CN206245444U - rainwater infiltration system - Google Patents

rainwater infiltration system Download PDF

Info

Publication number
CN206245444U
CN206245444U CN201621305969.0U CN201621305969U CN206245444U CN 206245444 U CN206245444 U CN 206245444U CN 201621305969 U CN201621305969 U CN 201621305969U CN 206245444 U CN206245444 U CN 206245444U
Authority
CN
China
Prior art keywords
well
rainwater
inspection well
penetration
penetration inspection
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201621305969.0U
Other languages
Chinese (zh)
Inventor
肖佩林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yunnan Longzhi Environment Engineering Co Ltd
Original Assignee
Yunnan Longzhi Environment Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yunnan Longzhi Environment Engineering Co Ltd filed Critical Yunnan Longzhi Environment Engineering Co Ltd
Priority to CN201621305969.0U priority Critical patent/CN206245444U/en
Application granted granted Critical
Publication of CN206245444U publication Critical patent/CN206245444U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A10/00TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE at coastal zones; at river basins
    • Y02A10/30Flood prevention; Flood or storm water management, e.g. using flood barriers

Landscapes

  • Sewage (AREA)

Abstract

本实用新型公开了一种雨水渗透系统,包括渗透检查井、汇水井、雨水管、蓄水池和储存渗透模块;渗透检查井与渗透检查井之间通过雨水管连通;渗透检查井的末端通过雨水管与汇水井的入口连通;汇水井的出口通过雨水管连接储存渗透模块;汇水井的下部设置在蓄水池中;汇水井的下部设置有出水孔;雨水管包括内管和外管;内管和外管之间设有内腔;渗透检查井口设有截污筐;截污筐四周设有过滤孔;渗透检查井底端固定设置在稳定座上;渗透检查井外壁四周设有横向加强筋和竖向加强筋;渗透检查井置于碎石层和粗砂层组成的垫层内。本实用新型利于雨水渗透和清理杂物;减少雨水地表流量和市政雨水管网的压力,实现雨水最大限度地被截留并快速渗透到地下。

The utility model discloses a rainwater infiltration system, which comprises a seepage inspection well, a water collection well, a rainwater pipe, a water storage tank and a storage infiltration module; the seepage inspection well and the seepage inspection well are connected through a rainwater pipe; The inlet of the catchment well is connected; the outlet of the catchment well is connected to the storage infiltration module through the rainwater pipe; the lower part of the catchment well is set in the reservoir; the lower part of the catchment well is provided with a water outlet; the rainwater pipe includes an inner pipe and an outer pipe; the inner pipe and the outer pipe There is an inner cavity between them; the penetration inspection wellhead is equipped with a sewage intercepting basket; the surrounding of the sewage interception basket is provided with filter holes; the bottom of the penetration inspection well is fixed on the stable seat; Reinforcing ribs; the penetration inspection well is placed in the cushion layer composed of crushed stone layer and coarse sand layer. The utility model is beneficial to rainwater infiltration and clearing up sundries, reduces the surface flow of rainwater and the pressure of the municipal rainwater pipe network, and realizes that the rainwater is intercepted to the greatest extent and penetrates into the ground quickly.

Description

雨水渗透系统rainwater infiltration system

技术领域technical field

本实用新型涉及污水处理装置,具体地说是涉及一种雨水渗透系统。The utility model relates to a sewage treatment device, in particular to a rainwater infiltration system.

背景技术Background technique

雨水渗透系统是指天然原生态的自然入渗系统被破坏,雨水无法再次回补到地下,人工将落到受雨面上的雨水经处理后,再次回补到地下的一种处理系统。The rainwater infiltration system refers to a treatment system in which the natural infiltration system of the original ecology is destroyed, and the rainwater cannot be replenished to the ground again.

