CN206607609U - Rich water sand-pebble layer underground engineering deformation joint structure - Google Patents

Rich water sand-pebble layer underground engineering deformation joint structure Download PDF

Info

Publication number
CN206607609U
CN206607609U CN201720249181.0U CN201720249181U CN206607609U CN 206607609 U CN206607609 U CN 206607609U CN 201720249181 U CN201720249181 U CN 201720249181U CN 206607609 U CN206607609 U CN 206607609U
Authority
CN
China
Prior art keywords
wall
coat
layer
movement joint
grouting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720249181.0U
Other languages
Chinese (zh)
Inventor
裴文陶
赵华伟
朱传伟
薛昌军
杨保全
冀留涛
李剑
隋毅
张威威
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Second Engineering Co Ltd of China Railway No 10 Engineering Group Co Ltd
Original Assignee
Second Engineering Co Ltd of China Railway No 10 Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Second Engineering Co Ltd of China Railway No 10 Engineering Group Co Ltd filed Critical Second Engineering Co Ltd of China Railway No 10 Engineering Group Co Ltd
Priority to CN201720249181.0U priority Critical patent/CN206607609U/en
Application granted granted Critical
Publication of CN206607609U publication Critical patent/CN206607609U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bulkheads Adapted To Foundation Construction (AREA)

Abstract

The utility model discloses a kind of rich water sand-pebble layer underground engineering deformation joint structure, it is referred to as fore-and-aft direction along the length direction of the underground space, the direction for being internally pointed to surrounding formation by the underground space is referred to as outer direction, provided with wall reinforcement layer inside formation wall, waterproof layer is equipped between wall reinforcement layer and inside formation wall, wall back-up coat and back wall back-up coat before wall reinforcement layer is divided into provided with movement joint on wall reinforcement layer, external labeling type waterstop is fixed with the outer end of movement joint, external labeling type waterstop is adhered to the inner side of waterproof layer, foam rods are provided between outer pasting type waterstop and waterproof layer;This deformation joint structure passes through cystosepiment and grouting tube type waterstop mating reaction, the effect of good enhancing waterproof is reached, the multiple shear connectors being arranged circumferentially in movement joint are obligated to preceding wall back-up coat and back wall back-up coat, prevent the closed failure of people's air defense;So as to six grades of explosion-proof, closed and construction requirements for meeting six grades of core of people's air defense.

