts | |
CN204959952U (en) | Recessed formula greenery patches rainwater regulation dispatch pond and distributed rainwater regulation dispatch pond system | |
CN211580790U (en) | Multifunctional landscape flower bed based on rainwater regulation | |
CN105089142A (en) | Low elevation greenbelt rainwater regulation scheduling pool and distributed rainwater regulation scheduling pool system | |
CN207998908U (en) | A kind of rainwater comprehensive utilization system for sponge urban architecture | |
CN111919621B (en) | Cold region habitat recovery-based street tree pool structure and manufacturing method | |
CN202425400U (en) | Water-saving structure utilizing rainwater on bridge floor of viaduct bridge to irrigate green space under bridge | |
CN104196179B (en) | A kind of rainwater utilization system and using method thereof | |
CN108678296A (en) | It is a kind of to irrigate roof rainwater collection device for cleansing and recycling certainly | |
CN106638219A (en) | Ramped urban road of sponge city | |
CN210869121U (en) | Landscape system for collecting and recycling rainwater | |
CN109380090A (en) | A kind of eco-species plant hole rain recycling system | |
CN204342529U (en) | A kind of landscape wetland system adopting reuse water to be applied to underground garage top | |
CN206189505U (en) | Rainwater is collected and is recycled landscape system | |
CN211547991U (en) | Rainwater drainage and utilization system capable of preventing urban road waterlogging | |
CN210042920U (en) | Landscape water saving fixtures | |
CN204163295U (en) | A kind of rainwater utilization system | |
CN106284587A (en) | Urban road is with oozing water tank and construction method thereof | |
CN105464190A (en) | Green space rain sewage reuse system | |
CN206110232U (en) | Community landscaping rainwater utilization device | |
CN213061576U (en) | Road-based multifunctional integrated green belt device | |
CN211446456U (en) | Multifunctional sponge structure under limited greenbelt condition | |
CN208701873U (en) | A kind of open settlement integrated environment improvement greenbelt water-storing device | |
CN109457792B (en) | Courtyard rainwater collection and purification structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20170524 Termination date: 20191019 |
|
CF01 | Termination of patent right due to non-payment of annual fee |