CN208918009U - A kind of assembled architecture goes along with sb. to guard him the connection structure of exterior wall and steel I-beam - Google Patents
A kind of assembled architecture goes along with sb. to guard him the connection structure of exterior wall and steel I-beam Download PDFInfo
- Publication number
- CN208918009U CN208918009U CN201821634800.9U CN201821634800U CN208918009U CN 208918009 U CN208918009 U CN 208918009U CN 201821634800 U CN201821634800 U CN 201821634800U CN 208918009 U CN208918009 U CN 208918009U
- Authority
- CN
- China
- Prior art keywords
- steel
- guard
- exterior wall
- pressure
- along
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Buildings Adapted To Withstand Abnormal External Influences (AREA)
Abstract
The utility model discloses the connection structures that a kind of assembled architecture goes along with sb. to guard him exterior wall and steel I-beam, it includes steel I-beam, it goes along with sb. to guard him exterior wall and is set to the built-in connection gone along with sb. to guard him in exterior wall, the built-in connection includes the pressure-bearing steel plate that two pieces of faces are arranged and the steel bushing being set between two blocks of pressure-bearing steel plates, two blocks of pressure-bearing steel plates are denoted as the first pressure-bearing steel plate and the second pressure-bearing steel plate respectively, the first pressure-bearing steel plate is set to the inside for going along with sb. to guard him exterior wall, the outer surface of the second pressure-bearing steel plate and the lateral wall for going along with sb. to guard him exterior wall are in the same plane, positioned at the upper of steel bushing on the first pressure-bearing steel plate, lower two sides are respectively arranged with hooked bar, the hooked bar is connected with the reinforced mesh muscle gone along with sb. to guard him inside exterior wall, angle steel there are two being correspondingly arranged along the vertical direction on the side wall for going along with sb. to guard him exterior wall.The utility model entirety shock resistance is strong, because can carry out the deformation of certain amplitude at connecting node, is conducive to earthquake energy, reparation and convenient disassembly after shake.
Description
Technical field
The utility model relates to building structure technology fields, and in particular to a kind of assembled architecture goes along with sb. to guard him exterior wall and I-steel
The connection structure of beam.
Background technique
Precast wall panel structure is compared with brick wall body structure, and with good integrity, structure is light, increases and builds effective using face
The features such as accumulating, reducing situ wet operation, improve working conditions, raise labour productivity and accelerate construction progress is to realize wall
Reform, improves one of important channel of building industrialization level.China collects the research of assembled architecture connection type mostly
In in the research of beam-column connection, the research about precast concrete wall panel connection is very few, more should deeply grind in this regard
Study carefully, propose Novel connection type, realizes whole the improving in period, economy, four quality, environmental protection aspects.
The modes such as the connection type of exterior wall and main body common are welded connecting at present, concrete is connected, is bolted.Example
Such as pre-embedded steel slab or reinforcing bar is reserved when component makes, steel plate or reinforcing bar are by the pre-embedded steel slab or reinforcing bar of adjacent members when installation
Weld together;Or pre-buried reinforcing bar or reinforced steel bar ring are mutually overlapped to the reinforcing bar for welding and being inserted into certain length, then mixed with pouring
Solidifying soil is linked to be entirety.But apparently with regard to current research, main problem and limitation major mass part design cannot completely disengage cast-in-place,
It needs site welding or pours, economic benefit not enough meets, while the side such as stability, durability, safety of structure entirety
Face is also required to further study.There is limitation in China very much in the research of the connection type of precast concrete, therefore needs to propose
A kind of connection type considering simple and efficient safety economy, and examine every stress performance of this connection type to refer to practice
Mark guarantees that the building structure of construction has the performances such as good tight type, safety, stability.Both at home and abroad to precast concrete
The research that exterior wall is connect with main structure also in the primary stage, the rapid development an urgent demand of housing industrialization we need with
The paces in tight epoch.
Utility model content
The purpose of this utility model is to provide the connection structure that a kind of assembled architecture goes along with sb. to guard him exterior wall and steel I-beam,
The technical issues of being previously mentioned in background technique can effectively be solved.
