CN107989224B - Connecting mechanism for wall corner of assembled house and construction process of connecting mechanism - Google Patents

Connecting mechanism for wall corner of assembled house and construction process of connecting mechanism Download PDF

Info

Publication number
CN107989224B
CN107989224B CN201810026650.1A CN201810026650A CN107989224B CN 107989224 B CN107989224 B CN 107989224B CN 201810026650 A CN201810026650 A CN 201810026650A CN 107989224 B CN107989224 B CN 107989224B
Authority
CN
China
Prior art keywords
plate
wall
corner
embedded iron
iron plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201810026650.1A
Other languages
Chinese (zh)
Other versions
CN107989224A (en
Inventor
侯鹏
白振年
顾宗堂
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhangjiakou Guangjian New Material Co ltd
Original Assignee
Zhangjiakou Green Rehui Building Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhangjiakou Green Rehui Building Technology Co Ltd filed Critical Zhangjiakou Green Rehui Building Technology Co Ltd
Priority to CN201810026650.1A priority Critical patent/CN107989224B/en
Publication of CN107989224A publication Critical patent/CN107989224A/en
Application granted granted Critical
Publication of CN107989224B publication Critical patent/CN107989224B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/38Connections for building structures in general
    • E04B1/41Connecting devices specially adapted for embedding in concrete or masonry

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Load-Bearing And Curtain Walls (AREA)

Abstract

the invention discloses a connecting mechanism for wall corners of assembled houses and a construction process thereof, belonging to the technical field of house construction, the connecting structure comprises wall boards on two sides and a supporting unit at the wall corner formed by the wall boards, the outer side of the supporting unit is fixedly connected with a corner post, the corner post is in a right-angle shape, the wall boards and the corner post are respectively provided with a first embedded iron plate and a second embedded iron plate, the first embedded iron plate is respectively provided with an outer side connecting end and an inner side connecting end on the two side end surfaces of the end part of the wall board, the second embedded iron plate is provided with an exposed end on the inner side surfaces of the two ends of the corner post, the inner side surfaces of the two ends of the corner post are attached to the outer side surface of the end part of the wall board, the exposed end of the second embedded iron plate is fixedly connected with the outer side connecting end of the first embedded iron plate, the supporting unit is a steel column positioned in, the application has the advantages of simple construction, high efficiency, beauty and firmness.

