CN206092042U - Loess tunnel strutting arrangement that is under construction - Google Patents

Loess tunnel strutting arrangement that is under construction Download PDF

Info

Publication number
CN206092042U
CN206092042U CN201621145794.1U CN201621145794U CN206092042U CN 206092042 U CN206092042 U CN 206092042U CN 201621145794 U CN201621145794 U CN 201621145794U CN 206092042 U CN206092042 U CN 206092042U
Authority
CN
China
Prior art keywords
support
haunch
supports
cross bar
reinforcement
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201621145794.1U
Other languages
Chinese (zh)
Inventor
余灿鑫
王增立
陈国胜
郝俊锁
李秋生
何包
王晓松
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway 18th Bureau Group Co Ltd
Second Engineering Co Ltd of China Railway 18th Bureau Group Co Ltd
Original Assignee
China Railway 18th Bureau Group Co Ltd
Second Engineering Co Ltd of China Railway 18th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway 18th Bureau Group Co Ltd, Second Engineering Co Ltd of China Railway 18th Bureau Group Co Ltd filed Critical China Railway 18th Bureau Group Co Ltd
Priority to CN201621145794.1U priority Critical patent/CN206092042U/en
Application granted granted Critical
Publication of CN206092042U publication Critical patent/CN206092042U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

The utility model discloses a loess tunnel strutting arrangement that is under construction belongs to the tunnel construction field for pour when solving current tunnel construction inconvenient, and support problem firm inadequately temporarily. It includes that the vault supports, is located haunch that the vault supported the below both sides and supports, is located the haunch and support the below and encircle the foot and support, be located and encircle the foot and support inboard main tributary and prop, the vault supports both ends and is equipped with the connection piece, both ends were equipped with the connection piece about the haunch supported, it is equipped with the connection piece to encircle foot support upper end, between supporting, vault support and haunch be equipped with the pivot, the vault supports and the haunch supports the inboard triangle -shaped of formation recess in junction, the haunch supports and encircles and is equipped with the pivot between the foot support, the haunch supports and encircles the inboard triangle -shaped of formation recess in foot support junction. This technical scheme provides a loess tunnel strutting arrangement that is under construction for convenience is more pour in the tunnel, and the time length of construction is shorter, and the feasible reinforcement that has obtained of encircleing foot and haunch department.

