CN108643944A - One kind being based on third system rich water fine sand layer constructing tunnel initial stage support device - Google Patents

One kind being based on third system rich water fine sand layer constructing tunnel initial stage support device Download PDF

Info

Publication number
CN108643944A
CN108643944A CN201810457294.9A CN201810457294A CN108643944A CN 108643944 A CN108643944 A CN 108643944A CN 201810457294 A CN201810457294 A CN 201810457294A CN 108643944 A CN108643944 A CN 108643944A
Authority
CN
China
Prior art keywords
fixedly connected
block
shield
support device
outside
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810457294.9A
Other languages
Chinese (zh)
Other versions
CN108643944B (en
Inventor
张贵永
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Yuan Qing Environmental Protection Technology Co Ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201810457294.9A priority Critical patent/CN108643944B/en
Publication of CN108643944A publication Critical patent/CN108643944A/en
Application granted granted Critical
Publication of CN108643944B publication Critical patent/CN108643944B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D15/00Props; Chocks, e.g. made of flexible containers filled with backfilling material
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D15/00Props; Chocks, e.g. made of flexible containers filled with backfilling material
    • E21D15/50Component parts or details of props

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Mechanical Engineering (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Lining And Supports For Tunnels (AREA)

Abstract

The present invention relates to technical field of tunnel construction, more particularly to one kind being based on third system rich water fine sand layer constructing tunnel initial stage support device.The technical problem to be solved by the present invention is to third system rich water thin silt substrate soft rock phenomenons to be easy to damage support device, lead to the generation of tunnel cave phenomenon.In order to solve the above-mentioned technical problem, it is based on third system rich water fine sand layer constructing tunnel initial stage support device the present invention provides such a, including bottom plate, the top of the bottom plate is fixedly connected with interior shield and outer shield respectively, it is fixedly connected between the interior shield and outer shield and inhibits deformation mechanism, first support bar and second support bar have been respectively fixedly connected with from the bottom up between the interior shield inner wall.Ponding on face can be expelled to outside tunnel by the present invention, substantially reduce the water pressure of face, and sandy-silt seepage is preferably controlled, and met the requirement of Tunnel Construction Schedule, reduced the risk of tunnel construction.

