A kind of mounting tool of roof large span large-diameter pipeline Download PDFInfo
- Publication number
- CN206000178U CN206000178U CN201620931090.0U CN201620931090U CN206000178U CN 206000178 U CN206000178 U CN 206000178U CN 201620931090 U CN201620931090 U CN 201620931090U CN 206000178 U CN206000178 U CN 206000178U
- Authority
- CN
- China
- Prior art keywords
- roof
- truss
- portal frame
- pipeline
- pipelines
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn - After Issue
Links
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
This utility model is related to a kind of mounting tool of roof large span large-diameter pipeline, including truss, guiding carrying roller, portal frame and electric block, described portal frame is the rectangular frame structure being made up of I-steel, and this portal frame is arranged on roof, described electric block is arranged at the top of portal frame, described truss is arranged on roof through portal frame, described guiding carrying roller includes base and 2 running rollers for consigning pipeline, described base is fixedly installed on truss, 2 described running rollers are respectively arranged at base two ends, and the distance between this 2 running rollers is less than pipe diameter, described truss passes through the support of pipelines on roof, and 2 described running rollers are higher than the support of pipelines on roof, described roof is located at and offers hoisting port at portal frame.On this utility model solves the problems, such as large-span industrial building and periphery cannot be stood roof that crane lifted, pipeline maintenance is installed, and no affects on producing under Factory Building.
Description
Technical field
This utility model is related to a kind of mounting tool of pipeline, particularly a kind of installation of roof large span large-diameter pipeline
Frock.
Background technology
At present large-diameter pipeline is substantially and is arranged on ground or underground, but some units are to need major diameter
Gas piping be arranged in factory roof, now pipeline engineering construction in usually need leaping over obstacles pipe laying, or
Even if person also cannot reach Pipe installing position using large tonnage crane, existing method be made by truss installed although
A part of problem can be solved, but for high-altitude group on roof to installing large-diameter pipeline, still have some problems can not solve, than
As truss itself cannot be mounted directly with crane, how to carry out field assembly, the installation of truss itself, roof system construction loads
Restriction, roof height is big, and the installation cost at the frock initial stage such as truss is higher.
Utility model content
The technical problems to be solved in the utility model is:One kind is provided to be arranged on roof dedicated for by large-diameter pipeline
The mounting tool of roof large span large-diameter pipeline and installation method.
Solve above-mentioned technical problem technical scheme be:A kind of mounting tool of roof large span large-diameter pipeline, including
Truss, guiding carrying roller, portal frame and electric block, described portal frame is the rectangular frame structure being made up of I-steel, and should
Portal frame is arranged on roof, and described electric block is arranged at the top of portal frame, and described truss passes through portal frame to arrange
On roof, the quantity of described guiding carrying roller is multiple and be fixedly installed on truss along truss, described guiding carrying roller bags
Include base and 2 running rollers for consigning pipeline, described base is fixedly installed on truss, and 2 described running rollers set respectively
The distance being placed between base two ends, and this 2 running rollers is less than pipe diameter, and described truss passes through the support of pipelines on roof,
And 2 described running rollers are higher than the support of pipelines on roof, described roof is located at and offers hoisting port at portal frame.
Further technical scheme of the present utility model is:Described truss is that 2 single truss structures are parallel installs the square constituting
Shape structure, the support of pipelines on described roof be provided with for single truss structure sliding install steel wire rope.
2 described running rollers are symmetricly set on base respectively in an inclined manner.
Also include cable wind rope and the bottle gouard moved by hands for movement pipeline, described cable wind rope one end is fixedly installed on portal frame
On, the other end is fixedly installed on roof.
Described portal frame lower end is fixed on the honeycomb purlin on roof, and described truss is fixed on the pipeline on roof
On support.
Due to adopting technique scheme, a kind of mounting tool of roof large span large-diameter pipeline of this utility model,
Have the advantages that:
1. this utility model opens up hoisting port on the roof of Factory Building, then passes through crane in Factory Building by material from lifting
Mouth is delivered on roof and is set up portal frame and truss, is then transported to roof pipeline from hoisting port by electric block segmentation
And by pipeline be placed on guiding carrying roller running roller on and carry out assembly welding, by guide carrying roller on running roller can conveniently hold
Pipeline and movement pipeline, pipeline removes running roller after moving to installation site can complete to install Pipe installing the pipe on roof
On road support.This utility model is easy for installation, improves installation effectiveness, reduces cost, solves large-span industrial building and periphery no
The problem that on the roof that method station crane is lifted, pipeline maintenance is installed, and no affect on producing under Factory Building, take tubing
Downtime is few it is only necessary to reserved joint treats that Pipe installing finishes meets and discusses, and shutdown loss is greatly decreased.This utility model is special
It is not applied to the gas piping that major diameter is installed on factory roof.