长期以来,无论是住宅开发还是道路、广场、地下管网等公共基础设施建设,大都采用钢筋混凝土进行硬化,彻底改变了地表原有的生态,加大了雨水径流,导致雨水资源流失,城市生态系统紊乱,地质灾害时有发生,加剧了城市内涝、雾霾及热岛效应,一旦长时间下雨,下水道如果不能及时、顺利地排掉雨水,就会出现严重的城市内涝。For a long time, whether it is residential development or the construction of public infrastructure such as roads, squares, and underground pipe networks, most of them have been hardened with reinforced concrete, which has completely changed the original ecology of the surface, increased rainwater runoff, and led to the loss of rainwater resources. The system is disordered, and geological disasters occur from time to time, which intensifies urban waterlogging, smog, and the heat island effect. Once it rains for a long time, if the sewers cannot drain the rainwater in a timely and smooth manner, serious urban waterlogging will occur.

虽然现有技术中的上述雨水蓄留系统能够满足一定的需要,但其仍存在一定的缺陷:比如,生态滤池、生态草沟系统的施工不方便,导致施工效率低下,成本高,可复制性差,不利于工业上大规模生产。Although the above-mentioned rainwater storage system in the prior art can meet certain needs, it still has certain defects: for example, the construction of the ecological filter and the ecological grass ditch system is inconvenient, resulting in low construction efficiency and high cost, which can be replicated Poor performance is not conducive to large-scale industrial production.

实用新型内容Utility model content

本实用新型要解决的技术问题是提供一种利于雨水渗透,便于清理杂物;减少了雨水地表流量和市政雨水管网的压力,实现了雨水最大限度地被截留并快速渗透到地下的雨水渗透系统。The technical problem to be solved by the utility model is to provide a rainwater infiltration system that is conducive to rainwater penetration and easy to clean up debris; reduces the surface flow of rainwater and the pressure of the municipal rainwater pipe network, and realizes that the rainwater is intercepted to the maximum and quickly penetrates into the ground. .

为了解决上述技术问题,本实用新型的技术方案为:一种雨水渗透系统,包括渗透检查井、汇水井、雨水管、蓄水池和储存渗透模块;所述渗透检查井与渗透检查井之间通过所述雨水管连通;所述渗透检查井的末端通过所述雨水管与所述汇水井的入口连通;所述汇水井的出口通过所述雨水管连接所述储存渗透模块;所述汇水井的下部设置在所述蓄水池中;所述汇水井的下部设置有出水孔;所述雨水管包括内管和外管;所述内管和外管之间设有内腔;所述内腔内设有支撑架;所述内管设有进水孔,所述外管设有出水孔;所述进水孔和所述出水孔错开设置;所述渗透检查井顶端开口、底端封闭;所述渗透检查井的井口设有截污筐;所述截污筐四周设有过滤孔;所述截污筐的顶端设置有井盖,所述井盖设置有流水孔;所述渗透检查井底端固定设置在稳定座上;所述渗透检查井的进水口的高度低于出水口的高度;所述进水口下部四周设有渗透孔;所述渗透检查井外壁四周设有横向加强筋和竖向加强筋;所述渗透检查井置于第一碎石层和第一粗砂层组成的垫层内;所述第一碎石层和第一粗砂层之间设有第一土工布;所述第一碎石层和第一土工布位于所述进水口的下缘。In order to solve the above technical problems, the technical solution of the utility model is: a rainwater infiltration system, including a seepage inspection well, a catchment well, a rainwater pipe, a water storage tank, and a storage infiltration module; The rainwater pipe is communicated; the end of the seepage inspection well is communicated with the inlet of the catchment well through the rainwater pipe; the outlet of the catchment well is connected to the storage infiltration module through the rainwater pipe; the lower part of the catchment well is arranged at In the reservoir; the lower part of the catchment well is provided with a water outlet; the rainwater pipe includes an inner tube and an outer tube; an inner cavity is provided between the inner tube and the outer tube; a support is provided in the inner cavity frame; the inner pipe is provided with a water inlet, and the outer pipe is provided with a water outlet; the water inlet and the water outlet are staggered; the top of the penetration inspection well is open and the bottom is closed; the penetration inspection The wellhead of the well is provided with an intercepting basket; the surroundings of the intercepting basket are provided with filter holes; the top of the intercepting basket is provided with a well cover, and the well cover is provided with a water hole; the bottom of the penetration inspection well is fixed on a stable On the seat; the height of the water inlet of the seepage inspection well is lower than the height of the water outlet; the lower part of the water inlet is provided with permeable holes; the outer wall of the seepage inspection well is provided with horizontal and vertical reinforcements; The penetration inspection well is placed in the cushion layer composed of the first crushed stone layer and the first coarse sand layer; a first geotextile is arranged between the first crushed stone layer and the first coarse sand layer; The stone layer and the first geotextile are located at the lower edge of the water inlet.