Description

One kind being based on third system rich water fine sand layer constructing tunnel initial stage support device
Technical field
The present invention relates to technical field of tunnel construction, more particularly to one kind being based on third system rich water fine sand layer constructing tunnel With initial stage support device.
Background technology
When constructing tunnel, because of its particularity, the tunnel for construction is needed to give initial stage support, to ensure work progress In safety, it is ensured that it is perfectly safe, as Chinese patent CN201720781967.7 provide it is a kind of applied to constructing tunnel Support device, including tunnel foundation and tunnel body, the tunnel body are fixed at the top of tunnel foundation, the tunnel foundation Top is movably installed with supporting beam, and the supporting beam bottom end is fixedly mounted there are four universal wheel, and four universal wheels are located at branch Beam corner location is supportted, and four universal wheels are in contact with tunnel foundation, the supporting beam top is installed with mounting blocks, institute It states mounting blocks top to open up there are two through-hole, two through-holes are based on supporting beam center symmetric setting, and activity in two through-holes Supporting rod is installed, fluted, side of two grooves far from opening is opened up on two through-holes side inner wall close to each other Spring is fixedly welded on inner wall.
The support device of present constructing tunnel is preferable to the face initial stage support effect in common landform tunnel, but the Three be that rich water fine sand layer chance water easily softens, and is easy to lose bearing capacity, leads to tunnel deformation, and third system rich water thin silt Substrate soft rock phenomenon is easy to damage initial stage support device, leads to the generation of tunnel cave phenomenon, influences the progress of construction, The difficulty and risk of construction are increased, we have proposed one kind thus is used just based on third system rich water fine sand layer constructing tunnel Phase support device.
Invention content
(1) the technical issues of solving
In view of the deficiencies of the prior art, the present invention provides one kind is used just based on third system rich water fine sand layer constructing tunnel Phase support device has the advantages of flexible fastening and dredging protection, it is existing to solve third system rich water thin silt substrate soft rock As being easy to damage to support device, leads to the generation of tunnel cave phenomenon, influence the progress of construction, increase the difficulty of construction The problem of degree and risk.
(2) technical solution
To realize above-mentioned technical problem, it is based on third system rich water fine sand layer constructing tunnel the present invention provides such a It is fixedly connected with interior shield and outer shield, the interior shield respectively with the top of initial stage support device, including bottom plate, the bottom plate It is fixedly connected between outer shield and inhibits deformation mechanism, be respectively fixedly connected with the between the interior shield inner wall from the bottom up One supporting rod and second support bar, the both sides at the top of the first support bar have been respectively fixedly connected with head rod and second and have connected The both sides of second support bar bottom are fixedly connected at the top of extension bar, the head rod and the second connecting rod, and first connects Extension bar, which is intersected with the middle part of the second connecting rod by shaft, to be flexibly connected, and flexible fastening machine is provided on the outside of the outer shield Structure, the interior shield are provided with dredging protection mechanism with outer shield.
Preferably, the inhibition deformation mechanism includes reinforced column, and fixed plate is fixedly connected at the top of the reinforced column, The inside of outer shield is fixedly connected at the top of the fixed plate, the bottom of the reinforced column is fixedly connected with securing plate, described The both sides of securing plate have been respectively fixedly connected with the first fixed link and the second fixed link, first fixed link and the second fixed link Bottom, which is respectively fixedly connected in the middle part of the outside of interior shield, the securing plate bottom, is fixedly connected with elastomeric spring, the bullet The bottom of property spring is fixedly connected in the outside of interior shield.
Preferably, the flexible retention mechanism includes to be opened in perforative mounting hole on the outside of outer shield, the mounting hole Internal activity be plugged with threaded rod, the bottom thread of the screw thread rod outer surface is socketed with fixing nut, the fixing nut Top and outer shield interior side contacts, the top of the threaded rod passes through mounting hole and extends to the outside of outer shield, described The middle part movable sleeve of screw thread rod outer surface is connected to stiffening ring, and flexible pipe, the flexibility are fixedly connected at the top of the stiffening ring The outer surface of pipe is inlaid with the first flexibility bar and the second flexibility bar respectively, and passes through in the middle part of the first flexibility bar and the second flexibility bar Shaft intersects flexible connection, is fixedly connected with flexible section at the top of the flexible pipe, the outer surface of the threaded rod is fixedly attached There is half round block, trapezoid block is fixedly connected at the top of the threaded rod, half round block is located at the lower section of trapezoid block, described trapezoidal Circular arc block is fixedly connected at the top of block, the outer surface of the circular arc block is fixedly connected with corner block.
Preferably, the quantity of the flexible section is six, and six flexible sections are fixedly connected on flexibility with equidistant The top of pipe, is fixedly connected on the outside of the flexible section jagged, and burr rotates to be cross, and the length of burr is one li Meter, it is fixedly connected with arc block at the top of the flexible section.