2. this utility model pass through the hoisting port that opens up on roof by required build material and transport to built on roof,
Then pass through to be provided on the support of pipelines on roof what single truss structure sliding was installed steel wire rope truss is moved and
Install, simple, solve the problems, such as that truss itself cannot be mounted directly with crane.
3. the portal frame lower end in this utility model is fixed on the honeycomb purlin on roof, and truss two ends are fixed on roof
On support of pipelines on, truss along conduit axis arrange, carry out the transmission of power using truss, by the weight of pipeline and construction lotus
Load is distributed on support of pipelines, solves the problems, such as that roof Local Loads exceed construction and allow load.Solid by cable wind rope one end
It is scheduled on gantry top of the trellis, the other end is fixed on roof, prevent portal frame from producing excessive swing,
Below, a kind of roof large span large-diameter pipeline to this utility model in conjunction with Figure of description and specific embodiment
The technical characteristic of mounting tool be further described.
Brief description
Fig. 1:A kind of mounting tool structural representation of the roof large span large-diameter pipeline of this utility model.
In above-mentioned accompanying drawing, each label declaration is as follows:
1- truss, 2- guiding carrying roller, 3- truss sliding installation steel wire rope, 4- cable wind rope, 5- portal frame, 6- electric block,
7- hoisting port, 8- pipeline.
Specific embodiment
A kind of mounting tool of roof large span large-diameter pipeline, including truss, guiding carrying roller, portal frame, electric block,
Cable wind rope and the bottle gouard moved by hands for movement pipeline, described portal frame is the rectangular frame structure being made up of I-steel, and should
Portal frame is vertically arranged on roof, and described electric block is arranged at the top of portal frame, and described portal frame lower end is fixed
On the honeycomb purlin on roof.Described cable wind rope one end is fixed on portal frame, and the other end of this cable wind rope is fixed on room
On top, described cable wind rope arranges 4 altogether, is respectively arranged on four drift angles of portal frame, prevents portal frame from producing excessive
Swing.Described truss is that 2 single truss structures are parallel installs the rectangular configuration constituting, and the support of pipelines on described roof is provided with use
In single truss structure sliding install steel wire rope, could be moved on roof by this steel wire rope truss and install, described
2 single truss structures between distance be less than pipe diameter, described single truss structure is to be made up of top boom, lower boom and web member,
Described truss is horizontally placed on roof through portal frame, and the quantity of described guiding carrying roller is multiple and sets along truss fixation
Be placed on truss, by this guiding carrying roller convenient pipeline is supported, group is to, mobile and install, described guiding carrying roller bag
Include base and 2 running rollers for consigning pipeline, described base is I-steel, and described base is fixedly installed on truss,
2 described running rollers are respectively arranged at base two ends and constitute support rail for holding pipeline, and 2 described running rollers are respectively to incline
Tiltedly mode is symmetricly set on base, and that is, the distance between this 2 running roller lower ends is less than the distance between upper end, conveniently holds pipeline,
And the distance between this 2 running rollers is less than pipe diameter, when dragging pipeline, this pipeline moves along truss under the guiding of running roller, side
Just pipeline is assembled, described truss passes through the support of pipelines on roof, and 2 described running rollers are higher than the pipe on roof
Road support, conveniently directly removing running roller after Pipe installing is good can be so that pipeline be fallen on support of pipelines, need not be again to pipeline
Move, reduces cost, described truss is fixed on the support of pipelines on roof, and the support of pipelines on roof is original
Support, carries out the transmission of power using truss, solves the problems, such as that roof Local Loads exceed construction and allow load.Described hoisting port
It is opened in roof immediately below portal frame, conveniently transport to material on roof.Width between described truss is institute's pipe laying
0.6~0.75 times of diameter, truss depth is equal to the width between truss.Such as certain steel plant's converter roof pipeline to be installed
Interior diameter is DN1700, and between support of pipelines, distance is 18m and 24m, duct length 172m, factory building height 40m, Factory Building length
300m, and be Multispans continuous structure, periphery cannot be stood crane.Now Pipe installing can be carried out using this utility model, if
Meter truss, truss depth is 1.2m, and the distance between two truss structures are 1.2m, and each bar cross section of truss passes through to calculate, institute
Stating guiding carrying roller is 4~6m along truss longitudinal pitch, and the longitudinal pitch guiding carrying roller below portal frame is 2m, and guiding carrying roller will
It is arranged in panel point, the installation of pipeline after end joist is installed, can be carried out, pipeline is divided into the pipeline section of 5m length.