Description

A kind of loess tunnel construction support meanss
Technical field
The utility model belongs to constructing tunnel field, is a kind of loess tunnel construction support meanss specifically.
Background technology
In constructing tunnel, large-section loess tunnel construct according to " New Austrian Tunneling Method " principle, it then follows " early forecast, manage it is advanced, non- Explosion, short excavation, disturb, sternly harness the river less, strong supporting, early closing, it is diligent measure, Pian tight liner is built " principle steer a steady course.Stand after excavation Carry out preliminary bracing, it is ensured that close country rock in the shortest time, inverted arch is completed in time, make shaped steel cyclization, it is true according to metric data The fixed optimal two lining engineering time, the construction of two linings is completed as early as possible, be haunch and arch where the stress of the temporary support in tunnel is larger Pin.
The content of the invention
The utility model purpose is intended to provide a kind of loess tunnel construction a kind of stabilized structure, easy to use Support arrangement.
To realize above-mentioned technical purpose, the technical solution adopted in the utility model is as follows:
A kind of loess tunnel construction support meanss, including vault is supported, the haunch positioned at vault support lower section both sides is supported, Lower section arch springing support, the main support on the inside of arch springing support, the vault is supported to support two ends to be provided with connection sheet positioned at haunch, The haunch supports upper and lower ends to be provided with connection sheet, and the arch springing supports upper end to be provided with connection sheet, and the vault is supported and haunch Rotating shaft is provided between support, the vault is supported and haunch supports junction inner side to form triangular groove, and the haunch is supported Rotating shaft is provided with and arch springing support between, the haunch is supported and arch springing support junction inner side formation triangular groove, described turn Axle passes through connection sheet;
The first hydraulically extensible bar is provided between the arch springing is supported and haunch is supported, the haunch is supported and main support between The second hydraulically extensible bar is provided with, the vault supports lower end to be connected to main support by fix bar, and the main support lower end is provided with 3rd hydraulically extensible bar, the 3rd hydraulically extensible bar lower end is provided with guide rail wheel.
Using above-mentioned technical proposal, rotating shaft passes through connection sheet so that arch springing is supported can support lower end to rotate around haunch, arch Waist supporting can support lower end to rotate around vault;Vault is supported and haunch supports junction inner side to form triangular groove, haunch Support and arch springing supports junction inner side to form triangular groove, it is to avoid lead to not because gap is too small the feelings of rotation Condition, triangular groove also enables the outside for supporting to isolate concrete in inner side, reaches the effect of steel form.Using When, first the first hydraulically extensible bar of support meanss, the second hydraulically extensible bar, the 3rd hydraulically extensible bar are shunk so that vault The height of support declines, and haunch is supported and shunk to inner side, and arch springing is supported and shunk to inner side, is then pushed from guide rail in tunnel, so Afterwards by the first hydraulically extensible bar, the second hydraulically extensible bar, the elongation of the 3rd hydraulically extensible bar, support meanss reach work support shape State, then toward casting concrete in the interlayer between support and tunnel, greatly shortens the cycle of construction.
Further limit, the main support includes main framing, the reinforcement on the inside of main framing, the main framing upper end Projection is arranged with, the raised and main framing is one, and the main framing includes supporting leg, the crossbeam above supporting leg, The supporting leg lower end is connected to the 3rd hydraulically extensible bar, and the crossbeam and supporting leg are one, and the reinforcement adds including first Strong muscle, the second reinforcement, the first reinforcement right-hand member vertical welding is in the second reinforcement centre position, first reinforcement Left end is welded in the junction of supporting leg and crossbeam, and the second reinforcement lower end is connected to supporting leg, the second reinforcement upper end It is connected to crossbeam.
Main framing upper end is arranged with projection, and raised and main framing is one, and raised sets up so that fix bar and master The contact area of skeleton is more so that connection is more consolidated.First reinforcement right-hand member vertical welding is in the middle of the second reinforcement Position, because the pressure in tunnel is using cooperatively from circular arc external surface applying, the first reinforcement and the second reinforcement so that The ability for bearing pressure of main framing is higher, and reliability is higher.
Further limit, the main support lower end is provided with cross bar, the cross bar two ends are contacted with arch springing and support inner side.
The effect of cross bar be strengthen arch springing support so that arch springing be supported on by inner side extruding force when, cross bar A part of power can be undertaken, the bearing strength of the first hydraulically extensible bar is reduced.
Further limit, the haunch supports inner side to be provided with the first screens groove, and the cross bar top is provided with the second screens groove, The haunch is supported and is provided with brace and cross bar between, and the jib head is placed in the first screens groove, and the brace lower end is placed on In second screens groove.
Brace plays a part of to reinforce haunch support, and easy for installation, only need to be by cross bar and the first screens groove and the second card Position groove coordinates.
Further limit, the cross bar divide into two sections, and the cross bar is including left cross bar, positioned at the I-shaped of left cross bar right-hand member Steel, positioned at the right cross bar of I-steel right-hand member, in the groove of the embedded I-steel of the left cross bar right-hand member, the right cross bar left end is embedded in work In the groove of word steel.