Preferably, the dredging protection mechanism includes mounting plate, and the bottom of the mounting plate is fixedly connected in interior shield Outside, the both sides at the top of the mounting plate have been movably connected with first annular piece and the second ring block by shaft, described Both sides at the top of mounting plate offer holding tank, and two holding tanks are located at first annular piece and the second ring block The inner bottom wall of underface, the holding tank is fixedly connected with spring washer, and the first annular piece of top is opposite with the second ring block Side is fixedly connected with locating piece, and the second ring block top offers location hole with first annular piece of opposite side, institute It states location hole to be adapted with locating piece, the top movable in the first annular piece of outside is connected with protective ring, second annular Top on the outside of block offers limit hole, and the protective ring is plugged on far from first annular piece of side activity in limit hole Portion has been fixedly connected with protective pad, described first annular piece and the second ring on the inside of described first annular piece and the second ring block Internal activity between shape block is plugged with dredging pipe, the outer surface of the dredging pipe and the interior side contacts of protective pad, and described first Middle part on the outside of ring block and the second ring block is connected with the first adjusting rod, and the bottom activity of first adjusting rod connects It is connected to the second adjusting rod, the bottom of second adjusting rod and the top movable of mounting plate connect, on the right side of first adjusting rod Middle part be fixedly connected with adjustment spring, the bottom of the adjustment spring is fixedly connected on the top of mounting plate, the outer shield Inside be inlaid with soakaway trench, the bottom of the soakaway trench is fixedly connected with connection water pipe, the bottom of the connection water pipe with dredge Siphunculus is fixedly connected by three-way connection, and filter screen is fixedly connected between the infiltration inside pipe wall.
Preferably, reinforcing plate is fixedly connected on the outside of the outer shield, side of the reinforcing plate far from outer shield is solid Surely it is connected with non-slipping block.
(3) advantageous effect
The present invention provides one kind being based on third system rich water fine sand layer constructing tunnel initial stage support device, has following Advantageous effect:
1, it should be based on third system rich water fine sand layer constructing tunnel initial stage support device, by the basis of interior shield The improvement for increasing outer shield improves holding for tunnel tunnel face support when third system rich water fine sand layer is met water and easily softened Power is carried, double layer support carrying avoids initial stage support device from being destroyed.
2, it should be based on third system rich water fine sand layer constructing tunnel initial stage support device, by inhibiting deformation mechanism It improves, elastomeric spring is compressed when outer shield is larger by bearing capacity while supporting fixed to outer shield, on face Ponding discharge after so that outer shield restore, improve the effect of support.
3, it should be based on third system rich water fine sand layer constructing tunnel initial stage support device, by dredging changing for protection mechanism Into the ponding on face can be expelled to outside tunnel, substantially reduce the water pressure of face, sandy-silt seepage obtains preferably Control avoids the problem that third system rich water fine sand layer is met water and easily softened, and efficiently solves tunnel and easily cave in and dash forward the feelings gushed Condition ensure that the integrally-built safety of the stability of face and tunnel, meet the requirement of Tunnel Construction Schedule, reduce The risk of tunnel construction.
4, it should be based on third system rich water fine sand layer constructing tunnel initial stage support device, by first annular piece and the Dredging pipe is effectively carried out arrangement constraint by the improvement of second ring block, is met and is realized and compares conjunction on the basis of dredging pipe is firm The arrangement of reason.
5, it should be based on third system rich water fine sand layer constructing tunnel initial stage support device, pass through first annular piece and second Increased protective pad on the inside of ring block, dredging pipe can be expanded in heated state, can be reduced in the state of being cooled, protective pad It is elastic preferable, it is preferable to the fixed effect of dredging pipe, avoid the position installed to dredging pipe from making a difference.
6, it should be based on third system rich water fine sand layer constructing tunnel initial stage support device, pass through the first adjusting rod, second The improvement of adjusting rod and adjustment spring facilitates and pulls first annular piece and the second ring block outward, pacifies to dredging pipe The inside that post-positioning block is plugged on location hole is unclamped in dress arrangement, is ensured to the fixed effect of dredging pipe.
7, it should be based on third system rich water fine sand layer constructing tunnel initial stage support device, pass through changing for flexible retention mechanism Into, enhance the grasp between outer shield and tunnel tunnel face, increase outer shield carrying pulling force so that outside Shield and rock face it is closer.
8, it should be scratched by the improvement of flexible section based on third system rich water fine sand layer constructing tunnel initial stage support device A property stress is easy to happen deformation, increase with the contact area inside face, avoid outer shield and be subjected to displacement.
9, it should be based on third system rich water fine sand layer constructing tunnel initial stage support device, by solid at the top of trapezoid block Surely the setting of connection circular arc block facilitates flexible retention mechanism being inserted into aperture after face drills out suitable aperture Inside, it is more time saving and laborsaving.
Description of the drawings
Fig. 1 is schematic structural view of the invention;
Fig. 2 is that the present invention inhibits deformation mechanism structure schematic diagram;
Fig. 3 is partial enlarged view at the A of structure of the invention Fig. 1;
Fig. 4 is partial enlarged view at the B of structure of the invention Fig. 1.
In figure:1 bottom plate, shield, 3 outer shields, 4 inhibit deformation mechanisms, 401 reinforced columns, 402 fixed plates, 403 to reinforce in 2 Plate, 404 first fixed links, 405 second fixed links, 406 elastomeric springs, 5 first support bars, 6 head rods, 7 second connections Bar, 8 second support bars, 9 flexible retention mechanisms, 901 mounting holes, 902 threaded rods, 903 fixing nuts, 904 stiffening rings, 905 are scratched Property pipe, 906 first flexibility bars, 907 second flexibility bars, 908 flexible sections, 909 burrs, 910 arc blocks, 911 half round blocks, 912 ladder Shape block, 913 circular arc blocks, 914 corner blocks, 10 dredging protection mechanisms, 1001 mounting plates, 1002 first annular pieces, 1,003 second rings Shape block, 1004 holding tanks, 1005 spring washers, 1006 locating pieces, 1007 location holes, 1008 protective rings, 1009 limit holes, 1010 protection Pad, 1011 dredging pipes, 1,012 first adjusting rods, 1,013 second adjusting rods, 1014 adjustment springs, 1015 soakaway trench, 1016 connections Water pipe, 1017 filter screens, 11 reinforcing plates, 12 non-slipping blocks.
Specific implementation mode
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation describes, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other Embodiment shall fall within the protection scope of the present invention.
