CN102182181B - Device for lowering anchor cable - Google Patents

Device for lowering anchor cable Download PDF

Info

Publication number
CN102182181B
CN102182181B CN 201110086700 CN201110086700A CN102182181B CN 102182181 B CN102182181 B CN 102182181B CN 201110086700 CN201110086700 CN 201110086700 CN 201110086700 A CN201110086700 A CN 201110086700A CN 102182181 B CN102182181 B CN 102182181B
Authority
CN
China
Prior art keywords
spacing framework
oblique
fixed
steel pipes
anchor cable
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201110086700
Other languages
Chinese (zh)
Other versions
CN102182181A (en
Inventor
刘才华
朱玺玺
陈从新
肖国峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuhan Institute of Rock and Soil Mechanics of CAS
Original Assignee
Wuhan Institute of Rock and Soil Mechanics of CAS
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuhan Institute of Rock and Soil Mechanics of CAS filed Critical Wuhan Institute of Rock and Soil Mechanics of CAS
Priority to CN 201110086700 priority Critical patent/CN102182181B/en
Publication of CN102182181A publication Critical patent/CN102182181A/en
Application granted granted Critical
Publication of CN102182181B publication Critical patent/CN102182181B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

本发明公开了一种长重锚索下索装置,卷扬机上的钢丝绳绕过定滑轮并穿过垂向限位框架、斜向限位框架用铁丝与锚索全长绑扎并在锚索尾端固定,垂向限位框架和定滑轮用钢管固定在脚手架上,垂向限位框架和定滑轮布置在钻孔外轴线傍,在垂向限位框架后下方设置固定在脚手架上的斜向限位框架。垂向限位框架和斜向限位框架均用四根钢管搭接成口字形并在上下两根横钢管上套有套管。斜向限位框架根据钻孔口离锚索放置平台高度确定设置数量,斜向限位框架设置角度从上至下递减。钢丝绳与锚索全长绑扎并在锚索外端固定。采用垂向限位框架和定滑轮在钻孔外轴线布置,使锚索沿钻孔轴线平顺的送入,结构简单,使用方便,节省了人力资源,操作方便,下索效率高。

Figure 201110086700

The invention discloses a cable lowering device for long and heavy anchor cables. The steel wire rope on the winch goes around the fixed pulley and passes through the vertical limit frame and the oblique limit frame. Fixed, the vertical limit frame and the fixed pulley are fixed on the scaffold with steel pipes, the vertical limit frame and the fixed pulley are arranged near the outer axis of the borehole, and the oblique limit fixed on the scaffold is set below the vertical limit frame. bit frame. Both the vertical limit frame and the oblique limit frame are lapped with four steel pipes to form a zigzag shape and the upper and lower horizontal steel pipes are covered with sleeve pipes. The setting quantity of the oblique limit frame is determined according to the height of the drill hole from the anchor cable placement platform, and the setting angle of the oblique limit frame decreases from top to bottom. The wire rope is tied to the full length of the anchor cable and fixed at the outer end of the anchor cable. The vertical limit frame and the fixed pulley are arranged on the outer axis of the borehole, so that the anchor cable can be fed smoothly along the borehole axis. The structure is simple, easy to use, saves human resources, easy to operate, and high in efficiency.

Figure 201110086700

Description

一种锚索下索装置An anchor cable lowering device

技术领域 technical field

本发明涉及岩土锚固工程技术领域,更具体涉及一种锚索下索装置,用于岩土工程中锚索加固,特别用于各种大型边坡的长重锚索加固施工。 The invention relates to the technical field of geotechnical anchoring engineering, and more particularly relates to an anchor cable lowering device, which is used for anchor cable reinforcement in geotechnical engineering, especially for long and heavy anchor cable reinforcement constructions of various large-scale slopes.