优选地,所述渗透检查井、汇水井和雨水管的四周设有渗漏层;所述渗漏层由内向外依次由第二碎石层、土工布渗透层、粗砂垫层组成。Preferably, a leakage layer is provided around the seepage inspection well, catchment well and rainwater pipe; the leakage layer is composed of a second crushed stone layer, a geotextile permeable layer, and a coarse sand cushion from inside to outside.

优选地,所述储存渗透模块从上到下设置有种植土层、第二粗砂层、第二土工布、土工格栅、砾石和粗砂混合层和第三土工布。Preferably, the storage infiltration module is provided with a planting soil layer, a second coarse sand layer, a second geotextile, a geogrid, a mixed layer of gravel and coarse sand, and a third geotextile from top to bottom.

优选地,所述出水孔设有锥形体,所述锥形体的顶端设有通孔。Preferably, the water outlet hole is provided with a cone, and the top of the cone is provided with a through hole.

优选地,所述渗透检查井与渗透检查井之间的距离为20-30米;所述渗透检查井与汇水井之间的距离为20-30米。Preferably, the distance between the seepage inspection well and the seepage inspection well is 20-30 meters; the distance between the seepage inspection well and the catchment well is 20-30 meters.

优选地,所述渗透检查井数量为2-5个,依次通过所述雨水管串接。Preferably, the number of the seepage inspection wells is 2-5, which are sequentially connected in series through the rainwater pipes.

本实用新型的有益效果是:1、由于本实用新型的雨水管采用内管和外管组成结构,内管设有进水孔,外管设有出水孔;进水孔和出水孔错开设置;内管内的雨水通过进水孔进入内腔,再通过外管上的出水孔排出到地下,对地下进行补水,补水效果好,防止地下水漏斗的出现,而且采用内腔的设计,防止泥沙进入雨水管道;2、由于本实用新型渗透检查井的出水口位置高于进水口的位置,当雨水从进水口或者井盖处进入井筒之后容易形成水压,一部分雨水在水压作用下从井筒四周的渗透孔渗透进井筒四周的泥土层中,不但增加了泥土中水分的含量,有利于植物的生长,而且减少了进入市政排水管道的雨水量,减轻了市政雨水排水管道的压力;另外,截污筐可直接从井盖处取出进行清理处理,也可以从井盖处打开对井筒内部进行杂质清理,使用方便;渗透检查井外壁四周设有横向加强筋和竖向加强筋,增强了渗透检查井的强度,延长使用寿命;3、渗透检查井置于第一碎石层和第一粗砂层组成的垫层内,利于雨水渗漏,补充地下水源,减少了雨水地表流量和市政雨水管网的压力,实现了雨水最大限度地被截留并快速渗透到地下。The beneficial effects of the utility model are: 1. Since the rainwater pipe of the present utility model adopts an inner tube and an outer tube to form a structure, the inner tube is provided with a water inlet hole, and the outer tube is provided with a water outlet hole; the water inlet hole and the water outlet hole are staggered; The rainwater in the pipe enters the inner cavity through the water inlet hole, and then is discharged to the ground through the water outlet hole on the outer pipe, so as to replenish water to the underground. Pipe; 2. Since the position of the water outlet of the penetration inspection well of the utility model is higher than that of the water inlet, when the rainwater enters the wellbore from the water inlet or the well cover, it is easy to form water pressure, and a part of the rainwater penetrates from around the wellbore under the action of water pressure. The holes infiltrate into the soil layer around the shaft, which not only increases the water content in the soil, which is beneficial to the growth of plants, but also reduces the amount of rainwater entering the municipal drainage pipes, reducing the pressure on the municipal rainwater drainage pipes; in addition, the interception basket It can be taken out directly from the well cover for cleaning, and can also be opened from the well cover to clean the inside of the wellbore, which is convenient to use; the outer wall of the penetration inspection well is equipped with horizontal and vertical reinforcement ribs, which enhances the strength of the penetration inspection well. Extend the service life; 3. The seepage inspection well is placed in the cushion layer composed of the first crushed stone layer and the first coarse sand layer, which is conducive to rainwater seepage, supplements groundwater sources, reduces the surface flow of rainwater and the pressure of municipal rainwater pipe networks, and realizes It maximizes the retention of rainwater and quickly penetrates into the ground.