Avoid that cross bar is long, inconvenient problem is installed, when mounted, left cross bar and right cross bar can be put on right position Afterwards, I-steel is put into from top to bottom between left cross bar and right cross bar.
Further limit, the arch springing supports lower end left side to be provided with holding tank, and it is fixed that the arch springing supports lower end right side to be provided with Position groove, forms support base between the locating slot and triangular groove, the support base upper end is connected to the first hydraulically extensible bar Lower end.
Holding tank causes arch springing to support and the interlayer in tunnel broadens, and improves the reliability in tunnel, and locating slot facilitates cross bar Install, at the same can also cross bar now displacement, support base facilitates the installation of the first hydraulically extensible bar.
The utility model compared to existing technology, stabilized structure, easy to use, short construction period.
Description of the drawings
The nonlimiting examples that the utility model can be given by accompanying drawing are further illustrated;
Fig. 1 is a kind of structural representation of loess tunnel construction support meanss of the utility model;
Main element symbol description is as follows:
Vault support 1, haunch support 2, arch springing support 3, main support 4, connection sheet 5, rotating shaft 6, triangular groove 7, first Hydraulically extensible bar 8, the second hydraulically extensible bar 9, the 3rd hydraulically extensible bar 10, guide rail wheel 11, main framing 41, reinforcement 42 is raised 12, supporting leg 411, crossbeam 412, the first reinforcement 421, the second reinforcement 422, cross bar 13, the first screens groove 14, the second screens groove 15, brace 16, left cross bar 131, I-steel 132, right cross bar 133, holding tank 17, locating slot 18, support base 19.
Specific embodiment
In order that those skilled in the art may be better understood the utility model, it is right with reference to the accompanying drawings and examples Technical solutions of the utility model are further illustrated.
As shown in figure 1, a kind of loess tunnel construction support meanss, including vault supports 1,1 lower section two is supported positioned at vault The main support 4 that the haunch of side supports 2, supports 2 lower section arch springings to support 3 positioned at haunch, 3 inner sides are supported positioned at arch springing, vault supports 1 Two ends are provided with connection sheet 5, and haunch supports 2 upper and lower ends to be provided with connection sheet 5, and arch springing supports 3 upper ends to be provided with connection sheet 5, vault Support 1 and haunch support and rotating shaft 6 are provided between 2, and vault to be supported and form triangular groove 7, arch on the inside of 1 and 2 junctions of haunch support Waist supporting 2 and arch springing support and rotating shaft 6 are provided between 3, and haunch supports 2 and 3 junctions of arch springing support inner side formation triangular groove 7, rotating shaft 6 passes through connection sheet 5;
Arch springing supports and the first hydraulically extensible bar 8 is provided between 3 and haunch support 2, and haunch is supported and set between 2 and main support 4 There is the second hydraulically extensible bar 9, vault supports 1 lower end to be connected to main support 4 by fix bar, and 4 lower ends of main support are provided with the 3rd liquid Pressure expansion link 10, the lower end of the 3rd hydraulically extensible bar 10 is provided with guide rail wheel 11.
Preferably, it is main to support 4 to include main framing 41, the reinforcement 42 on the inside of main framing 41, the upper end pair of main framing 41 Title is provided with raised 12, and raised 12 and main framing 41 are one, and main framing 41 includes supporting leg 411, the horizontal stroke above supporting leg 411 Beam 412, the lower end of supporting leg 411 is connected to the 3rd hydraulically extensible bar 10, and crossbeam 412 and supporting leg 411 are one, and reinforcement 42 includes First reinforcement 421, the second reinforcement 422, the right-hand member vertical welding of the first reinforcement 421 in the centre position of the second reinforcement 422, The left end of first reinforcement 421 is welded in the junction of supporting leg 411 and crossbeam 412, and the lower end of the second reinforcement 422 is connected to supporting leg 411, the upper end of the second reinforcement 422 is connected to crossbeam 412.
Preferably, 4 lower ends of main support are provided with cross bar 13, and the two ends of cross bar 13 are contacted with arch springing and support 3 inner sides.
Preferably, haunch supports 2 inner sides to be provided with the first screens groove 14, and the top of cross bar 13 is provided with the second screens groove 15, haunch Support and be provided with brace 16 between 2 and cross bar 13, the upper end of brace 16 is placed in the first screens groove 14, and the lower end of brace 16 is placed on the second card In the groove 15 of position.
Preferably, cross bar 13 divide into two sections, and cross bar 13 is including left cross bar 131, positioned at the I-steel of the right-hand member of left cross bar 131 132nd, positioned at the right cross bar 133 of the right-hand member of I-steel 132, in the groove of the embedded I-steel 132 of the right-hand member of left cross bar 131, right cross bar 133 is left In the groove of the embedded I-steel 132 in end.
Optimum, arch springing supports 3 lower ends left side to be provided with holding tank 17, and arch springing supports 3 lower ends right side to be provided with locating slot 18, fixed Support base 19 is formed between position groove 18 and triangular groove 7, the upper end of support base 19 is connected to the lower end of the first hydraulically extensible bar 8.
A kind of loess tunnel construction support meanss that the utility model is provided are described in detail above.It is embodied as The explanation of example is only intended to help and understands method of the present utility model and its core concept.It should be pointed out that for the art Those of ordinary skill for, on the premise of without departing from the utility model principle, the utility model can also be carried out some Improve and modify, these are improved and modification is also fallen in the utility model scope of the claims.

