CN206015832U - Flood diversion equipment - Google Patents

Flood diversion equipment Download PDF

Info

Publication number
CN206015832U
CN206015832U CN201620682463.5U CN201620682463U CN206015832U CN 206015832 U CN206015832 U CN 206015832U CN 201620682463 U CN201620682463 U CN 201620682463U CN 206015832 U CN206015832 U CN 206015832U
Authority
CN
China
Prior art keywords
flood diversion
blind shaft
flood
well
well head
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620682463.5U
Other languages
Chinese (zh)
Inventor
刘黾
周荫庭
李春辉
何士锋
潘娟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Lingnan Eco and Culture Tourism Co Ltd
Original Assignee
LINGNAN LANDSCAPE CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by LINGNAN LANDSCAPE CO Ltd filed Critical LINGNAN LANDSCAPE CO Ltd
Priority to CN201620682463.5U priority Critical patent/CN206015832U/en
Application granted granted Critical
Publication of CN206015832U publication Critical patent/CN206015832U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Sewage (AREA)

Abstract

This utility model is related to a kind of flood diversion equipment, including flood diversion blind shaft, described flood diversion blind shaft includes the vertical flood diversion blind shaft well body with well head, well head top is provided with well head collar tie beam, described well head periphery is provided with desilting ditch, below the flood diversion region of ground, described vertical flood diversion blind shaft well body bottom is provided with implant in described vertical flood diversion blind shaft well body in the full water layer of underground latent water layer or underground on described vertical flood diversion blind shaft well body top.Sewerage system load can be mitigated using this method flood diversion, so as to effective solves city because of heavy showers or the flood for concentrating rainfall to bring;Little, instant effect is invested using vertical flood diversion blind shaft flood diversion, permanent being benefited once is invested;The rain dirt flood shunted using vertical flood diversion blind shaft need not be guided to sewage farm and be processed, and directly not have any pollution using the water body for penetrating into river waters after deep soil natural filtration.