背景技术 Background technique

目前锚索在岩土工程加固中得到非常广泛的应用,绝大多数采用人力方式下索,其优点是施工现场人力资源较多,操作简单,比较适用于较短、较轻锚索的下索施工,但人力下索劳动强度大,需要下索人员紧密配合,安装效率低,安全性差,特别是对于一些大型锚固工程,锚索长度达好几十米,重量多达几百公斤,采用人力方式下索所需人员众多,操作难度极大,往往造成锚索下索不到位。在矿山井下开采中应用的一种风动长锚索安装机,采用风压对锚索进行顶推下索,该方法施工费用相当高昂,施工效果一般,因此在边坡锚固工程领域得不到应用。其他下索装置一般采用一种孔底装置,利用销钉、卡条和卡槽等将孔底装置固定在孔底,采用顶拉的方式进行下索,这些顶拉下索装置结构复杂,施工稳定性差,容易出现孔底装置固定不牢等技术问题,因其实用性差而得不到推广。 At present, anchor cables are widely used in geotechnical engineering reinforcement. Most of them are lowered by manpower. The advantage is that there are more human resources on the construction site, and the operation is simple. It is more suitable for shorter and lighter anchor cables. Construction, but the labor intensity of manpower lowering the cable is high, requiring the close cooperation of the lowering personnel, low installation efficiency and poor safety, especially for some large-scale anchoring projects, the length of the anchor cable is tens of meters, and the weight is as high as several hundred kilograms. There are many people required for lowering the cable in the way, and the operation is very difficult, which often causes the anchor cable to be lowered. A wind-driven long anchor cable installation machine used in underground mining of mines uses wind pressure to push and lower the anchor cable. This method has a high construction cost and general construction effect, so it is not available in the field of slope anchoring engineering. application. Other lowering devices generally use a hole bottom device, which is fixed at the bottom of the hole by pins, clips and slots, etc., and the top pull method is used to lower the cable. These top pull and lower cable devices have complex structures and stable construction. Poor performance, easy to occur technical problems such as the hole bottom device is not firmly fixed, because of its poor practicability and can not be promoted.

发明内容 Contents of the invention

本发明的目的是在于提供了一种锚索下索装置,采用垂向限位框架和定滑轮在钻孔外轴线布置,使锚索沿钻孔轴线平顺的送入,结构简单,使用方便,节省了人力资源,操作方便,下索效率高。 The purpose of the present invention is to provide an anchor cable lowering device, which adopts a vertical limit frame and fixed pulleys arranged on the outer axis of the borehole, so that the anchor cable can be smoothly fed along the borehole axis, has a simple structure and is easy to use. It saves human resources, is convenient to operate, and has high efficiency of lowering the cable.

为了实现上述的目的,本发明采用以下技术措施: In order to achieve the above object, the present invention adopts the following technical measures:

一种锚索下索装置,它由卷扬机、钢丝绳、定滑轮、垂向限位框架、斜向限位框架、锚索、钻孔、铁丝组成。其连接关系是:卷扬机上的钢丝绳绕过定滑轮并穿过垂向限位框架、斜向限位框架用铁丝与锚索全长绑扎并在锚索尾端固定。垂向限位框架和定滑轮均用钢管固定在施工脚手架上,垂向限位框架和定滑轮布置在钻孔外轴线傍(附近),然后根据钻孔口离地面的高度设置斜向限位框架。 An anchor cable lowering device is composed of a hoist, a steel wire rope, a fixed pulley, a vertical limit frame, an oblique limit frame, an anchor cable, a drill hole, and an iron wire. Its connection relationship is: the wire rope on the winch goes around the fixed pulley and passes through the vertical limit frame, and the oblique limit frame is bound with the full length of the anchor cable with iron wire and fixed at the end of the anchor cable. Both the vertical limit frame and the fixed pulley are fixed on the construction scaffold with steel pipes, the vertical limit frame and the fixed pulley are arranged near (near) the outer axis of the borehole, and then the oblique limit is set according to the height of the borehole from the ground frame.