附图说明Description of drawings

图1为本实用新型雨水渗透系统的结构示意图;Fig. 1 is the structural representation of the utility model rainwater infiltration system;

图2为图1的a部放大图;Figure 2 is an enlarged view of part a of Figure 1;

图3为图1b部放大图;Figure 3 is an enlarged view of Figure 1b;

图4为本实用新型雨水渗透系统的雨水管3的结构示意图;Fig. 4 is the structural representation of the rainwater pipe 3 of the rainwater infiltration system of the present invention;

图5为图4的横截面图。FIG. 5 is a cross-sectional view of FIG. 4 .

具体实施方式detailed description

下面结合附图对本实用新型的具体实施方式作进一步说明。在此需要说明的是,对于这些实施方式的说明用于帮助理解本实用新型,但并不构成对本实用新型的限定。此外,下面所描述的本实用新型各个实施方式中所涉及的技术特征只要彼此之间未构成冲突就可以相互组合。Below in conjunction with accompanying drawing, the specific embodiment of the present utility model will be further described. It should be noted here that the descriptions of these implementations are used to help understand the utility model, but are not intended to limit the utility model. In addition, the technical features involved in the various embodiments of the present invention described below can be combined with each other as long as they do not constitute conflicts with each other.

如图1所示,本实用新型一种雨水渗透系统,它包括渗透检查井1、汇水井2、雨水管3、蓄水池4和储存渗透模块5;渗透检查井1与渗透检查井1之间通过雨水管3连通;渗透检查井1的末端通过雨水管3与汇水井2的入口连通;汇水井2的出口21通过雨水管3连接储存渗透模块5;汇水井2的下部设置在蓄水池4中;汇水井2的下部设置有出水孔22,该渗透检查井1数量可以为多个,根据实际需要设计,本实用新型中优选为2-5个,依次通过雨水管3串接;该渗透检查井1与渗透检查井1之间的距离为20-30米;渗透检查井1与汇水井2之间的距离为20-30米。As shown in Figure 1, a rainwater infiltration system of the present utility model comprises a seepage inspection well 1, a catchment well 2, a rainwater pipe 3, a reservoir 4 and a storage infiltration module 5; Communication through the rainwater pipe 3; the end of the penetration inspection well 1 communicates with the entrance of the catchment well 2 through the rainwater pipe 3; the outlet 21 of the catchment well 2 is connected to the storage infiltration module 5 through the rainwater pipe 3; the lower part of the catchment well 2 is arranged in the reservoir 4; The bottom of catchment well 2 is provided with outlet hole 22, and this seepage inspection well 1 quantity can be a plurality of, according to actual needs design, preferably 2-5 in the utility model, successively connects in series by rainwater pipe 3; This seepage inspection well 1 The distance from the seepage inspection well 1 is 20-30 meters; the distance between the seepage inspection well 1 and the catchment well 2 is 20-30 meters.