To achieve the above object, the utility model provides the following technical solutions:
A kind of assembled architecture goes along with sb. to guard him the connection structure of exterior wall and steel I-beam comprising steel I-beam, go along with sb. to guard him exterior wall and
It is set to the built-in connection gone along with sb. to guard him in exterior wall, the built-in connection includes the pressure-bearing steel plate of two pieces of faces setting and is set to
Steel bushing between two blocks of pressure-bearing steel plates, two blocks of pressure-bearing steel plates are denoted as the first pressure-bearing steel plate and the second pressure-bearing steel plate respectively, described
First pressure-bearing steel plate is set to the inside for going along with sb. to guard him exterior wall, the outer surface of the second pressure-bearing steel plate and the lateral wall position for going along with sb. to guard him exterior wall
In on same plane, the upper and lower two sides on the first pressure-bearing steel plate positioned at steel bushing are respectively arranged with hooked bar, the hooked bar with
It goes along with sb. to guard him the reinforced mesh muscle inside exterior wall to be connected, be correspondingly arranged along the vertical direction on the side wall for going along with sb. to guard him exterior wall there are two angle
Steel, two angle steel are denoted as the first angle steel and the second angle steel respectively, and the angle steel is connected vertically by perpendicular limb and with perpendicular limb one end
Horizontal limb composition, fastening bolt sequentially pass through perpendicular limb on angle steel, penetrate in steel bushing again after the second pressure-bearing steel plate, the I-steel
Beam is by I-steel upper limb, I-steel bottom wing and the steel I-beam fixed plate for connecting I-steel upper limb and I-steel bottom wing, the work
Word steel upper limb is supported on the horizontal limb on the first angle steel and I-steel upper limb is bolted with the horizontal limb on the first angle steel, institute
The horizontal limb on the horizontal limb that I-steel bottom wing is supported on the second angle steel and on I-steel bottom wing and the second angle steel is stated to connect by bolt
It connects.
Preferably, two blocks of pressure-bearing steel plates are welded to connect with steel bushing.
Preferably, the damping protection layer being fabricated from a flexible material is provided in the steel bushing.
Preferably, floor of putting more energy into is provided between the horizontal limb and perpendicular limb on the angle steel.
Preferably, the exterior wall of going along with sb. to guard him is made of cement mortar and alkali-resistant glass fibre, and the inside for going along with sb. to guard him exterior wall is filled with
Heat-insulating material.
Preferably, there are two steel bushings for setting between two blocks of pressure-bearing steel plates.
Compared with prior art, the utility model has the beneficial effects that
The dry type connection type that the entire connection procedure use of exterior wall and steel I-beam is gone along with sb. to guard him in the utility model, is not necessarily to
Scene fluting, saves the duration, largely improves Contraction in Site frequency, reduces construction cost, and the utility model not only makes
Fixed function between exterior wall and steel I-beam must be gone along with sb. to guard him and reach requirement, entirety is linked to be between each component with transmission internal force, entirety is anti-
Shake, the exterior wall of going along with sb. to guard him for avoiding full welding caused are easy cracking destruction, repair after shake and convenient disassembly, real realization component produce
It is standardized with assembly.
Detailed description of the invention
Fig. 1 is a kind of master for the connection structure that assembled architecture goes along with sb. to guard him exterior wall and steel I-beam in the utility model embodiment
View;
Fig. 2 is a left side for the connection structure that a kind of assembled architecture goes along with sb. to guard him exterior wall and steel I-beam in the utility model embodiment
View;
Fig. 3 is the attachment structure schematic diagram of angle steel in the utility model embodiment;
Fig. 4 is the structural schematic diagram of steel I-beam in the utility model embodiment;
In figure, 1, steel I-beam, 2, go along with sb. to guard him exterior wall, 3, steel bushing, the 4, first pressure-bearing steel plate, the 5, second pressure-bearing steel plate, 6,
Hooked bar, the 7, first angle steel, the 8, second angle steel, 9, perpendicular limb, 10, horizontal limb, 11, fastening bolt, 12, I-steel upper limb, 13, I-steel
Bottom wing, 14, steel I-beam fixed plate, 15, floor of putting more energy into.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model
Clearly and completely describing, it is clear that described embodiment is only a part of the embodiment of the utility model, rather than all
Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are not making creative work premise
Under every other embodiment obtained, fall within the protection scope of the utility model.
