CN112377672A - Old factory dust removal pipeline reconstruction and installation method and special pipeline moving and hoisting device thereof - Google Patents

Old factory dust removal pipeline reconstruction and installation method and special pipeline moving and hoisting device thereof Download PDF

Info

Publication number
CN112377672A
CN112377672A CN202010564336.6A CN202010564336A CN112377672A CN 112377672 A CN112377672 A CN 112377672A CN 202010564336 A CN202010564336 A CN 202010564336A CN 112377672 A CN112377672 A CN 112377672A
Authority
CN
China
Prior art keywords
pipeline
dust removal
trolley
installing
movable
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202010564336.6A
Other languages
Chinese (zh)
Inventor
马松宝
孙树成
王凤杰
于国成
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China 22MCC Group Corp Ltd
Original Assignee
China 22MCC Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China 22MCC Group Corp Ltd filed Critical China 22MCC Group Corp Ltd
Priority to CN202010564336.6A priority Critical patent/CN112377672A/en
Publication of CN112377672A publication Critical patent/CN112377672A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L1/00Laying or reclaiming pipes; Repairing or joining pipes on or under water
    • F16L1/024Laying or reclaiming pipes on land, e.g. above the ground
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C13/00Other constructional features or details
    • B66C13/04Auxiliary devices for controlling movements of suspended loads, or preventing cable slack
    • B66C13/08Auxiliary devices for controlling movements of suspended loads, or preventing cable slack for depositing loads in desired attitudes or positions
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C19/00Cranes comprising trolleys or crabs running on fixed or movable bridges or gantries
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C5/00Base supporting structures with legs
    • B66C5/02Fixed or travelling bridges or gantries, i.e. elongated structures of inverted L or of inverted U shape or tripods

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The invention provides a method for reconstructing and installing a dust removal pipeline of an old factory building, which comprises the following steps: laying pipeline trolley steel rails and movable portal steel rails on the roof girders; respectively installing the pipeline trolley and the movable portal frame on the steel rail; hoisting the dust removal pipeline to the pipeline trolley and fixing; installing a winch at the end of a steel rail on the inner side of the roof girder, arranging a steel wire rope, and respectively dragging the pipeline trolley and the movable portal to a position to be installed; the special pipeline moving and hoisting device for the installation method comprises a pipeline trolley for transporting the dust removal pipe and a moving portal frame for lifting the dust removal pipe, wherein the pipeline trolley is fixedly provided with the dust removal pipe, and four upright posts of the moving portal frame are separated from the periphery of the pipeline trolley; the top of the upright post is provided with a top frame, the middle of the top frame is also provided with a supporting beam, and the supporting beam is provided with a chain block and a chain block; the two ends of the supporting beam are arranged on the top frame through the sliding structure, and the dust removal pipe solves the problem of installation of the dust removal pipe in a narrow space.

