CN205990820U - A kind of industrial working Assembled enclosing wall - Google Patents

A kind of industrial working Assembled enclosing wall Download PDF

Info

Publication number
CN205990820U
CN205990820U CN201620926091.6U CN201620926091U CN205990820U CN 205990820 U CN205990820 U CN 205990820U CN 201620926091 U CN201620926091 U CN 201620926091U CN 205990820 U CN205990820 U CN 205990820U
Authority
CN
China
Prior art keywords
prefabricated
stand column
wall
prefabricated stand
parapet
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620926091.6U
Other languages
Chinese (zh)
Inventor
杨松强
鲁万卿
钟王果
李欢
魏金桥
蔡善仕
曾凤娟
陈瑞玺
刘飞燕
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Cct Technology Henan Co Ltd
Original Assignee
Cct Technology Henan Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Cct Technology Henan Co Ltd filed Critical Cct Technology Henan Co Ltd
Priority to CN201620926091.6U priority Critical patent/CN205990820U/en
Application granted granted Critical
Publication of CN205990820U publication Critical patent/CN205990820U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Fencing (AREA)

Abstract

The utility model proposes a kind of wind loading rating strong, can Assembling, assembling speed be fast, the industrial working Assembled enclosing wall of reliable in quality.This utility model includes some fabricated bases and prefabricated stand column, prefabricated stand column pours on fabricated base, it is provided with precast wall body, the both sides of precast wall body are connected with corresponding prefabricated stand column and are arranged on fabricated base corresponding thereto between described adjacent prefabricated stand column;Precast wall body is prefabricated high body of wall or prefabricated parapet body, and prefabricated parapet body is provided with fence.This utility model has following beneficial effect:(1)Can realize manufacturing on a large scale on streamline, manufacturing time is short with factorial praluction, shear wall quality being capable of standardization;(2)Construction material is prefabricated, saves a large amount of construction-times, and structure is simple, and the installation time is short;(3)Structure is attractive in appearance, and long body of wall of can voluntarily arranging in pairs or groups is combined with parapet body, is provided with illuminating lamp, attractive in appearance and practical.