It please refers to shown in Fig. 1-4, a kind of assembled architecture goes along with sb. to guard him the connection structure of exterior wall and steel I-beam comprising I-shaped
Girder steel 1 goes along with sb. to guard him exterior wall 2 and is set to the built-in connection gone along with sb. to guard him in exterior wall 2, and the built-in connection includes two pieces of face settings
Pressure-bearing steel plate and the steel bushing 3 that is set between two blocks of pressure-bearing steel plates, two blocks of pressure-bearing steel plates be denoted as the first pressure-bearing steel plate 4 respectively
With the second pressure-bearing steel plate 5, the first pressure-bearing steel plate 4 is set to the inside for going along with sb. to guard him exterior wall 2, the second pressure-bearing steel plate 5 it is outer
Surface and the lateral wall for going along with sb. to guard him exterior wall 2 are in the same plane, and upper and lower the two of steel bushing 3 is located on the first pressure-bearing steel plate 4
Side is respectively arranged with hooked bar 6, the hooked bar 6 is connected with the reinforced mesh muscle gone along with sb. to guard him inside exterior wall 2, the exterior wall 2 of going along with sb. to guard him
Angle steel there are two being correspondingly arranged along the vertical direction on side wall, two angle steel are denoted as the first angle steel 7 and the second angle steel 8 respectively, described
Angle steel is formed by perpendicular limb 9 and with perpendicular 9 one end of limb horizontal limb 10 connected vertically, and fastening bolt 11 sequentially passes through the perpendicular limb on angle steel
9, it is penetrated in steel bushing 3 again after the second pressure-bearing steel plate 5, the steel I-beam 1 is by I-steel upper limb 12, I-steel bottom wing 13 and connects
The steel I-beam fixed plate 14 of I-steel upper limb 12 and I-steel bottom wing 13 is connect, the I-steel upper limb 12 is supported in the first angle steel
On horizontal limb 10 on 7 and I-steel upper limb 12 is bolted with the horizontal limb 10 on the first angle steel 7, the I-steel bottom wing 13
On the horizontal limb 10 being supported on the second angle steel 8 and I-steel bottom wing 13 is bolted with the horizontal limb 10 on the second angle steel 8, institute
It states two blocks of pressure-bearing steel plates to be welded to connect with steel bushing 3, is provided with the damping protection being fabricated from a flexible material in the steel bushing 3
Layer, is provided with floor 15 of putting more energy between the horizontal limb 10 and perpendicular limb 9 on the angle steel, and the exterior wall 2 of going along with sb. to guard him is by cement mortar and resistance to
Alkali containing glass fibre is made, and goes along with sb. to guard him the inside of exterior wall 2 filled with heat-insulating material.
Work progress
Assembled plant goes along with sb. to guard him exterior wall 2, while pre-buried good built-in connection and fixed good position according to design standard production,
When making steel bushing 3, end should be blocked to prevent concrete from falling into, and facilitate subsequent fastening bolt 11 interspersed and replacement, described
Flexible material is added in steel bushing 3, plays the role of energy dissipation and control fastening bolt 3 is displaced, first by upper and lower angle steel and work
Word girder steel 1 is fixed by fastening bolt 11, and the perpendicular limb 9 of angle steel is close to pressure-bearing steel plate, and fastening bolt 11 is on the outside of the perpendicular limb 9 of angle steel
It is inserted into steel bushing 3 after angle steel, pressure-bearing steel plate and is fixed with nut.