Description

Flood diversion equipment
Technical field
This utility model is related to urban flood defence water drainage technical field, and espespecially a kind of investment is little, and equipment is simple, easy to operate, Sustainability can effectively solve the problem that well puzzlement town dweller endures suffering, easy people from disaster area of effective protection that flood is wreaked havoc to the fullest extent for many years The security of the lives and property of the people.Substantially without operation expense after building up, it is adaptable to the city, township easily by rainwater annihilation The flood diversion equipment raise that controls flood and drains flooded fields in the regions such as village, factories and miness, office, highway, railway and application flood diversion equipment solve urban waterlogging Method.
Background technology
Urban waterlogging is referred to and cause city to produce hydrops calamity due to precipitation or continuous precipitation more than municipal drainage ability Harmful phenomenon.The reasons such as the odjective cause for causing waterlogging is in rainfall range set, big, the rain time length of the rain that plunges, rainfall intensity The large number of ground hydrops for causing surface pond to be formed more than the drainability of sewerage system.2008 are counted according to the portion of building is lived Years 2010, once there is waterlogging event in the city that the whole nation has 62%, this meet within 3 years heavy rain must the city of waterlogging have 137, This is the common fault in a lot of cities.Some urban ducts domestic are aging, design drainability and are not inconsistent with the actual flood discharge for producing, arrange Drainage facility imperfection, the delayed major reason for being to cause waterlogging of Drainage System Construction.In addition, the substantial amounts of hard paving in city Dress, such as substantial amounts of asphalt road, cement pavement, during rainfall, water permeability is bad, it is not easy to infiltrate, and is easily formed surface gathered water.
At present, both at home and abroad it has been proposed that build the regulating reservoir and regulating box of some interim water storages, carried out after waiting flood peak again Secondary drainage, so not only needs huge manpower and financial resources to put into, and later maintenance is difficult, it is often more important that heavy rain is caused Mighty torrent and interim water storage is unprocessed is directly discharged into waters, will result in serious water pollution to water system.Be one very passive and Irresponsible handled means.
Utility model content
China area of heavy rainfull every flood season endures wreaking havoc for flood to the fullest extent and not only feels simply helpless, the life of the prior people Property has different degrees of infringement every year, and the purpose of this utility model is to design flood diversion equipment for this situation, bag Flood diversion blind shaft is included, described flood diversion blind shaft includes that the vertical flood diversion blind shaft well body with well head, well head top are provided with well head collar tie beam, Described well head periphery is provided with desilting ditch, and described vertical flood diversion blind shaft well body top is below the flood diversion region of ground, described Vertical flood diversion blind shaft well body bottom in the full water layer in underground latent water layer or underground, in described vertical flood diversion blind shaft well body It is provided with implant.
Preferably, described implant is granular or blocks of solid, forms the gap of flowing of supplying water between solid.Particle diameter compared with Big and quality can be mixed for one or more for cobble, rubble, fragment of brick, tile fragment, coagulation grogs more than the granular or blocks of solid of water Compound, can reinforce flood diversion blind shaft body first, and next allows the water to preferably penetrate in underground latent water layer or full water layer.
Preferably, layer of metal guard is provided with described well head collar tie beam, and described metal net mask is externally provided with layer of metal Barrier, metal net mask are slightly closeer than metal grid.Metal net mask is slightly closeer than barrier, metal net mask except further prevent dead twigs and withered leaves, The solid contents such as weeds are entered outside flood diversion well, metal net mask on the one hand fixed well inner stuffing, on the one hand secondary obstruction dead twigs and withered leaves, The solid contents such as weeds and fixed implant.
Preferably, described desilting ditch inner top arranges half open cell type polyurathamc unit of plastic or metal grating.
The method that application flood diversion equipment solves urban waterlogging, comprises the steps:
Step one:Selected waterlogging critical regions, underground hydrological survey data, region meteorological data according to the region, city City's drainability calculates the area that the region may be disaster-stricken, total flood discharge, amount of monomer, hydrops degree, the flood subsidence time, Normal rainwash, need the amount of drainning off floodwaters, the relevant data of vertical flood diversion well flood diversion ability modulus, understand underground Bao Shui bands, full water layer, Water table aquifer situation;
Step 2, laying flood diversion blind shaft quantity, the position of the single vertical flood diversion blind shaft of design, well body diameter, depth;
Step 3, utilization well-digging machinery or the artificial correct position in region topography lower beat vertical flood diversion blind shaft, The depth of flood diversion well will reach the full water layer in underground or water table aquifer, so as to energy after the flood under flow of water pressure enters flood diversion blind shaft Rapid diffusion;
Step 4, the cobble for inserting certain particle diameter in the flood diversion well that accomplishes fluently, rubble, fragment of brick, tile fragment, coagulation grogs etc. are no Degradable and quality forms column flood diversion blind shaft chamber more than the granular or block implant of water;In column flood diversion blind shaft chamber On the one hand implant supports the borehole wall to prevent from caving in forming permanent flood diversion blind shaft, on the other hand draws flood from column flood diversion blind shaft Enter the full water layer in underground or water table aquifer;
Step 5, the blind mouth outer well head certain distance of vertical flood diversion well set mud of the annular desilting ditch to prevent flood from bringing Sand, stone etc. enter flood diversion blind shaft and result in blockage;
Concrete well mouth circle beam, metal grid and metal net mask is set at step 6, flood diversion well head;Metal grid and wire netting Cover is fixed on well head collar tie beam, and barrier prevents the solid contents such as dead twigs and withered leaves, weeds from entering in flood diversion well, and metal net mask is than barrier slightly Close, in addition to further preventing the solid contents such as dead twigs and withered leaves, weeds and entering flood diversion well, on the one hand metal net mask fixes well to metal net mask Inner stuffing, on the one hand secondary obstruction dead twigs and withered leaves, the solid content such as weeds and fixed implant.