Description

Rich water sand-pebble layer underground engineering deformation joint structure
Technical field
The utility model belongs to underground engineering movement joint field, more particularly to a kind of rich water sand-pebble layer underground engineering Deformation joint structure.
Background technology
With the development of urban construction, underground engineering is a kind of important building in city, while people's air defense can also be doubled as Engineering, below its general water level located underground, in long-term high pressure-bearing rich water environment, people's air defense is closed and waterproof problem one Directly one of the problem for perplexing underground engineering, the people's air defense of especially underground engineering movement joint part is closed and waterproof, its it is closed and The effect relation of waterproof is to the seal of underground engineering, durability and applicability.It is closed and anti-due to later stage movement joint position Water can not be handled, therefore the closed and waterproof technique of Study of The Underground engineering project deformation seam is the crucial institute solved the above problems .
The content of the invention
The problem of the utility model purpose is to solve the closed above-mentioned movement joint of underground engineering in the prior art and anti-shipwreck And a kind of rich water sand-pebble layer underground engineering deformation joint structure is proposed, the utility model reaches that above-mentioned purpose is taken Technical scheme is:A kind of rich water sand-pebble layer underground engineering deformation joint structure, before being referred to as along the length direction of the underground space Rear is to the direction for being internally pointed to surrounding formation by the underground space is referred to as outer direction, adds inside formation wall provided with wall Gu layer, is equipped with waterproof layer between wall reinforcement layer and inside formation wall, and is provided with movement joint by wall on wall reinforcement layer Wall back-up coat and back wall back-up coat, external labeling type waterstop, outer patch are fixed with the outer end of movement joint before back-up coat is divided into Formula waterstop is adhered to the inner side of waterproof layer, and foam rods are provided between outer pasting type waterstop and waterproof layer, are filled out in movement joint Filled with cystosepiment, the sealing compound for being used for sealing fixed foam plate is provided with the inner of movement joint, is circumferentially set in the middle part of movement joint There are multiple shear connectors, the front-end and back-end of shear connector are embedded within preceding wall back-up coat and back wall back-up coat, become respectively The inner of shape seam is fixed with guiding gutter, is equipped with the inner front side of movement joint and rear side for welding the pre- of the anti-seal steel plate of people If steel plate.
It is preferred that, grouting tube type waterstop is circumferentially embedded with the middle part of movement joint, in the front end of grouting tube type waterstop Circumferentially arranged with multiple preceding Grouting Pipes, the grouting port of preceding Grouting Pipe stretches out preceding wall back-up coat and within space located underground, noted The rear end of tubular type waterstop is starched circumferentially arranged with multiple grouting behind shaft or drift lining pipes, the grouting port of grouting behind shaft or drift lining pipe stretches out back wall back-up coat and position Within the underground space.
It is preferred that, circumferentially arranged with waterproof reinforced layer between waterproof layer and inside formation wall, the position of the waterproof reinforced layer Put corresponding with the position of movement joint.
The utility model have the advantage that for:This deformation joint structure is matched somebody with somebody by cystosepiment and grouting tube type waterstop Cooperation is used, and has reached the effect of good enhancing waterproof, and the multiple shear connectors being arranged circumferentially in movement joint add to preceding wall Gu layer and back wall back-up coat are obligated, the closed failure of people's air defense is prevented;Simultaneously can also be in two default steel in wartime Between plate weld the anti-seal steel plate of people so that meet six grades of core of people's air defense six grades it is explosion-proof, closed and construction requirement;Carry significantly The high efficiency of construction of movement joint, while also meet movement joint six grades that prevent six grades of core are explosion-proof, closed and constructions of construction It is required that.
Brief description of the drawings
Fig. 1 is structural representation of the present utility model.
Embodiment
The utility model is further described below in conjunction with the accompanying drawings.
As shown in figure 1, a kind of rich water sand-pebble layer underground engineering deformation joint structure, empty by underground for the ease of description Between length direction be referred to as fore-and-aft direction A, the direction for being internally pointed to surrounding formation 2 by the underground space is referred to as outer direction B, in close proximity to Provided with wall reinforcement layer at the inwall of stratum 2, waterproof layer 5 is equipped between wall reinforcement layer and the inwall of stratum 2, in wall reinforcement Wall back-up coat 1 and back wall back-up coat 6 before wall reinforcement layer is divided into by layer provided with movement joint, in the outer end of movement joint External labeling type waterstop 9 is fixed with, external labeling type waterstop 9 is adhered to the inner side of waterproof layer 5, in outer pasting type waterstop 9 and waterproof layer 5 Between be provided with foam rods 3, so as to reserve stroke for the effect of expanding with heat and contract with cold of waterproof layer 5, foam is filled with movement joint Plate 11, the sealing compound 12 for being used for sealing fixed foam plate 11 is provided with the inner of movement joint, the setting one of cystosepiment 11 is to play Closed effect, two be to prevent debris to drop in movement joint in work progress;In the middle part of movement joint circumferentially arranged with Multiple shear connectors 8, the front-end and back-end of shear connector 8 are embedded within preceding wall back-up coat 1 and back wall back-up coat 6 respectively, are entered And preceding wall back-up coat 1 and back wall back-up coat 6 are obligated, prevent the closed failure of people's air defense;In the inner of movement joint Guiding gutter is fixed with, 13 are equipped with the default steel plate for welding the anti-seal steel plate of people in the inner front side of movement joint and rear side 14。
In order to further enhance the seal and robustness of movement joint, grouting tube type is circumferentially embedded with the middle part of movement joint Waterstop 10, in the front end of grouting tube type waterstop 10 circumferentially arranged with multiple preceding Grouting Pipes 15, the grouting port of preceding Grouting Pipe 15 Wall back-up coat 15 before stretching out and within space located underground, the rear end of grouting tube type waterstop 10 is circumferentially arranged with noting after multiple Starch pipe 7, the grouting port of grouting behind shaft or drift lining pipe 7 stretch out back wall back-up coat 6 and within space located underground;Simultaneously can also be in waterproof layer Circumferentially arranged with waterproof reinforced layer 4 between 5 and the inwall of stratum 2, the position of the waterproof reinforced layer 4 is relative with the position of movement joint Should.
This deformation joint structure has reached that good enhancing is anti-by cystosepiment 11 and the mating reaction of grouting tube type waterstop 10 The effect of water, wall back-up coat 1 and back wall back-up coat 6 are carried out before 8 pairs of multiple shear connectors that movement joint is arranged circumferentially Obligate, prevent the closed failure of people's air defense;The anti-seal steel of people can also be welded between two default steel plates 14 in wartime simultaneously Plate, thus meet six grades of core of people's air defense six grades it is explosion-proof, closed and construction requirement.
A kind of construction method of rich water sand-pebble layer underground engineering deformation joint structure as described above, including following step Suddenly:
A:Laying waterproof reinforced layer 4, waterproof layer 5, the and of foam rods 3 successively from outside to inside at the inwall of stratum 2 first External labeling type waterstop 9, allows waterproof reinforced layer 4, position of the center of foam rods 3 and external labeling type waterstop 9 with movement joint It is corresponding, then back wall back-up coat steel bar framework is installed, then along week on the front end face of back wall back-up coat steel bar framework To grouting tube type waterstop 10 and multiple shear connectors 8 is laid, the grouting tube type waterstop 10 is located at the inner side of shear connector 8, protects The grouting port for demonstrate,proving grouting behind shaft or drift lining pipe 7 stretches out back wall back-up coat steel bar framework and within space located underground, finally completes back wall Back-up coat 6 is poured;
B:Wall back-up coat steel bar framework before installing, then the filled and process plate 11 in movement joint, stops while allowing and starching tubular type Before the front end of water band 10 and multiple shear connectors 8 is embedded in wall back-up coat steel bar framework, while Grouting Pipe 15 before ensureing Grouting port stretches out preceding wall back-up coat steel bar framework and within space located underground, wall back-up coat 1 is poured before finally completing;
C:It is last that guiding gutter 13 is installed in the inner of movement joint, it is pre-buried for welding in the inner front side of movement joint and rear side Connect the default steel plate 14 of the anti-seal steel plate of people.
The construction method of this deformation joint structure is simple to operation, substantially increases the efficiency of construction of movement joint, while also full Six grades that prevent six grades of core of foot movement joint are explosion-proof, closed and construction requirements of construction.
In actual use, this deformation joint structure is set per repetition separated by a distance along underground space fore-and-aft direction A, No matter the section of the underground space be rectangle or ellipse also or other geometries belong to this technology essence it is simple Modification, equivalent variations;Fallen within simultaneously in the change to preceding wall back-up coat 1 and the tandem of the construction of back wall back-up coat 6 The protection domain of this valve gate technology scheme.