- 4 are please referred to Fig.1, one kind being based on third system rich water fine sand layer constructing tunnel initial stage support device, including bottom plate 1, the top of bottom plate 1 is fixedly connected with interior shield 2 and outer shield 3 respectively, by increasing outer shield on the basis of interior shield 2 3 improvement improves the bearing capacity of tunnel tunnel face support, bilayer branch when third system rich water fine sand layer is met water and easily softened Support carrying avoids initial stage support device from being destroyed, and is fixedly connected between interior shield 2 and outer shield 3 and inhibits deformation mechanism 4, suppression Deformation mechanism 4 processed includes reinforced column 401, and the top of reinforced column 401 is fixedly connected with fixed plate 402, the top of fixed plate 402 It is fixedly connected on the inside of outer shield 3, the bottom of reinforced column 401 is fixedly connected with securing plate 403, the both sides point of securing plate 403 It is not fixedly connected with the first fixed link 404 and the second fixed link 405, the bottom point of the first fixed link 404 and the second fixed link 405 It is not fixedly connected in the outside of interior shield 2, when mounted, fixed plate 402 can be mounted on outer shield 3 by fixed screw Inside, after interior shield 2 is fixed, in the inside of interior shield 2 by fixed screw by the first fixed link 404 and the second fixed link 405 are fixed, and elastomeric spring 406 is fixedly connected in the middle part of 403 bottom of securing plate, and the bottom of elastomeric spring 406, which is fixed, to be connected It is connected on the outside of interior shield 2, by the improvement to inhibiting deformation mechanism 4, elastomeric spring while supporting fixed to outer shield 3 406 compress when outer shield 3 is larger by bearing capacity, after the ponding discharge on face so that outer shield 3 restores, and improves The effect of support.
It has been respectively fixedly connected with first support bar 5 and second support bar 8 between 2 inner wall of interior shield from the bottom up, first The both sides at 5 top of strut have been respectively fixedly connected with head rod 6 and the second connecting rod 7, head rod 6 and the second connecting rod 7 top is fixedly connected on the both sides of 8 bottom of second support bar, and the middle part of head rod 6 and the second connecting rod 7 is by turning Axis intersects flexible connection, and the outside of outer shield 3 is provided with flexible retention mechanism 9, and flexible retention mechanism 9 includes to be opened in outer shield The 3 perforative mounting hole 901 in outside of cover, the internal activity of mounting hole 901 are plugged with threaded rod 902, the bottom of 902 outer surface of threaded rod Portion's screw thread is socketed with fixing nut 903, the interior side contacts at the top and outer shield 3 of fixing nut 903, the top of threaded rod 902 Across mounting hole 901 and the outside of outer shield 3 is extended to, the middle part movable sleeve of 902 outer surface of threaded rod is connected to stiffening ring 904, The top of stiffening ring 904 is fixedly connected with flexible pipe 905, and the outer surface of flexible pipe 905 is inlaid with 906 He of the first flexibility bar respectively Second flexibility bar 907, and the first flexibility bar 906 is intersected by shaft with the middle part of the second flexibility bar 907 and is flexibly connected, flexible pipe 905 top is fixedly connected with flexible section 908, and by the improvement of flexible section 908,908 stress of flexible section is easy to happen deformation, increases It is big with the contact area inside face, avoid outer shield 3 and be subjected to displacement, the quantity of flexible section 908 is six, and six With equidistant top for being fixedly connected on flexible pipe 905, the outside of flexible section 908 is fixedly connected jagged flexible section 908 909, and burr 909 rotates to be cross, the length of burr 909 is one centimetre, the top of flexible section 908 is fixedly connected with arc Shape block 910, when tightening fixing nut 903, can make flexible section 908 that shape occur outward by the setting of arc block 910 Becoming, the outer surface fixing sleeve of threaded rod 902 is connected to semicircle block 911, and the top of threaded rod 902 is fixedly connected with trapezoid block 912, and half Round block 911 is located at the lower section of trapezoid block 912, and the top of trapezoid block 912 is fixedly connected with circular arc block 913, by trapezoid block 912 Top be fixedly connected with the setting of circular arc block 913 and facilitated flexible retention mechanism 9 after face drills out suitable aperture It is inserted into the inside in aperture, more time saving and laborsaving, the outer surface of circular arc block 913 is fixedly connected with corner block 914, by scratching Property retention mechanism 9 improvement, enhance the grasp between outer shield 3 and tunnel tunnel face, increase outer shield 3 carrying drawing Power, so that outer shield 3 and rock face is closer.
Interior shield 2 is provided with dredging protection mechanism 10 with outer shield 3, and dredging protection mechanism 10 includes mounting plate 1001, The bottom of mounting plate 1001 is fixedly connected in the outside of interior shield 2, and the both sides at 1001 top of mounting plate pass through shaft activity respectively It is connected with first annular piece 1002 and the second ring block 1003, passes through changing to first annular piece 1002 and the second ring block 1003 Into dredging pipe 1011 is effectively carried out arrangement constraint, meets and realizes relatively more rational on the basis of dredging pipe 1011 is firm The both sides of arrangement, 1001 top of mounting plate offer holding tank 1004, and two holding tanks 1004 are located at first annular piece 1002 and second ring block 1003 underface, the inner bottom wall of holding tank 1004 is fixedly connected with spring washer 1005, first annular piece The 1002 tops side opposite with the second ring block 1003 are fixedly connected with locating piece 1006,1003 top of the second ring block and the The opposite side of one ring block 1002 offers location hole 1007, and location hole 1007 is adapted with locating piece 1006, first annular The top movable in 1002 outside of block is connected with protective ring 1008, and the top in 1003 outside of the second ring block offers limit hole 1009, protective ring 1008 is plugged on the inside of limit hole 1009 far from first annular piece 1002 of side activity, first annular piece 1002 and second the inside of ring block 1003 be fixedly connected with protective pad 1010, pass through first annular piece 1002 and the second annular The 1003 increased protective pad 1010 in inside of block, dredging pipe 1011 can be expanded in heated state, can be reduced in the state of being cooled, The elasticity of protective pad 1010 is preferably, preferable to 1011 fixed effect of dredging pipe, avoids the position hair installed to dredging pipe 1011 Raw to influence, the internal activity between first annular piece 1002 and the second ring block 1003 is plugged with dredging pipe 1011, dredging pipe The middle part of the interior side contacts of 1011 outer surface and protective pad 1010, first annular piece 1002 and the outside of the second ring block 1003 is