如图4至5所示,雨水管3包括内管31和外管32;内管31和外管32之间设有内腔33;内腔33内设有支撑架34;内管31设有进水孔35,外管设有出水孔36;进水孔35和出水孔36错开设置;渗透检查井1顶端开口、底端封闭;As shown in Figures 4 to 5, the rainwater pipe 3 includes an inner tube 31 and an outer tube 32; an inner cavity 33 is provided between the inner tube 31 and the outer tube 32; a support frame 34 is provided in the inner cavity 33; The water hole 35, the outer pipe is provided with a water outlet hole 36; the water inlet hole 35 and the water outlet hole 36 are arranged in a staggered manner; the top end of the penetration inspection well 1 is open and the bottom end is closed;

如图2所示,该渗透检查井1的井口设有截污筐11;用于截留较大杂质,避免杂质堵塞管道;截污筐11四周设有过滤孔12;截污筐11的顶端设置有井盖13,井盖13设置有流水孔14;渗透检查井1底端固定设置在稳定座15上;渗透检查井1的进水口16的高度低于出水口17的高度;进水口16下部四周设有渗透孔18;渗透检查井1外壁四周设有横向加强筋19和竖向加强筋20;渗透检查井1置于第一碎石层6和第一粗砂层7组成的垫层内;第一碎石层6和第一粗砂层7之间设有第一土工布8;第一碎石层6和第一土工布8位于进水口16的下缘。As shown in Figure 2, the wellhead of the penetration inspection well 1 is provided with an interception basket 11; it is used to intercept larger impurities and prevent impurities from clogging the pipeline; filter holes 12 are provided around the interception basket 11; the top of the interception basket 11 is arranged There is a well cover 13, and the well cover 13 is provided with a flow hole 14; the bottom of the penetration inspection well 1 is fixedly arranged on the stable seat 15; the height of the water inlet 16 of the penetration inspection well 1 is lower than the height of the water outlet 17; There are permeation holes 18; the outer wall of the permeation inspection well 1 is provided with transverse reinforcement ribs 19 and vertical reinforcement ribs 20; the permeation inspection well 1 is placed in the cushion layer composed of the first gravel layer 6 and the first coarse sand layer 7; A first geotextile 8 is arranged between a gravel layer 6 and the first coarse sand layer 7 ; the first gravel layer 6 and the first geotextile 8 are located at the lower edge of the water inlet 16 .

为了更便于渗漏,该渗透检查井1、汇水井2和雨水管3的四周设有渗漏层9;渗漏层9由内向外依次由第二碎石层91、土工布渗透层92、粗砂垫层93组成。In order to be more convenient for leakage, a leakage layer 9 is provided around the seepage inspection well 1, the catchment well 2 and the rainwater pipe 3; The sand cushion layer 93 is composed.

进一步地,储存渗透模块5从上到下设置有种植土层51、第二粗砂层52、第二土工布53、土工格栅54、砾石和粗砂混合层55和第三土工布56;当降雨强度较大时,储存渗透结构中可暂时储存一定量的雨水,待降雨结束后逐渐渗入地下,进一步减少了雨水地表流量和市政雨水管网的压力,实现了雨水最大限度地被截留并快速渗透到地下。Further, the storage infiltration module 5 is provided with a planting soil layer 51, a second coarse sand layer 52, a second geotextile 53, a geogrid 54, a gravel and coarse sand mixed layer 55, and a third geotextile 56 from top to bottom; When the rainfall intensity is high, a certain amount of rainwater can be temporarily stored in the storage infiltration structure, and gradually infiltrate into the ground after the rainfall ends, further reducing the surface flow of rainwater and the pressure of the municipal rainwater pipe network, and realizing the maximum interception of rainwater and rapid penetrate into the ground.

为了便于雨水管3排水和避免堵塞,出水孔36设有锥形体37,锥形体37的顶端设有通孔(图中未画出来);通过锥形体37的设置,减少外部泥沙进入内腔33,同时内腔33内的泥沙可排出内腔33。In order to facilitate drainage of the rainwater pipe 3 and avoid blockage, the outlet hole 36 is provided with a cone 37, and the top of the cone 37 is provided with a through hole (not shown in the figure); through the setting of the cone 37, the external silt can be reduced from entering the inner cavity 33 , and the silt in the inner cavity 33 can be discharged from the inner cavity 33 at the same time.