Description

connecting mechanism for wall corner of assembled house and construction process of connecting mechanism
Technical Field
The invention belongs to the technical field of building construction, and relates to a construction process of a connecting mechanism at a wall corner of an assembled house.
Background
in the house erection process, the traditional construction mode of pouring concrete in situ has the disadvantages of large manpower requirement, high building construction cost and long construction period. In recent years, in response to national policy requirements and green development requirements of buildings, a building mode of the fabricated housing is gradually formed, namely, wallboards required by the fabricated housing are prefabricated in factory workshops and transported to a construction site for hoisting and installation. The connection between the assembled wallboards of the assembled house is a weak link, and particularly, the connection is firmly fixed and beautiful at the corner, so that higher requirements are provided for modern buildings.
Disclosure of Invention
The invention aims to solve the problems, designs the connecting mechanism for the wall corner of the assembled house and the construction process thereof, and has the advantages of simple and convenient construction, high efficiency, attractive appearance and firmness.
in order to achieve the purpose, the technical means adopted by the invention is as follows:
The utility model provides a coupling mechanism for assembled house wall angle department, this coupling mechanism includes the support element of wall angle department that both sides wallboard and both formed, support element outside fixedly connected with corner post, and the corner post is the right angle shape, and the key point lies in, wallboard and corner post are provided with first pre-buried iron plate and second pre-buried iron plate respectively, and first pre-buried iron plate leaves outside link and inboard link respectively on wallboard tip both sides terminal surface, and second pre-buried iron plate all leaves exposed end at corner post both ends medial surface, the inboard surface laminating in corner post both ends is in wallboard tip lateral surface, and the exposed end of second pre-buried iron plate is connected fixedly with the outside link of first pre-buried iron plate, the support element be the steel column that is arranged in the space that both sides wallboard and corner post formed, with the help of connecting piece welded fastening between the inboard link of first pre-buried iron plate and the steel column.
The first embedded iron plate and the second embedded iron plate are fixedly connected through bolts.
The wallboard both ends are provided with the first connecting plate that thickness is less than the wallboard, and first pre-buried iron plate sets up in first connecting plate and leaves outside link and inboard link respectively in the both sides of first connecting plate, and first connecting plate and wallboard casting structure as an organic whole, the corner post both ends be provided with the second connecting plate that thickness is less than the corner post, the pre-buried iron plate of second sets up in the second connecting plate and sets up in the medial surface of second connecting plate and expose the end, the outer wall and the corner post outer wall parallel and level of second connecting plate and corner post an organic whole are pour, second connecting plate and first connecting plate are the complementary shape of concatenation.
and castable is arranged among the wall plates, the corner columns and the steel columns.
The connecting piece be the L template, the minor face and the steel column welding of L template, the long limit and the inboard link laminating welding of first pre-buried iron plate.
A construction process of a connecting mechanism for wall corners of an assembled house comprises the following steps:
A. The wall plate and the corner post are processed in a factory, a group of first embedded iron plates are respectively arranged at two ends of the wall plate, and a group of second embedded iron plates are respectively arranged at two ends of the corner post;
B. After a steel column is fixed at a corner, hoisting the wall boards, and welding and fixing the inner side connecting ends of the first embedded iron plates of the two wall boards and the steel column by virtue of connecting pieces to form the corner;
C. Hoisting an angle column, wherein the angle column is installed on the outer side of the steel column, the exposed end of the inner side of the second embedded iron plate is attached to the connecting end of the outer side of the first embedded iron plate, and bolts are installed from the outer side of the angle column to fix the angle column and the first embedded iron plate;
D. And after the corner columns are installed, a template is arranged, C20 fine-stone concrete is poured, the steel columns are poured and fixed, and after maintenance is finished, the template is removed to form a finished product.
the invention has the beneficial effects that: the steel column is a supporting frame of the whole house, the corner column is arranged at the outer end of the steel column at the corner of the wall, and the steel column is arranged in a pouring space formed by the corner column and the wall plate, so that the steel column is prevented from being corroded, and the whole framework of the wall is ensured to be stable; the both ends of the corner post are respectively connected with the wallboard, so that the corner post has an attractive effect, and is fixed by means of the first embedded iron plate and the second embedded iron plate, so that the burden of the wallboard is reduced while the corner post is fixed firmly, and the corner post is prevented from falling off and dangerous events occur.
drawings