所述的垂向限位框架和斜向限位框架分别在水平和垂直方向相距1~2m,每个限位框架用四根钢管搭接成口字形并用扣件固定在施工脚手架上,限位框架上下两根横钢管上套有可自由滚动的套管。 The vertical spacer frame and the oblique spacer frame are separated by 1-2m in the horizontal and vertical directions respectively, and each spacer frame is lapped with four steel pipes to form a zigzag shape and fixed on the construction scaffold with fasteners. The upper and lower horizontal steel pipes of the frame are covered with free-rolling sleeves.

所述的斜向限位框架设置角度为70°左右,可根据钻孔口离锚索放置地面高度可适当增加1~2个斜向限位框架(垂直间距一般1.5~2.5m),设置角度从上至下依次递减为50°、30°,增设的斜向限位框架均固定在施工脚手架上。 The setting angle of the oblique limiting frame is about 70°, and 1~2 oblique limiting frames can be appropriately added according to the height of the drill hole from the ground where the anchor cable is placed (the vertical distance is generally 1.5~2.5m), and the setting angle Decrease to 50° and 30° from top to bottom, and the additional oblique limit frames are all fixed on the construction scaffolding.

所述的钢丝绳与锚索全长绑扎并在锚索外端固定,绑扎间距2m左右,下索过程中边下索边剪断定滑轮后绑扎钢丝绳和锚索的铁丝,即能达到连续平顺下索的目的。 The steel wire rope is tied to the full length of the anchor cable and fixed at the outer end of the anchor cable. The binding distance is about 2m. During the lowering process, the fixed pulley is cut while the cable is lowered, and the steel wire rope and the iron wire of the anchor cable are bound to achieve continuous and smooth lowering. the goal of.

所述的垂向限位框架和定滑轮设置在钻孔外轴线傍(附近)。 The vertical limit frame and the fixed pulley are arranged near (near) the outer axis of the borehole.

本发明与现有技术相比,具有以下优点和效果: Compared with the prior art, the present invention has the following advantages and effects:

采用卷扬机、钢丝绳和定滑轮进行下索,大量节省了人力成本,结构简单,操作方便且下索效率高,下索速度可控制在7~8m/min;采用垂向限位框架和斜向限位框架可有效控制下索过程中锚索向上弯曲而导致下索力损耗;采用垂向限位框架和定滑轮在钻孔外轴线傍(附近)布置,使锚索沿钻孔轴线平顺的送入。 Use hoist, steel wire rope and fixed pulley to lower the cable, which saves a lot of labor cost, simple structure, convenient operation and high efficiency of cable lowering, the speed of lower cable can be controlled at 7~8m/min; vertical limit frame and oblique limit The position frame can effectively control the cable force loss caused by the upward bending of the anchor cable during the cable lowering process; the vertical limit frame and the fixed pulley are arranged near (near) the outer axis of the drilling hole, so that the anchor cable can be sent smoothly along the drilling axis enter.

附图说明                               Description of drawings

    图1为一种锚索下索装置结构示意图。 Figure 1 is a schematic diagram of the structure of an anchor cable lowering device.

    其中: in:

             1—卷扬机(市场购置)、2—钢丝绳、3—定滑轮(市场购置)、4—垂向限位框架(现场制作,一般的技术工人不付出任何创造性劳动均能制备);5—斜向限位框架(现场制作,一般的技术工人不付出任何创造性劳动均能制备);6—锚索(现场制作,一般的技术工人不付出任何创造性劳动均能制备)、7—钻孔、8—铁丝。 1—Hoist (purchased in the market), 2—Wire rope, 3—Fixed pulley (purchased in the market), 4—Vertical limit frame (made on site, ordinary skilled workers can prepare without any creative labor); 5—Slanted Limiting frame (made on site, ordinary skilled workers can prepare without any creative labor); 6—anchor cable (made on site, ordinary skilled workers can prepare without any creative labor), 7—drilling, 8— iron wire.

具体实施方式 Detailed ways

实施例1: Example 1:

结合图1对本发明作进一步的详细说明。 The present invention will be further described in detail in conjunction with FIG. 1 .