This utility model has the beneficial effect that:
1st, sewerage system load can be mitigated using this method flood diversion, so as to effective solution city is because of heavy showers Or the flood that concentration rainfall brings;
2nd, little, instant effect is invested using vertical flood diversion blind shaft flood diversion, once invests permanent being benefited;
3rd, the rain dirt flood for being shunted using vertical flood diversion blind shaft need not be guided to sewage farm and be processed, and directly utilize The water body for penetrating into river waters after deep soil natural filtration does not have any pollution.
Description of the drawings
Fig. 1 is this utility model structure chart.
Mark explanation:1. vertical flood diversion blind shaft well body;2. well head collar tie beam;3. desilting ditch;4. the full water layer in underground;5. dive Water layer;6. underground water barrier;7. metal net mask;8. metal grid;9. implant.
Specific embodiment
Refer to shown in Fig. 1, flood diversion equipment, including flood diversion blind shaft, described flood diversion blind shaft is included with the vertical of well head Flood diversion blind shaft well body 1, well head top are provided with well head collar tie beam 2, and described well head periphery is provided with desilting ditch 3, described vertical flood diversion Lower of 1 top of blind shaft well body located at ground flood diversion region, described vertical 1 bottom of flood diversion blind shaft well body are located at underground latent water In the full water layer 4 of layer 5 or underground, at least on underground water barrier 6, described vertically divides for vertical 1 bottom of flood diversion blind shaft well body Implant 9 is provided with big vast blind shaft well body 1.
Preferably, layer of metal guard 7 is provided with described well head collar tie beam, and described metal net mask 7 is externally provided with one layer of gold Category barrier 8, metal net mask 7 are slightly closeer than metal grid 8.Metal net mask 7 is slightly closeer than barrier, and metal net mask 7 is withered except further preventing Branch loses the solid contents such as leaf, weeds and enters outside flood diversion well, and on the one hand metal net mask 7 fixes well inner stuffing 9, on the one hand secondary obstruction The solid contents such as dead twigs and withered leaves, weeds and fixed implant 9.
Preferably, described 3 inner top of desilting ditch arranges half open cell type polyurathamc unit of plastic or metal grating.
The method that application flood diversion equipment solves urban waterlogging, comprises the steps:
Step one:Selected waterlogging critical regions, underground hydrological survey data, region meteorological data according to the region, city City's drainability calculates the area that the region may be disaster-stricken, total flood discharge, amount of monomer, hydrops degree, the flood subsidence time, Normal rainwash, need the amount of drainning off floodwaters, the relevant data of vertical flood diversion well flood diversion ability modulus, understand underground Bao Shui bands, full water layer, Water table aquifer situation;
Step 2, laying flood diversion blind shaft quantity, the position of the single vertical flood diversion blind shaft of design, well body diameter, depth;
Step 3, utilization well-digging machinery or the artificial correct position in region topography lower beat vertical flood diversion blind shaft, The depth of flood diversion well will reach the full water layer 4 in underground or water table aquifer, so as to after the flood under flow of water pressure enters flood diversion blind shaft Can spread rapidly;
Step 4, the cobble for inserting certain particle diameter in the flood diversion well that accomplishes fluently, rubble, fragment of brick, tile fragment, coagulation grogs etc. are no Degradable and quality forms column flood diversion blind shaft chamber more than the granular or block implant 9 of water;In column flood diversion blind shaft chamber Implant 9 on the one hand support the borehole wall to prevent from caving in forming permanent flood diversion blind shaft, on the other hand that flood is blind from column flood diversion Well introduces the full water layer 4 in underground or water table aquifer;
Step 5, the blind mouth outer well head certain distance of vertical flood diversion well set mud of the annular desilting ditch 3 to prevent flood from bringing Sand, stone etc. enter flood diversion blind shaft and result in blockage;
Concrete well mouth circle beam 2, metal grid 8 and metal net mask 7 is set at step 6, flood diversion well head;Metal grid 8 and gold Category guard 7 is fixed on well head collar tie beam 2, and barrier prevents the solid contents such as dead twigs and withered leaves, weeds from entering in flood diversion well, metal net mask 7 Slightly closeer than barrier, metal net mask 7 in addition to further preventing dead twigs and withered leaves, the solid content such as weeds and entering flood diversion well, metal net mask 7 one Aspect fixes well inner stuffing 9, on the one hand the solid content such as secondary obstruction dead twigs and withered leaves, weeds and fixed implant 9.
Case one:
The applicant has 18.5 hectares of garden seedling tree Domestication bases in Huizhou little Jin mouths, due to city Political affairs pumping equipment is not in place, and annual rainy season full wafer ground is fallen into oblivion by flood, falls into oblivion depth typically all more than 0.5 meter, falls into oblivion most Sometimes up to 1 meter of depths.The applicant is provided with 3 vertical flood diversion blind shafts on 18.5 hectares within 2013, by vertical flood diversion Earth's surface flood is introduced underground reservoir by blind shaft, and when solving heavy showers, sewerage system over loading causes ground to form a large amount of products Urban Flood Waterlogging caused by water;Each flood diversion well well head diameter 800MM, depth base area expression condition are slightly different, and fill 9 material depth of thing reaches filling rubble in 7M, vertical flood diversion blind shaft, cobble, tile block or setting prefabricated components and can cross water dual intensity Cave-in is prevented, to guarantee the permanent of vertical flood diversion well;Apart from well head 300MM with peripheral hardware annular desilting ditch 3, vertically dividing Big vast Jing Jingkouchu is arranged annular desilting ditch 3 and is entered vertically with the solid content for collecting the heavier mass such as the muddy water masonry in rainwash In flood diversion well, barrier is set at vertical flood diversion blind shaft well head in case the solid content such as branch, weeds is entered in vertical flood diversion well;Even Continue 3 years regions and do not cause flood harm.
Embodiment of above is only that preferred implementation of the present utility model is described, not to this utility model Scope be defined, on the premise of without departing from this utility model design spirit, ordinary skill technical staff in this area is to this Various modifications and improvement that the technical scheme of utility model is made, all should fall into the guarantor that claims of the present utility model determine In the range of shield.