A kind of installation method of roof large span large-diameter pipeline, comprises the steps:The roof of Factory Building opens up and hangs
Then material is delivered to roof from hoisting port by crane in Factory Building and is set up portal frame, then use portal frame again by dress mouth
Lifting material sets up truss and lifting pipeline, and described portal frame lower end is fixed on the honeycomb purlin on roof, described purlin
Frame is fixed on the support of pipelines on roof, and the support of pipelines on roof is original support.Described portal frame passes through guy
Rope is fixed, and described cable wind rope one end is fixed on portal frame, and the other end is fixed on roof, and described cable wind rope arranges 4 altogether
Root, is respectively arranged on four drift angles of portal frame, prevents portal frame from producing excessive swing.The top of portal frame is arranged
Electric block, electric block is used for truss hoisting material and pipeline etc., and hoisting port is opened on roof, is alignd with portal frame, and under
Accessible in square Factory Building, all construction materials are all transported on roof by this hoisting port.Described truss is worn at hoisting port
Cross portal frame, two ends are fixed on the support of pipelines on roof, guiding carrying roller is set up on truss, the quantity of this guiding carrying roller is many
Individual and be fixedly installed on truss along truss, described guiding carrying roller is provided with the running roller for consigning pipeline, and described
Running roller is higher than the support of pipelines on roof, then by duct segments, is transported the first segment pipe from hoisting port by electric block
It is placed on the running roller of guiding carrying roller on roof and by pipeline, and manually this segment pipe is moved out along truss by calabash
Portal frame, then by electric block, the second segment pipe is transported on roof and pipeline is placed on guiding carrying roller, then will
Second segment pipe is welded with first paragraph Tube formation, in this way pipeline is all transported on roof and is assembled, works as pipe
Running roller on delivery pipeline is directly removed after all installing by road, and now pipeline just can take the support of pipelines on roof
On complete install, finally the hoisting port opening up in factory roof is filled up.
Described truss is that 2 single truss structures are parallel installs the rectangular configuration constituting, and the support of pipelines on described roof sets
Have for single truss structure sliding install steel wire rope.The installation steps of described truss are:Set up portal frame and first across purlin
After frame, with first on truss plane do platform carry out follow-up truss single Pin assembled, then outside the support of pipelines on roof
Side is installed truss sliding and is installed steel wire rope, tangles single truss structure with two pulleys, carries out sliding in place installation along the left side;Described
2 single truss structures between distance be less than pipe diameter, described single truss structure is to be made up of top boom, lower boom and web member.
Width between described truss is 0.6~0.75 times of institute's pipe laying diameter, and truss depth is equal to the width between truss.
Described guiding carrying roller includes base and 2 running rollers for consigning pipeline, and described base is I-steel, described
Base be fixedly installed on truss, 2 described running rollers are respectively arranged at base two ends and constitute the support for holding pipeline
Rail, when dragging pipeline, this pipeline moves along truss under the guiding of running roller, conveniently pipeline is assembled, and this 2 running rollers
Between distance be less than pipe diameter, 2 described running rollers are symmetricly set on base respectively in an inclined manner, i.e. this 2 running rollers
Distance between lower end is less than the distance between upper end.
Claims (5)
1. a kind of roof large span large-diameter pipeline mounting tool it is characterised in that:Including truss, guiding carrying roller, portal frame
And electric block, described portal frame is the rectangular frame structure being made up of I-steel, and this portal frame is arranged on roof, institute
The electric block stated is arranged at the top of portal frame, and described truss is arranged on roof through portal frame, described guiding carrying roller
Quantity be multiple and be fixedly installed on truss along truss, described guiding carrying roller include base and 2 be used for delivery pipe
The running roller in road, described base is fixedly installed on truss, and 2 described running rollers are respectively arranged at base two ends, and this 2 rollers
Distance between wheel is less than pipe diameter, and described truss passes through the support of pipelines on roof, and 2 described running rollers are higher than roof
On support of pipelines, described roof be located at portal frame at offer hoisting port.
2. a kind of roof according to claim 1 large span large-diameter pipeline mounting tool it is characterised in that:Described
Truss is that 2 single truss structures are parallel installs the rectangular configuration constituting, and the support of pipelines on described roof is provided with for single truss structure
Sliding install steel wire rope.
3. a kind of roof according to claim 2 large span large-diameter pipeline mounting tool it is characterised in that:Described
2 running rollers are symmetricly set on base respectively in an inclined manner.