以上结合附图对本实用新型的实施方式作了详细说明,但本实用新型不限于所描述的实施方式。对于本领域的技术人员而言,在不脱离本实用新型原理和精神的情况下,对这些实施方式进行多种变化、修改、替换和变型,仍落入本实用新型的保护范围内。The embodiments of the utility model have been described in detail above in conjunction with the accompanying drawings, but the utility model is not limited to the described embodiments. For those skilled in the art, without departing from the principle and spirit of the utility model, various changes, modifications, replacements and modifications to these embodiments still fall within the protection scope of the utility model.

Claims (6)

1. a kind of rainwater penetration system, including penetration inspection well (1), charge for remittance well (2), rain pipe (3), cistern (4) and storage Osmosis module (5);Connected by the rain pipe (3) between the penetration inspection well (1) and penetration inspection well (1);It is described to ooze The end of saturating inspection shaft (1) is connected by the rain pipe (3) with the entrance of the charge for remittance well (2);Charge for remittance well (2) go out Mouth (21) connects storage osmosis module (5) by the rain pipe (3);The bottom of the charge for remittance well (2) is arranged on described In cistern (4);The bottom of the charge for remittance well (2) is provided with apopore (22), it is characterised in that:The rain pipe (3) includes Inner tube (31) and outer tube (32);Inner chamber (33) is provided between said inner tube (31) and outer tube (32);It is provided with the inner chamber (33) Support frame (34);Said inner tube (31) is provided with inlet opening (35), and the outer tube is provided with apopore (36);The inlet opening (35) and The apopore (36) is staggered setting;Penetration inspection well (1) top end opening, bottom end closure;The penetration inspection well (1) Well head is provided with and cuts dirty basket (11);Described section of dirty basket (11) is formed around filter bores (12);The top of described section of dirty basket (11) is set There is well lid (13), the well lid (13) is provided with discharge orifice (14);Penetration inspection well (1) bottom is fixedly installed on stabilizing base (15) on;Height of the height of the water inlet (16) of the penetration inspection well (1) less than delivery port (17);The water inlet (16) Bottom is formed around permeability hole (18);Penetration inspection well (1) outer wall is formed around cross reinforcing (19) and vertical reinforcement Muscle (20);The penetration inspection well (1) is placed in the bed course of the first metalling (6) and the first coarse sands layer (7) composition;Described first The first geotextiles (8) are provided between metalling (6) and the first coarse sands layer (7);First metalling (6) and the first geotextiles (8) positioned at the lower edge of the water inlet (16).
2. rainwater penetration system according to claim 1, it is characterised in that:The penetration inspection well (1), charge for remittance well (2) and Rain pipe (3) is formed around seepage floor (9);The seepage floor (9) is from inside to outside successively by the second metalling (91), geotextiles Permeable formation (92), coarse sand bed course (93) composition.
3. rainwater penetration system according to claim 1, it is characterised in that:Storage osmosis module (5) sets from top to bottom It is equipped with plantation soil layer (51), the second coarse sands layer (52), the second geotextiles (53), GSZ (54), gravel and coarse sand mixed layer And the 3rd geotextiles (56) (55).
4. rainwater penetration system according to claim 1, it is characterised in that:The apopore (36) is provided with bullet (37), The top of the bullet (37) is provided with through hole.
5. rainwater penetration system according to claim 1, it is characterised in that:The penetration inspection well (1) and penetration inspection well The distance between (1) it is 20-30 meters;The distance between the penetration inspection well (1) and charge for remittance well (2) are 20-30 meters.
6. the rainwater penetration system according to any one of claim 1 to 5, it is characterised in that:Penetration inspection well (1) number It is 2-5 to measure, and passes sequentially through the rain pipe (3) concatenation.
CN201621305969.0U 2016-12-01 2016-12-01 rainwater infiltration system Expired - Fee Related CN206245444U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621305969.0U CN206245444U (en) 2016-12-01 2016-12-01 rainwater infiltration system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621305969.0U CN206245444U (en) 2016-12-01 2016-12-01 rainwater infiltration system