equal It is connected with the first adjusting rod 1012, the bottom of the first adjusting rod 1012 is connected with the second adjusting rod 1013, and second adjusts The bottom of pole 1013 is connect with the top movable of mounting plate 1001, and the middle part on 1012 right side of the first adjusting rod is fixedly connected with tune Spring 1014 is saved, the bottom of adjustment spring 1014 is fixedly connected on the top of mounting plate 1001, passes through the first adjusting rod 1012, the The improvement of two adjusting rods 1013 and adjustment spring 1014 facilitates first annular piece 1002 and 1003 outside layback of the second ring block It is dynamic, installation arrangement is carried out to dredging pipe 1011, unclamps the inside that post-positioning block 1006 is plugged on location hole 1007, is ensured to dredging The inside of 1011 fixed effect of pipe, outer shield 3 is inlaid with soakaway trench 1015, and the bottom of soakaway trench 1015 is fixedly connected with connection Water pipe 1016, connection water pipe 1016 bottom be fixedly connected by three-way connection with dredging pipe 1011,1015 inner wall of soakaway trench it Between be fixedly connected with filter screen 1017, by dredge protection mechanism 10 improvement, the ponding on face can be expelled to tunnel Outside road, the water pressure of face is substantially reduced, sandy-silt seepage is preferably controlled, and third system rich water fine sand layer is avoided to meet water Easily softening the problem of, efficiently solve tunnel and easily cave in and dash forward the case where gushing, ensure that the stability of face and tunnel are whole The safety of body structure meets the requirement of Tunnel Construction Schedule, reduces the risk of tunnel construction, and the outside of outer shield 3 is fixed It is connected with reinforcing plate 11, side of the reinforcing plate 11 far from outer shield 3 is fixedly connected with non-slipping block 12.
Operation principle:When carrying out constructing tunnel to third system rich water fine sand layer, need to carry out curtain note in construction surface Slurry is reinforced, and is then carried out excavation operation, after tunnelling is good, suitable aperture will be drilled out on face, by flexible retention mechanism 9 It is inserted into the inside in aperture, the mounting hole 901 on outer shield 3 is sleeved on threaded rod 902,903 screw thread of fixing nut is socketed On threaded rod 902, fixing nut 903 is constantly tightened so that half round block 911 and trapezoid block 912 constantly move forward, will Flexible section 908 struts deform upon outward so that half round block 911 is located at the inside of flexible pipe 905, and trapezoid block 912 is located at flexibility The inside of item 908 so that outer shield 3 is fixed, in the presence of having ponding on face, ponding can be from 1015 row of soakaway trench Enter into dredging pipe 1011, the outside in tunnel is then expelled to from dredging pipe 1011, facilitates the discharge of ponding.
In conclusion third system rich water fine sand layer constructing tunnel initial stage support device should be based on, by interior shield 2 On the basis of increase the improvement of outer shield 3, when third system rich water fine sand layer is met water and easily softened, improve tunnel tunnel face The bearing capacity of support, double layer support carrying avoid initial stage support device from being destroyed, by the improvement to inhibiting deformation mechanism 4, Elastomeric spring 406 is compressed when outer shield 3 is larger by bearing capacity while supporting fixed to outer shield 3, on face Ponding discharge after so that outer shield 3 restore, improve the effect of support.
By being fixedly connected with the setting of circular arc block 913 at the top of trapezoid block 912, suitable aperture is drilled out in face Afterwards, the inside that flexible retention mechanism 9 is inserted into aperture is facilitated, it is more time saving and laborsaving, pass through flexible retention mechanism 9 Improve, enhance the grasp between outer shield 3 and tunnel tunnel face, increase outer shield 3 carrying pulling force, so as to so that Outer shield 3 and rock face it is closer, by the improvement to first annular piece 1002 and the second ring block 1003, effectively Dredging pipe 1011 carries out to arrangement constraint, meet and realize relatively more rational arrangement on the basis of dredging pipe 1011 is firm, lead to Cross first annular piece 1002 and the 1003 increased protective pad 1010 in inside of the second ring block, dredging pipe 1011 is in heated state meeting Expansion, can reduce in the state of being cooled, and the elasticity of protective pad 1010 is preferably, preferable to 1011 fixed effect of dredging pipe, keeps away Exempt to make a difference to the position that dredging pipe 1011 is installed.
By the improvement of the first adjusting rod 1012, the second adjusting rod 1013 and adjustment spring 1014, facilitating will be first annular Block 1002 and the second ring block 1003 pull outward, and installation arrangement is carried out to dredging pipe 1011, unclamp post-positioning block 1006 and insert It is connected on the inside of location hole 1007, ensures to 1011 fixed effect of dredging pipe, it, can be with by dredging the improvement of protection mechanism 10 Ponding on face is expelled to outside tunnel, the water pressure of face is substantially reduced, sandy-silt seepage is preferably controlled, and is kept away Exempt from third system rich water fine sand layer and meet the problem of water easily softens, efficiently solves tunnel and easily cave in and prominent the case where gushing, guarantee The integrally-built safety of stability and tunnel of face, meets the requirement of Tunnel Construction Schedule, reduces tunnel and apply Work risk.
The configuration of the present invention is simple, reasonable design and easy to operate, solve third system rich water thin silt substrate soft rock Phenomenon is easy to damage support device, leads to the generation of tunnel cave phenomenon, influences the progress of construction, increases construction The problem of difficulty and risk.
It should be noted that herein, relational terms such as first and second and the like are used merely to a reality Body or operation are distinguished with another entity or operation, are deposited without necessarily requiring or implying between these entities or operation In any actual relationship or order or sequence.Moreover, the terms "include", "comprise" or its any other variant are intended to Non-exclusive inclusion, so that the process, method, article or equipment including a series of elements is not only wanted including those Element, but also include other elements that are not explicitly listed, or further include for this process, method, article or equipment Intrinsic element.
It although an embodiment of the present invention has been shown and described, for the ordinary skill in the art, can be with Understanding without departing from the principles and spirit of the present invention can carry out these embodiments a variety of variations, modification, replace And modification, the scope of the present invention is defined by the appended.

