CN102155026A - Waterproof method for precast pile head - Google Patents

Waterproof method for precast pile head Download PDF

Info

Publication number
CN102155026A
CN102155026A CN 201110102530 CN201110102530A CN102155026A CN 102155026 A CN102155026 A CN 102155026A CN 201110102530 CN201110102530 CN 201110102530 CN 201110102530 A CN201110102530 A CN 201110102530A CN 102155026 A CN102155026 A CN 102155026A
Authority
CN
China
Prior art keywords
pile crown
pile
waterstop
pile head
base plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN 201110102530
Other languages
Chinese (zh)
Inventor
吴兆圣
张道真
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN 201110102530 priority Critical patent/CN102155026A/en
Publication of CN102155026A publication Critical patent/CN102155026A/en
Pending legal-status Critical Current

Links

Images

Abstract

The invention discloses a waterproof method for a precast pile head. The method comprises the following steps of: sheathing a pile head water stopper into the pile head; opening the inner ring of the pile head water stopper, injecting epoxy resin adhesive into the inner ring, sticking one wing of the pile head water stopper to the outer wall of the pile head, and sticking the other wing of the pile head water stopper to the pad layer of a bottom plate; and spreading a bottom plate waterproof coiled material on the pad layer of the bottom plate, and welding or sticking the other wing of the pile head water stopper to the bottom plate waterproof coiled material. In the waterproof method, one wing of the pile head water stopper is stuck to the outer wall of the pile head steel pipe, the other wing of the pile head water stopper is stuck to the pad layer of the pile head, and the other wing of the pile head water stopper is welded or stuck to the bottom plate waterproof coiled material spread on the pad layer, so that a waterproof layer of the pile head and the bottom plate waterproof coiled material are seamlessly connected, the underground water is prevented from entering the surface of a basement bottom plate through a construction seam between the bottom plate and the outer wall of the pile head, and the waterproof reliability is improved.