一种锚索下索装置,它由卷扬机1、钢丝绳2、定滑轮3、垂向限位框架4、斜向限位框架5、锚索6、钻孔7、铁丝8组成。其连接关系是:卷扬机1上的钢丝绳2绕过定滑轮3并穿过垂向限位框架4、斜向限位框架5用铁丝8与锚索6全长绑扎并在锚索6尾端固定,绑扎间距2m。锚索6(一般的技术工人均能制备)制作完成后,根据钻孔7的方位确定垂向限位框架4和定滑轮3的固定位置,垂向限位框架4和定滑轮3均用钢管(附图1中未示出)固定在施工脚手架(附图1中未示出)上。然后根据钻7孔口离地面的高度设置斜向限位框架5。具体方法是从锚索6放置平台至钻孔7孔口的高度每2~3m设置一个斜向限位框架5,垂直限位框架4和斜向限位框架5上的横向钢管上均套有钢套管,其目的是消除下索过程中锚索6卡住现象并减小摩擦。启动卷扬机1拉动钢丝绳2,使锚索6依次穿过斜向限位框剪5、垂向限位框架4进入钻孔7,控制下索速度7~8m/min进行匀速下索。 An anchor cable lowering device, which is composed of a winch 1, a steel wire rope 2, a fixed pulley 3, a vertical limit frame 4, an oblique limit frame 5, an anchor cable 6, a drill hole 7, and an iron wire 8. The connection relationship is: the steel wire rope 2 on the winch 1 bypasses the fixed pulley 3 and passes through the vertical limit frame 4, and the oblique limit frame 5 is bound with the full length of the anchor cable 6 with the iron wire 8 and fixed at the end of the anchor cable 6 , binding interval 2m. After the anchor cable 6 (which can be prepared by ordinary skilled workers) is completed, the fixed positions of the vertical limit frame 4 and the fixed pulley 3 are determined according to the orientation of the drill hole 7, and the vertical limit frame 4 and the fixed pulley 3 are all made of steel pipes. (not shown in accompanying drawing 1) is fixed on the construction scaffolding (not shown in accompanying drawing 1). Then according to the height of drilling 7 apertures from the ground, the oblique limit frame 5 is set. The specific method is to set an oblique limit frame 5 every 2~3m from the platform where the anchor cable 6 is placed to the height of the hole 7, and the horizontal steel pipes on the vertical limit frame 4 and the oblique limit frame 5 are all covered with The purpose of the steel sleeve is to eliminate the phenomenon of the anchor cable 6 being stuck and reduce friction during the lowering process. Start the hoist 1 to pull the steel wire rope 2, so that the anchor cable 6 passes through the oblique limit frame 5 and the vertical limit frame 4 to enter the borehole 7, and the cable is lowered at a constant speed by controlling the lowering speed to 7-8m/min.

所述的垂向限位框架4由四根钢管和两根套管组成,分别在两根钢管上各套一根套管,并与另外两根钢管用扣件拼装成口字型垂向限位框架4,带有套管的两个钢管构成垂向限位框架的上下水平边,用扣件把垂向限位框架4固定在施工脚手架上。 Described vertical limit frame 4 is made up of four steel pipes and two sleeve pipes, respectively sets a sleeve pipe on two steel pipes, and assembles with other two steel pipes with fasteners to form a vertical limiter of mouth shape. Position frame 4, two steel pipes with sleeve pipe constitute the upper and lower horizontal sides of the vertical limit frame, and the vertical limit frame 4 is fixed on the construction scaffold with fasteners.

所述的斜向限位框架5由四根钢管和两根套管组成,分别在两根钢管上各套一根套管,并与另外两根钢管用扣件拼装成口字型斜向限位框架5,带有套管的两个钢管构成斜向限位框架的上下水平边,用扣件把斜向限位框架5固定在施工脚手架上。 The oblique limiting frame 5 is composed of four steel pipes and two sleeves, one sleeve is placed on each of the two steel pipes, and assembled with the other two steel pipes with fasteners to form a mouth-shaped oblique limiting frame 5. Position frame 5, two steel pipes with sleeve pipe constitute the upper and lower horizontal edges of the oblique position limiting frame, and the oblique position limiting frame 5 is fixed on the construction scaffold with fasteners.