Claims (4)

1. a kind of flood diversion equipment, it is characterised in that:Including flood diversion blind shaft, described flood diversion blind shaft includes vertical point with well head Big vast blind shaft well body, well head top are provided with well head collar tie beam, and described well head periphery is provided with desilting ditch, described vertical flood diversion blind shaft well Below the flood diversion region of ground, described vertical flood diversion blind shaft well body bottom is full located at underground latent water layer or underground on body top In water layer, in described vertical flood diversion blind shaft well body, implant is provided with.
2. a kind of flood diversion equipment according to claim 1, it is characterised in that:Described implant is granular or block solid Body, adjacent two is granular or blocks of solid between form the gap of flowing of supplying water.
3. a kind of flood diversion equipment according to claim 1, it is characterised in that:Layer of metal is provided with described well head collar tie beam Guard, described metal net mask are externally provided with layer of metal barrier, and metal net mask is slightly closeer than metal grid.
4. a kind of flood diversion equipment according to claim 1, it is characterised in that:Described desilting ditch inner top arranges half perforate Type polyurathamc unit of plastic or metal grating.
CN201620682463.5U 2016-06-28 2016-06-28 Flood diversion equipment Expired - Fee Related CN206015832U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620682463.5U CN206015832U (en) 2016-06-28 2016-06-28 Flood diversion equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620682463.5U CN206015832U (en) 2016-06-28 2016-06-28 Flood diversion equipment

Publications (1)

Publication Number Publication Date
CN206015832U true CN206015832U (en) 2017-03-15

Family

ID=58243211

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620682463.5U Expired - Fee Related CN206015832U (en) 2016-06-28 2016-06-28 Flood diversion equipment