FIG. 1 is a schematic structural view of the present invention;
Fig. 2 is a schematic cross-sectional structure at a corner.
In the figure, the steel column comprises a wall plate 1, a wall plate 101, a first embedded iron plate 102, a first connecting plate 2, a corner column 201, a second embedded iron plate 202, a second connecting plate 3, a connecting piece 4, a steel column 5 and a bolt.
Detailed Description
The invention relates to a connecting mechanism for wall corners of an assembled house, which comprises two side wall plates 1 and a supporting unit at the wall corner formed by the two side wall plates, wherein the outer side of the supporting unit is fixedly connected with a corner post 2, and the corner post 2 is in a right-angle shape, so that the attractive appearance of the house is ensured, and the stability and the safety of the house are not influenced.
the invention is further described with reference to the following figures and specific embodiments.
In a particular embodiment, as shown in figures 1 and 2,
Wallboard 1 and corner post 2 are provided with first pre-buried iron plate 101 and the pre-buried iron plate 201 of second respectively, and first pre-buried iron plate 101 leaves outside link and inboard link respectively on 1 tip both sides terminal surface of wallboard, and the pre-buried iron plate 201 of second all leaves the end that exposes at 2 both ends medial surfaces of corner post, 2 both ends medial surfaces laminating in wallboard 1 tip lateral surface of corner post, the end that exposes of the pre-buried iron plate 201 of second is connected fixedly with the outside link of first pre-buried iron plate 101, the support element for being located the steel column 4 in the space of both sides wallboard 1 and corner post 2 formation, with the help of connecting piece 3 welded fastening between the inboard link of first pre-buried iron plate 101 and the steel column 4. The first pre-buried iron plate 101 and the second pre-buried iron plate 201 are fixedly connected through bolts 5. Wallboard and corner post are connected with the help of first pre-buried iron plate 101 and second pre-buried iron plate 201 and bolt 5, and bolt 5 is directly driven in from the corner post outside, and the construction is simple and convenient.
the wall plate comprises a wall plate 1 and is characterized in that first connecting plates 102 with the thickness smaller than that of the wall plate 1 are arranged at two ends of the wall plate 1, first embedded iron plates 101 are arranged in the first connecting plates 102, outer side connecting ends and inner side connecting ends are reserved on two sides of the first connecting plates 102 respectively, the first connecting plates 102 and the wall plate 1 are of an integral pouring structure, second connecting plates 202 with the thickness smaller than that of corner posts 2 are arranged at two ends of the corner posts 2, second embedded iron plates 201 are arranged in the second connecting plates 202, exposed ends are arranged on inner side faces of the second connecting plates 202, outer walls of the second connecting plates 202 are parallel and level with outer walls of the corner posts 2, the second connecting plates 202 and the corner posts 2 are integrally poured, and the second connecting plates. The overall flatness of the outer wall is guaranteed, dead angles and gaps are reduced, dust accumulation is reduced, high-strength bonding agent is filled in the joint of the first connecting plate 102 and the second connecting plate 202 for bonding, and rainwater is prevented from washing into the gaps to corrode the first embedded iron plate 101 and the second embedded iron plate 201.
The two side wall plates 1 and the corner columns 2 form a corner column pouring space, the steel column 4 is located in the pouring space, and the pouring material is C20 fine aggregate concrete.
Connecting piece 3 is the L template, and the minor face and the steel column 4 welding of L template, long limit and the inboard link laminating welding of first pre-buried iron plate 101.
the corner post 2 comprises an inner side heat insulation layer and an outer side inorganic foaming surface layer, and the heat insulation effect and the aesthetic requirement are simultaneously realized.
The construction process of the connecting mechanism at the wall corner of the fabricated house comprises the following steps:
A. The wall plate 1 and the corner post 2 are processed in a factory, a group of first embedded iron plates 101 are respectively arranged at two ends of the wall plate 1, and two groups of post embedded iron plates are respectively arranged at two ends of the corner post 2;
B. After a steel column 4 is fixed at a corner, the short edge of a connecting piece 3 is welded on the steel column 4, the connecting piece 3 corresponds to a first pre-buried iron plate 101 one by one, a wallboard 1 is hoisted, the connecting piece and the wallboard 1 are temporarily fixed by means of a fixing clamp piece, the fixing clamp piece is an L-shaped plate, the short edge of the L-shaped plate is attached to the side surface of the wallboard 1, the long edge is attached to the end surface of the wallboard 1, the end part of the long edge is clamped with the connecting piece 3, the connecting piece 3 is provided with a clamping groove matched with the clamping groove, and the inner side;
C. Hoisting the corner post 2, installing the corner post 2 on the outer side of the steel column 4, attaching the exposed end of the inner side of the second embedded iron plate 201 to the connecting end of the outer side of the first embedded iron plate 101, and installing a bolt 5 from the outer side of the corner post 2 to fix the two;
D. And (3) after the corner columns 2 are installed, setting a template, pouring C20 fine-stone concrete, pouring and fixing the steel columns 4, and after maintenance is finished, removing the template to form a finished product.