所述的锚索6是指按设计要求经过下料、去皮、散索、去油、安装隔离架、紧固件、承载体、导向帽、止浆塞以及注浆管和排气管一系列工序后形成的岩土体加固受力体。 The anchor cable 6 refers to the process of blanking, peeling, loosening, degreasing, installing spacers, fasteners, bearings, guide caps, grout stoppers, grouting pipes and exhaust pipes according to the design requirements. The reinforced body of rock and soil formed after a series of processes.

Claims (6)

1. rope device under one kind long weight anchor rope, by hoist engine (1), vertical spacing framework (4), oblique spacing framework (5) and fixed pulley (3) are formed, it is characterized in that: the wire rope (2) on the hoist engine (1) is walked around fixed pulley (3) and is passed vertical spacing framework (4), oblique spacing framework (5), with iron wire with wire rope (2) and anchor cable (6) total length colligation, wire rope (2) is fixed at anchor cable (6) tail end, vertical spacing framework (4) and fixed pulley (3) are fixed on the construction scaffolding with fastener, vertical spacing framework (4) and fixed pulley (3) are arranged in by the outer axis of boring (7), according to hell (7) height overhead oblique spacing framework (5) is set
Vertical spacing framework (4) and oblique spacing framework (5) respectively in level and vertical direction at a distance of 1 ~ 2m, each spacing framework with four steel tube lappings become square shape and about two horizontal steel pipes put sleeve pipe.
2. rope device under a kind of long weight anchor rope according to claim 1, it is characterized in that: it is 70 ° that described oblique spacing framework (5) arranges angle, place ground level according to hell (7) from anchor cable (6) and increase by 1 ~ 2 oblique spacing framework (5), oblique spacing framework (5) vertical interval each other is 1.5 ~ 2.5m, the angle that arranges of 1 ~ 2 oblique spacing framework (5) of setting up is decremented to 50 °, 30 ° from top to bottom successively, and the oblique spacing framework of setting up (5) is fixed on the construction scaffolding.
3. rope device under a kind of long weight anchor rope according to claim 1 is characterized in that: described wire rope (2) is fixed on anchor cable (6) tail end, colligation spacing 2m with anchor cable (6) total length colligation and with wire rope (2).
4. rope device under a kind of long weight anchor rope according to claim 1, it is characterized in that: described vertical spacing framework (4) and fixed pulley (3) are arranged on by the outer axis of boring (7).
5. rope device under a kind of long weight anchor rope according to claim 1, it is characterized in that: described vertical spacing framework (4) is made up of four steel pipes and two sleeve pipes, on two steel pipes, respectively overlap a sleeve pipe respectively, and be assembled into the vertical spacing framework of hollow (4) with other two steel pipes with fastener, two steel pipes that have sleeve pipe constitute the horizontal sides up and down of vertical spacing framework, with fastener vertical spacing framework (4) are fixed on the construction scaffolding.
6. rope device under a kind of long weight anchor rope according to claim 1, it is characterized in that: described oblique spacing framework (5) is made up of four steel pipes and two sleeve pipes, on two steel pipes, respectively overlap a sleeve pipe respectively, and be assembled into the oblique spacing framework of hollow (5) with other two steel pipes with fastener, two steel pipes that have sleeve pipe constitute the horizontal sides up and down of oblique spacing framework, with fastener oblique spacing framework (5) are fixed on the construction scaffolding.
CN 201110086700 2011-04-07 2011-04-07 Device for lowering anchor cable Expired - Fee Related CN102182181B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201110086700 CN102182181B (en) 2011-04-07 2011-04-07 Device for lowering anchor cable

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201110086700 CN102182181B (en) 2011-04-07 2011-04-07 Device for lowering anchor cable

Publications (2)

Publication Number Publication Date
CN102182181A CN102182181A (en) 2011-09-14
CN102182181B true CN102182181B (en) 2013-09-04