The dry type connection type that the entire connection procedure use of exterior wall and steel I-beam is gone along with sb. to guard him in the utility model, is not necessarily to
Scene fluting, saves the duration, largely improves Contraction in Site frequency, reduces construction cost, and the utility model not only makes
Fixed function between exterior wall 1 and steel I-beam 2 must be gone along with sb. to guard him and reach requirement, be linked to be between each component whole with transmission internal force, entirety
Antidetonation avoids the exterior wall of going along with sb. to guard him caused by welding entirely from being easy cracking destruction, and reparation and convenient disassembly after shake really realize that component is raw
It produces and assembly standardizes.
Above content is only to the utility model structure example and explanation, the technology people of affiliated the art
Member makes various modifications or additions to the described embodiments or is substituted in a similar manner, without departing from this
The structure of utility model or beyond the scope defined by this claim, all should belong to the protection range of the utility model.
Claims (6)
1. the connection structure that a kind of assembled architecture goes along with sb. to guard him exterior wall and steel I-beam, it is characterised in that: including steel I-beam, go along with sb. to guard him
Exterior wall and be set to the built-in connection gone along with sb. to guard him in exterior wall, the built-in connection include the setting of two pieces of faces pressure-bearing steel plate and
The steel bushing being set between two blocks of pressure-bearing steel plates, two blocks of pressure-bearing steel plates are denoted as the first pressure-bearing steel plate and the second pressure-bearing steel respectively
Plate, the first pressure-bearing steel plate are set to the inside for going along with sb. to guard him exterior wall, the outer surface of the second pressure-bearing steel plate and go along with sb. to guard him exterior wall
Lateral wall is in the same plane, and the upper and lower two sides on the first pressure-bearing steel plate positioned at steel bushing are respectively arranged with hooked bar, institute
It states hooked bar and is connected with the reinforced mesh muscle gone along with sb. to guard him inside exterior wall, be correspondingly arranged along the vertical direction on the side wall for going along with sb. to guard him exterior wall
There are two angle steel, two angle steel are denoted as the first angle steel and the second angle steel respectively, and the angle steel is hung down by perpendicular limb and with perpendicular limb one end
The direct-connected horizontal limb composition connect, fastening bolt sequentially pass through perpendicular limb on angle steel, penetrate in steel bushing again after the second pressure-bearing steel plate, institute
Steel I-beam is stated to be fixed by the steel I-beam of I-steel upper limb, I-steel bottom wing and connection I-steel upper limb and I-steel bottom wing
Plate, the horizontal limb that the I-steel upper limb is supported on the horizontal limb on the first angle steel and on I-steel upper limb and the first angle steel pass through spiral shell
It tethers and connects, it is logical that the I-steel bottom wing is supported in the horizontal limb on the horizontal limb on the second angle steel and on I-steel bottom wing and the second angle steel
It crosses and is bolted.
2. a kind of assembled architecture according to claim 1 goes along with sb. to guard him the connection structure of exterior wall and steel I-beam, feature exists
In: two blocks of pressure-bearing steel plates are welded to connect with steel bushing.
3. a kind of assembled architecture according to claim 2 goes along with sb. to guard him the connection structure of exterior wall and steel I-beam, feature exists
In: the damping protection layer being fabricated from a flexible material is provided in the steel bushing.
4. a kind of assembled architecture according to claim 2 or 3 goes along with sb. to guard him the connection structure of exterior wall and steel I-beam, feature
It is: is provided with floor of putting more energy between the horizontal limb and perpendicular limb on the angle steel.
5. a kind of assembled architecture according to claim 4 goes along with sb. to guard him the connection structure of exterior wall and steel I-beam, feature exists
In: it is described to go along with sb. to guard him exterior wall and be made of cement mortar and alkali-resistant glass fibre, the inside of exterior wall is gone along with sb. to guard him filled with heat-insulating material.