Description

A kind of waterproof method of preformed pile pile crown
Technical field
The present invention relates to buildings waterproof, relate in particular to a kind of waterproof method of preformed pile pile crown.
Background technology
Regulation according to GB50108-2009 " Technical code for water proof in underground engineering ", the design of pile crown waterproof, material and technology to the success or failure of underground engineering waterproofing have directly, significant effects, owing to be subjected to the influence of factors such as existing technology, material, packaging waterproof layer outside the base plate upstream face is provided with flexibility, reach reliable waterproof, accomplish easily anything but.This all is an after-pouring because of cushion cap and bed course, a constuction joint is arranged between pile crown and cushion cap, the bed course, there is the underground water of pressure will enter into the surface of basement bottom board, so be difficult to accomplish reliable waterproof at the flexible waterproof layer of base plate upstream face setting by the constuction joint between bed course and pile crown steel pipe walls.
Summary of the invention
The invention provides a kind of waterproof method of preformed pile pile crown, its waterproof is reliable.
Technical scheme of the present invention is:
A kind of waterproof method of preformed pile pile crown comprises step:
The pile crown waterstop is packed into pile crown;
Break pile crown waterstop inner ring into two with one's hands, inject epobond epoxyn, the wing of pile crown waterstop is bonded on the pile crown outer wall, another wing of pile crown waterstop is bonded on the bed course of base plate;
The base plate waterproof roll of mating formation on the bed course of base plate is with another wing welding of this pile crown waterstop or bond on the base plate waterproof roll.
Waterproof method of the present invention, one wing of pile crown waterstop is bonded on the pile crown outer wall, another wing of pile crown waterstop is bonded on the bed course of base plate, and with another wing welding of this pile crown waterstop or bond on the base plate waterproof roll of mating formation on the bed course, thereby waterproofing course and the seamless link of base plate waterproof roll with pile crown, prevent that underground water from entering into the surface of basement bottom board by the constuction joint between bed course and pile crown outer wall, improved the waterproof reliability.
Description of drawings
Fig. 1 is the pile crown cross section structure schematic diagram behind the employing waterproof method of the present invention.
The specific embodiment
Below in conjunction with accompanying drawing specific embodiments of the invention are done a detailed elaboration.
Preformed pile generally comprises steel pipe pile and precast reinforced concrete pile, as shown in Figure 1 be steel pipe pile, pile crown outer wall 1 is a steel pipe; For precast reinforced concrete pile, its outer wall is a concrete.
Waterproof method of the present invention, as shown in Figure 1 be the pile crown cross section structure figure of steel pipe pile, comprise step:
Pile crown waterstop 4 is packed into pile crown; Pile crown waterstop 4 is columniform sleeve pipe, can pack into pile crown, and the pile crown periphery generally is cylindrical, inner concreting 9 and connecting reinforcement 6;
Break pile crown waterstop 4 inner rings into two with one's hands, inject epobond epoxyn 5, the wing of pile crown waterstop 4 is bonded on the pile crown outer wall 1, another wing of pile crown waterstop 4 is bonded on the bed course 2 of base plate; When injecting epobond epoxyn 5, epobond epoxyn 5 is continuous at necessary 360 degree of pile crown waterstop 4 inner rings, and can roll pile crown waterstop 4 inner rings with the hand roller, and epobond epoxyn 5 is evenly distributed, and can carry out next procedure in common 24 hours; Bed course 2 is positioned at around the pile crown outer wall 1, can be the concrete of building;
The base plate waterproof roll 3 of mating formation on the bed course 2 of base plate with another wing welding of this pile crown waterstop 4 or bond on the base plate waterproof roll 3, is about to bond to the wing welding of the pile crown waterstop 4 on the bed course 2 or bonds on the base plate waterproof roll 3.When mating formation base plate waterproof roll 3, bed course 2 and base plate waterproof roll 3 can clean down, with adhesive base plate waterproof roll 3 are bonded on the bed course 2; Can select the pile crown waterstop 4 of corresponding material in addition at the material of different base plate waterproof rolls 3, to improve the adhesive strength of pile crown waterstop 4 and base plate waterproof roll 3.
This shows that waterproof method of the present invention with the waterproofing course and the seamless link of base plate waterproof roll of pile crown, prevents that underground water from entering into the surface of basement bottom board by the constuction joint between bed course and pile crown outer wall, improved the waterproof reliability.
In a preferred embodiment,, before pile crown waterstop 4 is packed into pile crown, also comprise step in order to improve the adhesive strength of pile crown waterstop 4 and pile crown outer wall 1: clean pile crown waterstop 4 inner rings, and the bonding position on the cleaning pile crown outer wall 1.Specifically can be stained with cleaning agent and be coated with pile crown waterstop inner ring, and towel off dried immediately with hairbrush; Greasy dirt or iron rust are generally arranged on the pile crown outer wall 1, can improve adhesive strength under the cleaning.
If preformed pile is precast reinforced concrete pile, also can a little ground water seepage at the pile crown top, for this reason in a preferred embodiment, waterproof method of the present invention also comprises step: at pile crown top brushing cement-base infiltration crystallization water-repellent paint 8 or the dried penetrant crystalline powder 8 that spreads, be penetrated into base plate with the underground water that prevents pressure by the pile crown top.
Pile crown top brushing cement-base infiltration crystallization water-repellent paint or dried spread the penetrant crystalline powder after, can also comprise step: the connecting reinforcement 6 root injection water-swellable glue 7 between pile crown and cushion cap.Can prevent that underground water is penetrated into base plate by connecting reinforcement 6.
In a preferred embodiment; for base plate waterproof roll and pile crown waterstop are protected; after another wing with this pile crown waterstop welds or bonds on the base plate waterproof roll; also comprise step: the outer ring at base plate waterproof roll 3 tops and pile crown waterstop 4 is provided with topping 10, and this topping can be the pea gravel concreten of building.
Be the concrete application of waterproof method of the present invention in steel pipe pile below:
1, the bonding position of cleaning pile crown outer wall (steel pipe) 1, degreasing, iron rust.
2, be stained with cleaning agent with hairbrush and be coated with pile crown waterstop 4 inner rings, towel off dried immediately.
3, pile crown waterstop 4 is packed into pile crown.
4, break pile crown waterstop 4 inner rings into two with one's hands, inject epobond epoxyn 5, the wing of pile crown waterstop 4 is bonded on pile crown steel pipe 1 outer wall, another wing of pile crown waterstop 4 is bonded on the bed course 2 of base plate; Epobond epoxyn 5 must 360 ° continuously, can not disconnect, roll pile crown waterstop 4 with the hand roller, epobond epoxyn 5 is evenly distributed, common mistake can be carried out next procedure in 24 hours.
5, the base plate waterproof roll 3 of on the bed course 2 of base plate, mating formation.
6, finish the welding of another wing of this pile crown waterstop 4 and base plate waterproof roll 3 or bonding.
7, at pile crown top brushing cement-base infiltration crystallization water-repellent paint 8,1mm is thick.
8, do topping 10 in the outer ring of base plate waterproof roll 3 tops and pile crown waterstop 4, the C25 pea gravel concreten of this topping 10 for building, 50mm is thick.
9, the 6 root injection water-swellable glue 7 of the connecting reinforcement between pile crown and cushion cap.
Above-described embodiment of the present invention does not constitute the qualification to protection domain of the present invention.Any modification of being done within the spirit and principles in the present invention, be equal to and replace and improvement etc., all should be included within the claim protection domain of the present invention.