Claims (6)

1. The utility model provides a coupling mechanism for assembled house wall angle department, this coupling mechanism include the support element of the wall angle department of both sides wallboard (1) and both formation, support element outside fixedly connected with corner post (2), and corner post (2) are right angle shape, its characterized in that: the wall plate (1) and the corner post (2) are respectively provided with a first embedded iron plate (101) and a second embedded iron plate (201), the first embedded iron plate (101) is provided with an outer side connecting end and an inner side connecting end on the end surfaces of the two sides of the end part of the wall plate (1), the second embedded iron plate (201) is provided with an exposed end on the inner side surfaces of the two ends of the corner post (2), the inner side surfaces of the two ends of the corner post (2) are attached to the outer side surface of the end part of the wall plate (1), the exposed end of the second embedded iron plate (201) is fixedly connected with the outer side connecting end of the first embedded iron plate (101), the supporting unit is a steel column (4) located in a gap formed by the wall plate (1) and the corner post (2), and the inner side connecting end of the first embedded iron plate (101) is fixedly welded with the;
And a concrete layer is arranged in a cavity surrounded by the side end faces of the wall plate (1) and the first connecting plate (102), the inner side of the corner column (2), the outer side of the steel column (4) and the welding face of the connecting rod (3).
2. A connection mechanism for a wall corner of a prefabricated house according to claim 1, wherein: the first embedded iron plate (101) and the second embedded iron plate (201) are fixedly connected through bolts (5).
3. A connection mechanism for a wall corner of a prefabricated house according to claim 1, wherein: wallboard (1) both ends are provided with first connecting plate (102) that thickness is less than wallboard (1), and first pre-buried iron plate (101) set up in first connecting plate (102) and leave outside link and inboard link respectively in the both sides of first connecting plate (102), first connecting plate (102) and wallboard (1) structure as an organic whole of pouring, corner post (2) both ends be provided with second connecting plate (202) that thickness is less than corner post (2), second pre-buried iron plate (201) set up in second connecting plate (202) and set up the end that exposes at the medial surface of second connecting plate (202), the outer wall of second connecting plate (202) and corner post (2) outer wall parallel and level and second connecting plate (202) and corner post (2) integrative pouring, second connecting plate (202) and first connecting plate (102) are the complementary shape of concatenation.
4. A connection mechanism for a wall corner of a prefabricated house according to claim 1, wherein: and castable is arranged among the wall plates (1), the corner columns (2) and the steel columns (4).
5. A connection mechanism for a wall corner of a prefabricated house according to claim 1, wherein: the connecting piece (3) is an L-shaped plate, the short side of the L-shaped plate is welded with the steel column (4), and the long side of the L-shaped plate is welded with the inner side connecting end of the first embedded iron plate (101) in an attaching mode.
6. the construction process of a connection mechanism for the wall corner of a fabricated house according to claim 1, wherein the construction process comprises the following steps:
A. The wall plate (1) and the corner post (2) are processed in a factory, a group of first embedded iron plates (101) are respectively arranged at two ends of the wall plate (1), and a group of second embedded iron plates are respectively arranged at two ends of the corner post (2);
B. after a steel column (4) is fixed at a corner, the wall panels (1) are hoisted, and the inner side connecting ends of the first embedded iron plates (101) of the two wall panels (1) are welded and fixed with the steel column (4) by virtue of the connecting pieces (3) to form the corner;
C. Hoisting an angle column (2), installing the angle column (2) at the outer side of the steel column (4), attaching the exposed end of the inner side of the second embedded iron plate (201) to the connecting end of the outer side of the first embedded iron plate (101), and installing a bolt (5) from the outer side of the angle column (2) to fix the angle column (2) and the first embedded iron plate;
D. And (3) after the corner columns (2) are installed, setting a template, pouring C20 fine-stone concrete, pouring and fixing the steel columns (4), and after maintenance is finished, removing the template to form a finished product.
CN201810026650.1A 2018-01-11 2018-01-11 Connecting mechanism for wall corner of assembled house and construction process of connecting mechanism Active CN107989224B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810026650.1A CN107989224B (en) 2018-01-11 2018-01-11 Connecting mechanism for wall corner of assembled house and construction process of connecting mechanism

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810026650.1A CN107989224B (en) 2018-01-11 2018-01-11 Connecting mechanism for wall corner of assembled house and construction process of connecting mechanism

Publications (2)

Publication Number Publication Date
CN107989224A CN107989224A (en) 2018-05-04
CN107989224B true CN107989224B (en) 2019-12-10

Family

ID=62041035

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810026650.1A Active CN107989224B (en) 2018-01-11 2018-01-11 Connecting mechanism for wall corner of assembled house and construction process of connecting mechanism

Country Status (1)

Country Link
CN (1) CN107989224B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113250345B (en) * 2021-05-29 2022-10-18 中铁建设集团华北工程有限公司 Connecting mechanism for wall corner of assembled house and construction process of connecting mechanism

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4205497A (en) * 1977-02-26 1980-06-03 Schirm Klaus Werner Building with a frame or skeleton structure
JPH07317142A (en) * 1994-05-25 1995-12-05 Mitsui Home Co Ltd Construction method of building wooden house
CN1553030A (en) * 2003-06-06 2004-12-08 日吉华株式会社 Coner column constructioning body and coner structure of building therewith
CN103912076A (en) * 2014-04-25 2014-07-09 河南德霖集成房屋有限公司 Fast-assembled integrated house wall plate corner connecting column
CN105275089A (en) * 2015-09-14 2016-01-27 东南大学 Fully-prefabricated cold-formed steel house modular unit and assembly connection method
CN206053125U (en) * 2016-08-27 2017-03-29 东莞市微筑住宅科技有限公司 A kind of container house corner structure
CN107313532A (en) * 2017-08-23 2017-11-03 哈尔滨鸿盛房屋节能体系研发中心 Assembled heat insulation concrete walls structural connection and connection structure and method
CN207905160U (en) * 2018-01-11 2018-09-25 张家口绿汇建筑科技有限公司 A kind of bindiny mechanism at prefabricated buildings corner