Description

Old factory dust removal pipeline reconstruction and installation method and special pipeline moving and hoisting device thereof
Technical Field
The invention belongs to a construction method for installing a dust removal pipeline, and particularly relates to a method for installing a pipeline in a reconstruction project of a dust removal pipeline of an old factory building and a special hoisting device thereof.
Background
The span of the industrial factory building is large, the hoisting moment is long, and the longitudinal depth is large. The dust removal pipeline installation during the industrial factory building construction, consequently there is sufficient construction space, and the new-built factory building alternates with the installation pipeline of factory building and is under construction in step, adopts large-scale crane to hoist the pipeline and targets in place.
When the dust removal pipeline needs to be technically transformed or the dust removal pipe is additionally arranged for an completed factory building or an old factory building, only hoisting equipment can be arranged outside the factory building, but even if a large crane is used, the hoisting moment cannot meet the requirement of a large-span factory building. In addition, the space of the old factory building is small, and the pipeline cannot be directly hoisted into the factory building by the crane.
Therefore, when meeting the engineering that some factory buildings need technical transformation because of environmental protection and not meeting requirements, insisting on the difficulty of installing pipelines by adopting a large crane or a tower crane and installing the pipelines by assembly, the engineering can hardly be implemented, and the construction of the dust removal pipeline transformation of the old factory buildings becomes the technical problem in the field.
Disclosure of Invention
The invention provides a method for installing a dust removal pipeline for an old factory building or a completed factory building, which aims to solve the problem that the reconstruction, installation and implementation of the dust removal pipe for the old factory building are difficult in the prior art.
In order to achieve the purpose, the technical scheme provided by the invention is as follows:
a method for reconstructing and installing a dust removal pipeline of an old factory building comprises the following steps:
1) laying pipeline trolley steel rails on the roof beams from outside to inside, and mounting the trolleys on the steel rails;
2) installing movable portal steel rails on two sides of the pipeline trolley steel rail, and installing the movable portal trolley on the steel rail;
3) installing a stop at the starting end of the steel rail outside the roof girder;
4) installing a winch at the end of a steel rail on the inner side of the roof girder and arranging a steel wire rope;
5) hoisting the dust removal pipeline to the pipeline trolley and fixing;
6) the pipeline trolley is pulled to a position to be installed through a winch; the movable gantry is pulled to a position where the pipeline trolley stops;
7) and a chain block is arranged on the movable door frame, the dust removal pipeline is lifted to the designed height, and the pipeline is fixed and assembled.
The method can be used for installing pipelines at the top of the old factory building and can also be used in construction environments with narrow actual space and limited hoisting of cranes, and the method is high in applicability and high in construction safety. The problem that a large crane cannot stand due to the fact that a site is narrow can be solved.
The pipeline moving and hoisting device special for the installation method comprises a pipeline trolley used for transporting the dust removal pipe and a moving portal used for lifting the dust removal pipe, wherein the pipeline trolley comprises a supporting plate and rollers, the two sides and the front end of the supporting plate are provided with binding belt fixing points, and the rear end of the supporting plate is provided with a handrail; the movable portal frame comprises four upright posts, the bottoms of the four upright posts are respectively provided with a roller, and the four upright posts are respectively arranged around the pipeline trolley; the top of the upright post is provided with a top frame, the middle of the top frame is also provided with a supporting beam, and the supporting beam is provided with a chain block and a chain block; and two ends of the supporting beam are arranged on the top frame through a sliding structure.
Furthermore, the pipeline trolley and the movable portal frame are of a movable structure which is assembled into a whole through a connecting beam.
Drawings
FIG. 1 is a top view of the pipeline trolley and the movable gantry of the present invention installed at the beginning of a rail;
FIG. 2 is an elevation view of the installation and construction state of the pipeline trolley and the movable portal;
FIG. 3 is a view showing the positions of the pipeline trolley and the movable gantry;
FIG. 4 is a view showing a depression angle at the installation position of the pipeline trolley and the movable gantry;
fig. 5 is a perspective view of the moving gantry.
Detailed Description
The technical scheme of the invention is clearly, specifically and completely described in the following with reference to the accompanying drawings.
With reference to the attached drawings 1-2, a method for modifying and installing a dust removal pipeline of an old factory building comprises the following steps:
1) laying a pipeline trolley steel rail 3 on the roof girder 8 from outside to inside, and installing a pipeline trolley 6 on the pipeline trolley steel rail 3;
2) installing moving portal steel rails 4 on two sides of a pipeline trolley steel rail 3, and installing moving portals 5 on the moving portal steel rails 4;
3) installing a stop at the starting end of the steel rail outside the roof girder 8;
4) the end of the steel rail is provided with a winch 1 and a steel wire rope 2 on the inner side of the roof girder;
5) the dust removal pipeline 7 is hoisted to the pipeline trolley 6 and fixed;
6) the pipeline trolley 6 is pulled to a position to be installed through the winch 1; the moving gantry 5 is drawn to the position where the pipeline trolley 6 is stopped;
7) and a chain block 10 is arranged on the movable portal 5, the dust removal pipeline 7 is lifted to the designed height by adopting the chain block, and the pipeline is fixed and assembled.
The pipeline trolley steel rail 3 and the movable portal steel rail 4 can use the same specification rail, and the pipeline is installed by adopting the trolley and the movable portal, so that the problems that a large crane cannot stand and hoist, the construction period of a tower crane is long, the cost is high, and the construction difficulty of environmental protection transformation of an old factory building is well solved.
In the installation method, the pipeline trolley 6 and the movable portal 5 can be simultaneously moved by the winch 1.
As shown in fig. 3 to 5, the pipe trolley 6 of the present invention includes a support plate 61 and rollers, wherein the two sides and the front end of the support plate 61 are provided with binding belt fixing points, and the rear end of the support plate 61 is provided with a handrail 62. The moving gantry 5 comprises four upright posts 53, rollers are mounted at the bottoms of the four upright posts 53, the four upright posts 53 are separated around the pipeline trolley 6, a top frame 52 is arranged at the tops of the four upright posts 53, a supporting beam 51 is further arranged in the middle of the top frame 52, a chain block and a chain block are mounted on the supporting beam 51, sliding structures can be designed at two ends of the supporting beam 51, and the sliding structures are mounted on the top frame to realize supporting position adjustment.
Further, the pipeline trolley 6 and the movable portal 5 are designed into an integrated movable structure. The two can be assembled together by coupling beams.
The invention has the beneficial effects that: (1) the problems that the site of an old factory area is narrow and small, and a large-scale crane cannot stand and lift are solved. (2) Simple construction, low cost, high safety and short construction period. (3) And a small crane can meet the construction requirements.

