CN206093222U - Underground wall pipe waterproof construction - Google Patents

Underground wall pipe waterproof construction Download PDF

Info

Publication number
CN206093222U
CN206093222U CN201621022600.9U CN201621022600U CN206093222U CN 206093222 U CN206093222 U CN 206093222U CN 201621022600 U CN201621022600 U CN 201621022600U CN 206093222 U CN206093222 U CN 206093222U
Authority
CN
China
Prior art keywords
waterproof
layer
waterproof layer
pipeline
reinforced concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201621022600.9U
Other languages
Chinese (zh)
Inventor
王凝瑞
胡勇军
王占升
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing 100 Nell Waterproof Engineering Co Ltd
Original Assignee
Beijing 100 Nell Waterproof Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing 100 Nell Waterproof Engineering Co Ltd filed Critical Beijing 100 Nell Waterproof Engineering Co Ltd
Priority to CN201621022600.9U priority Critical patent/CN206093222U/en
Application granted granted Critical
Publication of CN206093222U publication Critical patent/CN206093222U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Revetment (AREA)

Abstract

The utility model discloses an underground wall pipe waterproof construction, include reinforced concrete layer and the pipeline of wearing to locate the reinforced concrete layer, set up the waterproof construction between reinforced concrete layer and the pipeline, the waterproof construction includes the waterproof layer, and the waterproof layer uses the aglet fixed in binding off department of pipeline, fills the sealer in the gap of binding off department and carries out the secondary seal. The waterproof layer include first waterproof layer, second waterproof layer and waterproof additional layer, waterproof additional layer adheres in the corner on pipeline and reinforced concrete layer, and first waterproof layer and second waterproof layer are laid on waterproof additional layer to the fissure of displacement is laid. This waterproof construction adopts the multilayer waterproof layer fissure of displacement to lay to add waterproof additional layer in the hidden danger department of leaking, waterproof performance is more superior.