Claims (3)

1. a kind of rich water sand-pebble layer underground engineering deformation joint structure, is referred to as front and back along the length direction of the underground space To the direction for being internally pointed to surrounding formation by the underground space is referred to as outer direction, it is characterised in that be provided with inside formation wall Wall reinforcement layer, waterproof layer is equipped between wall reinforcement layer and inside formation wall, provided with movement joint on wall reinforcement layer Wall back-up coat and back wall back-up coat before wall reinforcement layer is divided into, external labeling type sealing is fixed with the outer end of movement joint Band, external labeling type waterstop is adhered to the inner side of waterproof layer, and foam rods are provided between outer pasting type waterstop and waterproof layer, in deformation Cystosepiment is filled with seam, the sealing compound for being used for sealing fixed foam plate, the edge in the middle part of movement joint are provided with the inner of movement joint Be circumferentially with multiple shear connectors, before the front-end and back-end of shear connector are embedded in respectively wall back-up coat and back wall back-up coat it It is interior, guiding gutter is fixed with the inner of movement joint, is equipped with the inner front side of movement joint and rear side anti-seal for welding people The default steel plate of steel plate.
2. rich water sand-pebble layer underground engineering deformation joint structure according to claim 1, it is characterised in that in movement joint Middle part is circumferentially embedded with grouting tube type waterstop, in the front end of grouting tube type waterstop circumferentially arranged with multiple preceding Grouting Pipes, The grouting port of preceding Grouting Pipe stretches out preceding wall back-up coat and within space located underground, the rear end of grouting tube type waterstop is circumferentially Provided with multiple grouting behind shaft or drift lining pipes, the grouting port stretching back wall back-up coat of grouting behind shaft or drift lining pipe within space located underground.
3. rich water sand-pebble layer underground engineering deformation joint structure according to claim 2, it is characterised in that in waterproof layer Circumferentially arranged with waterproof reinforced layer between inside formation wall, the position of the waterproof reinforced layer is corresponding with the position of movement joint.
CN201720249181.0U 2017-03-15 2017-03-15 Rich water sand-pebble layer underground engineering deformation joint structure Expired - Fee Related CN206607609U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720249181.0U CN206607609U (en) 2017-03-15 2017-03-15 Rich water sand-pebble layer underground engineering deformation joint structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720249181.0U CN206607609U (en) 2017-03-15 2017-03-15 Rich water sand-pebble layer underground engineering deformation joint structure

