CN206049998U - Dredging erosion and deposition hydraulic transport of sediment ship - Google Patents

Dredging erosion and deposition hydraulic transport of sediment ship Download PDF

Info

Publication number
CN206049998U
CN206049998U CN201620546353.6U CN201620546353U CN206049998U CN 206049998 U CN206049998 U CN 206049998U CN 201620546353 U CN201620546353 U CN 201620546353U CN 206049998 U CN206049998 U CN 206049998U
Authority
CN
China
Prior art keywords
deposition
erosion
ship
hull
mud
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620546353.6U
Other languages
Chinese (zh)
Inventor
张瑞麟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Application granted granted Critical
Publication of CN206049998U publication Critical patent/CN206049998U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Treatment Of Sludge (AREA)

Abstract

A kind of dredging erosion and deposition hydraulic transport of sediment ship, it is by installing multigroup axle stream erosion and deposition pump under hull waterline, after loose to the impact of riverbed bed mud, flowing waters waterpower resourses nature sediment transport is made full use of again to downstream, operation ship then goes downstream and dredges erosion and deposition, hydraulic transport of sediment, to reach training of channel requirement, in flowing waters not for the purpose of taking mud, compare with cutter suction dredger with rake suction, eliminate the equipment of shipping or pipeline bed mud, manpower, time, energy consumption cost;Its efficiency, benefit are greatly improved, and cost, operation cost are greatly lowered;The erosion and deposition depth of ship, two-dimensional localization, the operation speed of a ship or plane is adjustable, the ship is novel, simple structure, can advance, fall back, side pushes away, flexibly turn to, lift, mooring, position, have the records of distance by the log, have the function of dredging erosion and deposition and navigation concurrently, at home and abroad shallow sea, river-flow waters may replace rake suction or cutter suction dredger operation.