Description

Underground wall pipe waterproof construction
Technical field
This utility model is related to the waterproof construction in a kind of architectural engineering, more specifically, it relates to a kind of underground is through walls Pipe waterproof construction.
Background technology
Be frequently necessary to setting pipeline through walls in architectural engineering, when pipeline through-wall is arranged inevitably with produce between the walls Raw gap, if tight or waterproof layer does not connect imprecision to wall pipe peripheral sealing in pipe periphery, may result in water and oozes along pipeline Go out to cause pipeline seepage occur with body of wall handing-over position, therefore the waterproof of wall pipe is the important step in construction waterproofing engineering.
Authorization Notice No. discloses a kind of pipe root waterproof construction for the Chinese patent of the 3U of CN20 377085, including body of wall with Pipeline, the pipeline is prefabricated in body of wall, and seal groove is machined near the position of pipeline in body of wall both sides, is filled with seal groove Encapsulant, in the root of wall outer side pipeline waterproof sealing mortar is wiped with, and is provided with outside pipeline, body of wall and seal sand slurry Waterproof sealing layer, in the outside filling back fill course of waterproof sealing layer.But the design is in pipe root and the junction of body of wall, this One weak part does not impose reinforcement water-proofing treatment, may cause seepage.
Utility model content
In view of the shortcomings of the prior art, this utility model provides a kind of underground wall pipe waterproof construction, it is therefore intended that Reinforcement water-proofing treatment is done to the junction of Guan Genyu bodies of wall, water resistance is more superior.
For achieving the above object, this utility model provides following technical scheme:A kind of underground wall pipe waterproof construction, bag Include reinforced concrete floor and be arranged in the pipeline of reinforced concrete floor, it is characterised in that:The pipeline and reinforced concrete floor it Between junction the sealing of the first sealing ring is set, waterproof layer is set on the sealing ring, the waterproof layer includes the first waterproof Layer, waterproof jacket and the second waterproof layer, first waterproof layer and waterproof jacket are arranged at the junction of pipeline and reinforced concrete floor, Second waterproof layer is arranged on the first waterproof layer and waterproof jacket;Waterproof layer end on pipeline arranges the second sealing ring; The waterproof layer is waterproof roll layer, and the waterproof roll layer includes some waterproof rolls.
Using above technical scheme, the junction between pipeline and reinforced concrete floor is susceptible to seepage, therefore here The waterproof construction that place is arranged is extremely important.Arranging the first sealing ring in the junction first carries out preliminary waterproof, afterwards in the company Connect and lay everywhere the waterproof layer of waterproof first and waterproof jacket, the first waterproof layer and waterproof jacket extend to pipeline and reinforced concrete floor, Junction is protected from seepage herein using double-deck waterproof layer, lays second on the first waterproof layer and waterproof jacket afterwards On the one hand waterproof layer, this layer of waterproof layer be used for the seam of the waterproof layer of reinforcement first and waterproof jacket, is on the other hand layed in body of wall table Face, is overlapped with the waterproof layer at ground other positions of lower side wall.Because the waterproof layer end laid at pipeline is also easily sent out Raw seepage, therefore, after carrying out the waterproof layer paving cloth of Guan Genyu concrete side walls handing-over corner, the end to waterproof layer on pipeline Shell nosing treatment is done, the sealing of the second sealing ring is set at closing in.The technical program lays multilayer flashing layer in root of pipeline, strengthens Join the water-proofing treatment of corner between pipeline and reinforced concrete floor, while carrying out the waterproof layer and body of wall waterproof of handing-over corner The overlap joint of layer, the laying method is simple, easy popularization and application.
This utility model is further arranged to, and the first waterproof layer middle part arranges the circular waterproof matched with outer diameter tube Component, the water repellent component is divided into the flashing of some equal portions with a diameter of line of cut, and first waterproof layer passes through waterproof Assembly set is located on pipeline and is bonded in the junction of pipeline and reinforced concrete floor.
Using above technical scheme, because pipe surface is curved, pipeline through-wall is arranged, pipeline and reinforced concrete floor it Between handing-over corner for arcwall face and the armored concrete layer plane of pipeline corner.Waterproof layer is rolled up by waterproof in this utility model Material laying is formed, and waterproof roll is layed at the corner structure out-of-flatness that inevitably wrinkles, therefore first by the first waterproof Layer middle part arranges the circular water repellent component matched with outer diameter tube, and the water repellent component is divided into some equal portions with a diameter of line of cut Flashing, the flashing can outwards overturn.First waterproof layer is sheathed on pipeline by water repellent component, and water repellent component is attached to Around pipe root, remainder is attached on reinforced concrete floor.