Claims (6)

1. one kind being based on third system rich water fine sand layer constructing tunnel initial stage support device, including bottom plate (1), feature exists In:The top of the bottom plate (1) is fixedly connected with interior shield (2) and outer shield (3), the interior shield (2) and outer shield respectively (3) it is fixedly connected between and inhibits deformation mechanism (4), be respectively fixedly connected with from the bottom up between interior shield (2) inner wall First support bar (5) and second support bar (8), the both sides at the top of the first support bar (5) have been respectively fixedly connected with the first company Extension bar (6) and the second connecting rod (7) are fixedly connected on second at the top of the head rod (6) and the second connecting rod (7) The both sides of strut (8) bottom, and head rod (6) is intersected by shaft with the middle part of the second connecting rod (7) and is flexibly connected, institute It states and is provided with flexible retention mechanism (9) on the outside of outer shield (3), the interior shield (2) is provided with dredging protection with outer shield (3) Mechanism (10).
2. one kind according to claim 1 is based on third system rich water fine sand layer constructing tunnel initial stage support device, It is characterized in that:The inhibition deformation mechanism (4) includes reinforced column (401), is fixedly connected at the top of the reinforced column (401) Fixed plate (402) is fixedly connected on the inside of outer shield (3) at the top of the fixed plate (402), the reinforced column (401) Bottom is fixedly connected with securing plate (403), and the both sides of the securing plate (403) have been respectively fixedly connected with the first fixed link (404) With the second fixed link (405), including the bottom of first fixed link (404) and the second fixed link (405) is respectively fixedly connected with The outside of shield (2) is fixedly connected with elastomeric spring (406), the elastomeric spring in the middle part of securing plate (403) bottom (406) bottom is fixedly connected with the outside in interior shield (2).
3. one kind according to claim 2 is based on third system rich water fine sand layer constructing tunnel initial stage support device, It is characterized in that:The flexibility retention mechanism (9) includes to be opened in perforative mounting hole (901) on the outside of outer shield (3), described solid The internal activity for determining hole (901) is plugged with threaded rod (902), and the bottom thread of threaded rod (902) outer surface is socketed with admittedly Determine nut (903), the interior side contacts at the top and outer shield (3) of the fixing nut (903), the top of the threaded rod (902) Portion passes through mounting hole (901) and extends to the outside of outer shield (3), the middle part pivot bush unit of threaded rod (902) outer surface Have stiffening ring (904), be fixedly connected with flexible pipe (905) at the top of the stiffening ring (904), the flexible pipe (905) it is outer Surface is inlaid with the first flexibility bar (906) and the second flexibility bar (907), and the first flexibility bar (906) and the second flexibility bar respectively (907) middle part is intersected by shaft to be flexibly connected, and flexible section (908), institute are fixedly connected at the top of the flexible pipe (905) The outer surface fixing sleeve for stating threaded rod (902) is connected to semicircle block (911), and ladder is fixedly connected at the top of the threaded rod (902) Shape block (912), half round block (911) are located at the lower section of trapezoid block (912), are fixedly connected at the top of the trapezoid block (912) There are circular arc block (913), the outer surface of the circular arc block (913) to be fixedly connected with corner block (914).
4. one kind according to claim 3 is based on third system rich water fine sand layer constructing tunnel initial stage support device, It is characterized in that:The quantity of the flexible section (908) is six, and six flexible sections (908) are fixedly connected on equidistant The top of flexible pipe (905) is fixedly connected jagged (909) on the outside of the flexible section (908), and the rotation of burr (909) Length for cross, burr (909) is one centimetre, and arc block (910) is fixedly connected at the top of the flexible section (908).
5. one kind according to claim 4 is based on third system rich water fine sand layer constructing tunnel initial stage support device, It is characterized in that:The dredging protection mechanism (10) includes mounting plate (1001), and the bottom of the mounting plate (1001), which is fixed, to be connected It is connected on the outside of interior shield (2), the both sides at the top of the mounting plate (1001) have been movably connected with first annular by shaft Block (1002) and the second ring block (1003), the both sides at the top of the mounting plate (1001) offer holding tank (1004), and two A holding tank (1004) is located at the underface of first annular piece (1002) and the second ring block (1003), the receiving The inner bottom wall of slot (1004) is fixedly connected with spring washer (1005), first annular piece (1002) top and the second ring block (1003) opposite side is fixedly connected with locating piece (1006), at the top of second ring block (1003) with first annular piece (1002) opposite side offers location hole (1007), and the location hole (1007) is adapted with locating piece (1006), described Top movable on the outside of first annular piece (1002) is connected with protective ring (1008), the top on the outside of second ring block (1003) Portion offers limit hole (1009), and side activity of the protective ring (1008) far from first annular piece (1002) is plugged on limit The inside in hole (1009) has been fixedly connected with protective pad on the inside of first annular piece (1002) and the second ring block (1003) (1010), the internal activity between first annular piece (1002) and the second ring block (1003) is plugged with dredging pipe (1011), the interior side contacts of the outer surface and protective pad (1010) of the dredging pipe (1011), it is described first annular piece (1002) It is connected with the first adjusting rod (1012), first adjusting rod (1012) with the middle part on the outside of the second ring block (1003) Bottom be connected with the second adjusting rod (1013), the top of the bottom and mounting plate (1001) of second adjusting rod (1013) Portion is flexibly connected, and the middle part on the right side of first adjusting rod (1012) is fixedly connected with adjustment spring (1014), the adjusting bullet The bottom of spring (1014) is fixedly connected on the top of mounting plate (1001), and the inside of the outer shield (3) is inlaid with soakaway trench (1015), the bottom of the soakaway trench (1015) is fixedly connected with connection water pipe (1016), the bottom of the connection water pipe (1016) Portion is fixedly connected with dredging pipe (1011) by three-way connection, and filter screen is fixedly connected between soakaway trench (1015) inner wall (1017)。
6. one kind according to claim 5 is based on third system rich water fine sand layer constructing tunnel initial stage support device, It is characterized in that:Reinforcing plate (11) is fixedly connected on the outside of the outer shield (3), the reinforcing plate (11) is far from outer shield (3) Side be fixedly connected with non-slipping block (12).
CN201810457294.9A 2018-05-14 2018-05-14 One kind being based on third system rich water fine sand layer constructing tunnel initial stage support device Active CN108643944B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810457294.9A CN108643944B (en) 2018-05-14 2018-05-14 One kind being based on third system rich water fine sand layer constructing tunnel initial stage support device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810457294.9A CN108643944B (en) 2018-05-14 2018-05-14 One kind being based on third system rich water fine sand layer constructing tunnel initial stage support device