Claims (6)

1. the waterproof method of a preformed pile pile crown is characterized in that, comprises step:
The pile crown waterstop is packed into pile crown;
Break pile crown waterstop inner ring into two with one's hands, inject epobond epoxyn, the wing of pile crown waterstop is bonded on the pile crown outer wall, another wing of pile crown waterstop is bonded on the bed course of base plate;
The base plate waterproof roll of mating formation on the bed course of base plate is with another wing welding of this pile crown waterstop or bond on the base plate waterproof roll.
2. the waterproof method of preformed pile pile crown according to claim 1 is characterized in that: before the pile crown waterstop is packed into pile crown, also comprise step: clean pile crown waterstop inner ring, and the bonding position on the cleaning pile crown outer wall.
3. the waterproof method of preformed pile pile crown according to claim 1 and 2 is characterized in that, also comprises step: at pile crown top brushing cement-base infiltration crystallization water-repellent paint or the dried penetrant crystalline powder that spreads.
4. the waterproof method of preformed pile pile crown according to claim 1 and 2; it is characterized in that: after another wing with this pile crown waterstop welded or bonds on the base plate waterproof roll, also comprise step: the outer ring at base plate waterproof roll top and pile crown waterstop was provided with topping.
5. the waterproof method of preformed pile pile crown according to claim 3; it is characterized in that: after another wing with the pile crown waterstop welded or bonds on the base plate waterproof roll, also comprise step: the outer ring at base plate waterproof roll top and pile crown waterstop was provided with topping.
6. the waterproof method of preformed pile pile crown according to claim 3, it is characterized in that: pile crown top brushing cement-base infiltration crystallization water-repellent paint or dried spread the penetrant crystalline powder after, also comprise step: the connecting reinforcement root injection water-swellable glue between pile crown and cushion cap.
CN 201110102530 2011-04-22 2011-04-22 Waterproof method for precast pile head Pending CN102155026A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201110102530 CN102155026A (en) 2011-04-22 2011-04-22 Waterproof method for precast pile head

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201110102530 CN102155026A (en) 2011-04-22 2011-04-22 Waterproof method for precast pile head

Publications (1)

Publication Number Publication Date
CN102155026A true CN102155026A (en) 2011-08-17

Family

ID=44436680

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201110102530 Pending CN102155026A (en) 2011-04-22 2011-04-22 Waterproof method for precast pile head

Country Status (1)

Country Link
CN (1) CN102155026A (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103015441A (en) * 2012-12-06 2013-04-03 上海市基础工程有限公司 Floating water stop device for bridge bearing platform or construction platform
CN103669422A (en) * 2013-12-06 2014-03-26 中国建筑第六工程局有限公司 Waterproof construction method of pile head of anchor rod static pressure pile
KR20170006891A (en) * 2015-07-10 2017-01-18 정광순 Construction pile having a waterproof portion
CN106759308A (en) * 2016-11-30 2017-05-31 中国冶集团有限公司 A kind of precast hollow pile head waterproof construction method
CN107313559A (en) * 2017-07-12 2017-11-03 南通市市政工程设计院有限责任公司 A kind of waterproof roof
CN107794953A (en) * 2017-09-27 2018-03-13 中建八局第二建设有限公司 A kind of constructing device for Punching Borehole Cast-in-place Concrete Pile pile crown waterproof
CN110644482A (en) * 2019-08-22 2020-01-03 中国十七冶集团有限公司 Waterproof construction method for PHC pipe pile head of super-large-area terrace