Family

ID=44568458

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201110086700 Expired - Fee Related CN102182181B (en) 2011-04-07 2011-04-07 Device for lowering anchor cable

Country Status (1)

Country Link
CN (1) CN102182181B (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103541360B (en) * 2013-11-12 2015-09-30 中国水利水电第七工程局有限公司 Automation lowering anchor cable equipment
CN104047624B (en) * 2014-06-09 2016-02-10 中国葛洲坝集团三峡建设工程有限公司 A kind of anchor cable hydraulic pressure send rope device automatically
CN110397032B (en) * 2019-07-02 2024-07-02 新疆新华叶尔羌河流域水利水电开发有限公司 Auxiliary cable unloading device and method suitable for pre-stressed anchor cable of high-steep complex terrain
CN111878087A (en) * 2020-07-30 2020-11-03 中铁五局集团有限公司 Karst cave section anchor cable construction method based on karst cave underground river environment tunnel construction
CN112195941A (en) * 2020-09-18 2021-01-08 中铁隧道集团一处有限公司 Quick installation method for overlong vertical upward prestressed anchor cable of underground cave depot

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201661302U (en) * 2009-12-25 2010-12-01 中国地质科学院探矿工艺研究所 Anchor Cable Auxiliary Installation System
CN202039373U (en) * 2011-04-07 2011-11-16 中国科学院武汉岩土力学研究所 Anchor rope hauling-down device

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6225613A (en) * 1985-07-24 1987-02-03 Tone Boring Co Method and apparatus for excavation of anchor hole in slope
JPH07259089A (en) * 1994-03-18 1995-10-09 Sumitomo Electric Ind Ltd Construction method of the upward anchor and anchor

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201661302U (en) * 2009-12-25 2010-12-01 中国地质科学院探矿工艺研究所 Anchor Cable Auxiliary Installation System
CN202039373U (en) * 2011-04-07 2011-11-16 中国科学院武汉岩土力学研究所 Anchor rope hauling-down device

Also Published As

Publication number Publication date
CN102182181A (en) 2011-09-14

Similar Documents

Publication Publication Date Title
CN102182181B (en) Device for lowering anchor cable
CN204080802U (en) A kind of flexible umbrella support anchor rod
CN202530769U (en) Large span steel structure high-altitude subsection hoisting support system
CN204551461U (en) A kind of pressure dispersing type electric hoist enlarged footing anchor cable
CN102817341A (en) Construction method for segmented installation of offshore anemometer tower and combination of high-altitude manufactured parts for assembly
CN105090613B (en) A kind of hanging method of high-rise building exterior wall gas pipeline
CN204000830U (en) Merogenesis take-over type sand drain machine
CN108203984A (en) A kind of Dangerous Rock Body bolting with wire mesh method
CN204982628U (en) Horizontal pull rope bridge
CN207633847U (en) A kind of chimney steel beam hydraulic promotion high-altitude integral slipping hanging apparatus
CN205742223U (en) Deep foundation pit supporting construction prestress anchorage cable
CN206352510U (en) A kind of dismountable anchorage cable lockset
CN205276269U (en) Anti -drop earth anchor
CN202039373U (en) Anchor rope hauling-down device
CN202492845U (en) Ground anchor capable of serially anchoring
CN106703418A (en) Mobile safety set hanging method for large-span net shell structure roof installation
CN108487854A (en) Multifunctional climbing device for carrying people and instruments on open-air high and steep slope
CN102296610B (en) Device for removing square pile and construction method thereof
CN204385762U (en) A kind of Rock Bolt Foundation structure
CN206941583U (en) A kind of crawler belt bonds formula anchor cable installation instrument
CN203394406U (en) Horizontal directional drilling emergency rescue device
CN102587370B (en) Serially anchorable anchor and uses thereof
CN104343406B (en) Horizontal directional drill emergency device and its application process
CN102635115B (en) Method for efficiently recycling anchor bars
CN101938096A (en) Transmission line pay-off traction board anti-turnover structure

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130904

Termination date: 20190407