Publications (2)

Publication Number Publication Date
CN108643944A true CN108643944A (en) 2018-10-12
CN108643944B CN108643944B (en) 2019-12-03

Family

ID=63755275

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810457294.9A Active CN108643944B (en) 2018-05-14 2018-05-14 One kind being based on third system rich water fine sand layer constructing tunnel initial stage support device

Country Status (1)

Country Link
CN (1) CN108643944B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109595017A (en) * 2018-11-23 2019-04-09 贵州大学 A kind of tunnel top support device of the constructing tunnel with defencive function

Citations (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2101109U (en) * 1991-01-13 1992-04-08 焦作市新新应用技术研究所 Strong steel support frame
JP3577046B2 (en) * 2002-02-05 2004-10-13 株式会社ケー・エフ・シー Reinforcing bar support and lining concrete casting method using the same
CN203702207U (en) * 2013-11-19 2014-07-09 青岛润佳建设集团有限公司 Tunnel construction support device
CN205297594U (en) * 2015-11-30 2016-06-08 中交第二航务工程局有限公司 Tunnel construction support device
CN206071600U (en) * 2016-08-29 2017-04-05 中南大学 A kind of rigid flexible system support system in swelling clay rock tunnel
CN206092042U (en) * 2016-10-21 2017-04-12 中铁十八局集团第二工程有限公司 Loess tunnel strutting arrangement that is under construction
CN206205898U (en) * 2016-08-24 2017-05-31 青海省湟源公路工程建设公司 A kind of constructing tunnel support meanss
CN107060774A (en) * 2017-05-08 2017-08-18 重庆电讯职业学院 A kind of anti-tunnel portal wall damage device and construction method
CN206668306U (en) * 2017-04-18 2017-11-24 中铁十二局集团第二工程有限公司 A kind of constructing tunnel multifunctional supporter
CN206917675U (en) * 2017-06-30 2018-01-23 中铁十二局集团有限公司 A kind of support meanss applied to constructing tunnel
CN207080233U (en) * 2017-08-10 2018-03-09 中铁十七局集团有限公司 The hard and soft bow member of large-deformation tunnel in soft rock supporting
CN107795327A (en) * 2017-09-28 2018-03-13 庄玉琼 A kind of novel tunnel Construction Support device
CN207297059U (en) * 2017-07-18 2018-05-01 徐午生 A kind of constructing tunnel support device