Publications (1)

Publication Number Publication Date
CN206607609U true CN206607609U (en) 2017-11-03

Family

ID=60165346

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720249181.0U Expired - Fee Related CN206607609U (en) 2017-03-15 2017-03-15 Rich water sand-pebble layer underground engineering deformation joint structure

Country Status (1)

Country Link
CN (1) CN206607609U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106759525A (en) * 2017-03-15 2017-05-31 中铁十局集团第二工程有限公司 Rich water sand-pebble layer underground engineering deformation joint structure and its construction method
CN111287793A (en) * 2020-03-02 2020-06-16 长安大学 Deformation joint water-proof and drainage system based on automatic drainage function and construction process thereof
CN112240215A (en) * 2020-10-23 2021-01-19 中铁工程装备集团有限公司 Waterproof structure between water-stop strip and prefabricated component and construction method of waterproof structure

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106759525A (en) * 2017-03-15 2017-05-31 中铁十局集团第二工程有限公司 Rich water sand-pebble layer underground engineering deformation joint structure and its construction method
CN111287793A (en) * 2020-03-02 2020-06-16 长安大学 Deformation joint water-proof and drainage system based on automatic drainage function and construction process thereof
CN112240215A (en) * 2020-10-23 2021-01-19 中铁工程装备集团有限公司 Waterproof structure between water-stop strip and prefabricated component and construction method of waterproof structure

Similar Documents

Publication Publication Date Title
CN105114105B (en) Steel-concrete combined type tunnel-liner support structure and making thereof and construction method
CN204691790U (en) A kind of Novel separated type cover arch of tunnel structural shape
CN206607609U (en) Rich water sand-pebble layer underground engineering deformation joint structure
WO2016058275A1 (en) Underground steel-concrete structure pipeline with spiral composite reinforcement ring on inner wall thereof and manufacturing method thereof
CN210164243U (en) Wall bushing structure
CN103256052A (en) Construction method for integral straight middle wall type double-arch tunnel
CN102733829B (en) Water-proof structure of tunnel lining joint in shield-method construction
CN209637782U (en) Tunnel water proofing discharge structure
CN104314584A (en) Assembled type jacking pipe piece structure and assembling method thereof
CN106759525A (en) Rich water sand-pebble layer underground engineering deformation joint structure and its construction method
CN105649649A (en) PVC sheet shield tunnel segment inner corrosion prevention system with linings
CN208073510U (en) A kind of shield tunnel liner construction of the assembled prefabricated secondary lining section of jurisdiction in arch
CN208073490U (en) A kind of shield tunnel liner construction of the assembled prefabricated secondary lining section of jurisdiction of week
CN204456124U (en) One is slip casing by pressure pipe repeatedly
CN108547316B (en) Double-layer corrugated steel structure for underground comprehensive pipe gallery
CN204312088U (en) A kind of pin-connected panel push pipe tunnel segment structure
CN104089103B (en) Glass steel pipe lining method of circulating water pipe lined with glass steel pipe
CN212506725U (en) Basement waterproof structure
CN105422129A (en) Splicing structure used for combined type tunnel lining, culvert or comprehensive pipe gallery
CN210238573U (en) A waterproof construction that is used for open cut station main part and attached junction
CN202788868U (en) Duct piece staggered joint and assembly lining structure for fixing inverted arch positions
CN205243521U (en) A mosaic structure for making up formula tunnel lining , culvert or utility tunnel
CN205839796U (en) Utility tunnel internode connection structure
CN112081607A (en) Tunnel primary support and waterproof and drainage combined system and construction method
CN103604000A (en) River and sea bottom steel jacking pipe butt joint construction method

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20171103