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4205497A (en) * 1977-02-26 1980-06-03 Schirm Klaus Werner Building with a frame or skeleton structure
JPH07317142A (en) * 1994-05-25 1995-12-05 Mitsui Home Co Ltd Construction method of building wooden house
CN1553030A (en) * 2003-06-06 2004-12-08 日吉华株式会社 Coner column constructioning body and coner structure of building therewith
CN103912076A (en) * 2014-04-25 2014-07-09 河南德霖集成房屋有限公司 Fast-assembled integrated house wall plate corner connecting column
CN105275089A (en) * 2015-09-14 2016-01-27 东南大学 Fully-prefabricated cold-formed steel house modular unit and assembly connection method
CN206053125U (en) * 2016-08-27 2017-03-29 东莞市微筑住宅科技有限公司 A kind of container house corner structure
CN107313532A (en) * 2017-08-23 2017-11-03 哈尔滨鸿盛房屋节能体系研发中心 Assembled heat insulation concrete walls structural connection and connection structure and method
CN207905160U (en) * 2018-01-11 2018-09-25 张家口绿汇建筑科技有限公司 A kind of bindiny mechanism at prefabricated buildings corner

Also Published As

Publication number Publication date
CN107989224A (en) 2018-05-04

Similar Documents

Publication Publication Date Title
CN107687210B (en) Construction method of fully-assembled house
CN107152088B (en) Prefabricated double-dovetail type steel-concrete combined beam connected by adopting studs
CN105019573A (en) Prefabricated external wall template structure system with heat insulation function, and construction method thereof
CN108222270B (en) Assembling construction building method of prefabricated building
WO2012065358A1 (en) Disassembling-free insulation decorative template and mounting method thereof
CN113638489B (en) RC beam column node can be dismantled to assembled
CN105089192A (en) Dismountable bottom formwork steel bar truss floor support plate and assembling method of dismountable bottom formwork steel bar truss floor support plate
CN113482208A (en) Dry-wet combined connecting structure of precast concrete floor slab and construction method
CN208009698U (en) A kind of modular architectural structural of combination shear wall and frame structure
CN107989224B (en) Connecting mechanism for wall corner of assembled house and construction process of connecting mechanism
CN219773324U (en) Concrete beam plate structure
CN211396109U (en) Steel pipe column combination wall
CN210888330U (en) Prefabricated building enclosure
CN210459701U (en) Stealthy roof beam assembled exempts from to tear open heat preservation floor structure
CN216840143U (en) Steel bar truss floor bearing plate with detachable aluminum bottom mold
CN112922193B (en) Composite partition wall with steel mesh outer mold structure of light steel combined frame and manufacturing method thereof
CN105544743A (en) Light weight wallboard pre-stress connection method
CN214942935U (en) Connecting structure for wallboard and outer support frame of pool body
CN207905160U (en) A kind of bindiny mechanism at prefabricated buildings corner
CN204781520U (en) Detachable die block steel bar truss building carrier plate
CN209907827U (en) Prefabricated high-strength concrete floor tile system of assembled
CN111535581A (en) Convenient and fast mounting and dismounting type combined prefabricated formwork applicable to building floor lowering position
CN103498512A (en) Stable connecting structure of prefabricated building wall beam
CN216740212U (en) Prefabricated assembled composite wall
CN214785299U (en) Load-bearing assembly type wallboard and wall system constructed by same

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20220310

Address after: 075000 north of Weiyi Road, Nanshan Industrial Cluster, Zuowei Town, Huai'an County, Zhangjiakou City, Hebei Province

Patentee after: ZHANGJIAKOU CONSTRUCTION GROUP GUANGJIAN NEW BUILDING ENERGY SAVING MATERIAL Co.,Ltd.

Address before: 075000 No. 46, floor 1, Yian building materials City, No. 28, ZHANGXUAN Road, high tech Zone, Zhangjiakou City, Hebei Province

Patentee before: ZHANGJIAKOU LVHUI BUILDING TECHNOLOGY CO.,LTD.

CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 075000 north of Weiyi Road, Nanshan Industrial Cluster, Zuowei Town, Huai'an County, Zhangjiakou City, Hebei Province

Patentee after: Zhangjiakou Guangjian New Material Co.,Ltd.

Address before: 075000 north of Weiyi Road, Nanshan Industrial Cluster, Zuowei Town, Huai'an County, Zhangjiakou City, Hebei Province

Patentee before: ZHANGJIAKOU CONSTRUCTION GROUP GUANGJIAN NEW BUILDING ENERGY SAVING MATERIAL Co.,Ltd.

PE01 Entry into force of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: A connecting mechanism used at the corner of a prefabricated house and its construction technology

Effective date of registration: 20230302

Granted publication date: 20191210

Pledgee: Zhangjiakou Agricultural Credit Financing Guarantee Co.,Ltd.

Pledgor: Zhangjiakou Guangjian New Material Co.,Ltd.

Registration number: Y2023980033924