Claims (6)

1. a kind of loess tunnel construction support meanss, including vault support, support positioned at vault the haunch of lower section both sides to support, position Lower section arch springing support, the main support on the inside of arch springing support are supported in haunch, it is characterised in that:The vault supports two ends to set There is connection sheet, the haunch supports upper and lower ends to be provided with connection sheet, and the arch springing supports upper end to be provided with connection sheet, the vault Support and haunch are provided with rotating shaft between supporting, the vault is supported and haunch supports junction inner side to form triangular groove, described Rotating shaft is provided between haunch is supported and arch springing is supported, it is recessed that the haunch support and arch springing support junction inner side to form triangle Groove, the rotating shaft passes through connection sheet;
The first hydraulically extensible bar is provided between the arch springing is supported and haunch is supported, the haunch is supported and main support between and is provided with Second hydraulically extensible bar, the vault supports lower end to be connected to main support by fix bar, and the main support lower end is provided with the 3rd Hydraulically extensible bar, the 3rd hydraulically extensible bar lower end is provided with guide rail wheel.
2. a kind of loess tunnel construction support meanss according to claim 1, it is characterised in that:The main support includes master Skeleton, the reinforcement on the inside of main framing, the main framing upper end is arranged with projection, and the raised and main framing is one , the main framing includes supporting leg, the crossbeam above supporting leg, and the supporting leg lower end is connected to the 3rd hydraulically extensible bar, institute It is one to state crossbeam and supporting leg, and the reinforcement includes the first reinforcement, the second reinforcement, and the first reinforcement right-hand member hangs down Directly it is welded in the second reinforcement centre position, the first reinforcement left end is welded in the junction of supporting leg and crossbeam, described Two reinforcement lower ends are connected to supporting leg, and the second reinforcement upper end is connected to crossbeam.
3. a kind of loess tunnel construction support meanss according to claim 2, it is characterised in that:The main support lower end sets There is cross bar, the cross bar two ends are contacted with arch springing and support inner side.
4. a kind of loess tunnel construction support meanss according to claim 3, it is characterised in that:The haunch supports inner side The first screens groove is provided with, the cross bar top is provided with the second screens groove, and the haunch is supported and is provided with brace and cross bar between, described Jib head is placed in the first screens groove, and the brace lower end is placed in the second screens groove.
5. a kind of loess tunnel construction support meanss according to claim 4, it is characterised in that:The cross bar divide into two Section, the cross bar includes left cross bar, the I-steel positioned at left cross bar right-hand member, the right cross bar positioned at I-steel right-hand member, the left horizontal stroke In the groove of the embedded I-steel of bar right-hand member, in the groove of the embedded I-steel of the right cross bar left end.
6. a kind of loess tunnel construction support meanss according to claim 5, it is characterised in that:The arch springing supports lower end Left side is provided with holding tank, and the arch springing supports lower end right side to be provided with locating slot, formed between the locating slot and triangular groove Support base, the support base upper end is connected to the first hydraulically extensible bar lower end.
CN201621145794.1U 2016-10-21 2016-10-21 Loess tunnel strutting arrangement that is under construction Expired - Fee Related CN206092042U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621145794.1U CN206092042U (en) 2016-10-21 2016-10-21 Loess tunnel strutting arrangement that is under construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621145794.1U CN206092042U (en) 2016-10-21 2016-10-21 Loess tunnel strutting arrangement that is under construction

Publications (1)

Publication Number Publication Date
CN206092042U true CN206092042U (en) 2017-04-12