Publications (1)

Publication Number Publication Date
CN206245444U true CN206245444U (en) 2017-06-13

Family

ID=59004630

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621305969.0U Expired - Fee Related CN206245444U (en) 2016-12-01 2016-12-01 rainwater infiltration system

Country Status (1)

Country Link
CN (1) CN206245444U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107905263A (en) * 2018-01-09 2018-04-13 苏交科集团股份有限公司 A kind of inspection shaft is from discharge structure
CN107938807A (en) * 2018-01-05 2018-04-20 广东中科华冉智网科技有限公司 Ooze storage row's rainwater piping lane and construction method
CN108193758A (en) * 2018-03-15 2018-06-22 郑州市市政工程总公司 Sponge urban road receives drainage structure
CN117027144A (en) * 2023-08-18 2023-11-10 北京市市政工程设计研究总院有限公司 A rainwater drainage system and rainwater drainage method

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107938807A (en) * 2018-01-05 2018-04-20 广东中科华冉智网科技有限公司 Ooze storage row's rainwater piping lane and construction method
CN107938807B (en) * 2018-01-05 2023-09-26 中国瑞林工程技术股份有限公司东莞分公司 Seepage, storage and drainage rainwater pipe gallery and construction method
CN107905263A (en) * 2018-01-09 2018-04-13 苏交科集团股份有限公司 A kind of inspection shaft is from discharge structure
CN107905263B (en) * 2018-01-09 2024-03-15 苏交科集团股份有限公司 Inspection shaft is from drainage structures
CN108193758A (en) * 2018-03-15 2018-06-22 郑州市市政工程总公司 Sponge urban road receives drainage structure
CN108193758B (en) * 2018-03-15 2024-01-09 郑州市市政工程总公司 Sponge city road collection and drainage structure
CN117027144A (en) * 2023-08-18 2023-11-10 北京市市政工程设计研究总院有限公司 A rainwater drainage system and rainwater drainage method

Similar Documents

Publication Publication Date Title
CN202017223U (en) Rain collection and permeation recharging device
CN103643612B (en) Shallow grass ditch and the manufacture method of shallow grass ditch
CN203546888U (en) Infiltration type rainwater filter well
CN103088897A (en) Green community impact resistance rainwater ecological utilization system
CN205100360U (en) Urban road rainwater holds stagnant structure
CN201539012U (en) Infiltration-drainage pipe duct for comprehensive utilization of rainwater
CN102531282A (en) Device and method for quality-based rainwater collection, treatment and utilization
CN206245444U (en) rainwater infiltration system
CN202450610U (en) Rainwater-collecting and contaminant-intercepting system for environment-friendly residential building
CN203782519U (en) Shallow grass ditch
CN217460855U (en) Ecological tree pool system for intercepting rainwater surface runoff pollutants
CN205822415U (en) A kind of catch-basin
CN104499560A (en) Combined rainwater seepage well and construction method
CN102086658B (en) Permeation and drainage pipe duct for comprehensively utilizing rainwater
CN205124593U (en) Irrigate infiltration pipe and be used for ecological water conservation irrigation system who resumes of side slope
CN204898828U (en) Rainwater conserves - restores integrative device
CN207727658U (en) A kind of processing system with rainwater-collecting, storage and reverse osmosis
CN106400946A (en) Water storage structure capable of improving moisture content in underground soil of urban street trees
CN206545257U (en) A kind of novel greening band water storage structure
CN107354990A (en) A kind of storage for roadside oozes net row's type rainwater reuse device
CN104975644B (en) Special pipe storage system for road initial rainwater
CN204608941U (en) A kind of rainwater is is comprehensively regulated and stored application system
CN109024831A (en) A kind of hollow cell system of biology for rainwater infiltration and purification
CN216739927U (en) A Drainage Connection Structure Based on Ecological Tree Pond
CN214461066U (en) Multistage retaining sponge facility

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170613