Description

Dredging erosion and deposition hydraulic transport of sediment ship
Technical field
This utility model is related to Ship Design and manufacturing technology field, more particularly to dredging erosion and deposition, hydraulic transport of sediment, extraordinary work Journey Ship Design and manufacturing technology field.
Background technology
Common waterway dredging ship has rake suction and cutter suction dredger, and drag suction dredger uses slusher by waters bottom Mud rake enters, and cutter suction dredger will transport to it by pipeline in the bed mud suction tube of waters, both diggings Mud mode is most widely suited in hydrostatic domain, but in flowing waters, the current inherently energy should make full use of;This utility model Using multigroup axle stream erosion and deposition pump, it is loose to waters bed mud impact of flowing after, wink i.e. by flowing waters waterpower nature sediment transport to downstream, Operation ship then goes downstream, dredges erosion and deposition while hydraulic transport of sediment, to reach training of channel requirement.
By taking the Yellow River as an example, Yellow River mud during the lunar New Year the amount of holding under the arm up to 1,600,000,000 tons, year riverbed increase 10 centimetres, 2002~2014 years, Once launched 10 unanimously extraordinary the Yellow River flow-sediment regulations of generally acknowledged effect under the hosting of Ministry of Water Resources, this can be regarded as one it is non- It is Chang Ju great, natural, below Xiao Langdi until the operation of " dredging erosion and deposition hydraulic transport of sediment ship " of the Yellow River estuary.
If annual many of wet season " dredging erosion and deposition hydraulic transport of sediment ship " is flush and under, from Xiao Langdi to the Yellow River estuary wheel Kind constantly waterway dredging erosion and deposition hydraulic transport of sediment operation, so that it may reduce the Yellow River aggradation of level year by year, reduce 20cm every year, it is several After 10 years, the Yellow River will no longer be " hanging river ", and the east of safety flows into sea, and the Yellow River shipping will also be risen, and benefit compatriots.
The ship ducted propeller Transform Type design that inventor was carried out before 30 years has common part with axle stream erosion and deposition pump, Connect the feasibility for having confirmed dredging erosion and deposition hydraulic transport of sediment ship.The Kapp orchid propeller that 1.48 meters of diameter is placed in No. 7 mozzles of ship In, 135 horsepowers of about 100KW of main engine power, actual measurement ridding bitt thrust is up to 2900~3200Kg;If the type of dredging erosion and deposition hydraulic transport of sediment ship A width of 40 meters, hull bottom midships section is transversely arranged to install 25 groups of such axle stream erosion and deposition pumps, and its effluent pipe mouth is all downwards away from riverbed 1~3 Rice, all under waterline, 12 groups of axle stream erosion and deposition pump water inlet mouths of pipe stretch to stem, 11 groups of axle stream erosion and deposition pump water inlet mouths of pipe to water inlet pipe mouth Ship stern is stretched to, the port and starboard axle stream erosion and deposition pump water inlet mouth of pipe under water stretches to both sides;25 groups of axle stream every group of thrust of erosion and deposition pump~ 3000Kg, its erosion and deposition power to riverbed are to meet enough, and axle stream erosion and deposition pump only always loads power onto ship:25 groups of * 100KW=2500KW (3380 horsepowers), compared with current dredger, small power, efficiency high.
Utility model content
The purpose of this utility model is to provide a kind of dredging erosion and deposition hydraulic transport of sediment ship, and it is more by installing under hull waterline Group axle stream erosion and deposition pump, flowing waters not for the purpose of taking mud, go downstream, to riverbed bed mud impact, after making which loose with Current are washed away, and reach the purpose of dredging erosion and deposition hydraulic transport of sediment, and the erosion and deposition depth of ship, two-dimensional localization, the operation speed of a ship or plane is adjustable, the ship Can advance, fall back, have the records of distance by the log, side pushes away, flexibly turns to, mooring, positioning, have concurrently dredging erosion and deposition and navigation function.
Technical scheme
To reach above-mentioned purpose, the technical solution of the utility model is, a kind of to dredge erosion and deposition hydraulic transport of sediment ship, hull waterline Under multigroup motor-driven axle stream erosion and deposition pump is installed, axle stream erosion and deposition water pump outlet pipe mouth all downwards in the face of riverbed, be symmetrical in ship Oceangoing ship indulges midship section, alow mounting arrangement, and from terms of captain direction, the effluent pipe mouth of hull bottom is transversely arranged at equal intervals, reaches boat Dredging erosion and deposition all standing in row operation to institute Jing riverbeds;The water inlet pipe mouth of axle stream erosion and deposition pump passes the deck of boat therewith under waterline Connection, some longitudinal directions pass stem, the longitudinal direction that has passes ship stern, have laterally pass both sides strake, water inlet pipe mouth or In bell mouth shape;Axle stream erosion and deposition pump energy forward and backward;Hull bottom is separated into multiple hydraulic pressure cabins, and hydraulic pressure cabin is provided with entery and delivery port, Or pipeline, the gate valve in connection hydraulic pressure cabin are set on axle stream erosion and deposition pump inlet tube and outlet tube, to give, draining ballasting into and out of Water;Install or do not fill steady to fin under water by both sides for hull bottom;Hull under-water is installed or is not filled propeller, rudder and steering gear;Install hull both sides Or mud-scraping frame is not filled, mud-scraping frame is the U-shaped structure of bottom flat, and the cleaning shoe side view of mud-scraping frame bottom is plow-shape, scrapes mud The hole of frame both upper ends thereof and the pin installed in port and starboard are slidably connected, and mud-scraping frame sets operation depth by adjusting draw off gear Degree;The dredging erosion and deposition depth of ship, two-dimensional localization, the operation speed of a ship or plane, draw off gear, Ship Power Station are adjusted by computer controls.
Beneficial effect
The dredging erosion and deposition hydraulic transport of sediment ship is dredged using multigroup axle stream erosion and deposition pump in flowing waters not for the purpose of taking mud Erosion and deposition, while using the hydraulic transport of sediment that flows naturally, go downstream operation, eliminate setting for dredger shipping or pipeline bed mud Standby, manpower, time, energy consumption cost;The ship is novel, simple structure, cost operation cost are low, can advance, fall back, lifting, Position, flexibly turn to, mooring, flowing waters may replace drag suction dredger or cutter suction dredger operation.
Description of the drawings
Fig. 1 is the schematic diagram of an embodiment
Fig. 2 is the elevational schematic view of an embodiment
Fig. 3 is the schematic side view of an embodiment
In figure:1 hull;2 motors;3 axle stream erosion and deposition pumps;4 effluent pipe mouths;5 hull bottom;6 water inlet pipe mouths;7 stems;8 ship sterns;9 Surely to fin;10 propellers;11 rudder and steering gears;12 mud-scraping frames;13 cleaning shoes;14 pins;15 adjust draw off gear.
Specific embodiment
Embodiment 1, refering to Fig. 1, Fig. 2, Fig. 3, a kind of dredging erosion and deposition hydraulic transport of sediment ship is provided with 1 waterline of hull multigroup The axle stream erosion and deposition pump 3 that motor 2 drives, 3 effluent pipe mouth of axle stream erosion and deposition pump 4 all face downwards riverbed, are symmetrical in during ship is indulged and cut open Face, alow 5 mounting arrangement, from terms of captain direction, the effluent pipe mouth of hull bottom 54 it is equidistantly transversely arranged, reach in navigation operation Dredging erosion and deposition all standing to institute Jing riverbeds;The water inlet pipe mouth 6 of axle stream erosion and deposition pump 3 passes the deck of boat under waterline and is attached thereto, The longitudinal direction that some longitudinal directions pass stem 7, have pass ship stern 8, have laterally pass both sides strake, water inlet pipe mouth 6 or be in Bell mouth shape;Axle stream erosion and deposition pump 3 can forward and backward;1 bottom of hull is separated into multiple hydraulic pressure cabins, and hydraulic pressure cabin is provided with entery and delivery port, Or pipeline, the gate valve in connection hydraulic pressure cabin are set on 3 inlet tube and outlet tube of axle stream erosion and deposition pump, to give, draining ballasting into and out of Water;The 5 both sides turn of the bilge of hull bottom is installed or is not filled steady to fin 9;Propeller 10, rudder and steering gear 11, hull 1 or so are installed or do not filled to hull bottom 5 Mud-scraping frame 12, U-shaped structure of the mud-scraping frame 12 for bottom flat, the cleaning shoe 13 of 12 bottom of mud-scraping frame are installed or are not filled on side plate Side view is plow-shape, and the hole of 12 both upper ends thereof of mud-scraping frame and the pin 14 on port and starboard side plate are slidably connected, and scrape mud Frame 12 sets depth of implements by adjusting draw off gear 15;The dredging erosion and deposition depth of ship, two-dimensional localization, the operation speed of a ship or plane, regulation are received Device 15, Ship Power Station is put by computer controls.