Country Status (1)

Country Link
CN (1) CN206015832U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106065655A (en) * 2016-06-28 2016-11-02 岭南园林股份有限公司 The method that flood diversion equipment and application flood diversion equipment solve urban waterlogging

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106065655A (en) * 2016-06-28 2016-11-02 岭南园林股份有限公司 The method that flood diversion equipment and application flood diversion equipment solve urban waterlogging

Similar Documents

Publication Publication Date Title
CN103643612B (en) Shallow grass ditch and the manufacture method of shallow grass ditch
CN201943173U (en) Sinking groove type permeable gutter inlet facility system
CN206752614U (en) A kind of sponge-type road sinks formula afforests dividing strip Rainwater collection system
CN202926388U (en) Drainage facility for road surface bubbling water of highway tunnel
CN103726476B (en) A kind of ecological pollution and bank protecting method protecting water head site
CN105297872A (en) LID type city rainwater closed conduit with functions of water permeating, storing, purifying and draining
CN206681021U (en) A kind of multi-functional slope reinforcement structure
CN206571217U (en) Outdoor Parking position system based on sponge the idea of the city
CN106917522A (en) A kind of Outdoor Parking position system based on sponge the idea of the city
CN103866774A (en) Ditch pipe network protection body for slope protection and collapsing hill drainage and soil fixation
CN104499560A (en) Combined rainwater seepage well and construction method
CN108532406A (en) Can rapid construction high-bearing capacity pervious surface and laying method
CN205224230U (en) LID type urban rainwater oozes and holds clean drainage closed conduit
CN206015832U (en) Flood diversion equipment
CN206245444U (en) Rainwater penetration system
CN203755322U (en) Channel pipe network guarded body used for slope protection and drainage and soil fixation of slope collapse
CN211228269U (en) High-grade highway central separation strip structure
CN211172034U (en) Water-rich basement falls drainage structures
CN202627002U (en) Tailing dam for river cutting type tailing pond water bursting section
CN205295848U (en) Firm type ecology system of mating formation of permeating water
CN106065655B (en) The method that flood diversion equipment and application flood diversion equipment solve urban waterlogging
CN103821217B (en) Low-lying green space flow limiting facility for relieving small-watershed waterlogging disaster of city
CN206368311U (en) A kind of ecological road of sponge city water collecting and purifying
CN205276436U (en) A secret device for rainwater regulation
CN105350637B (en) Urban green space subsurface stormwater is regulated and stored device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CP03 Change of name, title or address

Address after: 523000 10 building, 1 building, extension center, Dongcheng cultural center, Dongyuan Road, Dongcheng Street, Dongguan, Guangdong.

Patentee after: LINGNAN ECOLOGICAL CULTURE TRAVEL Co.,Ltd.

Address before: 523000 Room 301, A tower, Jinfeng Building, 27 Guangming Road, Dongcheng District, Dongguan, Guangdong.

Patentee before: Lingnan Landscape Co.,Ltd.

CP03 Change of name, title or address
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of utility model: Waterlogging-preventing intelligent flood diversion device aiming at heavy rains in cities

Effective date of registration: 20181023

Granted publication date: 20170315

Pledgee: GF finance leasing (Guangdong) Co.,Ltd.

Pledgor: LINGNAN ECOLOGICAL CULTURE TRAVEL Co.,Ltd.

Registration number: 2018440020065

PE01 Entry into force of the registration of the contract for pledge of patent right
PC01 Cancellation of the registration of the contract for pledge of patent right

Date of cancellation: 20200819

Granted publication date: 20170315

Pledgee: GF finance leasing (Guangdong) Co.,Ltd.

Pledgor: LINGNAN ECOLOGICAL CULTURE TRAVEL Co.,Ltd.

Registration number: 2018440020065

PC01 Cancellation of the registration of the contract for pledge of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170315

CF01 Termination of patent right due to non-payment of annual fee