4. a kind of roof according to claim 1 large span large-diameter pipeline mounting tool it is characterised in that:Also include
Cable wind rope and the bottle gouard moved by hands for movement pipeline, described cable wind rope one end is fixedly installed on portal frame, and the other end is fixed
It is arranged on roof.
5. a kind of roof according to claim 1 large span large-diameter pipeline mounting tool it is characterised in that:Described
Portal frame lower end is fixed on the honeycomb purlin on roof, and described truss is fixed on the support of pipelines on roof.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620931090.0U CN206000178U (en) | 2016-08-24 | 2016-08-24 | A kind of mounting tool of roof large span large-diameter pipeline |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620931090.0U CN206000178U (en) | 2016-08-24 | 2016-08-24 | A kind of mounting tool of roof large span large-diameter pipeline |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206000178U true CN206000178U (en) | 2017-03-08 |
Family
ID=58196955
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620931090.0U Withdrawn - After Issue CN206000178U (en) | 2016-08-24 | 2016-08-24 | A kind of mounting tool of roof large span large-diameter pipeline |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206000178U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106121234A (en) * | 2016-08-24 | 2016-11-16 | 广西壮族自治区冶金建设公司 | The mounting tool of a kind of roof large span large-diameter pipeline and installation method |
CN111536306A (en) * | 2020-04-17 | 2020-08-14 | 中联重科股份有限公司 | Pipe fitting assembling method of pumping equipment and pumping equipment |
-
2016
- 2016-08-24 CN CN201620931090.0U patent/CN206000178U/en not_active Withdrawn - After Issue
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106121234A (en) * | 2016-08-24 | 2016-11-16 | 广西壮族自治区冶金建设公司 | The mounting tool of a kind of roof large span large-diameter pipeline and installation method |
CN106121234B (en) * | 2016-08-24 | 2018-05-04 | 广西壮族自治区冶金建设公司 | A kind of mounting tool and installation method of roof large span large-diameter pipeline |
CN111536306A (en) * | 2020-04-17 | 2020-08-14 | 中联重科股份有限公司 | Pipe fitting assembling method of pumping equipment and pumping equipment |
CN111536306B (en) * | 2020-04-17 | 2021-11-30 | 中联重科股份有限公司 | Pipe fitting assembling method of pumping equipment and pumping equipment |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106121234B (en) | A kind of mounting tool and installation method of roof large span large-diameter pipeline | |
CN100557168C (en) | A kind of method for high altitude installation of large span steel truss | |
CN103633583B (en) | Bridge running line method under cable based on combined type running line cage | |
CN103123016B (en) | Construction method for laying gas pipelines along bridge | |
CN206000178U (en) | A kind of mounting tool of roof large span large-diameter pipeline | |
CN102720432A (en) | Self-propelled underground boring jumbo | |
CN204083499U (en) | Long distance sealed tube corridor interior conduit installs transmission positioning apparatus | |
CN110510527A (en) | Installation system of high slope variable cross-section slope precast block and construction method thereof | |
CN108343783B (en) | The installation method and hanging apparatus of high-altitude large-diameter pipeline under complex environment | |
CN203187333U (en) | Light carrying device for building block installment | |
CN104627849B (en) | Hoisting equipment and hoisting method for hoisting inner courtyard pipeline | |
CN108221512A (en) | Adjustable track laying machine | |
CN102182181B (en) | Device for lowering anchor cable | |
CN206986644U (en) | A kind of tunnel track simply removes device | |
CN204022201U (en) | A kind of weight-lifting equipment for vertical transport | |
CN213015280U (en) | Movable material loading platform | |
CN203334186U (en) | A wheel type device for cable-stayed bridge floor press anchoring | |
CN204376311U (en) | The heavy electric power cable high-altitude of lifting formula is handed over across unfolding device | |
CN103486330B (en) | Either inside high-altitude pipeline mounting construction method | |
CN203656365U (en) | Combination-type transition cable leading cage based on cable leading towards lower bridge surface | |
CN203581022U (en) | GIS (geographic information system) equipment conveying device | |
CN210794552U (en) | Net rack color steel plate profiling rapid conveying device | |
CN212198198U (en) | Pipeline installation device in crane beam | |
CN103629438B (en) | Based on the built-up type transition running line cage of bridge running line under cable | |
CN112377672A (en) | Old factory dust removal pipeline reconstruction and installation method and special pipeline moving and hoisting device thereof |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
AV01 | Patent right actively abandoned |
Granted publication date: 20170308 Effective date of abandoning: 20180504 |
|
AV01 | Patent right actively abandoned |