Claims (1)

1. a kind of to dredge erosion and deposition hydraulic transport of sediment ship, it includes hull, motor, axle stream erosion and deposition pump, effluent pipe mouth, hull bottom, water inlet pipe Mouth, stem, ship stern, hydraulic pressure cabin, Ship Power Station, sounding instrument, log, global position system, computer, is characterized in that, hull Multigroup motor-driven axle stream erosion and deposition pump is installed under waterline, axle stream erosion and deposition water pump outlet pipe mouth is all downwards in the face of riverbed, symmetrical In ship vertical midship section, alow mounting arrangement;From in terms of captain direction, the effluent pipe mouth of hull bottom is transversely arranged at equal intervals, reaches Dredging erosion and deposition all standing in navigation operation to institute Jing riverbeds;The water inlet pipe mouth of axle stream erosion and deposition pump passes the deck of boat simultaneously under waterline It is attached thereto, part water inlet pipe mouth longitudinally passes stem, part water inlet pipe mouth and longitudinally passes ship stern, part water inlet pipe mouth laterally to be worn Go out hull both sides, water inlet pipe mouth is in bell mouth shape;Axle stream erosion and deposition pump energy forward and backward;Hull bottom is separated into several hydraulic pressure cabins, water Ballasting is provided with entery and delivery port, arranges pipeline, the gate valve in connection hydraulic pressure cabin, to give, arrange on axle stream erosion and deposition pump inlet tube and outlet tube The water-in and water-out in hydraulic pressure cabin;Install surely to fin under water by both sides for hull bottom;Hull under-water installs propeller, rudder and steering gear;Install hull both sides Mud-scraping frame, U-shaped structure of the mud-scraping frame for bottom flat, the cleaning shoe side view of mud-scraping frame bottom is plow-shape, mud-scraping frame top The hole at two ends and the pin installed in port and starboard are slidably connected, and mud-scraping frame sets depth of implements by adjusting draw off gear;Ship Dredging erosion and deposition depth, two-dimensional localization, the operation speed of a ship or plane, regulation draw off gear, Ship Power Station are by computer controls.
CN201620546353.6U 2016-01-27 2016-05-31 Dredging erosion and deposition hydraulic transport of sediment ship Expired - Fee Related CN206049998U (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN2016201082662 2016-01-27
CN201620108266 2016-01-27