Patent Citations (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2101109U (en) * 1991-01-13 1992-04-08 焦作市新新应用技术研究所 Strong steel support frame
JP3577046B2 (en) * 2002-02-05 2004-10-13 株式会社ケー・エフ・シー Reinforcing bar support and lining concrete casting method using the same
CN203702207U (en) * 2013-11-19 2014-07-09 青岛润佳建设集团有限公司 Tunnel construction support device
CN205297594U (en) * 2015-11-30 2016-06-08 中交第二航务工程局有限公司 Tunnel construction support device
CN206205898U (en) * 2016-08-24 2017-05-31 青海省湟源公路工程建设公司 A kind of constructing tunnel support meanss
CN206071600U (en) * 2016-08-29 2017-04-05 中南大学 A kind of rigid flexible system support system in swelling clay rock tunnel
CN206092042U (en) * 2016-10-21 2017-04-12 中铁十八局集团第二工程有限公司 Loess tunnel strutting arrangement that is under construction
CN206668306U (en) * 2017-04-18 2017-11-24 中铁十二局集团第二工程有限公司 A kind of constructing tunnel multifunctional supporter
CN107060774A (en) * 2017-05-08 2017-08-18 重庆电讯职业学院 A kind of anti-tunnel portal wall damage device and construction method
CN206917675U (en) * 2017-06-30 2018-01-23 中铁十二局集团有限公司 A kind of support meanss applied to constructing tunnel
CN207297059U (en) * 2017-07-18 2018-05-01 徐午生 A kind of constructing tunnel support device
CN207080233U (en) * 2017-08-10 2018-03-09 中铁十七局集团有限公司 The hard and soft bow member of large-deformation tunnel in soft rock supporting
CN107795327A (en) * 2017-09-28 2018-03-13 庄玉琼 A kind of novel tunnel Construction Support device

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109595017A (en) * 2018-11-23 2019-04-09 贵州大学 A kind of tunnel top support device of the constructing tunnel with defencive function

Also Published As

Publication number Publication date
CN108643944B (en) 2019-12-03

Similar Documents

Publication Publication Date Title
CN204716291U (en) Dewatering installation is drawn in tunnel pressure release
AU2017328222A1 (en) Telescopic gage disc cutter box
CN108643944B (en) One kind being based on third system rich water fine sand layer constructing tunnel initial stage support device
CN110374349A (en) A kind of impaired armored concrete cylinder underpins processing unit and its application method
CN106400937B (en) Floor drain protects structure
CN108547392B (en) Four-steel-pipe-constrained sectional type buckling-restrained brace with replaceable cross-shaped inner core
CN206053957U (en) A kind of extension type side hobboing cutter girff
CN105672677A (en) Support tool used for fabricated building wallboard installation and use method of support tool
CN107794885B (en) Ecological water intake conical trash rack
CN209942860U (en) Tunnel inner wall reinforced structure
CN104675413B (en) A kind of tunnel duct piece rounding device and its using method
CN108678482B (en) Full-assembly sectional type buckling-restrained brace with straight-line-shaped inner core capable of being directly replaced
CN213742260U (en) Pull-up type cantilever frame beam convenient to mount and dismount
CN208106465U (en) A kind of easy-to-dismount coal mine temporary support device
CN210716307U (en) Civil engineering antidetonation composite set
CN220365293U (en) Connecting piece based on assembled building construction
CN207863982U (en) A kind of tunnel cross-section temporary support structure
CN209162839U (en) A kind of prefabricated foundation pit supporting member
CN221972433U (en) Foundation pit supporting structure
CN209429137U (en) A kind of lattice column stress release safety device
CN220538557U (en) Ecological slope protection structure of river course
CN217401714U (en) Ecological relief valve structure of hydraulic power plant
CN214999686U (en) Fixing device for remote control floating ball valve
CN220406264U (en) High-frequency material screening bucket
CN221372390U (en) Municipal drainage pipeline butt joint auxiliary member

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20191113

Address after: 225400 west side of Daiwang Road, Taixing high tech Industrial Development Zone, Jiangsu Province

Applicant after: Jiangsu yuan Qing Environmental Protection Technology Co., Ltd.

Address before: 230601 Anhui road University, 292 Ziyun Road, Hefei economic and Technological Development Zone, Anhui

Applicant before: Zhang Guiyong