6. a kind of assembled architecture according to claim 5 goes along with sb. to guard him the connection structure of exterior wall and steel I-beam, feature exists
In: there are two steel bushings for setting between two blocks of pressure-bearing steel plates.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821634800.9U CN208918009U (en) | 2018-10-09 | 2018-10-09 | A kind of assembled architecture goes along with sb. to guard him the connection structure of exterior wall and steel I-beam |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821634800.9U CN208918009U (en) | 2018-10-09 | 2018-10-09 | A kind of assembled architecture goes along with sb. to guard him the connection structure of exterior wall and steel I-beam |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208918009U true CN208918009U (en) | 2019-05-31 |
Family
ID=66708581
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201821634800.9U Expired - Fee Related CN208918009U (en) | 2018-10-09 | 2018-10-09 | A kind of assembled architecture goes along with sb. to guard him the connection structure of exterior wall and steel I-beam |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208918009U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108978884A (en) * | 2018-10-09 | 2018-12-11 | 安徽建筑大学 | A kind of assembled architecture goes along with sb. to guard him the connection structure of exterior wall and steel I-beam |
CN113187098A (en) * | 2021-03-30 | 2021-07-30 | 宁波建工工程集团有限公司 | Energy-consuming connection node of assembled external wall panel and construction method thereof |
-
2018
- 2018-10-09 CN CN201821634800.9U patent/CN208918009U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108978884A (en) * | 2018-10-09 | 2018-12-11 | 安徽建筑大学 | A kind of assembled architecture goes along with sb. to guard him the connection structure of exterior wall and steel I-beam |
CN113187098A (en) * | 2021-03-30 | 2021-07-30 | 宁波建工工程集团有限公司 | Energy-consuming connection node of assembled external wall panel and construction method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
WO2017197853A1 (en) | Insulation precast wall and prefabricated building | |
CN208918009U (en) | A kind of assembled architecture goes along with sb. to guard him the connection structure of exterior wall and steel I-beam | |
CN111749365B (en) | H-shaped steel-based assembled composite wall and construction method thereof | |
CN108118802A (en) | A kind of fabricated shear wall horizontal connection energy-dissipation structure and its construction method | |
CN207017483U (en) | The full precast shear wall structural system of regenerative steel skeleton | |
CN108978884A (en) | A kind of assembled architecture goes along with sb. to guard him the connection structure of exterior wall and steel I-beam | |
CN208168032U (en) | Assembled built-in heat insulation layer concrete composite wall-light steel frame-floor connecting node | |
CN111749364B (en) | Assembled composite wall based on C-shaped steel and construction method thereof | |
CN109944324A (en) | Steel concrete combo box trestle and the combination assembled structural system of reinforced concrete frame column | |
CN210289267U (en) | Assembled platform canopy | |
CN110230414B (en) | Assembled platform canopy and installation method thereof | |
CN204081090U (en) | The node component of a kind of U-shaped steel-concrete combination beam and special-shaped steel pipe concrete post | |
CN207003719U (en) | A kind of prefabricated steel faced wall with steel bar girder | |
CN212336411U (en) | Assembled wall connection structure based on bolted connection | |
CN210049380U (en) | Steel concrete combined frame column and reinforced concrete frame column combined assembly type structure system | |
CN208803631U (en) | Light steel grating concrete superposed column | |
CN207846214U (en) | Steel-concrete combined bridge with discontinuous perforated steel plate connection | |
CN207003738U (en) | A kind of prefabricated steel faced wall with stirrup | |
CN211421027U (en) | Ecological support for hydraulic engineering | |
CN207017478U (en) | There is the lightweight prefabricated member of hole wall placed in the middle for assembling steel building | |
CN101382001B (en) | Combined reinforced concrete hollow slab | |
CN211949016U (en) | Novel vertical connection structure of integral shear force wallboard of assembly | |
CN208039980U (en) | A kind of damping unit and the antidetonation Core Walls Structure system suitable for middle highlight lines area | |
CN205577107U (en) | PVA -ECC reinforced concrete Z shape post frame node of stirrup that excels in reinforcing | |
CN212295165U (en) | Assembled wall connection structure based on T template |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20190531 Termination date: 20211009 |
|