Publications (1)

Publication Number Publication Date
CN206049998U true CN206049998U (en) 2017-03-29

Family

ID=58372525

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620546353.6U Expired - Fee Related CN206049998U (en) 2016-01-27 2016-05-31 Dredging erosion and deposition hydraulic transport of sediment ship

Country Status (1)

Country Link
CN (1) CN206049998U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105923112A (en) * 2016-01-27 2016-09-07 张瑞麟 Dredger with dredging, scouring, silting and hydraulic sediment transporting functions
CN108909958A (en) * 2018-07-27 2018-11-30 中交广州航道局有限公司 A kind of barge sands device and its installation method
CN110258705A (en) * 2019-07-16 2019-09-20 中交天津航道局有限公司 A kind of engineering ship sand water mixing device
CN113026844A (en) * 2021-04-23 2021-06-25 马德志 Silt collection device and underwater dredging device

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105923112A (en) * 2016-01-27 2016-09-07 张瑞麟 Dredger with dredging, scouring, silting and hydraulic sediment transporting functions
CN105923112B (en) * 2016-01-27 2018-08-17 张瑞麟 Dredge erosion and deposition hydraulic transport of sediment ship
CN108909958A (en) * 2018-07-27 2018-11-30 中交广州航道局有限公司 A kind of barge sands device and its installation method
CN108909958B (en) * 2018-07-27 2024-05-07 中交广州航道局有限公司 Barge sand paving device, installation method and sand paving process
CN110258705A (en) * 2019-07-16 2019-09-20 中交天津航道局有限公司 A kind of engineering ship sand water mixing device
CN113026844A (en) * 2021-04-23 2021-06-25 马德志 Silt collection device and underwater dredging device

Similar Documents

Publication Publication Date Title
CN105923112B (en) Dredge erosion and deposition hydraulic transport of sediment ship
CN206049998U (en) Dredging erosion and deposition hydraulic transport of sediment ship
CN103125414A (en) Rotatable self-propulsion-type anti-wind-wave deep water cage
CN106370477B (en) Marine deep sea water intaking temperature measurement circulation system
CN202783722U (en) Whole rotational tugboat cooled outboard
CN106150844A (en) A kind of water power calculation system and water energy conversion equipment thereof
AU2017338597A1 (en) Tugboat having azimuthal propelling units
CN101992836A (en) Airflow channel bottom floating ship body
CN109649621B (en) Aquatic suspension track traffic system
CN109850083A (en) A kind of ultra-shallow draft has the sea cable ship of a variety of stationkeeping abilities
US2754791A (en) Ship turbulator
US4622912A (en) Draft reduction system for ships
CN204548423U (en) A kind of variable boat state unmanned boat
CN208264535U (en) Antiwind hydraulic jet propulsion unmanned boat
RU2527244C1 (en) Aft end of two-shaft vessel
CN201003178Y (en) Intelligent type highly effective dredging boat
CN110450926A (en) A kind of urgent heavy attitude stabilization two-body underwater towing gears of waterpower
JP2001248532A (en) Hydraulic energy converting method and its device
CN103046613B (en) Energy-conservation collection seawater cruise liner
CN201235926Y (en) High-speed energy-saving bidirectional force application screw propeller of watercraft
CN210284542U (en) Small electric waterweed cutting boat
CN203876971U (en) Side wall type high-speed launch with front-arrangement power propeller
JP2021143669A (en) Pumping-type hydraulic pressure power generation structure aimed at control of tropical cyclone such as typhoon and integrated operation method
CN205931171U (en) Novel multi -functional automatic barge
CN206012922U (en) A kind of marine oil and gas increase production the propulsion system of ship

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170329

Termination date: 20200531