Family

ID=58484452

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621145794.1U Expired - Fee Related CN206092042U (en) 2016-10-21 2016-10-21 Loess tunnel strutting arrangement that is under construction

Country Status (1)

Country Link
CN (1) CN206092042U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106948851A (en) * 2017-03-31 2017-07-14 中国矿业大学 A kind of alley hydraulic support
CN108643944A (en) * 2018-05-14 2018-10-12 张贵永 One kind being based on third system rich water fine sand layer constructing tunnel initial stage support device
CN109322688A (en) * 2018-10-26 2019-02-12 林翠英 Soft rock tunnel, which is got out of a predicament or an embarrassing situation, excavates the hydraulic collateral support arrangement of anti-settling convergence
CN110578534A (en) * 2019-09-16 2019-12-17 北京市市政四建设工程有限责任公司 novel template trolley for underground excavation of subway interval standard section tunnel
CN111155703A (en) * 2020-01-06 2020-05-15 东台市宏大耐热材料有限公司 Arch foot brick with tenon fourth of twelve earthly branches structure

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106948851A (en) * 2017-03-31 2017-07-14 中国矿业大学 A kind of alley hydraulic support
CN108643944A (en) * 2018-05-14 2018-10-12 张贵永 One kind being based on third system rich water fine sand layer constructing tunnel initial stage support device
CN109322688A (en) * 2018-10-26 2019-02-12 林翠英 Soft rock tunnel, which is got out of a predicament or an embarrassing situation, excavates the hydraulic collateral support arrangement of anti-settling convergence
CN110578534A (en) * 2019-09-16 2019-12-17 北京市市政四建设工程有限责任公司 novel template trolley for underground excavation of subway interval standard section tunnel
CN110578534B (en) * 2019-09-16 2021-01-26 北京市市政四建设工程有限责任公司 Template trolley for underground excavation of subway interval standard section tunnel
CN111155703A (en) * 2020-01-06 2020-05-15 东台市宏大耐热材料有限公司 Arch foot brick with tenon fourth of twelve earthly branches structure

Similar Documents

Publication Publication Date Title
CN206092042U (en) Loess tunnel strutting arrangement that is under construction
CN102200019B (en) Tunnel boring machine middle-plate stepping reinforcing support mechanism and construction method thereof
CN103498421B (en) A kind of mobile formwork of constructing for U-shaped water conservancy aqueduct
CN204343173U (en) A kind of Segmental assembling bridge-erecting machine
CN202466845U (en) Middle-layer node connecting structure for steel tube concrete column and steel reinforced concrete beam
CN108103945B (en) A kind of whole landing mould bases of cast-in-situ box girder
CN103195450A (en) Hydraulic tunnel inverted arch operation trolley and inverted arch construction method
CN107143357A (en) A kind of mobile tunnel lining trolley
CN203531924U (en) Lifting type moving trolley provided with tracks, wheels and templates
CN106087775B (en) For setting up intercity track and subway U beam self-balancing via hole type Bridge Erectors
CN102268858A (en) Cradle for suspension pouring of arch-type bridge
CN201972095U (en) Chain block lifting platform for thin-walled hollow piers of bridges
CN204212058U (en) For the steel truss girder assembling support in the construction of steel concrete composite truss beam
CN106284097A (en) The installation method of pier K support on a kind of tubular arch bridge arch
CN203821248U (en) Steel pipe arch main arch assembling supporting system
CN205135656U (en) Modular two lining platform trucks of multipurpose
CN206636581U (en) A kind of shield tunnel Second Lining Construction chassis
CN212867576U (en) Tunnel trolley with safety and stability
CN202039852U (en) Step reinforcing and supporting structure for middle plate of tunnel boring machine
CN205152981U (en) Disease treatment structure is kept off to existing of light -duty flexibility
CN211081900U (en) Tunnel reinforcing structure
CN103981810A (en) Steel tube arch main arch splicing and supporting system
CN203175575U (en) Concrete lining steel mould trolley side mould plate supporting device
CN204225897U (en) A kind of support of tunnel structure
CN104278640B (en) For the steel truss girder assembling support in the construction of steel concrete composite truss beam

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170412