Description

A kind of industrial working Assembled enclosing wall
Technical field
This utility model is related to building enclosing wall, particularly relates to a kind of industrial working Assembled enclosing wall.
Background technology
Enclosure wall refers to a kind of space partition constructure, is used for enclosing, separate or protect a certain region, is widely used in work Ground, factory, cell etc. isolate engineering.Wherein mainly have following several:
Color steel divider wall:It is fixed on fence with channel-section steel plate, for the isolation in interim building site.Can be used in turn, but anti- Wind ability, meets strong wind weather it is easy to be flushed away, causes certain threat to staff around;Perception is poor, and loss is relatively Greatly, and anti-theft capability is weaker.
Clay fragment of brick enclosure wall:Two-sided plaster, enclosure wall thickness 240mm, height 2.5m, top has bears down on one.Can meet and go along with sb. to guard him, resist Wind etc. requires, and usage cycles are long, but can not be used in turn, and consumes clay brick many.Process is simple tradition, it is impossible to dismounting, also can be made Become building waste.
Concrete panel enclosure wall:Built by laying bricks or stones using large-sized concrete wallboard and form, speed is fast, intensity is high, wind loading rating is strong, plate Pour column to be connected between plate, anti-fall by force, but cost is high, and can not dismantle, can not be used in turn.
Utility model content
The utility model proposes a kind of wind loading rating strong, can Assembling, assembling speed be fast, the industrial working of reliable in quality Assembled enclosing wall.
The technical solution of the utility model is realized in:A kind of industrial working Assembled enclosing wall, including some prefabricated Pedestal and prefabricated stand column, prefabricated stand column pours on fabricated base, is provided with precast wall body between described adjacent prefabricated stand column, The both sides of precast wall body are connected with corresponding prefabricated stand column and are arranged on fabricated base corresponding thereto;Dry wall Body is prefabricated high body of wall or prefabricated parapet body, and prefabricated parapet body is provided with fence.
The service sleeve bolt being matched with precast wall body is provided with described prefabricated stand column, prefabricated stand column passes through to connect Part, service sleeve bolt are connected with precast wall body.
Described precast wall body is prefabricated high body of wall, and prefabricated stand column is provided with the pre-buried set with prefabricated high-wall mates Pipe bolt, prefabricated stand column passes through connector, service sleeve bolt and prefabricated high wall connecting.
Described precast wall body is prefabricated parapet body, and prefabricated stand column is provided with the pre-buried set with prefabricated parapet mates Pipe bolt, prefabricated stand column passes through connector, service sleeve bolt and prefabricated short wall connecting.
Described fabricated base has base, and fabricated base has base recess, and prefabricated stand column is poured by concrete Build in base recess.
Described prefabricated stand column and prefabricated short wall connecting side are embedded with welding steel, and the upper end of prefabricated parapet body is pre-buried There is welding steel, fence is welded by welding steel with prefabricated stand column, fence is welded by welding steel with prefabricated parapet body.
It is provided with circuit path, prefabricated stand column is provided with illuminating lamp in described prefabricated stand column.
Described prefabricated stand column is provided with monitoring camera and intrusion detector.
This utility model has following beneficial effect:(1)Can realize making on a large scale on streamline with factorial praluction Make, manufacturing time is short, shear wall quality being capable of standardization;(2)Construction material is prefabricated, saves a large amount of construction-times, and structure is simple, The installation time is short;(3)Structure is attractive in appearance, and long body of wall of can voluntarily arranging in pairs or groups is combined with parapet body, is provided with illuminating lamp, attractive in appearance and real With.
Brief description
In order to be illustrated more clearly that this utility model embodiment or technical scheme of the prior art, below will be to embodiment Or in description of the prior art the accompanying drawing of required use be briefly described it should be apparent that, drawings in the following description are only It is some embodiments of the present utility model, for those of ordinary skill in the art, in the premise not paying creative work Under, other accompanying drawings can also be obtained according to these accompanying drawings.
Fig. 1 is this utility model connection diagram one.
Fig. 2 is this utility model connection diagram two.
Fig. 3 is this utility model connection diagram three.
Fig. 4 connects top view for this utility model.
Fig. 5 is pedestal of the present utility model and column connects top view.
Fig. 6 is pedestal of the present utility model and column connects sectional view.
Fig. 7 is this utility model design sketch.
Wherein:1. fabricated base, 2. prefabricated stand column, 3. prefabricated high body of wall, 4. prefabricated parapet body, 5. fence, 6. connector, 11. bases, 12 base recess, 13. concrete, 21. service sleeve bolts, 22. illuminating lamps.
Specific embodiments
Embodiment 1:As shown in Fig. 1 ~ 4, a kind of industrial working Assembled enclosing wall, including some fabricated bases 1 and prefabricated vertical Post 2, prefabricated stand column 2 pours on fabricated base 1, is provided with precast wall body, precast wall body between described adjacent prefabricated stand column 2 Both sides connect with corresponding prefabricated stand column 2 and be arranged on fabricated base 1 corresponding thereto;Precast wall body is pre- Make high body of wall 3 or prefabricated parapet body 4, prefabricated parapet body 4 is provided with fence 5.
The service sleeve bolt 21 being matched with precast wall body is provided with described prefabricated stand column 2, prefabricated stand column 2 passes through Connector 6, service sleeve bolt 21 are connected with precast wall body.
Embodiment 2:A kind of industrial working Assembled enclosing wall, described precast wall body is prefabricated high body of wall 3, prefabricated stand column 2 On be provided with the service sleeve bolt 21 matching with prefabricated high body of wall 3, prefabricated stand column 2 pass through connector 6, service sleeve bolt 21 are connected with prefabricated high body of wall 3.
Other structures are with embodiment 1.
Embodiment 3:A kind of industrial working Assembled enclosing wall, described precast wall body is prefabricated parapet body 4, prefabricated stand column 2 On be provided with the service sleeve bolt 21 matching with prefabricated parapet body 4, prefabricated stand column 2 pass through connector 6, service sleeve bolt 21 are connected with prefabricated parapet body 4.
Other structures are with embodiment 1.
Embodiment 4:As it can be seen in figures 5 and 6, a kind of industrial working Assembled enclosing wall, described fabricated base 1 has base 11, fabricated base 1 has base recess 12, prefabricated stand column 2 is cast in base recess 12 by concrete 13.
Described prefabricated stand column 2 is connected side and is embedded with welding steel, the upper end of prefabricated parapet body 4 with prefabricated parapet body 4 It is embedded with welding steel, fence 5 is welded by welding steel with prefabricated stand column 2, fence 5 and prefabricated parapet body 4 pass through to weld steel Plate weld.
Other structures are with embodiment 1.
Embodiment 5:As shown in fig. 7, a kind of industrial working Assembled enclosing wall, it is provided with circuit in described prefabricated stand column 2 and leads to Road, prefabricated stand column 2 is provided with illuminating lamp 22.Described prefabricated stand column 2 is provided with monitoring camera and intrusion detector.
Other structures are with embodiment 1.

Claims (8)