Claims (3)

1. A method for reconstructing and installing a dust removal pipeline of an old factory building comprises the following steps:
1) laying pipeline trolley steel rails on the roof beams from outside to inside, and mounting the trolleys on the steel rails;
2) installing movable portal steel rails on two sides of the pipeline trolley steel rail, and installing the movable portal trolley on the steel rail;
3) installing a stop at the starting end of the steel rail outside the roof girder;
4) installing a winch at the end of a steel rail on the inner side of the roof girder and arranging a steel wire rope;
5) hoisting the dust removal pipeline to the pipeline trolley and fixing;
6) the pipeline trolley is pulled to a position to be installed through a winch; the movable gantry is pulled to a position where the pipeline trolley stops;
7) and a chain block is arranged on the movable door frame, the dust removal pipeline is lifted to the designed height, and the pipeline is fixed and assembled.
2. The special pipeline moving and hoisting device for the old factory dust removal pipeline reconstruction and installation method comprises a pipeline trolley for transporting the dust removal pipe, and is characterized in that: the pipeline trolley comprises a supporting plate and rollers, binding belt fixing points are arranged on two sides and the front end of the supporting plate, and a handrail is arranged at the rear end of the supporting plate; the movable portal frame comprises four upright posts, the bottoms of the four upright posts are respectively provided with a roller, and the four upright posts are respectively arranged around the pipeline trolley; the top of the upright post is provided with a top frame, the middle of the top frame is also provided with a supporting beam, and the supporting beam is provided with a chain block and a chain block; and two ends of the supporting beam are arranged on the top frame through a sliding structure.
3. The special pipeline moving and hoisting device for the old factory building dedusting pipeline reconstruction and installation method according to claim 2, which is characterized in that: the pipeline trolley and the movable portal frame are of a movable structure which is assembled into a whole through a connecting beam.
CN202010564336.6A 2020-06-19 2020-06-19 Old factory dust removal pipeline reconstruction and installation method and special pipeline moving and hoisting device thereof Pending CN112377672A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010564336.6A CN112377672A (en) 2020-06-19 2020-06-19 Old factory dust removal pipeline reconstruction and installation method and special pipeline moving and hoisting device thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010564336.6A CN112377672A (en) 2020-06-19 2020-06-19 Old factory dust removal pipeline reconstruction and installation method and special pipeline moving and hoisting device thereof

Publications (1)

Publication Number Publication Date
CN112377672A true CN112377672A (en) 2021-02-19

Family

ID=74586350

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010564336.6A Pending CN112377672A (en) 2020-06-19 2020-06-19 Old factory dust removal pipeline reconstruction and installation method and special pipeline moving and hoisting device thereof

Country Status (1)

Country Link
CN (1) CN112377672A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113982100A (en) * 2021-11-11 2022-01-28 防城港中一重工有限公司 Overall sliding installation method for steel gallery in complex environment