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201386290Y (en) * 2009-03-27 2010-01-20 山东鑫达鲁鑫防水材料有限公司 PVC waterproof kit
KR20100095986A (en) * 2009-02-23 2010-09-01 유원석 Construction method of basement wall by combining the precast concrete member with the reinforced concrete member
CN201581397U (en) * 2009-12-07 2010-09-15 山西四建集团有限公司 Waterproof reinforced concrete cast-in-site pile head

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20100095986A (en) * 2009-02-23 2010-09-01 유원석 Construction method of basement wall by combining the precast concrete member with the reinforced concrete member
CN201386290Y (en) * 2009-03-27 2010-01-20 山东鑫达鲁鑫防水材料有限公司 PVC waterproof kit
CN201581397U (en) * 2009-12-07 2010-09-15 山西四建集团有限公司 Waterproof reinforced concrete cast-in-site pile head

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
《建筑技术》 20050831 赵继刚,杨海光,罗强,李志远 超深基础地下防水作法和施工工艺 第578-580页 1-6 第36卷, 第8期 2 *

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103015441A (en) * 2012-12-06 2013-04-03 上海市基础工程有限公司 Floating water stop device for bridge bearing platform or construction platform
CN103669422A (en) * 2013-12-06 2014-03-26 中国建筑第六工程局有限公司 Waterproof construction method of pile head of anchor rod static pressure pile
KR20170006891A (en) * 2015-07-10 2017-01-18 정광순 Construction pile having a waterproof portion
KR101867578B1 (en) * 2015-07-10 2018-06-14 정광순 Construction pile having a waterproof portion
CN106759308A (en) * 2016-11-30 2017-05-31 中国冶集团有限公司 A kind of precast hollow pile head waterproof construction method
CN106759308B (en) * 2016-11-30 2019-04-23 中国一冶集团有限公司 A kind of precast hollow pile head waterproof construction method
CN107313559A (en) * 2017-07-12 2017-11-03 南通市市政工程设计院有限责任公司 A kind of waterproof roof
CN107313559B (en) * 2017-07-12 2019-08-16 南通市市政工程设计院有限责任公司 A kind of waterproof roof
CN107794953A (en) * 2017-09-27 2018-03-13 中建八局第二建设有限公司 A kind of constructing device for Punching Borehole Cast-in-place Concrete Pile pile crown waterproof
CN110644482A (en) * 2019-08-22 2020-01-03 中国十七冶集团有限公司 Waterproof construction method for PHC pipe pile head of super-large-area terrace

Similar Documents

Publication Publication Date Title
CN102155026A (en) Waterproof method for precast pile head
CN101787742B (en) Planted roof soil lower deformation joint construction structure and construction method thereof
CN103774663A (en) Waterproof structure and construction method of basement anti-floating anchor bar
CN101787892A (en) Method for constructing maintainable tunnel waterproof system
CN110185135B (en) Basement bottom plate and outer wall waterproof structure and construction method
CN202851009U (en) Tunnel buffering multilayer waterproof-drainage structure
CN105401962B (en) The hermetically sealed waterproof construction method of side wall, engineering top surface
CN102852530A (en) Tunnel buffering multilayered water-discharging-preventing structure and construction method
CN103397633A (en) Self-drilling RCA (recycling composite anchor) rod and construction method thereof
CN106121061A (en) The waterproof construction of outer wall of basement and construction method thereof
CN112144673B (en) Basement waterproof structure and construction method
CN110080796B (en) Tunnel segment repairing process
CN210562162U (en) Prefabricated tubular pile crackle prosthetic devices
CN109083195B (en) Comprehensive pipe gallery waterproof system and construction method thereof
CN101831961A (en) Method for flexible connection of concrete and water stop processing
CN102852536A (en) Connecting structure and method for steel-edged rubber water stops
CN204420369U (en) A kind of linkage structure of large-caliber drainage pipeline
CN203834477U (en) Waterproof structure of anti-floating anchor bars of basement
CN104060576B (en) Concrete for hydraulic structure member expansion joint waterstop repairs attachment structure and method for repairing and connecting
CN213086878U (en) Pile head waterproof device
CN212827208U (en) PVC pre-paved anti-sticking inner-reinforced waterproof roll
CN215253039U (en) Pre-paving and anti-sticking construction structure for bottom plate modified asphalt base pre-paving waterproof coiled material
CN212336350U (en) Deformation joint waterproof structure
CN211368801U (en) Tunnel engineering seam waterproof construction
CN204386625U (en) A kind of railway tunnel hoop seam uses steel plate self-adhesion water stop band

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20110817