1. a kind of industrial working Assembled enclosing wall, including some fabricated bases(1)And prefabricated stand column(2), prefabricated stand column(2)Pour In fabricated base(1)Upper it is characterised in that:Described adjacent prefabricated stand column(2)Between be provided with precast wall body, precast wall body Both sides and corresponding prefabricated stand column(2)Connect and be arranged on fabricated base corresponding thereto(1)On;Precast wall body is Prefabricated high body of wall(3)Or prefabricated parapet body(4), prefabricated parapet body(4)On fence is installed(5).
2. industrial working according to claim 1 Assembled enclosing wall it is characterised in that:Described prefabricated stand column(2)On set It is equipped with the service sleeve bolt matching with precast wall body(21), prefabricated stand column(2)By connector(6), service sleeve bolt (21)It is connected with precast wall body.
3. industrial working according to claim 1 Assembled enclosing wall it is characterised in that:Described precast wall body is prefabricated height Body of wall(3), prefabricated stand column(2)On be provided with and prefabricated high body of wall(3)The service sleeve bolt matching(21), prefabricated stand column (2)By connector(6), service sleeve bolt(21)With prefabricated high body of wall(3)Connect.
4. industrial working according to claim 1 Assembled enclosing wall it is characterised in that:Described precast wall body is prefabricated short Body of wall(4), prefabricated stand column(2)On be provided with and prefabricated parapet body(4)The service sleeve bolt matching(21), prefabricated stand column (2)By connector(6), service sleeve bolt(21)With prefabricated parapet body(4)Connect.
5. industrial working as claimed in any of claims 1 to 4 Assembled enclosing wall it is characterised in that:Described is pre- Pedestal processed(1)Have base(11), fabricated base(1)On have base recess(12), prefabricated stand column(2)By concrete (13)It is cast in base recess(12)Interior.
6. industrial working as claimed in any of claims 1 to 4 Assembled enclosing wall it is characterised in that:Described is pre- Column processed(2)With prefabricated parapet body(4)Connect side and be embedded with welding steel, prefabricated parapet body(4)Upper end be embedded with welding Steel plate, fence(5)With prefabricated stand column(2)Welded by welding steel, fence(5)With prefabricated parapet body(4)By welding steel Welding.
7. industrial working as claimed in any of claims 1 to 4 Assembled enclosing wall it is characterised in that:Described is pre- Column processed(2)Inside it is provided with circuit path, prefabricated stand column(2)It is provided with illuminating lamp(22).
8. industrial working according to claim 7 Assembled enclosing wall it is characterised in that:Described prefabricated stand column(2)On set There are monitoring camera and intrusion detector.
CN201620926091.6U 2016-08-24 2016-08-24 A kind of industrial working Assembled enclosing wall Expired - Fee Related CN205990820U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620926091.6U CN205990820U (en) 2016-08-24 2016-08-24 A kind of industrial working Assembled enclosing wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620926091.6U CN205990820U (en) 2016-08-24 2016-08-24 A kind of industrial working Assembled enclosing wall

Publications (1)

Publication Number Publication Date
CN205990820U true CN205990820U (en) 2017-03-01

Family

ID=58106314

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620926091.6U Expired - Fee Related CN205990820U (en) 2016-08-24 2016-08-24 A kind of industrial working Assembled enclosing wall

Country Status (1)

Country Link
CN (1) CN205990820U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109295894A (en) * 2018-10-26 2019-02-01 中交第航务工程局有限公司 A kind of novel isolated gate and its installation method applied to highway
CN111962717A (en) * 2020-07-27 2020-11-20 安徽地平线建筑设计有限公司 Assembled wall body fixing and connecting device and mounting method thereof

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109295894A (en) * 2018-10-26 2019-02-01 中交第航务工程局有限公司 A kind of novel isolated gate and its installation method applied to highway
CN111962717A (en) * 2020-07-27 2020-11-20 安徽地平线建筑设计有限公司 Assembled wall body fixing and connecting device and mounting method thereof

Similar Documents

Publication Publication Date Title
CN104947792A (en) Simply-built green light steel fabricated building and installation method
CN103711238B (en) Assembled ring muscle fastens and is anchored concrete shear wall structure system
CN205990820U (en) A kind of industrial working Assembled enclosing wall
CN101672123A (en) Combined earthquake-resistant energy-saving house
CN2931627Y (en) Frame and wall plate combined building
CN106351358A (en) Method for manufacturing and mounting fabricated steel structure house sandwich thermal insulation concrete external wall panel
CN207934332U (en) Assembled architecture with steel Special-Shaped Column
CN206428805U (en) A kind of concrete prefabricated balcony of assembled steel
CN205557555U (en) Prefabricated concatenation formula case becomes basis
CN202164859U (en) Building structure of residence built by laying bricks
CN208918009U (en) A kind of assembled architecture goes along with sb. to guard him the connection structure of exterior wall and steel I-beam
CN207749657U (en) A kind of waterproofing node structure of the prefabricated composite wallboard in underground and cast in place frame column seam crossing
CN212743447U (en) Reinforced structure that building structure is firm anti collapsing
CN105484389A (en) Steel structure shear wall structure
CN204457079U (en) Enclosure upright post
CN211229781U (en) Novel prefabricated hollow enclosure
CN208294238U (en) A kind of parapeted prefabricated assembled Assembled surrounding wall of tool
CN109487817B (en) Three cabin crossing steel bar structure in gallery
WO2014176710A1 (en) Modular combined house able to be assembled and disassembled
CN107989224B (en) Connecting mechanism for wall corner of assembled house and construction process of connecting mechanism
CN209907827U (en) Prefabricated high-strength concrete floor tile system of assembled
CN207794429U (en) Assembled integral composite interior wallboard
CN202990234U (en) Construction-member-type light retaining wallboard
CN208088494U (en) A kind of assembled architecture component
CN206090965U (en) Cast -in -place composite wall

Legal Events

Date Code Title Description
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170301