CN206108724U - 长大直径桩基钢筋笼自制简易安装支架装置 - Google Patents
长大直径桩基钢筋笼自制简易安装支架装置 Download PDFInfo
- Publication number
- CN206108724U CN206108724U CN201621087145.0U CN201621087145U CN206108724U CN 206108724 U CN206108724 U CN 206108724U CN 201621087145 U CN201621087145 U CN 201621087145U CN 206108724 U CN206108724 U CN 206108724U
- Authority
- CN
- China
- Prior art keywords
- load
- beams
- bearing
- columns
- pile foundation
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Piles And Underground Anchors (AREA)
Abstract
Description
Claims (1)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201621087145.0U CN206108724U (zh) | 2016-09-28 | 2016-09-28 | 长大直径桩基钢筋笼自制简易安装支架装置 |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201621087145.0U CN206108724U (zh) | 2016-09-28 | 2016-09-28 | 长大直径桩基钢筋笼自制简易安装支架装置 |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN206108724U true CN206108724U (zh) | 2017-04-19 |
Family
ID=58522206
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201621087145.0U Expired - Fee Related CN206108724U (zh) | 2016-09-28 | 2016-09-28 | 长大直径桩基钢筋笼自制简易安装支架装置 |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN206108724U (zh) |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN109235424A (zh) * | 2018-09-18 | 2019-01-18 | 中国十九冶集团有限公司 | 桩基钢筋笼分段安装方法 |
| CN111910643A (zh) * | 2020-08-21 | 2020-11-10 | 中建桥梁有限公司 | 一种用于海域承台桩基钢筋笼的下放装置 |
-
2016
- 2016-09-28 CN CN201621087145.0U patent/CN206108724U/zh not_active Expired - Fee Related
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN109235424A (zh) * | 2018-09-18 | 2019-01-18 | 中国十九冶集团有限公司 | 桩基钢筋笼分段安装方法 |
| CN111910643A (zh) * | 2020-08-21 | 2020-11-10 | 中建桥梁有限公司 | 一种用于海域承台桩基钢筋笼的下放装置 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN108560927A (zh) | 一种钢骨柱的吊装系统及其使用方法 | |
| CN214653269U (zh) | 一种简易alc墙板吊装设备 | |
| CN101302760A (zh) | 超长超重混凝土灌注桩加固型钢筋笼 | |
| CN106592962A (zh) | 一种大高差、大跨度劲性骨架外包混凝土模板施工方法及施工设备 | |
| CN217579819U (zh) | 一种不受梁底空间条件限制的钢盖梁整体吊装结构 | |
| CN207294093U (zh) | 一种大跨度钢桁架整体提升装置 | |
| CN101446083B (zh) | 钻孔桩大吨位钢护筒下放方法 | |
| CN208024056U (zh) | 一种双平臂座地式抱杆 | |
| CN107842246A (zh) | 一种烟囱钢梁液压提升高空整体滑移吊装装置及方法 | |
| CN210737607U (zh) | 一种用于逆作法梁板施工的悬挂支撑体系 | |
| CN201506692U (zh) | 屋面钢结构简易提升装置及其安装结构 | |
| CN103982046A (zh) | 一种屈曲约束支撑的吊装和安装方法 | |
| CN203947754U (zh) | 电梯井工具式操作平台 | |
| CN1048065C (zh) | 混凝土筒体的建筑方法 | |
| CN214783820U (zh) | 一种吊点加固型超重地下连续墙钢筋笼 | |
| CN213804905U (zh) | 贝雷梁悬挂结构 | |
| CN206844181U (zh) | 整体式散体吨袋堆载装置 | |
| CN204917709U (zh) | 烟囱的吊装装置 | |
| CN111088904B (zh) | 一种百米高筒体铁质烟囱钢架整体吊装装置及其工艺 | |
| CN203361170U (zh) | 一种建筑基坑围护用的支撑立柱桩 | |
| CN218264865U (zh) | 一种三角式吊篮支撑结构 | |
| CN205132926U (zh) | 水轮发电机组尾水肘管的专用井字吊具 | |
| CN205397931U (zh) | 内爬塔机的安装体系 | |
| CN204198329U (zh) | 锚杆吊装设备 | |
| CN211169608U (zh) | 一种挂篮棱形片的吊装装置 |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| CP01 | Change in the name or title of a patent holder |
Address after: 530033 Hongli Road 2-8, Jiangnan Economic Development Zone, Nanning City, Guangxi Zhuang Autonomous Region Co-patentee after: CHINA FIRST HIGHWAY ENGINEERING Co.,Ltd. Patentee after: THE FOURTH ENGINEERING CO., LTD. OF CCCC FIRST HIGHWAY ENGINEERING Co.,Ltd. Address before: 530033 Hongli Road 2-8, Jiangnan Economic Development Zone, Nanning City, Guangxi Zhuang Autonomous Region Co-patentee before: CCCC FIRST HIGHWAY ENGINEERING Co.,Ltd. Patentee before: THE FOURTH ENGINEERING CO., LTD. OF CCCC FIRST HIGHWAY ENGINEERING Co.,Ltd. |
|
| CP01 | Change in the name or title of a patent holder | ||
| TR01 | Transfer of patent right |
Effective date of registration: 20190808 Address after: 100024 Beijing, Guanzhuang, Chaoyang District, Zhou Co-patentee after: THE FOURTH ENGINEERING CO., LTD. OF CCCC FIRST HIGHWAY ENGINEERING Co.,Ltd. Patentee after: CHINA FIRST HIGHWAY ENGINEERING Co.,Ltd. Address before: 530033 Hongli Road 2-8, Jiangnan Economic Development Zone, Nanning City, Guangxi Zhuang Autonomous Region Co-patentee before: CHINA FIRST HIGHWAY ENGINEERING Co.,Ltd. Patentee before: THE FOURTH ENGINEERING CO., LTD. OF CCCC FIRST HIGHWAY ENGINEERING Co.,Ltd. |
|
| TR01 | Transfer of patent right | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20170419 Termination date: 20210928 |
|
| CF01 | Termination of patent right due to non-payment of annual fee |