This utility model is further arranged to, and the waterproof jacket is sheathed on pipeline and is arranged at pipeline and reinforced concrete floor Junction, the waterproof jacket attaches to the convex piece that one end of reinforced concrete floor is divided into some equal portions.
It is the water resistance of further reinforced pipe root corner using above technical scheme, waterproof jacket is sheathed on pipeline, And some gaps are equidistantly sheared in one end that the waterproof jacket is located at reinforced concrete floor, some discrete and and waterproof jacket is formed The convex piece of connection, some convex pieces outwards overturn, radial to be attached on armored concrete layer plane.Set in handing-over corner Such two-layer waterproof layer is put, corner is smooth sticks in handing-over both to have ensured waterproof layer, ensure that handing-over corner has again good Waterproof effect.
This utility model is further arranged to, and the thickness of first waterproof layer and waterproof jacket is 3mm.
Using above technical scheme, the thickness of the first waterproof layer and waterproof jacket is set to into 3mm, this two-layer waterproof layer is direct Attach on the tube wall of reinforced concrete floor or pipeline, although these planes needed leveling to process before paving cloth waterproof layer, But still inevitably exist some it is uneven where.3mm thick waterproof layer has good deformability, directly Paving is adapted to the deformation on these surfaces in reinforced concrete floor and pipe surface, prevents seepage.
This utility model is further arranged to, and second waterproof layer is from junction between pipeline and reinforced concrete floor Arrange along armored concrete layer plane.
Using above technical scheme, the first waterproof layer and waterproof jacket are in pipeline and the handing-over corner of reinforced concrete floor Bend, the side of the bending place is the surface that dentation radially distributes in pipeline or reinforced concrete floor, these There is certain gap between dentation, there is hidden leakage defect.Second waterproof layer, this layer of waterproof are set on this two-layer waterproof layer Along the laying of armored concrete layer plane, reinforcement handing-over corner this weak link from handing-over corner, in addition second prevents layer Water layer is also beneficial to be overlapped with the waterproof layer at other positions of reinforced concrete floor.
This utility model is further arranged to, and there is gap, the gap between described the second waterproof layer and waterproof jacket Between arrange the 3rd sealing ring.
Using above technical scheme, the analysis by more than understands that the second waterproof layer is layed on the first waterproof layer and waterproof jacket The hidden leakage defect of handing-over corner is reduced, but gap is yet suffered between the second waterproof layer and waterproof jacket, to avoid being sent out at this Raw seepage, arranges the 3rd sealing ring and does further encapsulation process in the gap location.
This utility model is further arranged to, and second waterproof layer includes the first fish tail and waterproof layer and the second waterproofing protection Layer, the thickness of first fish tail and waterproof layer is 4mm, and the thickness of second fish tail and waterproof layer is 3mm.
Using above technical scheme, the first fish tail and waterproof layer of the second waterproof layer point and the second fish tail and waterproof layer carry out paving cloth, First fish tail and waterproof layer is attached on the first waterproof layer, and the thickness degree is 4mm, and the layer directly bonds with the first waterproof layer, makes The gap of handing-over corner is located at the thicker waterproof layer of waterproof layer reinforcement first.Second is laid on the first fish tail and waterproof layer Fish tail and waterproof layer, the thickness degree is 3mm, because this layer of fish tail and waterproof layer is relatively thin, is easily attached on the first fish tail and waterproof layer, Displacement is less likely to occur for the two, and two-layer one works more preferable waterproof effect.
This utility model is further arranged to, and the waterproof roll in the second described fish tail and waterproof layer is forward layed in On waterproof roll in one fish tail and waterproof layer, and have lap seams between the waterproof roll in every layer of fish tail and waterproof layer, it is described on The lap seams of lower two-layer fish tail and waterproof layer stagger the 1/2 of waterproof roll fabric width.
Using above technical scheme, when the first fish tail and waterproof layer is laid, there is seam in the lap of waterproof roll, this Individual seam crossing there may be hidden leakage defect, and when laying the second fish tail and waterproof layer on the first fish tail and waterproof layer, upper and lower two-layer is prevented There is seam in water conservation layer, in order to avoid seam is concentrated, while the seam weakness in the fish tail and waterproof layer of reinforcement first, on Seam between lower two-layer staggers the 1/2 of waterproof roll fabric width.Additionally, the waterproof roll in the second fish tail and waterproof layer is forward laid On the waterproof roll of the first fish tail and waterproof layer, to reduce the new seam of laying generation is intersected.
This utility model is further arranged to, and ferrule is arranged on second sealing ring and is closed up.
Using above technical scheme, after the waterproof layer end being layed on pipeline is with the closing in of the second sealing ring, to enter One step is sealed, and ferrule is set up on the first sealing ring for closing up.
This utility model is further arranged to, and the waterproof roll layer is modified for SBS elastomer Asphalt water-proof coiled material layer.
Using above technical scheme, the waterproof roll in waterproof layer is s-B-S rubber modified asphalt Waterproof roll, the waterproof material, also with autohension and self-healing property, is added using fired heater in addition to waterproof to waterproof roll Heat, coiled material surface Colophonium melting can preferably fit with concrete cushion, during paving, if it find that having projection or gas Bubble, needle within half an hour, can spontaneous recovery, do not affect waterproof effect.
Beneficial effect:This utility model lays multilayer flashing structure in the junction of pipeline and reinforced concrete floor, first Sealing member is set in junction, afterwards three layers of waterproof layer is arranged using different paving modes in junction, finally on pipeline Closed up the end of waterproof layer.It is progressive, strengthen junction water-proofing treatment, it is to avoid the connection of pipeline and reinforced concrete floor Place's leak.
Description of the drawings
Fig. 1 is the schematic cross-section of underground wall pipe waterproof construction;
Fig. 2 is the structural representation of the first waterproof layer;
Fig. 3 is the structural representation of waterproof jacket.
Description of reference numerals:1st, reinforced concrete floor;2nd, pipeline;3rd, the first waterproof layer;31st, water repellent component;32nd, waterproof Piece;4th, waterproof jacket;41st, convex piece;5th, the second waterproof layer;51st, the first fish tail and waterproof layer;52nd, the second fish tail and waterproof layer;6th, metal Hoop;7th, the first sealing ring;8th, the second sealing ring;9th, the 3rd sealing ring.
Specific embodiment
A kind of underground waterproof construction through walls, as shown in figure 1, including reinforced concrete floor 1 and being arranged in armored concrete There is gap in the pipeline 2 of layer 1, the junction between reinforced concrete floor 1 and pipeline 2, in gap location the first sealing ring 7 is used Sealed, this utility model is sealed using perfusion silicone seal cream.
Waterproof layer is set up in junction between reinforced concrete floor 1 and pipeline 2, the waterproof layer include the first waterproof layer 3, The waterproof layer 5 of waterproof jacket 4 and second.Waterproof layer is prevented by SBS elastomer modified pitch in this utility model The laying of water coiled material is formed.The shape of wherein the first waterproof layer 3 is as shown in Fig. 2 the middle part of the first waterproof layer 3 is arranged and the external diameter of pipeline 2 The circular water repellent component 31 of matching, the water repellent component 31 is divided into the flashing 32 of 12 equal portions, institute with a diameter of line of cut State the first waterproof layer 3 and the junction of pipeline 2 and reinforced concrete floor 1 be sheathed on pipeline 2 and be bonded in by water repellent component 31, Flashing radially distributes along the tube wall of pipeline 2.
Waterproof jacket 4 is laid on the first waterproof layer 3, the shape of waterproof jacket 4 is as shown in figure 3, the waterproof jacket 4 is sheathed on Pipeline 2, and the junction of pipeline 2 and reinforced concrete floor 1 is arranged at, the waterproof jacket 4 attaches to the one of reinforced concrete floor 1 End is divided into the convex piece 41 of eight equal portions, and convex piece 41 is radial to be bonded in the surface of reinforced concrete floor 1.
The second waterproof layer 5 is laid on waterproof jacket 4, the second waterproof layer 5 is between reinforced concrete floor 1 and pipeline 2 Rise along the laying of the plane of reinforced concrete floor 1 junction.Second waterproof layer 5 includes the first fish tail and waterproof layer 51 and the second waterproofing protection Layer 52, the first fish tail and waterproof layer 51 from junction start laying, in this layer between adjacent waterproof roll lap seams width For 100mm.Second fish tail and waterproof layer 52 is layed on the first fish tail and waterproof layer 51, paving mode and the first fish tail and waterproof layer 51 It is identical, additionally, the lap seams between two-layer fish tail and waterproof layer stagger the 1/2 of waterproof roll fabric width.
After waterproof layer laying is finished, the gap location between the second waterproof layer 5 and waterproof jacket 4 arranges the 3rd sealing ring 9, this Sealed using perfusion silicone seal cream in utility model, the is adopted at the end closing in of the waterproof jacket 4 laid on the pipeline 2 Two sealing rings 8 are sealed, and this utility model is sealed in the form of perfusion silicone seal cream, afterwards in the receipts of good seal Arrange ferrule 6 at mouthful to fasten.
This programme after the junction of pipeline 2 and reinforced concrete floor 1 is using sealing member sealing, in junction multi-compartment bed Set up defences water layer, and junction distribution of the structure ring of waterproof layer between pipeline 2 and reinforced concrete floor 1, afterwards to pipeline 2 at Sealed the end of waterproof layer.The waterproof construction of the underground wall pipe arranges reasonable, and waterproof effect is more superior.
The above is only preferred implementation of the present utility model, and protection domain of the present utility model is not limited merely to Above-described embodiment, all technical schemes belonged under this utility model thinking belong to protection domain of the present utility model.Should refer to Go out, for those skilled in the art, some improvement under the premise of without departing from this utility model principle and Retouching, these improvements and modifications also should be regarded as protection domain of the present utility model.

Claims (10)

1. a kind of underground wall pipe waterproof construction, including reinforced concrete floor(1)Be arranged in reinforced concrete floor(1)Pipeline (2), it is characterised in that:The pipeline(2)With reinforced concrete floor(1)Between junction arrange the first sealing ring(7), described Waterproof layer is set on sealing ring, and the waterproof layer includes the first waterproof layer(3), waterproof jacket(4)With the second waterproof layer(5), it is described First waterproof layer(3)And waterproof jacket(4)It is arranged at pipeline(2)And reinforced concrete floor(1)Junction, the second waterproof layer(5) It is arranged at the first waterproof layer(3)And waterproof jacket(4)On;Positioned at pipeline(2)On waterproof layer end arrange the second sealing ring (8);The waterproof layer is waterproof roll layer, and the waterproof roll layer includes some waterproof rolls.
2. wall pipe waterproof construction in underground according to claim 1, it is characterised in that:First waterproof layer(3)Middle part Arrange and pipeline(2)The circular water repellent component of external diameter matching(31), the water repellent component(31)It is divided into a diameter of line of cut The flashing of some equal portions(32), first waterproof layer(3)By water repellent component(31)It is sheathed on pipeline(2)Go up and be bonded in Pipeline(2)With reinforced concrete floor(1)Junction.
3. wall pipe waterproof construction in underground according to claim 1, it is characterised in that:The waterproof jacket(4)It is sheathed on pipe Road(2)And it is arranged at pipeline(2)With reinforced concrete floor(1)Junction, the waterproof jacket(4)Attach to reinforced concrete floor (1)One end be divided into the convex piece of some equal portions(41).
4. wall pipe waterproof construction in underground according to claim 1, it is characterised in that:First waterproof layer(3)With it is anti- Water jacket(4)Thickness be 3mm.
5. wall pipe waterproof construction in underground according to claim 1, it is characterised in that:Second waterproof layer(5)From pipe Road(2)With reinforced concrete floor(1)Between junction rise along reinforced concrete floor(1)Plane is arranged.
6. wall pipe waterproof construction in underground according to claim 5, it is characterised in that:The second described waterproof layer(5)With Waterproof jacket(4)Between there is gap, between the gap arrange the 3rd sealing ring(9).
7. wall pipe waterproof construction in underground according to claim 5, it is characterised in that:Second waterproof layer(5)Including First fish tail and waterproof layer(51)With the second fish tail and waterproof layer(52), first fish tail and waterproof layer(51)Thickness be 4mm, it is described Second fish tail and waterproof layer(52)Thickness be 3mm.
8. wall pipe waterproof construction in underground according to claim 7, it is characterised in that:The second described fish tail and waterproof layer (52)In waterproof roll be forward layed in the first fish tail and waterproof layer(51)In waterproof roll on, and in every layer of fish tail and waterproof layer Waterproof roll between have a lap seams, the lap seams of the upper and lower two-layer fish tail and waterproof layer stagger the 1/ of waterproof roll fabric width 2。
9. wall pipe waterproof construction in underground according to claim 1, it is characterised in that:Second sealing ring(8)On set Put ferrule(6)Close up.
10. wall pipe waterproof construction in underground according to claim 1, it is characterised in that:The waterproof roll layer is benzene second Alkene-butadiene-styrene elastomer modified asphalt waterproof roll layer.
CN201621022600.9U 2016-08-31 2016-08-31 Underground wall pipe waterproof construction Expired - Fee Related CN206093222U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621022600.9U CN206093222U (en) 2016-08-31 2016-08-31 Underground wall pipe waterproof construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621022600.9U CN206093222U (en) 2016-08-31 2016-08-31 Underground wall pipe waterproof construction

Publications (1)

Publication Number Publication Date
CN206093222U true CN206093222U (en) 2017-04-12

Family

ID=58478852

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621022600.9U Expired - Fee Related CN206093222U (en) 2016-08-31 2016-08-31 Underground wall pipe waterproof construction

Country Status (1)

Country Link
CN (1) CN206093222U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109736515A (en) * 2018-12-26 2019-05-10 北京东方雨虹防水工程有限公司 A kind of the waterproof receipts head sealing structure and encapsulating method of stretching basal plane component
CN110173303A (en) * 2019-04-02 2019-08-27 中铁隧道集团二处有限公司 A kind of tunnel drainage blind pipe and splash guard seal construction method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109736515A (en) * 2018-12-26 2019-05-10 北京东方雨虹防水工程有限公司 A kind of the waterproof receipts head sealing structure and encapsulating method of stretching basal plane component
CN110173303A (en) * 2019-04-02 2019-08-27 中铁隧道集团二处有限公司 A kind of tunnel drainage blind pipe and splash guard seal construction method

Similar Documents

Publication Publication Date Title
CN105019919B (en) Tunnel and its construction method for transmitting fluid
CN106761812B (en) A kind of existing shield tunnel tunnel segment structure reinforcement means
CN107762532A (en) Tunnel vault band mould grouting construction method
CN108825269A (en) Mechanical Method service channel T socket part position adaptive waterproof construction
CN110700857A (en) Composite tunnel supporting system and construction method
CN206487496U (en) A kind of shield tunnel knocker anti-seep water structure
CN207961758U (en) Underground effective waterproof construction through walls
CN101787892A (en) Method for constructing maintainable tunnel waterproof system
CN206093222U (en) Underground wall pipe waterproof construction
CN203948853U (en) Heat-shrinkable T bush
CN102155026A (en) Waterproof method for precast pile head
CN211312492U (en) Prestressed pipe pile head waterproof structure and pipe pile head
CN210163948U (en) Construction system for pouring post-cast strip of basement roof
CN204827469U (en) A tunnel for transmission fluid
CN104453939B (en) Rail tunnel lightweight compound material supporting structural member and installation method thereof
CN206607609U (en) Rich water sand-pebble layer underground engineering deformation joint structure
CN207121936U (en) A kind of pipe gallery roof deformation stitches waterproof construction
CN108361049A (en) A kind of tunnel waterproofing construction construction method
KR100819822B1 (en) Water proof construction method for tunnel using union water proof sheet
CN208023622U (en) A kind of epoxy resin and CMG grouting material waterproofing and leakage-stopping devices
CN107059916A (en) A kind of retaining wall disengaged with body structure portion and its construction method
CN205714225U (en) A kind of railway culvert, tunnel defect wavy metal culvert pipe liner bracing means
CN106759525A (en) Rich water sand-pebble layer underground engineering deformation joint structure and its construction method
CN103628506B (en) Construction method for waterproof positions of foundation platform and pile head
CN217579825U (en) Prefabricated pin-connected panel rainwater box culvert suitable for integrative machine of strutting

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170412

Termination date: 20190831