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN203112447U (en) * 2013-03-11 2013-08-07 中交天航滨海环保浚航工程有限公司 Detachable type gantry groove orbit pipe transporting machine for mud-removing pipeline
CN205526359U (en) * 2016-01-29 2016-08-31 中民筑友有限公司 Prefab conveyer
CN205574939U (en) * 2016-01-29 2016-09-14 中民筑友有限公司 Prefab conveyer
CN107842648A (en) * 2017-11-30 2018-03-27 湖北天圜工程有限公司 A kind of long distance pipeline steep slope region stringing mechanism
CN111173305A (en) * 2019-12-14 2020-05-19 中冶天工集团有限公司 Sliding device for dust removal pipeline with newly increased diameter in old factory building in narrow space and using method
CN210566648U (en) * 2019-07-22 2020-05-19 中建三局集团有限公司 Installation device for directional sliding of large pipeline in limited space
CN212251443U (en) * 2020-06-19 2020-12-29 中国二十二冶集团有限公司 Special pipeline of old factory building dust removal pipeline transformation installation removes hoist device

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN203112447U (en) * 2013-03-11 2013-08-07 中交天航滨海环保浚航工程有限公司 Detachable type gantry groove orbit pipe transporting machine for mud-removing pipeline
CN205526359U (en) * 2016-01-29 2016-08-31 中民筑友有限公司 Prefab conveyer
CN205574939U (en) * 2016-01-29 2016-09-14 中民筑友有限公司 Prefab conveyer
CN107842648A (en) * 2017-11-30 2018-03-27 湖北天圜工程有限公司 A kind of long distance pipeline steep slope region stringing mechanism
CN210566648U (en) * 2019-07-22 2020-05-19 中建三局集团有限公司 Installation device for directional sliding of large pipeline in limited space
CN111173305A (en) * 2019-12-14 2020-05-19 中冶天工集团有限公司 Sliding device for dust removal pipeline with newly increased diameter in old factory building in narrow space and using method
CN212251443U (en) * 2020-06-19 2020-12-29 中国二十二冶集团有限公司 Special pipeline of old factory building dust removal pipeline transformation installation removes hoist device

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113982100A (en) * 2021-11-11 2022-01-28 防城港中一重工有限公司 Overall sliding installation method for steel gallery in complex environment

Similar Documents

Publication Publication Date Title
CN212251443U (en) Special pipeline of old factory building dust removal pipeline transformation installation removes hoist device
CN216072749U (en) Indoor track beam push type installation construction device
CN108396749B (en) Installation system and installation method of steel support in foundation pit
CN112377672A (en) Old factory dust removal pipeline reconstruction and installation method and special pipeline moving and hoisting device thereof
JP5421143B2 (en) Overhead crane installation equipment
JP2909413B2 (en) Suspension device for building exterior walls
CN110040632A (en) A kind of segmental hoisting construction method of large span section steel beam
JPH06272389A (en) Temporary unloading stage
CN210563326U (en) Overhead unit type overhead sliding splicing operation platform
CN212687392U (en) Cable crane hoisting device for bridge erection
CN111877165B (en) Bailey beam translation device in limited space and construction method thereof
JP4187445B2 (en) crane
CN210594968U (en) Sliding device for hoisting truss
CN220056126U (en) Curtain wall hoisting and installing system
CN215331380U (en) Rail type suspension platform
CN110127527B (en) Bridge crane hoisting method in limited space
CN214570326U (en) Curtain wall unit plate rail hoisting and hard protection integrated device
CN219116989U (en) Rail sliding device for hoisting high-rise building surface
CN220058910U (en) Unit type curtain wall turning lifting hoisting equipment
CN215714661U (en) Device for installing steel truss girder cable carrying channel
CN216235766U (en) High-rise building steel vestibule hoisting device
CN117645241B (en) Steel construction factory building roof component hoist device
CN215798013U (en) Reinforced concrete roof truss beam conveyor in hole
CN117886229B (en) Multifunctional integrated rail type lifting mechanism
CN211081059U (en) Hoisting device for unit plate of curtain wall with curved outer vertical surface

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination